AK20260002
rev 0Highway
42 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| CARPENTER North of 63 Latitude Highway SUAK2023-001 | $43.34 | $27.92 | $71.26 | |
| CEMENT MASON/CONCRETE FINISHER Highway SUAK2023-001 | $44.43 | $22.13 | $66.56 | |
| ELECTRICIAN Inside Journeyman Wireman Highway SUAK2023-001 (Technician) | $44.44 | $29.72 | $74.16 | |
| Group 1A Highway SUAK2023-001 Scope differs by code/WD | $49.64 | $27.15 | $76.79 | |
| Group 1A Highway SUAK2023-001 Scope differs by code/WD | $48.19 | $27.32 | $75.51 | |
| Group 2 Highway SUAK2023-001 Scope differs by code/WD | $37.00 | $32.56 | $69.56 | |
| Group 2 Highway SUAK2023-001 Scope differs by code/WD | $37.00 | $32.56 | $69.56 | |
| Group 2 Highway SUAK2023-001 Scope differs by code/WD | $46.91 | $27.15 | $74.06 | |
| Group 2 Highway SUAK2023-001 Scope differs by code/WD | $45.51 | $27.32 | $72.83 | |
| Group 3 Highway SUAK2023-001 Scope differs by code/WD | $37.90 | $32.56 | $70.46 | |
| Group 3 Highway SUAK2023-001 Scope differs by code/WD | $37.90 | $32.56 | $70.46 | |
| Group 3 Highway SUAK2023-001 Scope differs by code/WD | $46.13 | $27.15 | $73.28 | |
| Group 3 Highway SUAK2023-001 Scope differs by code/WD | $44.64 | $27.32 | $71.96 | |
| Group 3A Highway SUAK2023-001 Scope differs by code/WD | $41.78 | $32.56 | $74.34 | |
| Group 3A Highway SUAK2023-001 Scope differs by code/WD | $41.78 | $32.56 | $74.34 | |
| Group 3B Highway SUAK2023-001 Scope differs by code/WD | $47.36 | $28.51 | $75.87 | |
| Group 3B Highway SUAK2023-001 Scope differs by code/WD | $47.36 | $28.51 | $75.87 | |
| Group 4 Highway SUAK2023-001 Scope differs by code/WD | $39.42 | $27.15 | $66.57 | |
| Group 4 Highway SUAK2023-001 Scope differs by code/WD | $44.02 | $27.32 | $71.34 | |
| Group 5 Highway SUAK2023-001 | $43.22 | $27.32 | $70.54 | |
| Guardrail Installer Highway SUAK2023-001 | $38.99 | $35.63 | $74.62 | |
| Guardrail Layout Man Highway SUAK2023-001 | $38.73 | $35.63 | $74.36 | |
| IRONWORKER Fence Barrier Installer Highway SUAK2023-001 | $37.99 | $35.63 | $73.62 | |
| LABORER Highway SUAK2023-001 (North of N 63 Latitude and east of W138 longitude) Group 1 | $36.00 | $32.56 | $68.56 | |
| LABORERS CLASSIFICATIONS Concrete Labor Highway SUAK2023-001 (curb & gutter, chute handler, curing, grouting, screeding); Crusher Plant Laborer; Demolition Laborer; Ditch Digger; Dumper; Environmental Laborer (hazard/toxic waste, oil spill); Fence Installer; Fire Watch Laborer; Flagger; Form Stripper; General Laborer; Guardrail Laborer, or Planter; Laying of Mortarless Decorative Block (retaining walls, flowered decorative block 4 feet or less - highway or landscape work); Material Handler; Pneumatic or Power Tools; Portable or Chemical Toilet Servicer; Pump Person or Mixer Person; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tender; Slurry Work; Steam Cleaner Operator; Steam Point or Water Jet Operator; Storm Water Pollution Protection Plan Worker (SWPPP Worker-erosion and sediment control Laborer); Tank Cleaning; Utiliwalk & Utilidor Laborer GROUP 2: Burning & Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, air-track & hydraulic drills); Concrete Laborer (power buggy, concrete saws, pumpcrete nozzle person, vibrator person); Laborer (asbestos, marine work); Foam Gun or Foam Machine Operator; Gunite Operator; Hod Carrier; Jackhammer/Chipping Mortarless Decorative Block (retaining walls, flowered decorative block over 4 feet - highway or landscape work); Mason Tender & Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer & Cement Finisher Tender; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Scaffold Building & Erecting; Sewer Caulker; Filer; Timber person GROUP 3: Bit Grinder; Camera/Tool/Video Operator; Guardrail Machine Operator; High Rigger & Tree Topper; High Scaler; Multiplate; Plastic Welding; Slurry Seal Squeegee Person GROUP 3A: Asphalt Raker, Asphalt Belly Dump Lay Down; Drill wagon drills, air-track drills, hydraulic drills); Pioneer Powder person (Employee Possessor); Storm Water Pollution Protection Specialist (SWPPP Specialist) air-track drills, hydraulic drills; over 5,000 hours); Grade Checking (setting or transferring of grade marks, line and grade, GPS, drones); Pioneer Drilling & Stake Hopper LABORER (South of N 63 Latitude and west of W138 longitude) Group 1 | $36.00 | $32.56 | $68.56 | |
| LABORERS CLASSIFICATIONS Concrete Labor Highway SUAK2023-001 (curb & gutter, chute handler, curing, grouting, screeding); Crusher Plant Laborer; Demolition Laborer; Ditch Digger; Dumper; Environmental Laborer (hazard/toxic waste, oil spill); Fence Installer; Fire Watch Laborer; Flagger; Form Stripper; General Laborer; Guardrail Laborer, or Planter; Laying of Mortarless Decorative Block (retaining walls, flowered decorative block 4 feet or less - highway or landscape work); Material Handler; Pneumatic or Power Tools; Portable or Chemical Toilet Servicer; Pump Person or Mixer Person; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tender; Slurry Work; Steam Cleaner Operator; Steam Point or Water Jet Operator; Storm Water Pollution Protection Plan Worker (SWPPP Worker-erosion and sediment control Laborer); Tank Cleaning; Utiliwalk & Utilidor Laborer GROUP 2: Burning & Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, air-track & hydraulic drills); Concrete Laborer (power buggy, concrete saws, pumpcrete nozzle person, vibrator person); Laborer (asbestos, marine work); Foam Gun or Foam Machine Operator; Gunite Operator; Hod Carrier; Jackhammer/Chipping Mortarless Decorative Block (retaining walls, flowered decorative block over 4 feet - highway or landscape work); Mason Tender & Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer & Cement Finisher Tender; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Scaffold Building & Erecting; Sewer Caulker; Filer; Timber person GROUP 3: Bit Grinder; Camera/Tool/Video Operator; Guardrail Machine Operator; High Rigger & Tree Topper; High Scaler; Multiplate; Plastic Welding; Slurry Seal Squeegee Person GROUP 3A: Asphalt Raker, Asphalt Belly Dump Lay Down; Drill wagon drills, air-track drills, hydraulic drills); Pioneer Powder person (Employee Possessor); Storm Water Pollution Protection Specialist (SWPPP Specialist) air-track drills, hydraulic drills; over 5,000 hours); Grade Checking (setting or transferring of grade marks, line and grade, GPS, drones); Pioneer Drilling & Stake Hopper LINE CONSTRUCTION Line Installer | $50.78 | $33.42 | $84.20 | |
| PAINTER Highway SUAK2023-001 (Region 1: North of N 63 Latitude) Brush and Roller | $36.08 | $25.45 | $61.53 | |
| PAINTER Highway SUAK2023-001 (South of N 63 Latitude) Brush, Roll and Spray | $33.22 | $26.30 | $59.52 | |
| PILEDRIVER PERSON Piledriver, Sheet Stabber Highway SUAK2023-001 | $43.34 | $27.92 | $71.26 | |
| Piledriver-Welder Highway SUAK2023-001 | $48.90 | $27.92 | $76.82 | |
| PLUMBER/PIPEFITTER Highway SUAK2023-001 (First Judicial District) | $41.50 | $28.12 | $69.62 | |
| PLUMBER/PIPEFITTER Highway SUAK2023-001 (North of N 63 Latitude) | $46.06 | $30.70 | $76.76 | |
| PLUMBER/PIPEFITTER Highway SUAK2023-001 (South of N 63 Latitude) | $41.00 | $28.70 | $69.70 | |
| Powderperson Highway SUAK2023-001 | $61.44 | $34.53 | $95.97 | |
| POWER EQUIPMENT OPERATOR CLASSIFICATIONS Back Filler; Barrier Machine Highway SUAK2023-001 (Zipper); Beltcrete with Power Pack & similar conveyors; Bending Machine; Boat Coxswain; Coating Machine; Concrete Hydro Blaster; Cranes (45 tons & under or 150 feet of boom & under (including jib & attachments)), (a) Hydralifts or Transporters, (all track or truck type), (b) Derricks, (c) Overhead; Crushers; Deck or over); Drag Scraper, Yarder, and similar types; Drilling Machines, Core, Cable, Rotary and Exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb & Gutter Machine; Grade Checker and/or Line and Grade including Drone; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All-Terrain Vehicle, Rollagon, Bargecable, Nodwell, & Snow Cat; Hydro Ax, Feller Buncher & similar; Hydro Excavation (Vac-Truck and Similar); Loaders (2 1/2 yards through 5 yards, including all attachments): (a) Forklifts (with telescopic boom & swing attachment), (b) Front End & Overhead, (2-1/2 yards through 5 yards), (c) Loaders, (with forks or pipe clamp), (d) Loaders, elevating belt type, Euclid & similar types); Material Transfer Mechanic, Bodyperson, Electrical; Micro Tunneling Machine; Mixers: Mobile type with hoist combination; Motor Patrol Grader; Mucking Machine: Mole, Tunnel Drill, paving breaker; Plant Operator (Asphalt & Concrete); Power Plant, Turbine Operator 200 k.w & over (power plants or combination of power units over 300 k.w.); Remote Controlled Engineer; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards & under); Sideboom (under 45 tons); Sub Grader (Gurries & similar types); Tack Tractor; Truck Mounted Concrete Pump, Conveyor/Tele-belt, & Creter; Wate Kote Machine Group 1A: Camera/Tool/Video Operator (Slipline); Electrical or 150 feet including jib & attachments) (a) Clamshells & Draglines (over 3 yards), (b) Tower Cranes; Licensed Motor Patrol Grader, Dozer, Grade Tractor (finish: when finishing to final grade and/or to hubs, or for asphalt); Mill; Quad; Scrapers (over 40 yards); Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards); Sidebooms (over 45 tons); Slip Form Paver, C.M.I. & similar types; Topside (Asphalt Paver, Slurry machine, Spreaders, and similar types) Group 2: Boiler ? Fireperson; Cement Hogs & Concrete Pump on Steel Erection, Towermobiles & Air Tuggers; Horizontal/Directional Drill Locator; Locomotives, Rod & Geared Engines; Mixers; Screening, Washing Plant; Sideboom (cradling rock drill, regardless of size); Skidder; Trenching Machines (under 16 inches); Water/Waste Water Treatment Operator tow rig); Boring Machine; Brooms, Power (sweeper, elevator, vacuum, or similar); Bump Cutter; Compressor; Farm Tractor; Forklift, Industrial Type; Gin Truck or Winch Truck (with poles when used for hoisting); Hoists, Air Tuggers, Elevators; (b) Forklifts or Lumber Carrier (on construction job sites), (c) Forklifts, (with tower), (d) Overhead & Front End, (under 2-l/2 yards); Locomotives: Dinkey (air, steam, gas & electric) Speeders; Mechanics, Light Duty; Oil, Blower Distribution; Roller (other than Asphalt); Saws, Concrete; Skid Hustler; Skid Steer (with all attachments); Stake Hopper; Straightening Machine; Tow Tractor Coordinator; Spotter; Steam Cleaner; Swamper (on trenching machines or shovel type equipment) TRUCK DRIVER Group 1 | $46.84 | $27.32 | $74.16 | |
| POWER EQUIPMENT OPERATOR Group 1 Highway SUAK2023-001 | $47.74 | $27.15 | $74.89 | |
| Power Journeyworker Line Highway SUAK2023-001 (including Equipment Operator) | $63.44 | $34.59 | $98.03 | |
| Sandblast and Spray Highway SUAK2023-001 | $36.60 | $25.45 | $62.05 | |
| Sandblast and Structural Steel Painter Highway SUAK2023-001 | $34.57 | $26.30 | $60.87 | |
| Signalman, Stage Rigger, Structural, Ornamental, and Reinforcing Highway SUAK2023-001 | $41.49 | $35.63 | $77.12 | |
| South of N63 Latitude Highway SUAK2023-001 | $43.34 | $28.46 | $71.80 | |
| Tree Trimmer Highway SUAK2023-001 | $40.71 | $29.27 | $69.98 |
No trade rates match your search and filter selection.