AZ20260025
rev 1General
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER ZONE PAY: General BRAZ0003-009 (RADIUS MILES FROM THE INTERSECTION OF CENTRAL AVE. AND WASHINGTON ST., PHOENIX, AZ) ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER HOUR ZONE D: 101-200 MILES- BASE RATE PLUS $3.50 PER HOUR ZONE E: OVER 200 MILES- BASE RATE PLUS $6.50 PER HOUR | $32.29 | $9.97 | $42.26 |
| CARPENTER (DRYWALL HANGING ONLY) General CARP1327-001 | $26.24 | $8.86 | $35.10 |
| CARPENTER, EXCLUDES DRYWALL HANGING General SUAZ2012-014 | $18.42 | $1.46 | $19.88 |
| CARPENTER: FORMWORK CONCRETE General SUAZ2023-015 | $33.16 | $10.71 | $43.87 |
| CEMENT MASON/CONCRETE FINISHER General SUAZ2012-014 | $17.71 | $2.60 | $20.31 |
| ELECTRICIAN General SUAZ2012-014 | $32.40 | $4.95 | $37.35 |
| ELECTRICIAN: ALARM INSTALLATION AND LOW VOLTAGE WIRING ONLY ZONE DEFINITIONS- ZONE A: THE AREA WITHIN A THIRTY-NINE General ELEC0570-012 (39) MILE RADIUS FROM A BASE POINT AT THE TUCSON TOWN HALL. ZONE B: 40 TO 74 MILE RADIUS FROM THE TOWN HALL IN TUCSON- AN ADDITIONAL $ 3.50 PER HOUR ZONE C: 75 MILE RADIUS FROM THE TOWN HALL IN TUCSON TO THE OUTER LIMITS OF THE GEOGRAPHIC JURISDICTION- AN ADDITIONAL $ 7.50 PER HOUR | $33.00 | $13.04 | $46.04 |
| FLOOR LAYER: HARDWOOD AND RESILIENT FLOORING General SUAZ2012-014 | $17.98 | $6.50 | $24.48 |
| GLAZIER General SUAZ2012-014 | $15.71 | 0.00 | $15.71 |
| IRONWORKER General IRON0075-013 | $39.50 | $19.91 | $59.41 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR General LABO1184-025 | $29.91 | $9.26 | $39.17 |
| LABORER: COMMON OR GENERAL General SUAZ2012-014 | $11.30 | $1.64 | $12.94 |
| LABORER: GENERAL General SUAZ2023-015 | $32.28 | $6.98 | $39.26 |
| LABORER: LANDSCAPE & IRRIGATION General SUAZ2012-014 | $9.31 | 0.00 | $9.31 |
| LABORER: MASON TENDER General LABO1184-030 | $29.91 | $9.26 | $39.17 |
| LABORER: MASON TENDER - CEMENT/CONCRETE General SUAZ2012-014 | $16.05 | $1.49 | $17.54 |
| LABORER: MASON TENDER-BRICK General LABO1184-010 | $27.41 | $9.26 | $36.67 |
| LABORER: PIPELAYER General LABO1184-038 | $31.98 | $9.26 | $41.24 |
| MILES AND OVER FROM THE OLD PHOENIX COURTHOUSE: DRYWALL FINISHER/TAPER General PAIN0086-006 (ZONE B) ZONE PAY: ZONE A: FREE ZONE: A DISTANCE OF 0 TO 100 MILES FROM THE OLD PHOENIX COURTHOUSE. ZONE B: A DISTANCE OF 101 $3.50 PER HOUR OVER ZONE A | $27.05 | $7.49 | $34.54 |
| MILES AND OVER FROM THE OLD PHOENIX COURTHOUSE: DRYWALL FINISHER/TAPER General PAIN0086-006 (ZONE A) ZONE PAY: ZONE A: FREE ZONE: A DISTANCE OF 0 TO 100 MILES FROM THE OLD PHOENIX COURTHOUSE. ZONE B: A DISTANCE OF 101 $3.50 PER HOUR OVER ZONE A | $23.55 | $7.49 | $31.04 |
| OPERATOR: BACKHOE General SUAZ2012-014 | $14.00 | $1.80 | $15.80 |
| PAINTER: BRUSH, ROLLER AND SPRAY General SUAZ2012-014 | $16.13 | 0.00 | $16.13 |
| PAINTER: SIGN AND DISPLAY ERECTOR General SUAZ2023-015 | $19.06 | $2.99 | $22.05 |
| PIPEFITTER General SUAZ2012-014 | $22.21 | $6.12 | $28.33 |
| PLUMBER General SUAZ2012-014 | $19.04 | $3.07 | $22.11 |
| POWER EQUIPMENT OPERATOR: (DRILL RIG/AUGER) General ENGI0012-068 | $35.56 | $18.12 | $53.68 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER General SUAZ2023-015 | $32.53 | 0.00 | $32.53 |
| POWER EQUIPMENT OPERATOR: COMPACTOR/ROLLER General SUAZ2023-015 | $26.91 | $5.13 | $32.04 |
| POWER EQUIPMENT OPERATOR: CONCRETE SCREED General SUAZ2023-015 | $33.90 | 0.00 | $33.90 |
| POWER EQUIPMENT OPERATOR: CRANE General ENGI0428-003 (4) 100 TONS AND OVER | $35.52 | $12.57 | $48.09 |
| POWER EQUIPMENT OPERATOR: CRANE General ENGI0428-003 (3) 15 TONS TO 100 TONS, TOWER CRANE | $34.49 | $12.57 | $47.06 |
| POWER EQUIPMENT OPERATOR: CRANE (2) UNDER 15 TONS General ENGI0428-003 | $33.41 | $12.57 | $45.98 |
| POWER EQUIPMENT OPERATOR: CRANE / DERRICKS General SUAZ2023-015 | $47.73 | $13.07 | $60.80 |
| POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE General SUAZ2023-015 | $39.48 | 0.00 | $39.48 |
| POWER EQUIPMENT OPERATOR: FORKLIFT General SUAZ2023-015 | $38.76 | $9.20 | $47.96 |
| POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER General SUAZ2023-015 | $39.20 | 0.00 | $39.20 |
| POWER EQUIPMENT OPERATOR: MOTOR GRADER/BLADE General SUAZ2023-015 | $36.90 | $3.81 | $40.71 |
| POWER EQUIPMENT OPERATOR: OILER General SUAZ2023-015 | $31.86 | $10.01 | $41.87 |
| POWER EQUIPMENT OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT (ASPHALT, AGGREGATE, & CONCRETE) General SUAZ2023-015 | $30.40 | $0.06 | $30.46 |
| ROOFER, INCLUDES INSTALLATION OF METAL ROOFS General SUAZ2012-014 | $17.46 | $4.47 | $21.93 |
| SHEET METAL WORKER General SUAZ2012-014 | $18.68 | $4.91 | $23.59 |
| SPRINKLER FITTER (FIRE SPRINKLERS) General SUAZ2012-014 | $16.48 | $2.94 | $19.42 |
| TILE SETTER General SUAZ2012-014 | $15.93 | $0.45 | $16.38 |
| TRAFFIC CONTROL General SUAZ2023-015 | $20.69 | $2.77 | $23.46 |
| TRUCK DRIVER: DUMP General SUAZ2023-015 | $24.50 | $2.75 | $27.25 |
| TRUCK DRIVER: WATER General SUAZ2023-015 | $29.52 | $3.47 | $32.99 |
No trade rates match your search and filter selection.