CA20260018
rev 5General
0 trades
Applies to
California of Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito +7 more
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BE UTILIZED UNDER THE FOLLOWING CONDITIONS: GROUP 4 General LABO0270-007 (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES) FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION"". (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $28.94 | $27.30 | $56.24 |
| BE UTILIZED UNDER THE FOLLOWING CONDITIONS: GROUP 4 FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER General LABO0261-009 (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION"". (SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $29.94 | $27.30 | $57.24 |
| BE UTILIZED UNDER THE FOLLOWING CONDITIONS: GROUP 4 FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER General LABO0270-010 (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION"". (SANTA CLARA COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $29.94 | $27.30 | $57.24 |
| BE UTILIZED UNDER THE FOLLOWING CONDITIONS: GROUP 4 FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER General LABO0294-008 (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION"". (FRESNO, KINGS, AND MADERA COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. GUNITE LABORER CLASSIFICATIONS | $28.94 | $27.30 | $56.24 |
| BE UTILIZED UNDER THE FOLLOWING CONDITIONS: GROUP 4 FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER General LABO0304-004 (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION"". (ALAMEDA COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $29.94 | $27.30 | $57.24 |
| BE UTILIZED UNDER THE FOLLOWING CONDITIONS: GROUP 4 FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER General LABO0324-012 (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION"". (CONTRA COSTA COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $29.94 | $27.30 | $57.24 |
| BE UTILIZED UNDER THE FOLLOWING CONDITIONS: GROUP 4 FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER General LABO1130-007 (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION"". (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $28.94 | $27.30 | $56.24 |
| BOILERMAKER: (AREA 1) General BOIL0549-001 | $49.62 | $41.27 | $90.89 |
| BOILERMAKER: (AREA 2) General BOIL0549-001 | $45.60 | $38.99 | $84.59 |
| BRICK TENDER General LABO0324-014 (CONTRA COSTA COUNTY) FOOTNOTES: WORK ON JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL. WORK AT GRINDERS: $.25 PER HOUR ADDITIONAL. MANHOLE WORK: $2.00 PER DAY ADDITIONAL | $37.05 | $27.45 | $64.50 |
| BRICK TENDER General LABO0324-015 (CONTRA COSTA COUNTY) FOOTNOTES: WORK ON JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL. WORK AT GRINDERS: $.25 PER HOUR ADDITIONAL. MANHOLE WORK: $2.00 PER DAY ADDITIONAL | $37.05 | $27.45 | $64.50 |
| BRICKLAYER General BRCA0003-005 (8) ALAMEDA, CONTRA COSTA, SAN BENITO, SANTA CLARA) | $56.94 | $26.28 | $83.22 |
| BRICKLAYER General BRCA0003-005 ( 9) CALAVERAS, SAN JOAQUIN, STANISLAUS, TOULUMNE | $52.76 | $25.01 | $77.77 |
| BRICKLAYER General BRCA0003-005 ( 1) FRESNO, KINGS, MADERA, MARIPOSA, MERCED | $51.17 | $25.80 | $76.97 |
| BRICKLAYER ( 7) SAN FRANCISCO, SAN MATEO General BRCA0003-005 | $57.02 | $28.50 | $85.52 |
| BRICKLAYER (16) MONTEREY, SANTA CRUZ General BRCA0003-005 | $54.18 | $27.82 | $82.00 |
| BRICKLAYER: General BRCA0003-002 (16) MONTEREY, SANTA CRUZ SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE. (B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE | $54.18 | $27.82 | $82.00 |
| BRICKLAYER: General BRCA0003-002 ( 9) EL DORADO, PLACER, SACRAMENTO, SUTTER SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE | $52.76 | $25.01 | $77.77 |
| BRICKLAYER: General BRCA0003-002 ( 8) ALAMEDA, CONTRA COSTA, SAN BENITO, SANTA CLARA SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE. (B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE | $56.94 | $26.28 | $83.22 |
| BRICKLAYER: General BRCA0003-002 ( 7) MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SOLANO, SONOMA SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE. (B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE | $57.02 | $28.50 | $85.52 |
| CABLE SPLICER General ELEC0332-001 (SANTA CLARA COUNTY) FOOTNOTES: WORK UNDER COMPRESSED AIR OR WHERE GAS MASKS ARE REQUIRED, ORWORK ON LADDERS, SCAFFOLDS, STACKS, ""BOSUN'S CHAIRS,"" OR OTHER STRUCTURES AND WHERE THE WORKERS ARE NOT PROTECTED BY PERMANENT GUARD RAILS AT A DISTANCE OF 40 TO 60 FT. FROM THE GROUND OR SUPPORTING STRUCTURES: TO BE PAID ONE AND ONE-HALF TIMES THE STRAIGHT-TIME RATE OF PAY. WORK ON STRUCTURES OF 60 FT. OR OVER (AS DESCRIBED ABOVE): TO BE PAID TWICE THE STRAIGHT-TIME RATE OF PAY | $104.68 | $49.46 | $154.14 |
| CABLE SPLICER (ALAMEDA COUNTY) General ELEC0595-001 Scope differs by code/WD | $87.40 | $49.41 | $136.81 |
| CABLE SPLICER (ALAMEDA COUNTY) General ELEC0595-004 Scope differs by code/WD | $87.40 | $49.41 | $136.81 |
| CABLE SPLICER (CALAVERAS AND SAN JOAQUIN COUNTIES) General ELEC0595-002 | $59.34 | $32.26 | $91.60 |
| CABLE SPLICER (CONTRA COSTA COUNTY) General ELEC0302-001 Scope differs by code/WD | $74.54 | $36.09 | $110.63 |
| CABLE SPLICER (CONTRA COSTA COUNTY) General ELEC0302-002 Scope differs by code/WD | $74.54 | $36.09 | $110.63 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0022-001 (SAN FRANCISCO COUNTY) | $60.39 | $33.52 | $93.91 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0152-001 (CONTRA COSTA COUNTY) | $52.65 | $30.82 | $83.47 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0152-002 (SAN JOAQUIN COUNTY) | $52.65 | $30.82 | $83.47 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0152-004 (CALAVERAS, MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES) | $52.65 | $30.82 | $83.47 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0217-001 (SAN MATEO COUNTY) | $60.39 | $33.52 | $93.91 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0405-001 (SANTA CLARA COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0405-002 (SAN BENITO COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0505-001 (SANTA CRUZ COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0605-001 (MONTEREY COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0701-001 (FRESNO AND MADERA COUNTIES) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0713-001 (ALAMEDA COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP1109-001 (KINGS COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0022-001 (SAN FRANCISCO COUNTY) | $60.39 | $33.52 | $93.91 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0046-003 (EL DORADO (EAST), PLACER (EAST), SUTTER AND YUBA COUNTIES) | $60.39 | $33.52 | $93.91 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0152-001 (CONTRA COSTA COUNTY) | $52.65 | $30.82 | $83.47 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0217-001 (SAN MATEO COUNTY) | $60.39 | $33.52 | $93.91 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0405-001 (SANTA CLARA COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0405-002 (SAN BENITO COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0505-001 (SANTA CRUZ COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0605-001 (MONTEREY COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0713-001 (ALAMEDA COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER General CARP0751-001 (NAPA AND SONOMA COUNTIES) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER EL DORADO General CARP0046-001 (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES FOOTNOTE: PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY LIMITS OF PLACERVILLE | $60.39 | $33.52 | $93.91 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (ALAMEDA COUNTY) General CARP0713-001 Scope differs by code/WD | $55.00 | $31.49 | $86.49 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (ALAMEDA COUNTY) General CARP0713-001 Scope differs by code/WD | $55.00 | $31.49 | $86.49 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (CONTRA COSTA COUNTY) General CARP0152-001 Scope differs by code/WD | $52.80 | $30.82 | $83.62 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (CONTRA COSTA COUNTY) General CARP0152-001 Scope differs by code/WD | $52.80 | $30.82 | $83.62 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (FRESNO AND MADERA COUNTIES) General CARP0701-001 | $47.77 | $31.49 | $79.26 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (MONTEREY COUNTY) General CARP0605-001 Scope differs by code/WD | $49.12 | $31.49 | $80.61 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (MONTEREY COUNTY) General CARP0605-001 Scope differs by code/WD | $49.12 | $31.49 | $80.61 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (NAPA AND SONOMA COUNTIES) General CARP0751-001 | $55.00 | $31.49 | $86.49 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN BENITO COUNTY) General CARP0405-002 Scope differs by code/WD | $49.12 | $31.49 | $80.61 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN BENITO COUNTY) General CARP0405-002 Scope differs by code/WD | $49.12 | $31.49 | $80.61 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN FRANCISCO COUNTY) General CARP0022-001 Scope differs by code/WD | $60.54 | $33.52 | $94.06 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN FRANCISCO COUNTY) General CARP0022-001 Scope differs by code/WD | $60.54 | $33.52 | $94.06 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN JOAQUIN COUNTY) General CARP0152-002 | $46.92 | $30.82 | $77.74 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN MATEO COUNTY) General CARP0217-001 Scope differs by code/WD | $60.54 | $33.52 | $94.06 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN MATEO COUNTY) General CARP0217-001 Scope differs by code/WD | $60.54 | $33.52 | $94.06 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SANTA CLARA COUNTY) General CARP0405-001 Scope differs by code/WD | $55.00 | $31.49 | $86.49 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SANTA CLARA COUNTY) General CARP0405-001 Scope differs by code/WD | $55.00 | $31.49 | $86.49 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SANTA CRUZ COUNTY) General CARP0505-001 Scope differs by code/WD | $49.12 | $31.49 | $80.61 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SANTA CRUZ COUNTY) General CARP0505-001 Scope differs by code/WD | $49.12 | $31.49 | $80.61 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER EL DORADO General CARP0046-001 (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES FOOTNOTE: PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY LIMITS OF PLACERVILLE | $54.66 | $33.52 | $88.18 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER EL DORADO General CARP0046-003 (EAST), PLACER (EAST), SUTTER AND YUBA COUNTIES | $53.31 | $33.52 | $86.83 |
| CARPENTERS: JOURNEYMAN CARPENTER General CARP0022-001 (SAN FRANCISCO COUNTY) | $60.39 | $33.52 | $93.91 |
| CARPENTERS: JOURNEYMAN CARPENTER General CARP0152-001 (CONTRA COSTA COUNTY) | $52.65 | $30.82 | $83.47 |
| CARPENTERS: JOURNEYMAN CARPENTER General CARP0152-002 (SAN JOAQUIN COUNTY) | $46.77 | $30.82 | $77.59 |
| CARPENTERS: JOURNEYMAN CARPENTER General CARP0152-004 (CALAVERAS, MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES) | $45.42 | $30.82 | $76.24 |
| CARPENTERS: JOURNEYMAN CARPENTER General CARP0405-001 (SANTA CLARA COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: JOURNEYMAN CARPENTER General CARP0405-002 (SAN BENITO COUNTY) | $48.97 | $31.49 | $80.46 |
| CARPENTERS: JOURNEYMAN CARPENTER General CARP0505-001 (SANTA CRUZ COUNTY) | $48.97 | $31.49 | $80.46 |
| CARPENTERS: JOURNEYMAN CARPENTER General CARP0701-001 (FRESNO AND MADERA COUNTIES) | $47.62 | $31.49 | $79.11 |
| CARPENTERS: JOURNEYMAN CARPENTER General CARP0022-001 (SAN FRANCISCO COUNTY) | $60.39 | $33.52 | $93.91 |
| CARPENTERS: JOURNEYMAN CARPENTER General CARP0046-003 (EL DORADO (EAST), PLACER (EAST), SUTTER AND YUBA COUNTIES) | $53.16 | $33.52 | $86.68 |
| CARPENTERS: JOURNEYMAN CARPENTER General CARP0152-001 (CONTRA COSTA COUNTY) | $52.65 | $30.82 | $83.47 |
| CARPENTERS: JOURNEYMAN CARPENTER General CARP0405-001 (SANTA CLARA COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: JOURNEYMAN CARPENTER General CARP0405-002 (SAN BENITO COUNTY) | $48.97 | $31.49 | $80.46 |
| CARPENTERS: JOURNEYMAN CARPENTER General CARP0505-001 (SANTA CRUZ COUNTY) | $48.97 | $31.49 | $80.46 |
| CARPENTERS: JOURNEYMAN CARPENTER General CARP0751-001 (NAPA AND SONOMA COUNTIES) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: JOURNEYMAN CARPENTER (ALAMEDA COUNTY) General CARP0713-001 Scope differs by code/WD | $54.85 | $31.49 | $86.34 |
| CARPENTERS: JOURNEYMAN CARPENTER (ALAMEDA COUNTY) General CARP0713-001 Scope differs by code/WD | $54.85 | $31.49 | $86.34 |
| CARPENTERS: JOURNEYMAN CARPENTER (KINGS COUNTY) General CARP1109-001 | $47.62 | $31.49 | $79.11 |
| CARPENTERS: JOURNEYMAN CARPENTER (MONTEREY COUNTY) General CARP0605-001 Scope differs by code/WD | $48.97 | $31.49 | $80.46 |
| CARPENTERS: JOURNEYMAN CARPENTER (MONTEREY COUNTY) General CARP0605-001 Scope differs by code/WD | $48.97 | $31.49 | $80.46 |
| CARPENTERS: JOURNEYMAN CARPENTER (SAN MATEO COUNTY) General CARP0217-001 Scope differs by code/WD | $60.39 | $33.52 | $93.91 |
| CARPENTERS: JOURNEYMAN CARPENTER (SAN MATEO COUNTY) General CARP0217-001 Scope differs by code/WD | $60.39 | $33.52 | $93.91 |
| CARPENTERS: JOURNEYMAN CARPENTER EL DORADO General CARP0046-001 (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY LIMITS OF PLACERVILLE | $54.51 | $33.52 | $88.03 |
| CARPENTERS: MILLWRIGHT General CARP0152-004 (CALAVERAS, MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES) | $47.92 | $32.41 | $80.33 |
| CARPENTERS: MILLWRIGHT General CARP0046-003 (EL DORADO (EAST), PLACER (EAST), SUTTER AND YUBA COUNTIES) | $55.66 | $35.11 | $90.77 |
| CARPENTERS: MILLWRIGHT (ALAMEDA COUNTY) General CARP0713-001 Scope differs by code/WD | $54.95 | $33.08 | $88.03 |
| CARPENTERS: MILLWRIGHT (ALAMEDA COUNTY) General CARP0713-001 Scope differs by code/WD | $54.95 | $33.08 | $88.03 |
| CARPENTERS: MILLWRIGHT (CONTRA COSTA COUNTY) General CARP0152-001 Scope differs by code/WD | $52.75 | $32.41 | $85.16 |
| CARPENTERS: MILLWRIGHT (CONTRA COSTA COUNTY) General CARP0152-001 Scope differs by code/WD | $52.75 | $32.41 | $85.16 |
| CARPENTERS: MILLWRIGHT (FRESNO AND MADERA COUNTIES) General CARP0701-001 | $50.12 | $33.08 | $83.20 |
| CARPENTERS: MILLWRIGHT (KINGS COUNTY) General CARP1109-001 | $50.12 | $33.08 | $83.20 |
| CARPENTERS: MILLWRIGHT (MONTEREY COUNTY) General CARP0605-001 Scope differs by code/WD | $51.47 | $33.08 | $84.55 |
| CARPENTERS: MILLWRIGHT (MONTEREY COUNTY) General CARP0605-001 Scope differs by code/WD | $51.47 | $33.08 | $84.55 |
| CARPENTERS: MILLWRIGHT (NAPA AND SONOMA COUNTIES) General CARP0751-001 | $54.95 | $33.08 | $88.03 |
| CARPENTERS: MILLWRIGHT (SAN BENITO COUNTY) General CARP0405-002 Scope differs by code/WD | $51.47 | $33.08 | $84.55 |
| CARPENTERS: MILLWRIGHT (SAN BENITO COUNTY) General CARP0405-002 Scope differs by code/WD | $51.47 | $33.08 | $84.55 |
| CARPENTERS: MILLWRIGHT (SAN FRANCISCO COUNTY) General CARP0022-001 Scope differs by code/WD | $60.49 | $35.11 | $95.60 |
| CARPENTERS: MILLWRIGHT (SAN FRANCISCO COUNTY) General CARP0022-001 Scope differs by code/WD | $60.49 | $35.11 | $95.60 |
| CARPENTERS: MILLWRIGHT (SAN JOAQUIN COUNTY) General CARP0152-002 | $49.27 | $32.41 | $81.68 |
| CARPENTERS: MILLWRIGHT (SAN MATEO COUNTY) General CARP0217-001 Scope differs by code/WD | $60.49 | $35.11 | $95.60 |
| CARPENTERS: MILLWRIGHT (SAN MATEO COUNTY) General CARP0217-001 Scope differs by code/WD | $60.49 | $35.11 | $95.60 |
| CARPENTERS: MILLWRIGHT (SANTA CLARA COUNTY) General CARP0405-001 Scope differs by code/WD | $54.95 | $33.08 | $88.03 |
| CARPENTERS: MILLWRIGHT (SANTA CLARA COUNTY) General CARP0405-001 Scope differs by code/WD | $54.95 | $33.08 | $88.03 |
| CARPENTERS: MILLWRIGHT (SANTA CRUZ COUNTY) General CARP0505-001 Scope differs by code/WD | $51.47 | $33.08 | $84.55 |
| CARPENTERS: MILLWRIGHT (SANTA CRUZ COUNTY) General CARP0505-001 Scope differs by code/WD | $51.47 | $33.08 | $84.55 |
| CARPENTERS: MILLWRIGHT EL DORADO General CARP0046-001 (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES FOOTNOTE: PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY LIMITS OF PLACERVILLE | $57.01 | $35.11 | $92.12 |
| cast in place manhole form setters AREA A: LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:: GROUP 1 (CONTRA COSTA COUNTY) General LABO0324-012 | $36.50 | $27.30 | $63.80 |
| cast in place manhole form setters AREA A: LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-G Pipelayer General LABO0324-012 (including grade checking in connection with pipelaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; Pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, CONTRA COSTA COUNTY Sewer cleaners shall receive cleaner"""" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. Maintenance and repair track and road beds. All employees performing work covered herein shall receive $.25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $36.70 | $27.30 | $64.00 |
| CEMENT MASON/CONCRETE FINISHER General PLAS0300-005 Scope differs by code/WD | $32.15 | $23.27 | $55.42 |
| CEMENT MASON/CONCRETE FINISHER General PLAS0300-005 Scope differs by code/WD | $32.15 | $23.27 | $55.42 |
| COMMUNICATIONS SYSTEM: INSTALLER General ELEC0100-005 (FRESNO, KINGS, MADERA) SCOPE OF WORK INCLUDES THE INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND DIGITAL FOR COMMERCIAL, EDUCATION, SECURITY AND ENTERTAINMENT PURPOSES FOR THE FOLLOWING: TV MONITORING AND SURVEILLANCE, BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL SYSTEM, RADIO PAGE, SCHOOL INTERCOM AND SOUND, BURGLAR ALARMS, AND LOW VOLTAGE MASTER CLOCK SYSTEMS. A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS BACKGROUND FOREGROUND MUSIC, INTERCOM AND TELEPHONE INTERCONNECT SYSTEMS, TELEPHONE SYSTEMS NURSE CALL SYSTEMS, RADIO PAGE SYSTEMS, SCHOOL INTERCOM AND SOUND SYSTEMS, BURGLAR ALARM SYSTEMS, LOW VOLTAGE, MASTER CLOCK SYSTEMS, MULTI-MEDIA/MULTIPLEX SYSTEMS, SOUND AND MUSICAL ENTERTAINMENT SYSTEMS, RF SYSTEMS, ANTENNAS AND WAVE GUIDE, B. FIRE ALARM SYSTEMS INSTALLATION, WIRE PULLING AND TESTING C. TELEVISION AND VIDEO SYSTEMS TELEVISION MONITORING AND SURVEILLANCE SYSTEMS VIDEO SECURITY SYSTEMS, VIDEO ENTERTAINMENT SYSTEMS, VIDEO EDUCATIONAL SYSTEMS, MICROWAVE TRANSMISSION SYSTEMS, CATV AND CCTV D. SECURITY SYSTEMS PERIMETER SECURITY SYSTEMS VIBRATION SENSOR SYSTEMS CARD ACCESS SYSTEMS ACCESS CONTROL SYSTEMS, SONAR/INFRARED MONITORING EQUIPMENT E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION) PCM (PULSE CODE MODULATION) INVENTORY CONTROL SYSTEMS, DIGITAL DATA SYSTEMS BROADBAND AND BASEBAND AND CARRIERS POINT OF SALE SYSTEMS, VSAT DATA SYSTEMS DATA COMMUNICATION SYSTEMS RF AND REMOTE CONTROL SYSTEMS, FIBER OPTIC DATA SYSTEMS WORK EXCLUDED RACEWAY SYSTEMS ARE NOT COVERED (EXCLUDING LADDER-RACK FOR THE PURPOSE OF THE ABOVE LISTED SYSTEMS). CHASES AND/OR NIPPLES (NOT TO EXCEED 10 FEET) MAY BE INSTALLED ON OPEN WIRING SYSTEMS. ENERGY MANAGEMENT SYSTEMS. SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION) WHEN NOT INTRINSIC TO THE ABOVE LISTED SYSTEMS (IN THE SCOPE). FIRE ALARM SYSTEMS WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) SHALL BE PERFORMED AT THE ELECTRICIAN WAGE RATE, WHEN EITHER OF THE FOLLOWING TWO (2) CONDITIONS APPLY: 1. THE PROJECT INVOLVES NEW OR MAJOR REMODEL BUILDING TRADES CONSTRUCTION. 2. THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT | $45.28 | $28.01 | $73.29 |
| COMMUNICATIONS SYSTEM: INSTALLER General ELEC0595-008 (CALAVERAS AND SAN JOAQUIN COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN | $45.28 | $28.01 | $73.29 |
| COMMUNICATIONS SYSTEM: INSTALLER General ELEC0684-004 (MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS. RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN | $45.28 | $28.01 | $73.29 |
| COMMUNICATIONS SYSTEM: TECHNICIAN General ELEC0100-005 (FRESNO, KINGS, MADERA) SCOPE OF WORK INCLUDES THE INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND DIGITAL FOR COMMERCIAL, EDUCATION, SECURITY AND ENTERTAINMENT PURPOSES FOR THE FOLLOWING: TV MONITORING AND SURVEILLANCE, BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL SYSTEM, RADIO PAGE, SCHOOL INTERCOM AND SOUND, BURGLAR ALARMS, AND LOW VOLTAGE MASTER CLOCK SYSTEMS. A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS BACKGROUND FOREGROUND MUSIC, INTERCOM AND TELEPHONE INTERCONNECT SYSTEMS, TELEPHONE SYSTEMS NURSE CALL SYSTEMS, RADIO PAGE SYSTEMS, SCHOOL INTERCOM AND SOUND SYSTEMS, BURGLAR ALARM SYSTEMS, LOW VOLTAGE, MASTER CLOCK SYSTEMS, MULTI-MEDIA/MULTIPLEX SYSTEMS, SOUND AND MUSICAL ENTERTAINMENT SYSTEMS, RF SYSTEMS, ANTENNAS AND WAVE GUIDE, B. FIRE ALARM SYSTEMS INSTALLATION, WIRE PULLING AND TESTING C. TELEVISION AND VIDEO SYSTEMS TELEVISION MONITORING AND SURVEILLANCE SYSTEMS VIDEO SECURITY SYSTEMS, VIDEO ENTERTAINMENT SYSTEMS, VIDEO EDUCATIONAL SYSTEMS, MICROWAVE TRANSMISSION SYSTEMS, CATV AND CCTV D. SECURITY SYSTEMS PERIMETER SECURITY SYSTEMS VIBRATION SENSOR SYSTEMS CARD ACCESS SYSTEMS ACCESS CONTROL SYSTEMS, SONAR/INFRARED MONITORING EQUIPMENT E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION) PCM (PULSE CODE MODULATION) INVENTORY CONTROL SYSTEMS, DIGITAL DATA SYSTEMS BROADBAND AND BASEBAND AND CARRIERS POINT OF SALE SYSTEMS, VSAT DATA SYSTEMS DATA COMMUNICATION SYSTEMS RF AND REMOTE CONTROL SYSTEMS, FIBER OPTIC DATA SYSTEMS WORK EXCLUDED RACEWAY SYSTEMS ARE NOT COVERED (EXCLUDING LADDER-RACK FOR THE PURPOSE OF THE ABOVE LISTED SYSTEMS). CHASES AND/OR NIPPLES (NOT TO EXCEED 10 FEET) MAY BE INSTALLED ON OPEN WIRING SYSTEMS. ENERGY MANAGEMENT SYSTEMS. SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION) WHEN NOT INTRINSIC TO THE ABOVE LISTED SYSTEMS (IN THE SCOPE). FIRE ALARM SYSTEMS WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) SHALL BE PERFORMED AT THE ELECTRICIAN WAGE RATE, WHEN EITHER OF THE FOLLOWING TWO (2) CONDITIONS APPLY: 1. THE PROJECT INVOLVES NEW OR MAJOR REMODEL BUILDING TRADES CONSTRUCTION. 2. THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT | $52.07 | $28.21 | $80.28 |
| COMMUNICATIONS SYSTEM: TECHNICIAN General ELEC0595-008 (CALAVERAS AND SAN JOAQUIN COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN | $52.07 | $28.21 | $80.28 |
| COMMUNICATIONS SYSTEM: TECHNICIAN General ELEC0684-004 (MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS. RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN | $52.07 | $28.21 | $80.28 |
| DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIAN DEPTH PAY General CARP0034-001 (SURFACE DIVING): 050 TO 100 FT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS. DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT | $54.10 | $34.69 | $88.79 |
| DIVER: DIVER STANDBY DEPTH PAY General CARP0034-001 (SURFACE DIVING): 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS. DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT | $60.51 | $34.69 | $95.20 |
| DIVER: DIVER TENDER DEPTH PAY General CARP0034-001 (SURFACE DIVING): 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS. DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT | $59.51 | $34.69 | $94.20 |
| DIVER: DIVER WET DEPTH PAY General CARP0034-001 (SURFACE DIVING): 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS. DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT | $103.62 | $34.69 | $138.31 |
| DIVER: MANIFOLD OPERATOR General CARP0034-001 (STANDBY) DEPTH PAY (SURFACE DIVING): 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS. DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT | $59.51 | $34.69 | $94.20 |
| DIVER: MANIFOLD OPERATOR General CARP0034-001 (MIXED GAS) DEPTH PAY (SURFACE DIVING): 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS. DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT | $64.51 | $34.69 | $99.20 |
| DREDGING General ENGI0003-008 (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING) AREA 2: (4) BARGEMAN; DECKHAND; FIREMAN; LEVEEHAND; OILER AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART COLUSA COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL PART AREA 2: REMAINDER FRESNO COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART GLENN COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART | $53.23 | $39.55 | $92.78 |
| DREDGING General ENGI0003-008 (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING) AREA 2: (3) BOOSTER PUMP OPERATOR; DECK ENGINEER; DECK MATE; DREDGE TENDER; WINCH OPERATOR AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART COLUSA COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL PART AREA 2: REMAINDER FRESNO COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART GLENN COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART | $56.53 | $39.55 | $96.08 |
| DREDGING General ENGI0003-008 (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING) AREA 2: (2) DREDGE DOZER; HEAVY DUTY REPAIRMAN : AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART COLUSA COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL PART AREA 2: REMAINDER FRESNO COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART GLENN COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART | $57.65 | $39.55 | $97.20 |
| DREDGING General ENGI0003-008 (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING) AREA 2: (1) LEVERMAN AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART COLUSA COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL PART AREA 2: REMAINDER FRESNO COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART GLENN COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART | $62.61 | $39.55 | $102.16 |
| DREDGING General ENGI0003-008 (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING) AREA 1: (4) BARGEMAN; DECKHAND; FIREMAN; LEVEEHAND; OILER AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART COLUSA COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL PART AREA 2: REMAINDER FRESNO COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART GLENN COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART | $51.23 | $39.55 | $90.78 |
| DREDGING General ENGI0003-008 (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING) AREA 1: (3) BOOSTER PUMP OPERATOR; DECK ENGINEER; DECK MATE; DREDGE TENDER; WINCH OPERATOR AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART COLUSA COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL PART AREA 2: REMAINDER FRESNO COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART GLENN COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART | $54.53 | $39.55 | $94.08 |
| DREDGING General ENGI0003-008 (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING) AREA 1: (1) LEVERMAN AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART COLUSA COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL PART AREA 2: REMAINDER FRESNO COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART GLENN COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART | $60.61 | $39.55 | $100.16 |
| DREDGING General ENGI0003-008 ( CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING) AREA 1: (2) DREDGE DOZER; HEAVY DUTY REPAIRMAN AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART COLUSA COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL PART AREA 2: REMAINDER FRESNO COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART GLENN COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART | $55.65 | $39.55 | $95.20 |
| DRYWALL FINISHER/TAPER General PAIN0567-011 (EL DORADO AND PLACER COUNTIES) STEEPLEJACK-DRYWALL FINISHER OVER 40 FT WITH OPEN SPACE BELOW: $1.50 ADDITIONAL PER HOUR | $42.79 | $16.12 | $58.91 |
| DRYWALL FINISHER/TAPER: General PAIN0016-011 (AREA 2) AREA 2: EL DORADO COUNTY, MONTEREY, PLACER, SACRAMENTO, BENITO, SANTA CRUZ, SIERRA, SUTTER AND YUBA COUNTIES | $59.63 | $31.29 | $90.92 |
| DRYWALL FINISHER/TAPER: General PAIN0016-011 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, NAPA, SAN FRANCISCO, SAN SANTA CLARA, SOLANO AND SONOMA COUNTIES | $63.76 | $32.69 | $96.45 |
| DRYWALL FINISHER/TAPER: (AREA 1) General PAIN0016-003 | $63.76 | $32.69 | $96.45 |
| DRYWALL FINISHER/TAPER: (AREA 2) General PAIN0016-003 | $59.63 | $31.29 | $90.92 |
| DRYWALL INSTALLERS/LATHERS: General CARP0035-005 (AREA 4) AREA 4: El Dorado, Placer, Sacramento, Sutter, Yolo, & YubaCounties | $48.12 | $31.93 | $80.05 |
| DRYWALL INSTALLERS/LATHERS: General CARP0035-005 (AREA 2) AREA 2: Monterey, San Benito & Santa Cruz Counties | $48.97 | $31.93 | $80.90 |
| DRYWALL INSTALLERS/LATHERS: General CARP0035-005 (AREA 1) AREA 1: Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano & Sonoma Counties | $54.85 | $31.93 | $86.78 |
| DRYWALL INSTALLERS/LATHERS:: (AREA 1) General CARP0035-008 | $52.65 | $31.26 | $83.91 |
| DRYWALL INSTALLERS/LATHERS:: (AREA 2) General CARP0035-008 | $46.77 | $31.26 | $78.03 |
| DRYWALL INSTALLERS/LATHERS:: (AREA 3) General CARP0035-008 | $47.27 | $31.26 | $78.53 |
| DRYWALL INSTALLERS/LATHERS:: (AREA 4) General CARP0035-008 | $45.92 | $31.26 | $77.18 |
| DRYWALL STOCKER/SCRAPPER: General CARP0035-005 (AREA 4) AREA 4: El Dorado, Placer, Sacramento, Sutter, Yolo, & Yuba Counties | $24.07 | $18.58 | $42.65 |
| DRYWALL STOCKER/SCRAPPER: General CARP0035-005 (AREA 2) AREA 2: Monterey, San Benito & Santa Cruz Counties | $24.49 | $18.58 | $43.07 |
| DRYWALL STOCKER/SCRAPPER: General CARP0035-005 (AREA 1) AREA 1: Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano & Sonoma Counties | $27.43 | $18.58 | $46.01 |
| DRYWALL STOCKER/SCRAPPER: (AREA 1) General CARP0035-008 | $26.33 | $18.22 | $44.55 |
| DRYWALL STOCKER/SCRAPPER: (AREA 2) General CARP0035-008 | $23.39 | $18.22 | $41.61 |
| DRYWALL STOCKER/SCRAPPER: (AREA 3) General CARP0035-008 | $23.64 | $18.22 | $41.86 |
| DRYWALL STOCKER/SCRAPPER: (AREA 4) General CARP0035-008 | $22.97 | $18.22 | $41.19 |
| ELECTRICIAN General ELEC0234-001 (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES) ZONE A : ALL OF SANTA CRUZ, MONTEREY, AND SAN BENITO COUNTIES WITHIN 25 AIR MILES OF HIGHWAY 1 AND DOLAN ROAD IN MOSS LANDING, AND AN AREA EXTENDING 5 MILES EAST AND WEST OF HIGHWAY 101 SOUTH TO THE SAN LUIS OBISPO COUNTY LINE | $70.41 | $33.76 | $104.17 |
| ELECTRICIAN General ELEC0234-001 (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES) ZONE B: ANY AREA OUTSIDE OF ZONE A | $77.45 | $33.97 | $111.42 |
| ELECTRICIAN General ELEC0332-001 (SANTA CLARA COUNTY) FOOTNOTES: WORK UNDER COMPRESSED AIR OR WHERE GAS MASKS ARE REQUIRED, ORWORK ON LADDERS, SCAFFOLDS, STACKS, ""BOSUN'S CHAIRS,"" OR OTHER STRUCTURES AND WHERE THE WORKERS ARE NOT PROTECTED BY PERMANENT GUARD RAILS AT A DISTANCE OF 40 TO 60 FT. FROM THE GROUND OR SUPPORTING STRUCTURES: TO BE PAID ONE AND ONE-HALF TIMES THE STRAIGHT-TIME RATE OF PAY. WORK ON STRUCTURES OF 60 FT. OR OVER (AS DESCRIBED ABOVE): TO BE PAID TWICE THE STRAIGHT-TIME RATE OF PAY | $91.03 | $49.05 | $140.08 |
| ELECTRICIAN General ELEC0684-001 (MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES) CABLE SPLICER = 110% OF JOURNEYMAN ELECTRICIAN | $48.50 | $30.09 | $78.59 |
| ELECTRICIAN General ELEC0006-005 (SAN FRANCISCO COUNTY) WORK ON RESIDENTIAL WOOD FRAME REMODEL AND REPAIR IN ALL WOOD-CONSTRUCTED BUILDINGS NOT TO EXCEED 24 LIVING UNITS; AND NEW WOOD FRAME SINGLE STRUCTURE 1 OR 2 FAMILY HOUSES, OR ON ALL WOOD- CONSTRUCTED BUILDINGS NOT TO EXCEED 20 LIVING UNITS UNDER 1 ROOF EXCLUDING PROJECTS OR TRACTS CONTAINING MORE THAN 2 HOUSES, OR MORE THAN 1 BUILDING | $55.50 | $25.64 | $81.14 |
| ELECTRICIAN General ELEC0401-006 (EL DORADO AND PLACER COUNTIES) ZONE PAY: ZONE 1 - 0 TO 70 MILES $0.00 PER HOUR ZONE 2 - 70 TO 90 MILES $5.00 PER HOUR ZONE 3 - 91 MILES AND OVER $7.00 PER HOUR | $31.88 | $8.46 | $40.34 |
| ELECTRICIAN (ALAMEDA COUNTY) General ELEC0595-001 Scope differs by code/WD | $76.00 | $49.07 | $125.07 |
| ELECTRICIAN (ALAMEDA COUNTY) General ELEC0595-004 Scope differs by code/WD | $76.00 | $49.07 | $125.07 |
| ELECTRICIAN (CONTRA COSTA COUNTY) General ELEC0302-001 Scope differs by code/WD | $66.26 | $35.84 | $102.10 |
| ELECTRICIAN (CONTRA COSTA COUNTY) General ELEC0302-002 Scope differs by code/WD | $66.26 | $35.84 | $102.10 |
| ELECTRICIAN (FRESNO, KINGS, AND MADERA COUNTIES) General ELEC0100-002 | $50.00 | $30.15 | $80.15 |
| ELECTRICIAN (MARIN AND SONOMA COUNTIES) General ELEC0551-003 | $41.00 | $24.26 | $65.26 |
| ELECTRICIAN (NAPA & SOLANO COUNTIES) General ELEC0180-002 | $38.50 | $21.16 | $59.66 |
| ELECTRICIAN (SAN FRANCISCO COUNTY) General ELEC0006-007 | $91.25 | $48.05 | $139.30 |
| ELECTRICIAN (SAN MATEO COUNTY) General ELEC0617-001 Scope differs by code/WD | $86.00 | $51.07 | $137.07 |
| ELECTRICIAN (SAN MATEO COUNTY) General ELEC0617-002 Scope differs by code/WD | $86.00 | $51.07 | $137.07 |
| ELECTRICIAN (SANTA CLARA COUNTY) General ELEC0332-002 | $47.35 | $23.49 | $70.84 |
| ELECTRICIAN: General ELEC0595-002 (2) ALL OTHER WORK (CALAVERAS AND SAN JOAQUIN COUNTIES) | $49.45 | $31.96 | $81.41 |
| ELECTRICIAN: General ELEC0595-002 (1) TUNNEL WORK (CALAVERAS AND SAN JOAQUIN COUNTIES) | $51.92 | $32.04 | $83.96 |
| ELECTRICIAN: ALL OTHER WORK (SAN FRANCISCO COUNTY:) General ELEC0006-009 | $91.25 | $48.05 | $139.30 |
| ELECTRICIAN: FOUR STORIES General ELEC0340-001 (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $39.06 | $24.51 | $63.57 |
| ELECTRICIAN: WORK ON SINGLE FAMILY HOMES AND APARTMENTS UP TO AND INCLUDING 3 STORIES General ELEC0340-001 (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $23.10 | $12.48 | $35.58 |
| ELECTRICIAN: ZONE A: General ELEC0234-002 (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) ZONE A: ALL OF SANTA CRUZ, MONTEREY, AND SAN BENITO COUNTIES WITHIN 25 AIR MILES OF HIGHWAY 1 AND DOLAN ROAD IN MOSS LANDING, AND AN AREA EXTENDING 5 MILES EAST AND WEST OF HIGHWAY 101 SOUTH TO THE SAN LUIS OBISPO COUNTY LINE | $70.41 | $33.76 | $104.17 |
| ELECTRICIAN: ZONE B: General ELEC0234-002 (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) ZONE B: ANY AREA OUTSIDE OF ZONE A | $77.45 | $33.97 | $111.42 |
| GLAZIER General PAIN0169-001 (FRESNO, KINGS, MADERA, MARIPOSA AND MERCED COUNTIES) | $44.33 | $28.88 | $73.21 |
| GLAZIER General PAIN0169-005 (ALAMEDA CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA & SANTA CRUZ COUNTIES) | $56.22 | $34.00 | $90.22 |
| GLAZIER General PAIN0767-001 (CALAVERAS, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR. DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. EMPLOYEE REQUIRED TO WEAR A BODY HARNESS SHALL RECEIVE $1.50 PER HOUR ABOVE THE BASIC HOURLY RATE AT ANY ELEVATION | $43.25 | $35.62 | $78.87 |
| GLAZIER General PAIN0169-006 (ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SONOMA COUNTIES;AND SOLANO COUNTY (WEST OF A LINE DEFINED AS FOLLOWS: HWY. 80 CORRIDOR BEGINNING AT THE CITY OF FAIRFIELD, INCLUDING TRAVIS AIR FORCE BASE AND SUISUN CITY; GOING NORTH OF MANAKAS CORNER RD., CONTINUE NORTH ON SUISUN VALLEY RD. TO THE NAPA COUNTY LINE; HWY. 80 CORRIDOR SOUTH ON GRIZZLY ISLAND RD. TO THE GRIZZLY ISLAND MANAGEMENT AREA) | $56.22 | $34.00 | $90.22 |
| GLAZIER General PAIN0767-002 (EL DORADO, PLACER, SACRAMENTO, SOLANO, SUTTER, YOLO AND YUBA COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR. DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTE: EMPLOYEE REQUIRED TO WEAR A BODY HARNESS SHALL RECEIVE $1.50 ABOVE THE BASIC HOURLY RATE AT ANY ELEVATION | $43.25 | $35.62 | $78.87 |
| INSTALLER (MODULAR FURNITURE INSTALLER) AREA 1 General CARP0035-007 | $28.76 | $22.53 | $51.29 |
| INSTALLER (MODULAR FURNITURE INSTALLER) AREA 2 General CARP0035-007 | $26.11 | $22.53 | $48.64 |
| INSTALLER (MODULAR FURNITURE INSTALLER) AREA 3 General CARP0035-007 | $25.16 | $22.53 | $47.69 |
| IRONWORKER: FENCE ERECTOR General IRON0433-005 (REMAINING COUNTIES) PREMIUM locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock | $45.78 | $26.51 | $72.29 |
| IRONWORKER: FENCE ERECTOR (REMAINING COUNTIES) General IRON0433-005 | $45.78 | $26.51 | $72.29 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL General IRON0433-005 (REMAINING COUNTIES) | $50.70 | $35.15 | $85.85 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL General IRON0433-005 (REMAINING COUNTIES) PREMIUM locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock | $50.70 | $35.15 | $85.85 |
| IRONWORKERS: FENCE ERECTOR General IRON0377-001 (ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES) | $45.78 | $26.51 | $72.29 |
| IRONWORKERS: FENCE ERECTOR General IRON0377-003 (SAN FRANCISCO CITY AND COUNTY) | $45.78 | $26.51 | $72.29 |
| IRONWORKERS: FENCE ERECTOR General IRON0377-001 (ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES) PREMIUM locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock | $45.78 | $26.51 | $72.29 |
| IRONWORKERS: FENCE ERECTOR General IRON0377-003 (SAN FRANCISCO CITY AND COUNTY) PREMIUM locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock | $45.78 | $26.51 | $72.29 |
| IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL General IRON0377-001 (ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES) | $55.33 | $35.15 | $90.48 |
| IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL General IRON0377-003 (SAN FRANCISCO CITY AND COUNTY) | $55.83 | $35.15 | $90.98 |
| IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL General IRON0377-001 (ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES) PREMIUM locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock | $55.33 | $35.15 | $90.48 |
| IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL General IRON0377-003 (SAN FRANCISCO CITY AND COUNTY) PREMIUM locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock | $55.83 | $35.15 | $90.98 |
| JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: BRICK TENDER General LABO0304-005 (ALAMEDA COUNTY) FOOTNOTES: WORK ON PER HOUR ADDITIONAL. MANHOLE WORK: $2.00 PER DAY ADDITIONAL | $37.05 | $27.45 | $64.50 |
| JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: BRICK TENDER General LABO0304-006 (ALAMEDA COUNTY) FOOTNOTES: WORK ON PER HOUR ADDITIONAL. MANHOLE WORK: $2.00 PER DAY ADDITIONAL | $37.05 | $27.45 | $64.50 |
| LABORER General LABO0073-007 (CONSTRUCTION CRAFT LABORERS) GROUP 1-f CALAVERAS AND SAN JOAQUIN COUNTIES | $30.37 | $29.89 | $60.26 |
| LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1 General LABO0067-006 Scope differs by code/WD | $39.15 | $30.03 | $69.18 |
| LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1 General LABO0067-007 (AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO,SANMATEO, SANTA CLARA) SCOPE OF WORK: Covers site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations | $39.15 | $30.03 | $69.18 |
| LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2 General LABO0067-006 Scope differs by code/WD | $38.15 | $30.03 | $68.18 |
| LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2 General LABO0067-007 (AREA 2: EL DORADO, MONTEREY, PLACE, SACRAMENTO, SAN BENITO, SANTA CRUZ, SOLANO, SONOMA, SUTTER, YOLO, AND YUBA COUNTIES) SCOPE OF WORK: Covers site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations | $38.15 | $30.03 | $68.18 |
| LABORER, BRICK: MASON TENDER-BRICK General LABO0294-001 (FRESNO, KINGS AND MADERA COUNTIES) | $36.29 | $25.55 | $61.84 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1- ASPHALT SPREADER BOXES General LABO0261-009 (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER SAN FRANCISCO, AND SAN MATEO COUNTIES FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. | $36.50 | $27.30 | $63.80 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-C BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING General LABO0261-009 (SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.55 | $27.30 | $63.85 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-C BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING General LABO0270-010 (SANTA CLARA COUNTY) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.55 | $27.30 | $63.85 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-C BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING General LABO0304-004 (ALAMEDA COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.55 | $27.30 | $63.85 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-C BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING General LABO0324-012 (CONTRA COSTA COUNTY) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.55 | $27.30 | $63.85 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-E WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS General LABO0261-009 (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. (SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $37.05 | $27.30 | $64.35 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-E WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS General LABO0270-010 (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. (SANTA CLARA COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $37.05 | $27.30 | $64.35 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-E WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS General LABO0304-004 (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. (ALAMEDA COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $37.05 | $27.30 | $64.35 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-E WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS General LABO0324-012 (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. (CONTRA COSTA COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $37.05 | $27.30 | $64.35 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-F WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE General LABO0270-010 (SANTA CLARA COUNTY) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $37.08 | $27.30 | $64.38 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-F WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE General LABO0304-004 (ALAMEDA COUNTY) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $37.08 | $27.30 | $64.38 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-F WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE General LABO0324-012 (CONTRA COSTA COUNTY) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $37.08 | $27.30 | $64.38 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER General LABO0261-009 (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES (SAN FRANCISCO, AND SAN MATEO COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.35 | $27.30 | $63.65 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER General LABO0270-010 (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES (SANTA CLARA COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.35 | $27.30 | $63.65 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER General LABO0304-004 (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES (ALAMEDA COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.35 | $27.30 | $63.65 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER General LABO0324-012 (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES (CONTRA COSTA COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.35 | $27.30 | $63.65 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:: GROUP 1 (ALAMEDA COUNTY) General LABO0304-004 | $36.50 | $27.30 | $63.80 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:: GROUP 1 (SANTA CLARA COUNTY) General LABO0270-010 | $36.50 | $27.30 | $63.80 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1- ASPHALT SPREADER BOXES General LABO0294-008 (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER (FRESNO, KINGS, AND MADERA COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. | $35.50 | $27.30 | $62.80 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1- ASPHALT SPREADER BOXES General LABO1130-007 (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES | $35.50 | $27.30 | $62.80 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-C BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING General LABO0270-007 (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $35.55 | $27.30 | $62.85 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-C BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING General LABO0294-008 (FRESNO, KINGS, AND MADERA COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $35.55 | $27.30 | $62.85 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-C BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING General LABO1130-007 (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $35.55 | $27.30 | $62.85 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-E WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS General LABO0270-007 (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.05 | $27.30 | $63.35 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-E WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS General LABO0294-008 (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. (FRESNO, KINGS, AND MADERA COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.05 | $27.30 | $63.35 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-E WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS General LABO1130-007 (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.05 | $27.30 | $63.35 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-F WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE General LABO0270-007 (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.08 | $27.30 | $63.38 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-F WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE General LABO0294-008 (FRESNO, KINGS, AND MADERA COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.08 | $27.30 | $63.38 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-F WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE General LABO1130-007 (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.08 | $27.30 | $63.38 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 2 General LABO1130-007 (ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $35.35 | $27.30 | $62.65 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER General LABO0270-007 (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $35.35 | $27.30 | $62.65 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER General LABO0294-008 (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES (FRESNO, KINGS, AND MADERA COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $35.35 | $27.30 | $62.65 |
| LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES General LABO0073-007 (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER (CALAVERAS AND SAN JOAQUIN COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $38.15 | $29.89 | $68.04 |
| LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS General LABO0073-007 (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. (CALAVERAS AND SAN JOAQUIN COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $38.70 | $29.89 | $68.59 |
| LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER General LABO0073-007 (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES (CALAVERAS AND SAN JOAQUIN COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $38.00 | $29.89 | $67.89 |
| LABORER, GUNITE - AREA A: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN General LABO0270-010 (SANTA CLARA COUNTY) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $36.96 | $27.30 | $64.26 |
| LABORER, GUNITE - AREA A: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN General LABO0304-004 (ALAMEDA COUNTY) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $36.96 | $27.30 | $64.26 |
| LABORER, GUNITE - AREA A: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN General LABO0324-012 (CONTRA COSTA COUNTY) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $36.96 | $27.30 | $64.26 |
| LABORER, GUNITE - AREA A: GROUP 3 REBOUNDMAN General LABO0270-010 (SANTA CLARA COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $36.37 | $27.30 | $63.67 |
| LABORER, GUNITE - AREA A: GROUP 3 REBOUNDMAN General LABO0304-004 (ALAMEDA COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $36.37 | $27.30 | $63.67 |
| LABORER, GUNITE - AREA A: GROUP 3REBOUNDMAN General LABO0324-012 (CONTRA COSTA COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $36.37 | $27.30 | $63.67 |
| LABORER, GUNITE - AREA A: GROUP 4 GUNITE LABORER General LABO0270-010 (SANTA CLARA COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $36.25 | $27.30 | $63.55 |
| LABORER, GUNITE - AREA A: GROUP 4 GUNITE LABORER General LABO0304-004 (ALAMEDA COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $36.25 | $27.30 | $63.55 |
| LABORER, GUNITE - AREA A: GROUP 4 GUNITE LABORER General LABO0324-012 (CONTRA COSTA COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $36.25 | $27.30 | $63.55 |
| LABORER, GUNITE - AREA A:: GROUP 1 General LABO0270-010 (SANTA CLARA COUNTY) | $37.46 | $27.30 | $64.76 |
| LABORER, GUNITE - AREA A:: GROUP 1 General LABO0324-012 (CONTRA COSTA COUNTY) | $37.46 | $27.30 | $64.76 |
| LABORER, GUNITE - AREA A:: GROUP 1 (ALAMEDA COUNTY) General LABO0304-004 | $37.46 | $27.30 | $64.76 |
| LABORER, GUNITE - AREA B: GROUP 1 General LABO0270-007 (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES) | $36.46 | $27.30 | $63.76 |
| LABORER, GUNITE - AREA B: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN General LABO0270-007 (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $35.96 | $27.30 | $63.26 |
| LABORER, GUNITE - AREA B: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN General LABO0294-008 (FRESNO, KINGS, AND MADERA COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $35.96 | $27.30 | $63.26 |
| LABORER, GUNITE - AREA B: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN General LABO1130-007 (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $35.96 | $27.30 | $63.26 |
| LABORER, GUNITE - AREA B: GROUP 3 REBOUNDMAN General LABO0294-008 (FRESNO, KINGS, AND MADERA COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $35.37 | $27.30 | $62.67 |
| LABORER, GUNITE - AREA B: GROUP 3 REBOUNDMAN General LABO1130-007 (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $35.37 | $27.30 | $62.67 |
| LABORER, GUNITE - AREA B: GROUP 3REBOUNDMAN General LABO0270-007 (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $35.37 | $27.30 | $62.67 |
| LABORER, GUNITE - AREA B: GROUP 4 Gunite laborer General LABO1130-007 (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $35.25 | $27.30 | $62.55 |
| LABORER, GUNITE - AREA B: GROUP 4 GUNITE LABORER General LABO0270-007 (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $35.25 | $27.30 | $62.55 |
| LABORER, GUNITE - AREA B: GROUP 4 GUNITE LABORER General LABO0294-008 (FRESNO, KINGS, AND MADERA COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $35.25 | $27.30 | $62.55 |
| LABORER, GUNITE - AREA B:: GROUP 1 General LABO0294-008 (FRESNO, KINGS, AND MADERA COUNTIES) | $36.46 | $27.30 | $63.76 |
| LABORER, GUNITE: GROUP 1 General LABO0073-007 (CALAVERAS AND SAN JOAQUIN COUNTIES) | $39.11 | $29.89 | $69.00 |
| LABORER, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN General LABO0073-007 (CALAVERAS AND SAN JOAQUIN COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $38.61 | $29.89 | $68.50 |
| LABORER, GUNITE: GROUP 3 REBOUNDMAN General LABO0073-007 (CALAVERAS AND SAN JOAQUIN COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $38.02 | $29.89 | $67.91 |
| LABORER, GUNITE: GROUP 4 GUINTE LABORER General LABO0073-007 (CALAVERAS AND SAN JOAQUIN COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $37.90 | $29.89 | $67.79 |
| LABORER, PLASTER TENDER General LABO0073-009 (CALAVERAS AND SAN JOAQUIN COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $39.77 | $28.54 | $68.31 |
| LABORER, PLASTER TENDER General LABO0270-011 (MONTEREY, SAN BENITO, SANTA CRUZ, SANTA CLARA COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $40.68 | $29.68 | $70.36 |
| LABORER, PLASTER TENDER General LABO0294-011 (FRESNO, KINGS, AND MADERA COUNTIES) | $39.77 | $28.54 | $68.31 |
| LABORER, PLASTER TENDER General LABO1130-009 (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $39.77 | $28.54 | $68.31 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON General LABO0073-002 (CALAVERAS AND SAN JOAQUIN COUNTIES) | $36.26 | $27.30 | $63.56 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON General LABO0261-003 (SAN FRANCISCO AND SAN MATEO COUNTIES) | $37.26 | $27.30 | $64.56 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON General LABO0294-002 (FRESNO, KINGS, AND MADERA COUNTIES) | $36.26 | $27.30 | $63.56 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON General LABO1130-002 (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES) | $36.26 | $27.30 | $63.56 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (ALAMEDA COUNTY) General LABO0304-002 | $37.26 | $27.30 | $64.56 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (Area A) General LABO0270-003 | $37.26 | $27.30 | $64.56 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (Area B) General LABO0270-003 | $36.26 | $27.30 | $63.56 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (CONTRA COSTA COUNTY) General LABO0324-002 | $37.26 | $27.30 | $64.56 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I (Area A) General LABO0270-003 | $37.56 | $27.30 | $64.86 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I (Area B) General LABO0270-003 | $36.56 | $27.30 | $63.86 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE General LABO0073-002 (CALAVERAS AND SAN JOAQUIN COUNTIES) | $36.56 | $27.30 | $63.86 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE General LABO0261-003 (SAN FRANCISCO AND SAN MATEO COUNTIES) | $37.56 | $27.30 | $64.86 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE General LABO0294-002 (FRESNO, KINGS, AND MADERA COUNTIES) | $36.56 | $27.30 | $63.86 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE General LABO0304-002 (ALAMEDA COUNTY) | $37.56 | $27.30 | $64.86 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE General LABO0324-002 (CONTRA COSTA COUNTY) | $37.56 | $27.30 | $64.86 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE General LABO1130-002 (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES) | $36.56 | $27.30 | $63.86 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II (Area A) General LABO0270-003 | $35.06 | $27.30 | $62.36 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II (Area B) General LABO0270-003 | $34.06 | $27.30 | $61.36 |
| LABORER, WRECKING - AREA A: GROUP 2 Semi-skilled wrecker General LABO0261-009 (salvaging of other building materials) (SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $36.35 | $27.30 | $63.65 |
| LABORER, WRECKING - AREA A: GROUP 2 Semi-skilled wrecker General LABO0304-004 (salvaging of other building materials) (ALAMEDA COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $36.35 | $27.30 | $63.65 |
| LABORER, WRECKING - AREA A: GROUP 2 Semi-skilled wrecker General LABO0324-012 (salvaging of other building materials) (CONTRA COSTA COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $36.35 | $27.30 | $63.65 |
| LABORER, WRECKING - AREA A:: GROUP 1 General LABO0261-009 (SAN FRANCISCO, AND SAN MATEO COUNTIES) | $36.50 | $27.30 | $63.80 |
| LABORER, WRECKING - AREA A:: GROUP 1 General LABO0270-010 (SANTA CLARA COUNTY) | $36.50 | $27.30 | $63.80 |
| LABORER, WRECKING - AREA A:: GROUP 1 General LABO0304-004 (ALAMEDA COUNTY) | $36.50 | $27.30 | $63.80 |
| LABORER, WRECKING - AREA A:: GROUP 1 General LABO0324-012 (CONTRA COSTA COUNTY) | $36.50 | $27.30 | $63.80 |
| LABORER, WRECKING - AREA A:: GROUP 2 Semi-skilled wrecker General LABO0270-010 (salvaging of other building materials) (SANTA CLARA COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $36.35 | $27.30 | $63.65 |
| LABORER, WRECKING - AREA B: GROUP 1 General LABO0270-007 (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES) | $35.50 | $27.30 | $62.80 |
| LABORER, WRECKING - AREA B: GROUP 1- SKILLED WRECKER General LABO1130-007 (REMOVING AND SALVAGING OF SASH, WINDOWS AND MATERIALS) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES | $35.50 | $27.30 | $62.80 |
| LABORER, WRECKING - AREA B: GROUP 2 Semi-skilled wrecker General LABO0270-007 (salvaging of other building materials) (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $35.35 | $27.30 | $62.65 |
| LABORER, WRECKING - AREA B: GROUP 2 Semi-skilled wrecker General LABO0294-008 (salvaging of other building materials) (FRESNO, KINGS, AND MADERA COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. | $35.35 | $27.30 | $62.65 |
| LABORER, WRECKING - AREA B: GROUP 2 SEMI-SKILLED WRECKER General LABO1130-007 (SALVAGING OF OTHER BUILDING MATERIALS) (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $35.35 | $27.30 | $62.65 |
| LABORER, WRECKING - AREA B:: GROUP 1 General LABO0294-008 (FRESNO, KINGS, AND MADERA COUNTIES) | $35.50 | $27.30 | $62.80 |
| LABORER, WRECKING: GROUP 1 General LABO0073-007 (CALAVERAS AND SAN JOAQUIN COUNTIES) | $38.15 | $29.89 | $68.04 |
| LABORER, WRECKING: GROUP 2 Semi-skilled wrecker General LABO0073-007 (salvaging of other building materials) (CALAVERAS AND SAN JOAQUIN COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $38.00 | $29.89 | $67.89 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS General LABO0073-007 (CALAVERAS AND SAN JOAQUIN COUNTIES)- (2) Establishment Warranty Period | $31.59 | $29.89 | $61.48 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS General LABO0073-007 (CALAVERAS AND SAN JOAQUIN COUNTIES)- (1) New Construction | $37.90 | $29.89 | $67.79 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: General LABO0261-009 (SAN FRANCISCO, AND SAN MATEO COUNTIES)- (2) Establishment Warranty Period | $29.94 | $27.30 | $57.24 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: General LABO0261-009 (SAN FRANCISCO, AND SAN MATEO COUNTIES)- (1) New Construction | $36.25 | $27.30 | $63.55 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: General LABO0270-010 (SANTA CLARA COUNTY)- (2) Establishment Warranty Period | $29.94 | $27.30 | $57.24 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: General LABO0270-010 (SANTA CLARA COUNTY)- (1) New Construction | $36.25 | $27.30 | $63.55 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: General LABO0304-004 (ALAMEDA COUNTY)- (2) Establishment Warranty Period | $29.94 | $27.30 | $57.24 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: General LABO0304-004 (ALAMEDA COUNTY)- (1) New Construction | $36.25 | $27.30 | $63.55 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B General LABO0270-007 (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES)- (2) Establishment Warranty Period | $28.94 | $27.30 | $56.24 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B General LABO0270-007 (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES)- (1) New Construction | $35.25 | $27.30 | $62.55 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: General LABO0294-008 (FRESNO, KINGS, AND MADERA COUNTIES)- (2) Establishment Warranty Period | $28.94 | $27.30 | $56.24 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: General LABO0294-008 (FRESNO, KINGS, AND MADERA COUNTIES)- (1) New Construction | $35.25 | $27.30 | $62.55 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: General LABO1130-007 (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES)- (2) Establishment Warranty Period | $28.94 | $27.30 | $56.24 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: General LABO1130-007 (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES)- (1) New Construction | $35.25 | $27.30 | $62.55 |
| LABORER: GARDENERS, HORTICULURAL & LANDSCAPE LABORERS - AREA A: General LABO0324-012 (CONTRA COSTA COUNTY)- (2) Establishment Warranty Period | $29.94 | $27.30 | $57.24 |
| LABORER: GARDENERS, HORTICULURAL & LANDSCAPE LABORERS - AREA A: General LABO0324-012 (CONTRA COSTA COUNTY)- (1) New Construction | $36.25 | $27.30 | $63.55 |
| LABORER: MASON TENDER-BRICK General LABO0270-005 (MONTEREY AND SAN BENITO COUNTIES) | $36.29 | $25.55 | $61.84 |
| LABORER: MASON TENDER-BRICK General LABO1130-005 (MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES) | $36.29 | $25.55 | $61.84 |
| LABORER: MASON TENDER-BRICK General LABO0185-003 (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $36.29 | $25.55 | $61.84 |
| LABORER: MASON TENDER-BRICK General LABO0270-006 (MONTEREY AND SAN BENITO COUNTIES) | $36.29 | $25.55 | $61.84 |
| LABORER: MASON TENDER-BRICK General LABO0324-011 (SOLANO AND SONOMA COUNTIES) FOOTNOTE: REFRACTORY WORK WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL | $36.84 | $26.24 | $63.08 |
| LABORER: MASON TENDER-BRICK (SAN JOAQUIN COUNTY) General LABO0073-003 | $36.29 | $25.55 | $61.84 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-C: General LABO0324-001 (BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE (AREA ""A"" - CONTRA COSTA COUNTY) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. | $36.55 | $27.30 | $63.85 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings General LABO0270-001 (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional. Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates. Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed | $37.05 | $27.30 | $64.35 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS General LABO0324-001 (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF (AREA ""A"" - CONTRA COSTA COUNTY) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. | $37.05 | $27.30 | $64.35 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-F: Wire winding machine in connection with guniting or shot crete General LABO0270-001 (AREA ""A"" - SANTA CLARA COUNTY AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional. Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates. Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed | $37.08 | $27.30 | $64.38 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-F: Wire winding machine in connection with guniting or shot crete General LABO0324-001 (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates. Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed | $37.08 | $27.30 | $64.38 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-G CONTRA COSTA COUNTY: Pipelayer General LABO0324-001 (including grade checking on connection with peiplaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole from setters (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates. Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed | $36.70 | $27.30 | $64.00 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1: Asphalt spreader boxes General LABO0270-001 (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"""" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional. Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates. Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed | $36.50 | $27.30 | $63.80 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1: Asphalt spreader boxes General LABO0324-001 (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"""" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional. Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates. Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed | $36.50 | $27.30 | $63.80 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger General LABO0270-001 (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional. Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates. Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed | $36.35 | $27.30 | $63.65 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER General LABO0324-001 (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 (AREA ""A"" - CONTRA COSTA COUNTY) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED. | $36.35 | $27.30 | $63.65 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings General LABO0270-001 (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional. | $36.05 | $27.30 | $63.35 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings General LABO0324-001 (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional. | $36.05 | $27.30 | $63.35 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-F: Wire winding machine in connection with guniting or shot crete General LABO0270-001 (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional. | $36.08 | $27.30 | $63.38 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-F: Wire winding machine in connection with guniting or shot crete General LABO0324-001 (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional. | $36.08 | $27.30 | $63.38 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1: Asphalt spreader boxes General LABO0270-001 (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"""" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional. | $35.50 | $27.30 | $62.80 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1: Asphalt spreader boxes General LABO0324-001 (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"""" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional. | $35.50 | $27.30 | $62.80 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger General LABO0270-001 (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional. | $35.35 | $27.30 | $62.65 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger General LABO0324-001 (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional. | $35.35 | $27.30 | $62.65 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1 ASPHALT SPREADER BOXES General LABO0304-001 (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER (ALAMEDA COUNTY) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER CLEANERS SHALL RECEIVE CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.50 | $27.30 | $63.80 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS General LABO0304-001 (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. (ALAMEDA COUNTY) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER CLEANERS SHALL RECEIVE CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $37.05 | $27.30 | $64.35 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS General LABO0185-001 (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | $36.05 | $27.30 | $63.35 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS General LABO0261-001 (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $37.05 | $27.30 | $64.35 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-F WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE General LABO0304-001 (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $37.08 | $27.30 | $64.38 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1: Asphalt spreader boxes General LABO0185-001 (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"""" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | $35.50 | $27.30 | $62.80 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1: ASPHALT SPREADER BOXES General LABO0261-001 (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.50 | $27.30 | $63.80 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER General LABO0304-001 (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.35 | $27.30 | $63.65 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER General LABO0185-001 (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | $35.35 | $27.30 | $62.65 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER General LABO0261-001 (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.35 | $27.30 | $63.65 |
| LABORERS:, GUNITE - AREA A: GROUP 1: Structural nozzleman General LABO0324-001 (AREA ""A"" - CONTRA COSTA COUNTY) bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $37.46 | $27.30 | $64.76 |
| LABORERS:, GUNITE - AREA A: GROUP 1: STRUCTURAL NOZZLEMAN General LABO0270-001 (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $37.46 | $27.30 | $64.76 |
| LABORERS:, GUNITE - AREA A: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN General LABO0261-009 (SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW. | $36.96 | $27.30 | $64.26 |
| LABORERS:, GUNITE - AREA A: GROUP 2: Nozzleman, Gunman, Potman, Groundman General LABO0324-001 (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $36.96 | $27.30 | $64.26 |
| LABORERS:, GUNITE - AREA A: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN General LABO0270-001 (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $36.96 | $27.30 | $64.26 |
| LABORERS:, GUNITE - AREA A: GROUP 3 REBOUNDMAN General LABO0261-009 (SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $36.37 | $27.30 | $63.67 |
| LABORERS:, GUNITE - AREA A: GROUP 3: Reboundman General LABO0324-001 (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $36.37 | $27.30 | $63.67 |
| LABORERS:, GUNITE - AREA A: GROUP 3: REBOUNDMAN General LABO0270-001 (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $36.37 | $27.30 | $63.67 |
| LABORERS:, GUNITE - AREA A: GROUP 4 GUNITE LABORER General LABO0261-009 (SAN FRANCISCO, AND SAN MATEO COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW | $36.25 | $27.30 | $63.55 |
| LABORERS:, GUNITE - AREA A: GROUP 4: Gunite laborer General LABO0324-001 (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $36.25 | $27.30 | $63.55 |
| LABORERS:, GUNITE - AREA A: GROUP 4: GUNITE LABORER General LABO0270-001 (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $36.25 | $27.30 | $63.55 |
| LABORERS:, GUNITE - AREA A:: GROUP 1 General LABO0261-009 (SAN FRANCISCO, AND SAN MATEO COUNTIES) | $37.46 | $27.30 | $64.76 |
| LABORERS:, GUNITE - AREA B: GROUP 1: Structural nozzleman General LABO0324-001 (AREA ""A"" - CONTRA COSTA COUNTY) bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $36.46 | $27.30 | $63.76 |
| LABORERS:, GUNITE - AREA B: GROUP 1: STRUCTURAL NOZZLEMAN General LABO0270-001 (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $36.46 | $27.30 | $63.76 |
| LABORERS:, GUNITE - AREA B: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GORUNDMAN General LABO0270-001 (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $35.96 | $27.30 | $63.26 |
| LABORERS:, GUNITE - AREA B: GROUP 2: Nozzleman, Gunman, Potman, Groundman General LABO0324-001 (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $35.96 | $27.30 | $63.26 |
| LABORERS:, GUNITE - AREA B: GROUP 3: Reboundman General LABO0324-001 (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $35.37 | $27.30 | $62.67 |
| LABORERS:, GUNITE - AREA B: GROUP 3: REBOUNDMAN General LABO0270-001 (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $35.37 | $27.30 | $62.67 |
| LABORERS:, GUNITE - AREA B: GROUP 4: Gunite laborer General LABO0324-001 (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $35.25 | $27.30 | $62.55 |
| LABORERS:, GUNITE - AREA B: GROUP 4: GUNITE LABORER General LABO0270-001 (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $35.25 | $27.30 | $62.55 |
| LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN General LABO0185-001 (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS : $0.25 PER HOUR ADDITIONAL | $36.46 | $27.30 | $63.76 |
| LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN General LABO0261-001 (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | $37.46 | $27.30 | $64.76 |
| LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN General LABO0304-001 (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL | $37.46 | $27.30 | $64.76 |
| LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN General LABO0185-001 (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS : $0.25 PER HOUR ADDITIONAL | $35.96 | $27.30 | $63.26 |
| LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN General LABO0261-001 (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | $36.96 | $27.30 | $64.26 |
| LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN General LABO0304-001 (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL | $36.96 | $27.30 | $64.26 |
| LABORERS:, GUNITE: GROUP 3 REBOUNDMAN General LABO0185-001 (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS : $0.25 PER HOUR ADDITIONAL | $35.37 | $27.30 | $62.67 |
| LABORERS:, GUNITE: GROUP 3 REBOUNDMAN General LABO0261-001 (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | $36.37 | $27.30 | $63.67 |
| LABORERS:, GUNITE: GROUP 3 REBOUNDMAN General LABO0304-001 (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL | $36.37 | $27.30 | $63.67 |
| LABORERS:, GUNITE: GROUP 4 GUNITE LABORER General LABO0185-001 (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS : $0.25 PER HOUR ADDITIONAL. | $35.25 | $27.30 | $62.55 |
| LABORERS:, GUNITE: GROUP 4 GUNITE LABORER General LABO0261-001 (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | $36.25 | $27.30 | $63.55 |
| LABORERS:, GUNITE: GROUP 4 GUNITE LABORER General LABO0304-001 (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL | $36.25 | $27.30 | $63.55 |
| LABORERS:, WRECKING - AREA A: GROUP 1: Skilled wrecker General LABO0270-001 (removing and salvaging of sash, windows and materials) (AREA ""A"" - SANTA CLARA COUNTY) bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $36.50 | $27.30 | $63.80 |
| LABORERS:, WRECKING - AREA A: GROUP 1: Skilled wrecker General LABO0324-001 (removing and salvaging of sash, windows and materials) (AREA ""A"" - CONTRA COSTA COUNTY ) bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $36.50 | $27.30 | $63.80 |
| LABORERS:, WRECKING - AREA A: GROUP 2: Semi-skilled wrecker General LABO0270-001 (salvaging of other building materials) (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $36.35 | $27.30 | $63.65 |
| LABORERS:, WRECKING - AREA A: GROUP 2: Semi-skilled wrecker General LABO0324-001 (salvaging of other building materials) (AREA ""A"" - CONTRA COSTA COUNTY ) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $36.35 | $27.30 | $63.65 |
| LABORERS:, WRECKING - AREA B: GROUP 1: Skilled wrecker General LABO0270-001 (removing and salvaging of sash, windows and materials) (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $35.50 | $27.30 | $62.80 |
| LABORERS:, WRECKING - AREA B: GROUP 1: Skilled wrecker General LABO0324-001 (removing and salvaging of sash, windows and materials) (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $35.50 | $27.30 | $62.80 |
| LABORERS:, WRECKING - AREA B: GROUP 2 : Semi-skilled wrecker General LABO0270-001 (salvaging of other building materials)(AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $35.35 | $27.30 | $62.65 |
| LABORERS:, WRECKING - AREA B: GROUP 2: Semi-skilled wrecker General LABO0324-001 (salvaging of other building materials) (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $35.35 | $27.30 | $62.65 |
| LABORERS:, WRECKING: GROUP 1 Skilled wrecker General LABO0185-001 (removing and salvaging of sash, windows and materials) (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS): $0.25 PER HOUR ADDITIONAL | $35.50 | $27.30 | $62.80 |
| LABORERS:, WRECKING: GROUP 1 Skilled wrecker General LABO0304-001 (removing and salvaging of sash, windows and materials) (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | $36.50 | $27.30 | $63.80 |
| LABORERS:, WRECKING: GROUP 1 SKILLED WRECKER General LABO0261-001 (REMOVING AND SALVAGING OF SASH, WINDOWS ADN MATERIALS (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL. | $36.50 | $27.30 | $63.80 |
| LABORERS:, WRECKING: GROUP 2 GROUP 2: Semi-skilled wrecker General LABO0304-001 (salvaging of other building materials) (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | $36.35 | $27.30 | $63.65 |
| LABORERS:, WRECKING: GROUP 2 Semi-skilled wrecker General LABO0185-001 (salvaging of other building materials) (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL | $35.35 | $27.30 | $62.65 |
| LABORERS:, WRECKING: GROUP 2 SEMI-SKILLED WRECKER General LABO0261-001 (SALVAGING OF OTHER BUILDING MATERIALS) (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS ): $0.25 PER HOUR ADDITIONAL | $36.35 | $27.30 | $63.65 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: ESTABLISHMENT WARRANTY PERIOD General LABO0270-001 (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $29.94 | $27.30 | $57.24 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: ESTABLISHMENT WARRANTY PERIOD General LABO0324-001 (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $29.94 | $27.30 | $57.24 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: NEW CONSTRUCTION General LABO0270-001 (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $36.25 | $27.30 | $63.55 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: NEW CONSTRUCTION General LABO0324-001 (AREA ""A"" - CONTRA COSTA COUNTY ) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $36.25 | $27.30 | $63.55 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: ESTABLISHMENT WARRANTY PERIOD General LABO0270-001 (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $28.94 | $27.30 | $56.24 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: ESTABLISHMENT WARRANTY PERIOD General LABO0324-001 (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $28.94 | $27.30 | $56.24 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: NEW CONSTRUCTION General LABO0270-001 (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $35.25 | $27.30 | $62.55 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: NEW CONSTRUCTION General LABO0324-001 (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $35.25 | $27.30 | $62.55 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD General LABO0261-001 (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL | $29.94 | $27.30 | $57.24 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD General LABO0304-001 (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | $29.94 | $27.30 | $57.24 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEW CONSTRUCTION General LABO0185-001 (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL | $35.25 | $27.30 | $62.55 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEW CONSTRUCTION General LABO0261-001 (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS): $0.25 PER HOUR ADDITIONAL | $36.25 | $27.30 | $63.55 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEW CONSTRUCTION General LABO0304-001 (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | $36.25 | $27.30 | $63.55 |
| LANDSCAPE LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD General LABO0185-001 (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS : $0.25 PER HOUR ADDITIONAL | $28.94 | $27.30 | $56.24 |
| LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY FITTER (MARIN, SAN FRANCISCO & SONOMA COUNTIES) General PLUM0038-007 | $77.35 | $36.53 | $113.88 |
| LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY FITTER (SAN FRANCISCO COUNTY) General PLUM0038-005 | $77.35 | $36.53 | $113.88 |
| LEAD INSTALLER (MODULAR FURNITURE INSTALLER) AREA 1 General CARP0035-007 | $32.21 | $23.03 | $55.24 |
| LEAD INSTALLER (MODULAR FURNITURE INSTALLER) AREA 2 General CARP0035-007 | $29.08 | $23.03 | $52.11 |
| LEAD INSTALLER (MODULAR FURNITURE INSTALLER) AREA 3 General CARP0035-007 | $27.96 | $23.03 | $50.99 |
| LINE CONSTRUCTION: General ELEC1245-001 (3) GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY | $40.76 | $21.76 | $62.52 |
| LINE CONSTRUCTION: General ELEC1245-001 (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE EQUIPMENT) HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY | $53.30 | $22.26 | $75.56 |
| LINE CONSTRUCTION: General ELEC1245-001 (1) LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY | $70.16 | $24.71 | $94.87 |
| MARBLE FINISHER General BRCA0003-001 Scope differs by code/WD | $42.06 | $19.80 | $61.86 |
| MARBLE FINISHER General BRCA0003-001 Scope differs by code/WD | $42.06 | $19.80 | $61.86 |
| MARBLE MASON General BRCA0003-003 Scope differs by code/WD | $61.72 | $30.31 | $92.03 |
| MARBLE MASON General BRCA0003-009 Scope differs by code/WD | $61.72 | $30.31 | $92.03 |
| MASON TENDER, BRICK (SANTA CLARA COUNTY) General LABO0270-002 | $35.29 | $26.85 | $62.14 |
| MASON TENDER, BRICK (SANTA CRUZ COUNTY) General LABO0270-002 | $35.29 | $26.85 | $62.14 |
| MASTER INSTALLER General CARP0035-007 (MODULAR FURNITURE INSTALLER) AREA 3 | $31.38 | $23.03 | $54.41 |
| MASTER INSTALLER General CARP0035-007 (MODULAR FURNITURE INSTALLER) AREA 2 | $32.71 | $23.03 | $55.74 |
| MASTER INSTALLER General CARP0035-007 (MODULAR FURNITURE INSTALLER) AREA 1 | $36.43 | $23.03 | $59.46 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1: Operator of helicopter General ENGI0003-010 (when used in erection work); Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds. (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES ""AREA 1"" WAGE RATES ARE LISTED BELOW ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE AREA DESCRIPTIONS BELOW) FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $65.54 | $34.69 | $100.23 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6: Armor-Coater General ENGI0003-009 (or similar); Ballast jack tamper; Boom-type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Chemical grouting machine, truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator; Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines only); Pipewrapping machine (tractor propelled and supported); Screed(except asphaltic concrete paving); Self- propelled pipeline wrapping machine; Tractor; Self-loading chipper; Concrete barrier moving machine (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA COUNTIES FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1: All but the Northwestern Area 2: Reaminder | $58.88 | $34.69 | $93.57 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6: Armor-Coater General ENGI0003-010 (or similar); Ballast jack tamper; Boom- type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Chemical grouting machine, truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator; Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines only); Pipe wrapping machine (tractor propelled and supported); Screed (except asphaltic concrete paving); Self- propelled pipeline wrapping machine; Tractor; Self-loading chipper; Concrete barrier moving machine (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES ""AREA 1"" WAGE RATES ARE LISTED BELOW ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE AREA DESCRIPTIONS BELOW) work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $58.88 | $34.69 | $93.57 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8: Bit sharpener; Boiler tender; Box operator; Brakeperson; Combination mixer and compressor General ENGI0003-009 (shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator; Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump operator; Refrigeration plant; Reservoir-debris tug (self- propelled floating); Ross Carrier (construction site); Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator (includes vacuum sweeper); Slusher operator; Surface heater; Switchperson; Tar pot firetender; Tugger hoist, single drum; Vacuum cooling plant; Welding machine (powered other than by electricity) (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA COUNTIES FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1: All but the Northwestern Area 2: Reaminder | $56.71 | $34.69 | $91.40 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8: Bit sharpener; Boiler tender; Box operator; Brakeperson; Combination mixer and compressor General ENGI0003-010 (shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator; Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump operator; Refrigeration plant; Reservoir-debris tug (self- propelled floating); Ross Carrier (construction site); Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator (includes vacuum sweeper); Slusher operator; Surface heater; Switchperson; Tar pot firetender; Tugger hoist, single drum; Vacuum cooling plant; Welding machine (powered other than by electricity) (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES ""AREA 1"" WAGE RATES ARE LISTED BELOW ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE AREA DESCRIPTIONS BELOW) FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $56.71 | $34.69 | $91.40 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 1 General ENGI0003-001 Scope differs by code/WD | $66.96 | $32.53 | $99.49 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 1 General ENGI0003-001 Scope differs by code/WD | $66.96 | $32.53 | $99.49 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 2 General ENGI0003-001 Scope differs by code/WD | $65.43 | $32.53 | $97.96 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 2 General ENGI0003-001 Scope differs by code/WD | $65.43 | $32.53 | $97.96 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 3 General ENGI0003-001 Scope differs by code/WD | $63.95 | $32.53 | $96.48 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 3 General ENGI0003-001 Scope differs by code/WD | $63.95 | $32.53 | $96.48 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 4 General ENGI0003-001 Scope differs by code/WD | $62.57 | $32.53 | $95.10 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 4 General ENGI0003-001 Scope differs by code/WD | $62.57 | $32.53 | $95.10 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 5 General ENGI0003-001 Scope differs by code/WD | $61.30 | $32.53 | $93.83 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 5 General ENGI0003-001 Scope differs by code/WD | $61.30 | $32.53 | $93.83 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 6 General ENGI0003-001 Scope differs by code/WD | $59.98 | $32.53 | $92.51 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 6 General ENGI0003-001 Scope differs by code/WD | $59.98 | $32.53 | $92.51 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 7 General ENGI0003-001 Scope differs by code/WD | $58.84 | $32.53 | $91.37 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 7 General ENGI0003-001 Scope differs by code/WD | $58.84 | $32.53 | $91.37 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8 General ENGI0003-001 Scope differs by code/WD | $57.70 | $32.53 | $90.23 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8 General ENGI0003-001 Scope differs by code/WD | $57.70 | $32.53 | $90.23 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8-A General ENGI0003-001 Scope differs by code/WD | $55.49 | $32.53 | $88.02 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8-A General ENGI0003-001 Scope differs by code/WD | $55.49 | $32.53 | $88.02 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar General ENGI0003-009 (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA COUNTIES FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1: All but the Northwestern Area 2: Reaminder | $54.69 | $34.69 | $89.38 |
| OPERATOR: POWER EQUIPMENT, AREA 1:GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar General ENGI0003-010 (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES) ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $54.69 | $34.69 | $89.38 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 1 General ENGI0003-001 Scope differs by code/WD | $68.59 | $32.53 | $101.12 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 1 General ENGI0003-001 Scope differs by code/WD | $68.59 | $32.53 | $101.12 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 2 General ENGI0003-001 Scope differs by code/WD | $66.08 | $32.53 | $98.61 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 2 General ENGI0003-001 Scope differs by code/WD | $66.08 | $32.53 | $98.61 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 3 (Cranes) General ENGI0003-001 Scope differs by code/WD | $64.34 | $32.53 | $96.87 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 3 (Cranes) General ENGI0003-001 Scope differs by code/WD | $64.34 | $32.53 | $96.87 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 3 (Hydraulic) General ENGI0003-001 Scope differs by code/WD | $59.98 | $32.53 | $92.51 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 3 (Hydraulic) General ENGI0003-001 Scope differs by code/WD | $59.98 | $32.53 | $92.51 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 4 General ENGI0003-001 Scope differs by code/WD | $61.30 | $32.53 | $93.83 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 4 General ENGI0003-001 Scope differs by code/WD | $61.30 | $32.53 | $93.83 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 General ENGI0003-011 (AREA 2) THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $57.85 | $28.56 | $86.41 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 General ENGI0003-011 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $55.85 | $28.56 | $84.41 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 (AREA 1) General ENGI0003-019 | $55.85 | $28.56 | $84.41 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 (AREA 2) General ENGI0003-019 | $57.85 | $28.56 | $86.41 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 General ENGI0003-011 (AREA 2) THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $54.25 | $28.56 | $82.81 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 General ENGI0003-011 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $52.25 | $28.56 | $80.81 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 (AREA 1) General ENGI0003-019 | $52.25 | $28.56 | $80.81 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 (AREA 2) General ENGI0003-019 | $54.25 | $28.56 | $82.81 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 General ENGI0003-011 (AREA 2) THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $49.64 | $28.56 | $78.20 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 General ENGI0003-011 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $47.64 | $28.56 | $76.20 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 (AREA 1) General ENGI0003-019 | $47.64 | $28.56 | $76.20 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 (AREA 2) General ENGI0003-019 | $49.64 | $28.56 | $78.20 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 (Lifting devices) General ENGI0003-001 Scope differs by code/WD | $52.64 | $31.15 | $83.79 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 (Lifting devices) General ENGI0003-001 Scope differs by code/WD | $52.64 | $31.15 | $83.79 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 (Oiler) General ENGI0003-001 Scope differs by code/WD | $43.38 | $31.15 | $74.53 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 (Oiler) General ENGI0003-001 Scope differs by code/WD | $43.38 | $31.15 | $74.53 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 (Truck Crane Oiler) General ENGI0003-001 Scope differs by code/WD | $45.66 | $31.15 | $76.81 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 (Truck Crane Oiler) General ENGI0003-001 Scope differs by code/WD | $45.66 | $31.15 | $76.81 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 (Lifting devices) General ENGI0003-001 Scope differs by code/WD | $50.82 | $31.15 | $81.97 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 (Lifting devices) General ENGI0003-001 Scope differs by code/WD | $50.82 | $31.15 | $81.97 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 (Oiler) General ENGI0003-001 Scope differs by code/WD | $43.11 | $31.15 | $74.26 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 (Oiler) General ENGI0003-001 Scope differs by code/WD | $43.11 | $31.15 | $74.26 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 (Truck Crane Oiler) General ENGI0003-001 Scope differs by code/WD | $45.41 | $31.15 | $76.56 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 (Truck Crane Oiler) General ENGI0003-001 Scope differs by code/WD | $45.41 | $31.15 | $76.56 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 (Lifting devices) General ENGI0003-001 Scope differs by code/WD | $49.14 | $31.15 | $80.29 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 (Lifting devices) General ENGI0003-001 Scope differs by code/WD | $49.14 | $31.15 | $80.29 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 (Oiler) General ENGI0003-001 Scope differs by code/WD | $42.89 | $31.15 | $74.04 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 (Oiler) General ENGI0003-001 Scope differs by code/WD | $42.89 | $31.15 | $74.04 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 (Truck Crane Oiler) General ENGI0003-001 Scope differs by code/WD | $45.12 | $31.15 | $76.27 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 (Truck Crane Oiler) General ENGI0003-001 Scope differs by code/WD | $45.12 | $31.15 | $76.27 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 4 General ENGI0003-001 Scope differs by code/WD | $47.37 | $31.15 | $78.52 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 4 General ENGI0003-001 Scope differs by code/WD | $47.37 | $31.15 | $78.52 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 5 General ENGI0003-001 Scope differs by code/WD | $44.73 | $31.15 | $75.88 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 5 General ENGI0003-001 Scope differs by code/WD | $44.73 | $31.15 | $75.88 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 6 General ENGI0003-001 Scope differs by code/WD | $42.50 | $31.15 | $73.65 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 6 General ENGI0003-001 Scope differs by code/WD | $42.50 | $31.15 | $73.65 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 1 General ENGI0003-001 Scope differs by code/WD | $68.81 | $32.53 | $101.34 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 1 General ENGI0003-001 Scope differs by code/WD | $68.81 | $32.53 | $101.34 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 2 General ENGI0003-001 Scope differs by code/WD | $67.04 | $32.53 | $99.57 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 2 General ENGI0003-001 Scope differs by code/WD | $67.04 | $32.53 | $99.57 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 3 General ENGI0003-001 Scope differs by code/WD | $65.56 | $32.53 | $98.09 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 3 General ENGI0003-001 Scope differs by code/WD | $65.56 | $32.53 | $98.09 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 4 General ENGI0003-001 Scope differs by code/WD | $63.54 | $32.53 | $96.07 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 4 General ENGI0003-001 Scope differs by code/WD | $63.54 | $32.53 | $96.07 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 5 General ENGI0003-001 Scope differs by code/WD | $62.24 | $32.53 | $94.77 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 5 General ENGI0003-001 Scope differs by code/WD | $62.24 | $32.53 | $94.77 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1-A) General ENGI0003-001 Scope differs by code/WD | $65.53 | $32.53 | $98.06 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1-A) General ENGI0003-001 Scope differs by code/WD | $65.53 | $32.53 | $98.06 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1) General ENGI0003-001 Scope differs by code/WD | $63.06 | $32.53 | $95.59 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1) General ENGI0003-001 Scope differs by code/WD | $63.06 | $32.53 | $95.59 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 2) General ENGI0003-001 Scope differs by code/WD | $61.80 | $32.53 | $94.33 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 2) General ENGI0003-001 Scope differs by code/WD | $61.80 | $32.53 | $94.33 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 3) General ENGI0003-001 Scope differs by code/WD | $60.47 | $32.53 | $93.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 3) General ENGI0003-001 Scope differs by code/WD | $60.47 | $32.53 | $93.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 4) General ENGI0003-001 Scope differs by code/WD | $59.33 | $32.53 | $91.86 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 4) General ENGI0003-001 Scope differs by code/WD | $59.33 | $32.53 | $91.86 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 5) General ENGI0003-001 Scope differs by code/WD | $58.19 | $32.53 | $90.72 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 5) General ENGI0003-001 Scope differs by code/WD | $58.19 | $32.53 | $90.72 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 1-A) General ENGI0003-001 Scope differs by code/WD | $65.43 | $32.53 | $97.96 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 1-A) General ENGI0003-001 Scope differs by code/WD | $65.43 | $32.53 | $97.96 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 1) General ENGI0003-001 Scope differs by code/WD | $62.96 | $32.53 | $95.49 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 1) General ENGI0003-001 Scope differs by code/WD | $62.96 | $32.53 | $95.49 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 2) General ENGI0003-001 Scope differs by code/WD | $61.70 | $32.53 | $94.23 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 2) General ENGI0003-001 Scope differs by code/WD | $61.70 | $32.53 | $94.23 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 3) General ENGI0003-001 Scope differs by code/WD | $60.37 | $32.53 | $92.90 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 3) General ENGI0003-001 Scope differs by code/WD | $60.37 | $32.53 | $92.90 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 4) General ENGI0003-001 Scope differs by code/WD | $59.23 | $32.53 | $91.76 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 4) General ENGI0003-001 Scope differs by code/WD | $59.23 | $32.53 | $91.76 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 5) General ENGI0003-001 Scope differs by code/WD | $58.09 | $32.53 | $90.62 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 5) General ENGI0003-001 Scope differs by code/WD | $58.09 | $32.53 | $90.62 |
| PAINTER General PAIN0016-013 (ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, SAN BENITO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO & SONOMA COUNTIES) FOOTNOTES: SPRAY WORK: $0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR | $53.38 | $28.04 | $81.42 |
| PAINTER (SAN FRANCISCO COUNTY) General PAIN0016-022 Scope differs by code/WD | $57.00 | $28.04 | $85.04 |
| PAINTER (SAN FRANCISCO COUNTY) General PAIN0016-019 Scope differs by code/WD | $57.00 | $28.04 | $85.04 |
| PAINTER: BRUSH General PAIN0016-015 (CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE COUNTIES) HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR. HIGH TIME: OVER 50 FT ABOVE GROUND OR WATER LEVEL GROUND OR WATER LEVEL $4.00 ADDITIONAL PER HOUR. OVER 180 FT ABOVE GROUND OR WATER LEVEL $6.00 ADDITIONAL PER HOUR | $43.45 | $22.80 | $66.25 |
| PAINTER: BRUSH AND ROLLER General PAIN0567-002 (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY & PAPERHANGER = COATING IS A COATING THAT REQUIRES THE MIXING OF 2 OR MORE PRODUCTS | $39.43 | $16.16 | $55.59 |
| PAINTER: BRUSH, ROLLER General PAIN0294-004 (FRESNO, KINGS AND MADERA COUNTIES) FOOTNOTE: SPRAY PAINTERS & PAPERHANGERS RECIVE $1.00 ADDITIONAL PER HOUR. PAINTERS DOING DRYWALL PATCHING RECEIVE $1.25 ADDITIONAL PER HOUR. LEAD ABATERS & SANDBLASTERS RECEIVE $1.50 ADDITIONAL PER HOUR. HIGH TIME - OVER 30 FEET (DOES NOT INCLUDE WORK FROM A LIFT) $0.75 PER HOUR ADDITIONAL | $34.49 | $21.80 | $56.29 |
| PAINTER: DRYWALL FINISHER/TAPER General PAIN0294-004 (FRESNO, KINGS AND MADERA COUNTIES) FOOTNOTE: SPRAY PAINTERS & PAPERHANGERS RECIVE $1.00 ADDITIONAL PER HOUR. PAINTERS DOING DRYWALL PATCHING RECEIVE $1.25 ADDITIONAL PER HOUR. LEAD ABATERS & SANDBLASTERS RECEIVE $1.50 ADDITIONAL PER HOUR. HIGH TIME - OVER 30 FEET (DOES NOT INCLUDE WORK FROM A LIFT) $0.75 PER HOUR ADDITIONAL | $35.74 | $21.80 | $57.54 |
| PAINTER: PAPER HANGER General PAIN0567-002 (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY & PAPERHANGER = COATING IS A COATING THAT REQUIRES THE MIXING OF 2 OR MORE PRODUCTS | $42.19 | $16.16 | $58.35 |
| PAINTER: SPRAY PAINTER General PAIN0567-002 (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY & PAPERHANGER = COATING IS A COATING THAT REQUIRES THE MIXING OF 2 OR MORE PRODUCTS | $41.43 | $16.16 | $57.59 |
| PAINTERS: BRUSH General PAIN0016-002 (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) SPRAY/SANDBLAST: ADDITIONAL PER HOUR. HIGH TIME: OVER 50 FT ABOVE GROUND OR WATER LEVEL $2.00 ADDITIONAL PER HOUR. 100 TO 180 FT ABOVE GROUND OR WATER LEVEL $4.00 ADDITIONAL PER HOUR. OVER 180 FT ABOVE GROUND OR WATER LEVEL $6.00 ADDITIONAL PER HOUR | $43.45 | $22.80 | $66.25 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND INSTALLER General PAIN1176-001 Scope differs by code/WD | $34.71 | $17.62 | $52.33 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND INSTALLER General PAIN1176-001 Scope differs by code/WD | $34.71 | $17.62 | $52.33 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT SEALING General PAIN1176-001 Scope differs by code/WD | $35.11 | $17.62 | $52.73 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT SEALING General PAIN1176-001 Scope differs by code/WD | $35.11 | $17.62 | $52.73 |
| PILEDRIVER General CARP0034-003 | $54.10 | $34.69 | $88.79 |
| PLASTER TENDER General LABO0261-014 (SAN FRANCISCO AND SAN MATEO COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $41.93 | $30.32 | $72.25 |
| PLASTER TENDER General LABO0261-013 (SAN FRANCISCO AND SAN MATEO COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $41.93 | $30.32 | $72.25 |
| PLASTER TENDER General LABO0270-008 (SANTA CLARA & SANTA CRUZ) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $40.68 | $29.68 | $70.36 |
| PLASTER TENDER General LABO0324-017 (EL DORADO, MARIN, NAPA, PLACER, SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO, AND YUBA COUNTIES) Work on a swing stage scaffold: $1.00 per hour additional | $39.77 | $28.54 | $68.31 |
| PLASTERER General PLAS0066-002 (ALAMEDA, CONTRA COSTA, SAN MATEO AND SAN FRANCISCO COUNTIES) | $42.41 | $30.73 | $73.14 |
| PLASTERER General PLAS0300-001 (AREA 295: CALAVERAS & SAN JOAQUIN COUNTIES) | $32.70 | $31.68 | $64.38 |
| PLASTERER General PLAS0300-001 (AREA 224: SAN BENITO, SANTA CLARA, SANTA CRUZ) | $32.88 | $31.68 | $64.56 |
| PLASTERER General PLAS0300-001 (AREA 429: MARIPOSA, MERCED, STANISLAUS, TUOLUMNE COUNTIES) | $32.70 | $31.68 | $64.38 |
| PLASTERER General PLAS0066-001 (ALAMEDA, CONTRA COSTA, SAN FRANCISCO AND SAN MATEO COUNTIES) | $42.41 | $30.73 | $73.14 |
| PLASTERER General PLAS0300-002 (AREA 295: EL DORADO, NAPA, PLACER, SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO & YUBA COUNTIES) | $32.70 | $31.68 | $64.38 |
| PLASTERER General PLAS0300-002 (AREA 224: SAN BENITO, SANTA CLARA & SANTA CRUZ COUNTIES) | $32.88 | $31.68 | $64.56 |
| PLASTERER (AREA 188: FRESNO) General PLAS0300-001 | $32.70 | $31.68 | $64.38 |
| PLASTERER (AREA 337: MONTEREY COUNTY) General PLAS0300-001 Scope differs by code/WD | $32.88 | $31.68 | $64.56 |
| PLASTERER (AREA 337: MONTEREY COUNTY) General PLAS0300-002 Scope differs by code/WD | $32.88 | $31.68 | $64.56 |
| PLASTERER (AREA 355: MARIN COUNTY) General PLAS0300-002 | $36.73 | $31.68 | $68.41 |
| PLASTERER TENDER General LABO0294-010 (CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $39.77 | $28.54 | $68.31 |
| PLASTERER TENDER General LABO0304-008 (ALAMEDA AND CONTRA COSTA COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $41.93 | $30.32 | $72.25 |
| PLASTERER TENDER General LABO0261-012 (EL DORADO, MARIN, NAPA, PLACER, SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO AND YUBA COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $39.77 | $28.54 | $68.31 |
| PLASTERER TENDER General LABO0270-009 (MONTEREY AND SAN BENITO COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $40.68 | $29.68 | $70.36 |
| PLASTERER TENDER General LABO0304-007 (ALAMEDA AND CONTRA COSTA COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $41.93 | $30.32 | $72.25 |
| PLUMBER (SUTTER & YUBA COUNTIES) General PLUM0228-002 | $52.75 | $41.39 | $94.14 |
| PLUMBER & STEAMFITTER General PLUM0062-001 (MONTEREY AND SANTA CRUZ COUNTIES) | $57.75 | $43.60 | $101.35 |
| PLUMBER & STEAMFITTER General PLUM0246-001 (FRESNO, KINGS & MADERA COUNTIES) | $54.50 | $42.54 | $97.04 |
| PLUMBER & STEAMFITTER General PLUM0442-001 (CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE COUNTIES) | $58.45 | $38.74 | $97.19 |
| PLUMBER & STEAMFITTER General PLUM0062-001 (MONTEREY AND SANTA CRUZ COUNTIES) | $57.75 | $43.60 | $101.35 |
| PLUMBER & STEAMFITTER (ALAMEDA COUNTY) General PLUM0342-002 | $80.50 | $50.45 | $130.95 |
| PLUMBER AND STEAMFITTER: General PLUM0159-001 (2) ALL OTHER WORK (CONTRA COSTA COUNTY) | $68.57 | $49.04 | $117.61 |
| PLUMBER AND STEAMFITTER: General PLUM0159-001 (1) REFRIGERATION (CONTRA COSTA COUNTY) | $67.68 | $49.04 | $116.72 |
| PLUMBER, PIPEFITTER, STEAMFITTER General PLUM0342-001 (ALAMEDA & CONTRA COSTA COUNTIES) | $80.50 | $50.45 | $130.95 |
| PLUMBER, PIPEFITTER, STEAMFITTER General PLUM0159-002 (CONTRA COSTA COUNTY) | $43.72 | $20.29 | $64.01 |
| PLUMBER, PLUMBER, STEAMFITTER, REFRIGERATION FITTER General PLUM0038-001 (SAN FRANCISCO COUNTY) | $85.50 | $48.98 | $134.48 |
| PLUMBER, STEAMFITTER, REFRIGERATION FITTER: General PLUM0038-003 (2) NEW CONSTRUCTION IN SAN FRANCISCO COUNTY (MARIN, SAN FRANCISCO & SONOMA COUNTIES) | $91.00 | $49.49 | $140.49 |
| PLUMBER, STEAMFITTER, REFRIGERATION FITTER: General PLUM0038-003 (1) Wood Frame Construction in San Francisco, and all work in Marin & Sonoma Counties (MARIN, SAN FRANCISCO & SONOMA COUNTIES) | $82.00 | $48.18 | $130.18 |
| PLUMBER/PIPEFITTER General PLUM0393-001 (SAN BENITO AND SANTA CLARA COUNTIES) | $68.76 | $46.63 | $115.39 |
| PLUMBER/PIPEFITTER/STEAMFITTER (SAN MATEO COUNTY) General PLUM0467-001 Scope differs by code/WD | $87.75 | $41.44 | $129.19 |
| PLUMBER/PIPEFITTER/STEAMFITTER (SAN MATEO COUNTY) General PLUM0467-001 Scope differs by code/WD | $87.75 | $41.44 | $129.19 |
| PLUMBERS AND PIPEFITTERS General PLUM0343-002 (NAPA AND SOLANO COUNTIES) FOOTNOTES: WORK FROM TRUSSES, TEMPORARY STAGING, UNGUARDED STRUCTURES 35' FROM THE GROUND OR WATER: $.75 PER HOUR ADDITIONAL. WORK FROM SWINGING SCAFFOLDS, BOATSWAINS CHAIRS OR SIMILAR DEVICES: $.75 PER HOUR ADDITIONAL | $37.35 | $21.15 | $58.50 |
| PLUMBERS AND PIPEFITTERS General PLUM0350-002 (EL DORADO AND PLACER COUNTIES (LAKE TAHOE BASIN ONLY)) | $52.14 | $18.71 | $70.85 |
| PLUMBERS AND PIPEFITTERS General PLUM0393-002 (SAN BENITO & SANTA CLARA COUNTIES) | $30.90 | $7.90 | $38.80 |
| PLUMBERS AND PIPEFITTERS General PLUM0447-003 (EL DORADO,PLACER, SACRAMENTO AND YOLO COUNTIES) | $55.58 | $24.02 | $79.60 |
| ROOFER General ROOF0081-004 (CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES) | $49.65 | $22.19 | $71.84 |
| ROOFER General ROOF0081-003 (ALAMEDA, CONTRA COSTA, MARIN, NAPA, SOLANO, AND SONOMA COUNTIES) | $54.94 | $23.34 | $78.28 |
| ROOFER General ROOF0081-005 (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $46.73 | $21.36 | $68.09 |
| ROOFER (ALAMEDA AND CONTRA COSTA COUNTIES) General ROOF0081-001 | $54.94 | $23.34 | $78.28 |
| ROOFER (FRESNO, KINGS, AND MADERA COUNTIES) General ROOF0027-002 | $45.76 | $16.86 | $62.62 |
| ROOFER (SAN FRANCISCO & SAN MATEO COUNTIES) General ROOF0040-002 Scope differs by code/WD | $55.30 | $22.97 | $78.27 |
| ROOFER (SAN FRANCISCO & SAN MATEO COUNTIES) General ROOF0040-001 Scope differs by code/WD | $55.30 | $22.97 | $78.27 |
| ROOFER: BITUMASTIC, ENAMELER, COAL TAR, PITCH AND MASTIC WORKER General ROOF0095-002 (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES) | $57.17 | $21.51 | $78.68 |
| ROOFER: BITUMASTIC, ENAMELER, COAL TAR, PITCH AND MASTIC WORKER General ROOF0095-001 (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES) | $57.17 | $21.51 | $78.68 |
| ROOFER: JOURNEYMAN General ROOF0095-002 (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES) | $53.17 | $21.51 | $74.68 |
| ROOFER: JOURNEYMAN General ROOF0095-001 (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES) | $53.17 | $21.51 | $74.68 |
| ROOFER: KETTLE PERSON General ROOF0095-002 (2 KETTLES) (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES:) | $55.17 | $21.51 | $76.68 |
| ROOFER: KETTLE PERSON General ROOF0095-001 (2 KETTLES) (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES) | $55.17 | $21.51 | $76.68 |
| SHEET METAL WORKER General SHEE0104-003 (CALAVERAS AND SAN JOAQUIN COUNTIES) | $44.34 | $39.22 | $83.56 |
| SHEET METAL WORKER General SHEE0104-007 (FRESNO, KINGS, AND MADERA COUNTIES) | $44.07 | $40.79 | $84.86 |
| SHEET METAL WORKER General SHEE0104-017 (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $30.29 | $16.41 | $46.70 |
| SHEET METAL WORKER: General SHEE0104-002 (AREA 2) AREA 2: MONTEREY & SAN BENITO | $60.64 | $39.04 | $99.68 |
| SHEET METAL WORKER: General SHEE0104-002 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SOLANO & SONOMA | $67.03 | $50.79 | $117.82 |
| SHEET METAL WORKER: (AREA 2) General SHEE0104-001 | $64.23 | $39.65 | $103.88 |
| SHEET METAL WORKER: (AREA 3) AREA 3: SANTA CRUZ General SHEE0104-002 | $55.16 | $34.18 | $89.34 |
| SHEET METAL WORKER: EXCLUDING METAL DECK AND SIDING General SHEE0104-005 (MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES) | $41.28 | $45.41 | $86.69 |
| SHEET METAL WORKER: METAL DECKING AND SIDING ONLY CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES: General SHEE0104-018 | $56.23 | $37.52 | $93.75 |
| SOFT FLOOR LAYER General PAIN1237-003 (CALAVERAS; SAN JOAQUIN COUNTIES; STANISLAUS AND TUOLUMNE COUNTIES) | $48.54 | $26.59 | $75.13 |
| SOFT FLOOR LAYER General PAIN0016-009 (ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ AND SONOMA COUNTIES) | $59.00 | $33.03 | $92.03 |
| SOFT FLOOR LAYER General PAIN1237-002 (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $48.54 | $26.59 | $75.13 |
| SOFT FLOOR LAYER (EL DORADO AND PLACER COUNTIES) General PAIN0567-008 | $34.27 | $16.47 | $50.74 |
| SOFT FLOOR LAYER (FRESNO, KINGS & MADERA) General PAIN0294-005 | $38.53 | $23.19 | $61.72 |
| SOFT FLOOR LAYER ALAMEDA, CONTRA COSTA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES General PAIN0016-012 | $59.00 | $33.03 | $92.03 |
| SONOMA, SUTTER, YOLO AND YUBA COUNTIES FOOTNOTE: OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1: Operator of helicopter General ENGI0003-009 (when used in erection work); Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7cu. yds. (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1: All but the Northwestern Area 2: Reaminder | $65.54 | $34.69 | $100.23 |
| SOUND & COMMUNICATIONS, INSTALLER General ELEC0234-003 (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) | $47.93 | $24.09 | $72.02 |
| SOUND & COMMUNICATIONS, INSTALLER General ELEC0595-007 (ALAMEDA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $56.68 | $28.35 | $85.03 |
| SOUND & COMMUNICATIONS, TECHNICIAN General ELEC0234-003 (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS. RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN | $55.12 | $24.30 | $79.42 |
| SOUND & COMMUNICATIONS, TECHNICIAN General ELEC0595-006 (ALAMEDA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN | $67.08 | $31.26 | $98.34 |
| SOUND & COMMUNICATIONS: INSTALLER General ELEC0302-003 (CONTRA COSTA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN | $53.08 | $30.84 | $83.92 |
| SOUND & COMMUNICATIONS: INSTALLER General ELEC0332-003 (SANTA CLARA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN | $58.33 | $31.00 | $89.33 |
| SOUND & COMMUNICATIONS: INSTALLER General ELEC0617-003 (SAN MATEO COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN | $58.33 | $31.00 | $89.33 |
| SOUND & COMMUNICATIONS: INSTALLER General ELEC0006-003 (SAN FRANCISCO COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $58.83 | $31.51 | $90.34 |
| SOUND & COMMUNICATIONS: INSTALLER General ELEC0234-004 (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $47.93 | $24.09 | $72.02 |
| SOUND & COMMUNICATIONS: INSTALLER General ELEC0302-004 (CONTRA COSTA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $53.08 | $30.84 | $83.92 |
| SOUND & COMMUNICATIONS: INSTALLER General ELEC0332-004 (SANTA CLARA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $58.33 | $31.00 | $89.33 |
| SOUND & COMMUNICATIONS: INSTALLER General ELEC0340-004 (COLUSA, PLACER, SUTTER, YOLO AND YUBA COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $40.00 | $25.50 | $65.50 |
| SOUND & COMMUNICATIONS: INSTALLER (ALAMEDA COUNTY) General ELEC0595-006 | $58.33 | $31.00 | $89.33 |
| SOUND & COMMUNICATIONS: TECHNICIAN General ELEC0006-004 (SAN FRANCISCO COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN | $67.65 | $31.78 | $99.43 |
| SOUND & COMMUNICATIONS: TECHNICIAN General ELEC0302-003 (CONTRA COSTA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN | $61.04 | $31.08 | $92.12 |
| SOUND & COMMUNICATIONS: TECHNICIAN General ELEC0332-003 (SANTA CLARA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN | $67.08 | $31.26 | $98.34 |
| SOUND & COMMUNICATIONS: TECHNICIAN General ELEC0617-003 (SAN MATEO COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS. FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN | $67.08 | $31.26 | $98.34 |
| SOUND & COMMUNICATIONS: TECHNICIAN General ELEC0006-003 (SAN FRANCISCO COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $67.65 | $31.78 | $99.43 |
| SOUND & COMMUNICATIONS: TECHNICIAN General ELEC0234-004 (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $55.12 | $24.30 | $79.42 |
| SOUND & COMMUNICATIONS: TECHNICIAN General ELEC0302-004 (CONTRA COSTA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $61.04 | $31.08 | $92.12 |
| SOUND & COMMUNICATIONS: TECHNICIAN General ELEC0332-004 (SANTA CLARA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $67.08 | $31.26 | $98.34 |
| SOUND & COMMUNICATIONS: TECHNICIAN General ELEC0340-004 (COLUSA, PLACER, SUTTER, YOLO AND YUBA COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $46.00 | $25.68 | $71.68 |
| SPRINKLER FITTER General SFCA0483-002 (ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SOLANO AND SONOMA COUNTIES:) | $49.82 | $18.05 | $67.87 |
| SPRINKLER FITTER General SFCA0669-006 (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES) | $49.69 | $29.72 | $79.41 |
| SPRINKLER FITTER General SFCA0669-012 (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $52.06 | $29.86 | $81.92 |
| SPRINKLER FITTER CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS AND TUOLUMNE COUNTIES: General SFCA0669-011 | $49.69 | $29.72 | $79.41 |
| SPRINKLER FITTER: FIRE General SFCA0483-001 (ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES) | $81.54 | $41.35 | $122.89 |
| TERRAZZO FINISHER General BRCA0003-008 | $44.93 | $20.98 | $65.91 |
| TERRAZZO FINISHER FOOTNOTE: BASE MACHINE OPERATOR: $1.00 PER HOUR ADDITIONAL General BRCA0003-007 | $44.93 | $20.98 | $65.91 |
| TERRAZZO WORKER FOOTNOTE: BASE MACHINE OPERATOR: $1.00 PER HOUR ADDITIONAL General BRCA0003-007 | $60.58 | $29.79 | $90.37 |
| TERRAZZO WORKER/SETTER General BRCA0003-008 | $60.58 | $29.79 | $90.37 |
| TILE FINISHER General BRCA0003-012 (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO, YUBA) | $35.00 | $17.44 | $52.44 |
| TILE FINISHER General BRCA0003-012 (ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO) | $37.75 | $19.28 | $57.03 |
| TILE FINISHER (SONOMA) General BRCA0003-012 | $35.78 | $19.23 | $55.01 |
| TILE FINISHER AREA 1 General BRCA0003-011 | $37.75 | $19.28 | $57.03 |
| TILE FINISHER AREA 2 General BRCA0003-011 | $34.76 | $19.22 | $53.98 |
| TILE FINISHER AREA 3 General BRCA0003-011 | $32.68 | $18.32 | $51.00 |
| TILE LAYER General BRCA0003-012 (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO, YUBA) | $55.55 | $21.08 | $76.63 |
| TILE LAYER General BRCA0003-012 (ALAMEDA, CONTRA COSTA, MARIN, MONTERREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO) | $59.92 | $22.62 | $82.54 |
| TILE LAYER (SONOMA) General BRCA0003-012 | $56.79 | $22.54 | $79.33 |
| TILE LAYER AREA 1 General BRCA0003-011 | $59.92 | $22.62 | $82.54 |
| TILE LAYER AREA 2 General BRCA0003-011 | $55.17 | $22.52 | $77.69 |
| TILE LAYER AREA 3 General BRCA0003-011 | $50.28 | $22.05 | $72.33 |
| TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK General TEAM0094-001 (2- AXLE UNIT); NIPPER TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP MACHINE; FORK LIFT AND LIFT JITNEYS; FUEL AND/OR GREASE TRUCK DRIVER OR FUEL PERSON; SNOW BUGGY; STEAM CLEANING; BUS OR PERSONHAUL DRIVER; ESCORT OR PILOT CAR DRIVER; PICKUP TRUCK; TEAMSTER OILER/GREASER AND/OR SERVICEPERSON; HOOK TENDER (INCLUDING LOADING AND UNLOADING); TEAM DRIVER; TOOL ROOM ATTENDANT (REFINERIES) SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED. TRUCK DRIVER CLASSIFICATIONS | $43.26 | $34.28 | $77.54 |
| TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK General TEAM0094-001 (2- AXLE UNIT); NIPPER TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP MACHINE; FORK LIFT AND LIFT JITNEYS; FUEL AND/OR GREASE TRUCK DRIVER OR FUEL PERSON; SNOW BUGGY; STEAM CLEANING; BUS OR PERSONHAUL DRIVER; ESCORT OR PILOT CAR DRIVER; PICKUP TRUCK; TEAMSTER OILER/GREASER AND/OR SERVICEPERSON; HOOK TENDER (INCLUDING LOADING AND UNLOADING); TEAM DRIVER; TOOL ROOM ATTENDANT (REFINERIES) SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED. | $43.26 | $34.28 | $77.54 |
| TUNNEL AND SHAFT LABORERS: GROUP 1 DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN General LABO0073-005 Scope differs by code/WD | $45.89 | $27.72 | $73.61 |
| TUNNEL AND SHAFT LABORERS: GROUP 1 DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN General LABO0261-005 (SAN FRANCISCO AND SAN MATEO COUNTIES) | $45.89 | $27.72 | $73.61 |
| TUNNEL AND SHAFT LABORERS: GROUP 1 DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN General LABO0294-005 (FRESNO, KINGS, AND MADERA COUNTIES) | $45.89 | $27.72 | $73.61 |
| TUNNEL AND SHAFT LABORERS: GROUP 1 DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN General LABO1130-003 (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES) | $45.89 | $27.72 | $73.61 |
| TUNNEL AND SHAFT LABORERS: GROUP 1: DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN General LABO0270-004 (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES) | $45.89 | $27.72 | $73.61 |
| TUNNEL AND SHAFT LABORERS: GROUP 2 RODMEN; SHAFT WORK & RAISE General LABO0073-005 (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) | $45.66 | $27.72 | $73.38 |
| TUNNEL AND SHAFT LABORERS: GROUP 2 RODMEN; SHAFT WORK & RAISE General LABO0261-005 (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (SAN FRANCISCO AND SAN MATEO COUNTIES) | $45.66 | $27.72 | $73.38 |
| TUNNEL AND SHAFT LABORERS: GROUP 2 RODMEN; SHAFT WORK & RAISE General LABO0270-004 (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES) | $45.66 | $27.72 | $73.38 |
| TUNNEL AND SHAFT LABORERS: GROUP 2 RODMEN; SHAFT WORK & RAISE General LABO1130-003 (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES) | $45.66 | $27.72 | $73.38 |
| TUNNEL AND SHAFT LABORERS: GROUP 5 GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN General LABO0073-005 Scope differs by code/WD | $44.42 | $27.72 | $72.14 |
| TUNNEL AND SHAFT LABORERS: GROUP 5 GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN General LABO0261-005 (SAN FRANCISCO AND SAN MATEO COUNTIES) | $44.42 | $27.72 | $72.14 |
| TUNNEL AND SHAFT LABORERS: GROUP 5 GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN General LABO0270-004 (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES) | $44.42 | $27.72 | $72.14 |
| TUNNEL AND SHAFT LABORERS: GROUP 5 GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN General LABO0294-005 (FRESNO, KINGS, AND MADERA COUNTIES) | $44.42 | $27.72 | $72.14 |
| TUNNEL AND SHAFT LABORERS: GROUP 5 GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN General LABO1130-003 (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES) | $44.42 | $27.72 | $72.14 |
| TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST General LABO0073-005 Scope differs by code/WD | $46.41 | $27.72 | $74.13 |
| TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST General LABO0261-005 (SAN FRANCISCO AND SAN MATEO COUNTIES) | $46.41 | $27.72 | $74.13 |
| TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST General LABO0270-004 (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES) | $46.41 | $27.72 | $74.13 |
| TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST General LABO0294-005 (FRESNO, KINGS, AND MADERA COUNTIES) | $46.41 | $27.72 | $74.13 |
| TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST General LABO0304-003 (ALAMEDA COUNTY) | $46.41 | $27.72 | $74.13 |
| TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST General LABO0324-006 (CONTRA COSTA COUNTY) | $46.41 | $27.72 | $74.13 |
| TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST General LABO1130-003 (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES) | $46.41 | $27.72 | $74.13 |
| TUNNEL AND SHAFT LABORERS:, GROUP 1 DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN General LABO0304-003 (ALAMEDA COUNTY) | $45.89 | $27.72 | $73.61 |
| TUNNEL AND SHAFT LABORERS:, GROUP 1 DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN General LABO0324-006 (CONTRA COSTA COUNTY) | $45.89 | $27.72 | $73.61 |
| TUNNEL AND SHAFT LABORERS:, GROUP 2 RODMEN; SHAFT WORK & RAISE General LABO0294-005 (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (FRESNO, KINGS, AND MADERA COUNTIES) | $45.66 | $27.72 | $73.38 |
| TUNNEL AND SHAFT LABORERS:, GROUP 2 RODMEN; SHAFT WORK & RAISE General LABO0304-003 (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (ALAMEDA COUNTY) | $45.66 | $27.72 | $73.38 |
| TUNNEL AND SHAFT LABORERS:, GROUP 2 RODMEN; SHAFT WORK & RAISE General LABO0324-006 (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (CONTRA COSTA COUNTY) | $45.66 | $27.72 | $73.38 |
| TUNNEL AND SHAFT LABORERS:, GROUP 5 GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (ALAMEDA COUNTY) General LABO0304-003 | $44.42 | $27.72 | $72.14 |
| TUNNEL AND SHAFT LABORERS:, GROUP 5 GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (CONTRA COSTA COUNTY) General LABO0324-006 | $44.42 | $27.72 | $72.14 |
| UNDERGROUND UTILITY WORKER: /LANDSCAPE FITTER General PLUM0355-002 (ALAMEDA, CONTRA COSTA, EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, SUTTER, YOLO AND YUBA COUNTIES) | $36.01 | $18.50 | $54.51 |
No trade rates match your search and filter selection.
General
Applies to
California of Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito +7 more
General
Applies to
California of Alameda, Contra Costa, El Dorado, Marin, Monterey, Napa, Placer, Sacramento, San Benito, San Francisco +8 more