| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| BRICKLAYER Building SUCO2013-012 | $21.96 | 0.00 | $21.96 | |
| CARPENTER Residential SUCO2001-004 | $17.86 | 0.00 | $17.86 | |
| CARPENTER Building CARP0055-001 (ACOUSTICAL CEILING INSTALLATION AND DRYWALL HANGING ONLY) | $35.09 | $13.84 | $48.93 | |
| CARPENTER Building SUCO2013-012 (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION) | $20.80 | $3.80 | $24.60 | |
| CARPENTER (METAL STUD INSTALLATION ONLY) Building SUCO2013-012 | $17.68 | 0.00 | $17.68 | |
| CARPENTER, EXCLUDES FORM WORK Highway SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK) | $19.27 | $5.08 | $24.35 | |
| CARPENTER, EXCLUDES FORM WORK (ADAMS) Highway SUCO2011-001 | $16.61 | $3.88 | $20.49 | |
| CARPENTER, FORM WORK ONLY Highway SUCO2011-001 (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $19.11 | $5.46 | $24.57 | |
| CARPENTER, FORM WORK ONLY (ADAMS) Highway SUCO2011-001 | $16.78 | $3.57 | $20.35 | |
| CARPENTER, FORM WORK ONLY (JEFFERSON) Highway SUCO2011-001 | $16.88 | $3.81 | $20.69 | |
| CARPENTER, FORM WORK ONLY (PARK) Highway SUCO2011-001 | $17.28 | $5.38 | $22.66 | |
| CARPENTERS: ALL OTHER WORK Heavy SUCO2001-005 | $15.72 | 0.00 | $15.72 | |
| CARPENTERS: FORM BUILDING AND SETTING Heavy SUCO2001-005 | $16.16 | $0.82 | $16.98 | |
| CEMENT MASON/CONCRETE FINISHER Heavy SUCO2001-005 | $14.76 | $2.28 | $17.04 | |
| CEMENT MASON/CONCRETE FINISHER Highway SUCO2011-001 (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $18.37 | $3.00 | $21.37 | |
| CEMENT MASON/CONCRETE FINISHER Building SUCO2013-012 | $20.33 | $6.76 | $27.09 | |
| CEMENT MASON/CONCRETE FINISHER (ADAMS) Highway SUCO2011-001 | $16.05 | $3.00 | $19.05 | |
| CEMENT MASON/CONCRETE FINISHER (ARAPAHOE) Highway SUCO2011-001 | $18.70 | $3.85 | $22.55 | |
| CEMENT MASON/CONCRETE FINISHER (JEFFERSON) Highway SUCO2011-001 | $18.02 | $3.42 | $21.44 | |
| CEMENT MASON/CONCRETE FINISHER (PARK) Highway SUCO2011-001 | $17.09 | $2.85 | $19.94 | |
| DRYWALL FINISHER/TAPER Building PAIN0079-007 | $28.11 | $11.56 | $39.67 | |
| ELECTRICIAN Heavy ELEC0068-011 (CLEAR CREEK, EAGLE, GILPIN, GRAND, JACKSON, LAKE, LOGAN, MORGAN, PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON AND YUMA COUNTIES) | $46.80 | $19.53 | $66.33 | |
| ELECTRICIAN Heavy ELEC0111-008 (DELTA, GARFIELD, MONTROSE, AND RIO BLANCO COUNTIES IN COLORADO.) | $31.75 | $13.25 | $45.00 | |
| ELECTRICIAN Heavy ELEC0111-010 (DOLORES, GUNNISON, HINSDALE, LA PLATA, MOFFAT, MONTEZUMA, OURAY, PITKIN, ROUTT, SAN JUAN AND SAN MIGUEL COUNTIES IN COLORADO.) | $36.95 | $14.41 | $51.36 | |
| ELECTRICIAN Heavy ELEC0113-004 (CHEYENNE, ELBERT, KIT CARSON, LINCOLN, PARK AND TELLER COUNTIES) | $40.70 | $18.47 | $59.17 | |
| ELECTRICIAN Residential ELEC0113-008 (CHEYENNE, ELBERT, KIT CARSON, LINCOLN, PARK AND TELLER COUNTIES) | $30.53 | $16.30 | $46.83 | |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) Building ELEC0068-012 | $46.80 | $19.53 | $66.33 | |
| ELECTRICIAN, TRAFFIC SIGNALIZATION ONLY Highway ELEC0111-003 (CLEAR CREEK) | $38.97 | $13.16 | $52.13 | |
| ELECTRICIAN: Residential ELEC0012-013 (INCLUDING LOW VOLTAGE WIRING AND INSTALLATION OF FIRE ALARMS) (ALAMOSA, ARCHULETA, BACA, BENT, CHAFFEE, CONEJOS, COSTILLA, CROWLEY, CUSTER, FREMONT, HUERFANO, KIOWA, LAS ANIMAS, MINERAL, OTERO, PROWERS, RIO GRANDE AND SAGUACHE COUNTIES) | $35.40 | $16.06 | $51.46 | |
| ELECTRICIAN: Residential ELEC0068-015 (INCLUDING LOW VOLTAGE WIRING AND INSTALLATION OF FIRE ALARMS) (CLEAR CREEK, EAGLE, GILPIN, GRAND, JACKSON, LAKE, LOGAN, MORGAN, PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON AND YUMA COUNTIES) | $31.96 | $12.50 | $44.46 | |
| ELECTRICIAN: Residential ELEC0111-012 (INCLUDING LOW VOLTAGE WIRING AND INSTALLATION OF FIRE ALARMS) (DELTA, GARFIELD, MONTROSE, AND RIO BLANCO COUNTIES IN COLORADO.) | $31.75 | $13.25 | $45.00 | |
| ELECTRICIAN: Residential ELEC0111-015 (INCLUDING LOW VOLTAGE WIRING AND INSTALLATION OF FIRE ALARMS) (DOLORES, GUNNISON, HINSDALE, LA PLATA, MOFFAT, MONTEZUMA, OURAY, PITKIN, ROUTT, SAN JUAN AND SAN MIGUEL COUNTIES IN COLORADO.) | $36.95 | $14.41 | $51.36 | |
| ELECTRICIAN: EXCLUDES TRAFFIC SIGNAL INSTALLATION Highway SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK) | $35.13 | $6.83 | $41.96 | |
| ELECTRICIAN: EXCLUDES TRAFFIC SIGNAL INSTALLATION Highway SUCO2011-001 (ADAMS) | $31.00 | $14.01 | $45.01 | |
| ELECTRICIAN: TRAFFIC SIGNALIZATION ELECTRICIAN Highway SUCO2011-001 (JEFFERSON) | $26.78 | $5.44 | $32.22 | |
| ELECTRICIAN: TRAFFIC SIGNALIZATION ELECTRICIAN Highway SUCO2011-001 (ADAMS, ARAPAHOE, BROOMFIELD, ELBERT, GILPIN, PARK) | $27.25 | $7.10 | $34.35 | |
| ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN Highway SUCO2011-001 (JEFFERSON) | $15.19 | $4.72 | $19.91 | |
| ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN Highway SUCO2011-001 (CLEAR CREEK) | $15.70 | $2.14 | $17.84 | |
| ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN Highway SUCO2011-001 (ARAPHAOE, BROOMFIELD, ELBERT, GILPIN, PARK) | $15.24 | $3.81 | $19.05 | |
| ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN Highway SUCO2011-001 (ADAMS) | $13.96 | $2.80 | $16.76 | |
| ELECTRICIANS Heavy ELEC0012-006 (ALAMOSA, ARCHULETA, BACA, BENT, CHAFFEE, CONEJOS, COSTILLA, CROWLEY, CUSTER, FREMONT, HUERFANO, KIOWA, LAS ANIMAS, MINERAL, OTERO, PROWERS, PUEBLO, RIO GRANDE, SAGUACHE COUNTIES) | $35.40 | $16.06 | $51.46 | |
| FENCE ERECTOR Highway SUCO2011-001 | $13.02 | $3.20 | $16.22 | |
| FORM WORKER (ARAPAHOE) Highway SUCO2011-001 | $15.30 | $3.90 | $19.20 | |
| GLAZIER Building PAIN0930-002 | $37.26 | $13.15 | $50.41 | |
| GUARDRAIL INSTALLER Highway SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK) | $12.89 | $3.20 | $16.09 | |
| GUARDRAIL INSTALLER (ADAMS) Highway SUCO2011-001 | $12.89 | $3.45 | $16.34 | |
| HIGHWAY/PARKING LOT STRIPING: PAINTER Highway SUCO2011-001 (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $12.62 | $3.21 | $15.83 | |
| HIGHWAY/PARKING LOT STRIPING:PAINTER (JEFFERSON) Highway SUCO2011-001 | $14.21 | $3.21 | $17.42 | |
| INSULATOR - MECHANICAL Building SUCO2013-012 (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $23.12 | $7.97 | $31.09 | |
| IRONWORKER, STRUCTURAL Residential IRON0024-001 | $39.21 | $12.50 | $51.71 | |
| IRONWORKER, STRUCTURAL Highway SUCO2011-001 | $18.22 | $6.01 | $24.23 | |
| IRONWORKER, STRUCTURAL Building IRON0024-010 | $39.21 | $12.50 | $51.71 | |
| IRONWORKER: ORNAMENTAL Building IRON0024-009 | $39.21 | $12.50 | $51.71 | |
| IRONWORKER: REINFORCING Highway SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON) | $16.69 | $5.45 | $22.14 | |
| IRONWORKER: REINFORCING (ADAMS) Highway SUCO2011-001 | $22.14 | $0.77 | $22.91 | |
| IRONWORKER: REINFORCING (PARK) Highway SUCO2011-001 | $19.98 | $2.89 | $22.87 | |
| LABORER, COMMON Heavy SUCO2001-005 | $11.11 | $3.80 | $14.91 | |
| LABORER: ASPHALT RAKER Highway SUCO2011-001 (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON) | $16.29 | $4.25 | $20.54 | |
| LABORER: ASPHALT RAKER (PARK) Highway SUCO2011-001 | $17.41 | $1.86 | $19.27 | |
| LABORER: ASPHALT SHOVELER Highway SUCO2011-001 | $21.21 | $4.25 | $25.46 | |
| LABORER: ASPHALT SPREADER Highway SUCO2011-001 | $18.58 | $4.65 | $23.23 | |
| LABORER: COMMON OR GENERAL Highway SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $16.67 | $4.27 | $20.94 | |
| LABORER: COMMON OR GENERAL Building SUCO2013-012 | $14.86 | $4.98 | $19.84 | |
| LABORER: COMMON OR GENERAL (ADAMS) Highway SUCO2011-001 | $16.29 | $4.25 | $20.54 | |
| LABORER: COMMON OR GENERAL (JEFFERSON) Highway SUCO2011-001 | $16.51 | $4.27 | $20.78 | |
| LABORER: COMMON OR GENERAL (PARK) Highway SUCO2011-001 | $15.64 | $2.46 | $18.10 | |
| LABORER: CONCRETE SAW Highway SUCO2011-001 (HAND HELD) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK) | $16.29 | $6.14 | $22.43 | |
| LABORER: CONCRETE SAW (HAND HELD) (ADAMS) Highway SUCO2011-001 | $16.29 | $5.20 | $21.49 | |
| LABORER: LANDSCAPE AND IRRIGATION Highway SUCO2011-001 (ADAMS, ARAPAHOE, BROOMFIELD, ELBERT, GILPIN, JEFFERSON, PARK) | $12.26 | $3.16 | $15.42 | |
| LABORER: LANDSCAPE AND IRRIGATION (CLEAR CREEK) Highway SUCO2011-001 | $14.98 | $3.16 | $18.14 | |
| LABORER: MASON TENDER - BRICK Building SUCO2013-012 | $15.99 | 0.00 | $15.99 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Building SUCO2013-012 | $16.00 | 0.00 | $16.00 | |
| LABORER: MASON TENDER-CEMENT/CONCRETE Highway SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $16.96 | $4.04 | $21.00 | |
| LABORER: MASON TENDER-CEMENT/CONCRETE (ADAMS) Highway SUCO2011-001 | $17.71 | $2.83 | $20.54 | |
| LABORER: MASON TENDER-CEMENT/CONCRETE (JEFFERSON) Highway SUCO2011-001 | $16.29 | $4.25 | $20.54 | |
| LABORER: MASON TENDER-CEMENT/CONCRETE (PARK) Highway SUCO2011-001 | $15.08 | $3.10 | $18.18 | |
| LABORER: PIPELAYER Highway SUCO2011-001 | $13.55 | $2.41 | $15.96 | |
| LABORER: PIPELAYER Building SUCO2013-012 | $16.96 | $3.68 | $20.64 | |
| LABORER: TRAFFIC CONTROL Highway SUCO2011-001 (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS) (EXCLUDES FLAGGERS) (PARK) | $12.76 | $3.20 | $15.96 | |
| LABORER: TRAFFIC CONTROL Highway SUCO2011-001 (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS) (EXCLUDES FLAGGERS) (CLEAR CREEK) | $13.14 | $3.20 | $16.34 | |
| LABORER: TRAFFIC CONTROL Highway SUCO2011-001 (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS) (EXCLUDES FLAGGERS) (ADAMS, ARAPAHOE, BROOMFIELD, ELBERT, GILPIN, JEFFERSON) | $12.43 | $3.22 | $15.65 | |
| LABORER: TRAFFIC CONTROL Highway SUCO2011-001 (FLAGGER) (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $9.55 | $3.05 | $12.60 | |
| LABORER: TRAFFIC CONTROL (FLAGGER) (JEFFERSON) Highway SUCO2011-001 | $9.73 | $3.05 | $12.78 | |
| LABORER: TRAFFIC CONTROL (FLAGGER) (PARK) Highway SUCO2011-001 | $9.42 | $3.21 | $12.63 | |
| LABORERS: (COMMON) Residential SUCO2001-004 | $10.33 | 0.00 | $10.33 | |
| LINE CONSTRUCTION: GROUNDMEN Heavy ELEC0111-002 | $27.39 | $5.82 | $33.21 | |
| LINE CONSTRUCTION: LINE EQUIPMENT OPERATOR Heavy ELEC0111-002 | $44.27 | $9.41 | $53.68 | |
| LINE CONSTRUCTION: LINEMAN AND WELDER Heavy ELEC0111-002 | $61.36 | $14.88 | $76.24 | |
| MILLWRIGHT Building CARP1607-001 | $42.10 | $19.02 | $61.12 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building SUCO2013-012 | $20.78 | $5.78 | $26.56 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Building SUCO2013-012 | $19.10 | $3.89 | $22.99 | |
| OPERATOR: GRADER/BLADE Building SUCO2013-012 | $21.50 | 0.00 | $21.50 | |
| PAINTER (SPRAY ONLY) Highway SUCO2011-001 | $16.99 | $2.87 | $19.86 | |
| PAINTER: BRUSH, ROLLER AND SPRAY Building PAIN0079-006 (EXCLUDES DRYWALL FINISHING/TAPING) | $27.41 | $11.56 | $38.97 | |
| PAINTERS: BRUSH, SPRAY & ROLLER Residential SUCO2001-004 | $15.00 | 0.00 | $15.00 | |
| PIPEFITTER Heavy SUCO2001-005 | $18.13 | $1.84 | $19.97 | |
| PIPEFITTER Building PLUM0208-008 (INCLUDES HVAC PIPE AND UNIT INSTALLATION; EXCLUDES HVAC DUCT INSTALLATION) | $45.40 | $22.11 | $67.51 | |
| PLUMBER Heavy PLUM0003-003 (CLEAR CREEK, GILPIN, GRAND, JACKSON, LAKE, LOGAN, MORGAN, PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON, AND YUMA. PARTS OF ELBERT, EAGLE, KIT CARSON, LINCOLN, AND PARK COUNTIES) | $50.68 | $20.15 | $70.83 | |
| PLUMBER Heavy PLUM0058-010 (ALAMOSA, BACA, BENT, CHAFFEE, CHEYENNE, CONEJOS, COSTILLA, CROWLEY, CUSTER, ELBERT (SOUTHERN PORTION INCLUDING TOWNS OF ELBERT, MATHERSON AND SIMLA), FREMONT, HUERFANO, KIOWA, KIT CARSON (INCLUDING TOWNS OF DFALGLER, SIEBERT, VONA, STRATTON AND BETHUNE), LAS ANIMAS, LINCOLN (INCLUDING TOWNS OF GEONA AND ARRIBA IN THE SOUTHERN PORTION OF THE COUNTY), MINERAL, OTERO, PARK (INCLUDING TOWNS OF FAUPLAY, HARTSEL AND LAKE GEORGE), PROWERS, PUEBLO, RIO GRANDE, AND SAGUACHE COUNTIES) | $45.90 | $17.17 | $63.07 | |
| PLUMBER Heavy PLUM0145-004 (ARCHULETA, DELTA, DOLORES, EAGLE (EAGLE COUNTY IS DIVIDED FROM WHERE PITKIN AND LAKE COUNTIES JOIN ON THE NORTH, AND IN A STRAIGHT LINE TO AND INCLUDING THE TOWN OF EDWARDS AND NORTHERLY TO THE SOUTH EAST CORNER OF ROUTT COUNTY), GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT, MONTEZUMA, MONTROSE, OURAY, PITKIN, RIO BLANCO, ROUTT, SAN JUAN AND SAN MIGUEL COUNTIES) | $41.32 | $16.01 | $57.33 | |
| PLUMBER Building PLUM0003-009 (EXCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION) | $47.23 | $21.68 | $68.91 | |
| PLUMBER (INCLUDING HVAC PIPE) Residential SUCO2001-004 | $18.06 | $2.78 | $20.84 | |
| PLUMBER: INCLUDES HVAC WORK (TELLER COUNTY) Heavy PLUM0058-012 | $45.90 | $17.17 | $63.07 | |
| POWER EQUIPMENT OPERATOR: Highway ENGI0009-010 (6)-CRANE (91-140 TONS) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN COUNTIES) | $37.34 | $15.20 | $52.54 | |
| POWER EQUIPMENT OPERATOR: Highway ENGI0009-010 (5)-DRILL RIG CAISSON (WATSON 2500 SIMILAR OR LARGER), SCRAPER (40 CU.YD AND OVER) | $35.41 | $15.20 | $50.61 | |
| POWER EQUIPMENT OPERATOR: Highway ENGI0009-010 (5)-CRANE (51-90 TONS) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN COUNTIES) | $36.09 | $15.20 | $51.29 | |
| POWER EQUIPMENT OPERATOR: Highway ENGI0009-010 (4)-SCRAPER (SINGLE BOWL, UNDER 40 CU. YD) | $35.20 | $15.20 | $50.40 | |
| POWER EQUIPMENT OPERATOR: Highway ENGI0009-010 (4)-CRANE (50 TONS AND UNDER) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN COUNTIES) | $35.78 | $15.20 | $50.98 | |
| POWER EQUIPMENT OPERATOR: Highway ENGI0009-010 (3)- DRILL RIG CAISSON (SMALLER THAN WATSON 2500 AND SIMILAR) | $35.03 | $15.20 | $50.23 | |
| POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN Highway SUCO2011-001 (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON) | $22.67 | $8.75 | $31.42 | |
| POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN (PARK) Highway SUCO2011-001 | $22.67 | $8.72 | $31.39 | |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVER Highway SUCO2011-001 | $24.97 | $6.13 | $31.10 | |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER Highway SUCO2011-001 (JEFFERSON) | $22.84 | $7.69 | $30.53 | |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER Highway SUCO2011-001 (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $23.41 | $7.67 | $31.08 | |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (ADAMS) Highway SUCO2011-001 | $24.20 | $7.70 | $31.90 | |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (ARAPAHOE) Highway SUCO2011-001 | $22.68 | $8.72 | $31.40 | |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (PARK) Highway SUCO2011-001 | $22.84 | $8.72 | $31.56 | |
| POWER EQUIPMENT OPERATOR: ASPHALT SPREADER Highway SUCO2011-001 (JEFFERSON) | $23.34 | $8.06 | $31.40 | |
| POWER EQUIPMENT OPERATOR: ASPHALT SPREADER Highway SUCO2011-001 (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $22.67 | $8.67 | $31.34 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE Highway SUCO2011-001 (JEFFERSON) | $21.99 | $5.60 | $27.59 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE Highway SUCO2011-001 (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $22.19 | $6.48 | $28.67 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE Highway SUCO2011-001 (ARAPAHOE) | $24.59 | $6.24 | $30.83 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (ADAMS) Highway SUCO2011-001 | $20.31 | $4.24 | $24.55 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (PARK) Highway SUCO2011-001 | $20.81 | $6.58 | $27.39 | |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER Highway SUCO2011-001 (JEFFERSON) | $16.85 | $4.28 | $21.13 | |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER Highway SUCO2011-001 (ARAPAHOE) | $18.23 | $4.28 | $22.51 | |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER Highway SUCO2011-001 (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $15.37 | $4.28 | $19.65 | |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (PARK) Highway SUCO2011-001 | $22.46 | 0.00 | $22.46 | |
| POWER EQUIPMENT OPERATOR: BOOM Highway SUCO2011-001 | $22.67 | $8.72 | $31.39 | |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER Highway SUCO2011-001 (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $22.70 | $8.07 | $30.77 | |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (ARAPAHOE) Highway SUCO2011-001 | $22.67 | $8.73 | $31.40 | |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (JEFFERSON) Highway SUCO2011-001 | $22.18 | $8.36 | $30.54 | |
| POWER EQUIPMENT OPERATOR: BULLDOZER Highway SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK) | $26.90 | $5.59 | $32.49 | |
| POWER EQUIPMENT OPERATOR: BULLDOZER (ADAMS) Highway SUCO2011-001 | $25.20 | $6.72 | $31.92 | |
| POWER EQUIPMENT OPERATOR: CONCRETE PUMP Highway SUCO2011-001 | $21.60 | $5.21 | $26.81 | |
| POWER EQUIPMENT OPERATOR: CRANE (141 TONS AND OVER) Building ENGI0009-017 | $39.80 | $15.20 | $55.00 | |
| POWER EQUIPMENT OPERATOR: CRANE (50 TONS AND UNDER) Building ENGI0009-017 | $35.78 | $15.20 | $50.98 | |
| POWER EQUIPMENT OPERATOR: CRANE (51 TO 90 TONS) Building ENGI0009-017 | $36.09 | $15.20 | $51.29 | |
| POWER EQUIPMENT OPERATOR: CRANE (91 TO 140 TONS) Building ENGI0009-017 | $37.34 | $15.20 | $52.54 | |
| POWER EQUIPMENT OPERATOR: CRANE (ADAMS, PARK) Highway SUCO2011-001 | $22.82 | $8.72 | $31.54 | |
| POWER EQUIPMENT OPERATOR: CRANE (JEFFERSON) Highway SUCO2011-001 | $23.55 | $6.68 | $30.23 | |
| POWER EQUIPMENT OPERATOR: DRILL Highway SUCO2011-001 (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $20.48 | $4.71 | $25.19 | |
| POWER EQUIPMENT OPERATOR: DRILL (JEFFERSON) Highway SUCO2011-001 | $20.65 | $5.74 | $26.39 | |
| POWER EQUIPMENT OPERATOR: FORKLIFT Highway SUCO2011-001 | $15.91 | $4.68 | $20.59 | |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE Highway SUCO2011-001 (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $23.90 | $7.93 | $31.83 | |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (ADAMS) Highway SUCO2011-001 | $23.94 | $8.23 | $32.17 | |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (ARAPAHOE) Highway SUCO2011-001 | $22.67 | $8.72 | $31.39 | |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (JEFFERSON) Highway SUCO2011-001 | $23.28 | $7.73 | $31.01 | |
| POWER EQUIPMENT OPERATOR: GUARDRAIL/POST DRIVER Highway SUCO2011-001 | $16.07 | $4.41 | $20.48 | |
| POWER EQUIPMENT OPERATOR: LOADER Highway SUCO2011-001 (FRONT END) (JEFFERSON) | $23.06 | $7.76 | $30.82 | |
| POWER EQUIPMENT OPERATOR: LOADER Highway SUCO2011-001 (FRONT END) (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $23.20 | $8.33 | $31.53 | |
| POWER EQUIPMENT OPERATOR: LOADER Highway SUCO2011-001 (FRONT END) (ARAPAHOE) | $26.80 | $4.84 | $31.64 | |
| POWER EQUIPMENT OPERATOR: LOADER Highway SUCO2011-001 (FRONT END) (ADAMS) | $23.09 | $8.72 | $31.81 | |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (PARK) Highway SUCO2011-001 | $22.67 | $8.72 | $31.39 | |
| POWER EQUIPMENT OPERATOR: MECHANIC Highway SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $24.04 | $7.35 | $31.39 | |
| POWER EQUIPMENT OPERATOR: MECHANIC (ADAMS) Highway SUCO2011-001 | $22.82 | $8.72 | $31.54 | |
| POWER EQUIPMENT OPERATOR: MECHANIC (JEFFERSON) Highway SUCO2011-001 | $23.56 | $8.72 | $32.28 | |
| POWER EQUIPMENT OPERATOR: OILER Highway SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $23.73 | $8.41 | $32.14 | |
| POWER EQUIPMENT OPERATOR: OILER (ADAMS, JEFFERSON) Highway SUCO2011-001 | $21.97 | $8.72 | $30.69 | |
| POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR Highway SUCO2011-001 (DIRT AND GRADE COMPACTION) (PARK) | $16.52 | $3.13 | $19.65 | |
| POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR Highway SUCO2011-001 (DIRT AND GRADE COMPACTION) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON) | $20.30 | $5.51 | $25.81 | |
| POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR Highway SUCO2011-001 (DIRT AND GRADE COMPACTION) (ADAMS) | $16.70 | $3.30 | $20.00 | |
| POWER EQUIPMENT OPERATOR: ROTOMILL Highway SUCO2011-001 | $16.22 | $4.41 | $20.63 | |
| POWER EQUIPMENT OPERATOR: SCREED Highway SUCO2011-001 (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $24.67 | $6.02 | $30.69 | |
| POWER EQUIPMENT OPERATOR: SCREED (ADAMS) Highway SUCO2011-001 | $27.89 | $3.50 | $31.39 | |
| POWER EQUIPMENT OPERATOR: SCREED (ARAPAHOE) Highway SUCO2011-001 | $22.67 | $8.72 | $31.39 | |
| POWER EQUIPMENT OPERATOR: SCREED (JEFFERSON) Highway SUCO2011-001 | $22.64 | $8.43 | $31.07 | |
| POWER EQUIPMENT OPERATOR: SCREED (PARK) Highway SUCO2011-001 | $20.36 | $3.04 | $23.40 | |
| POWER EQUIPMENT OPERATOR: TRACTOR Highway SUCO2011-001 | $13.13 | $2.95 | $16.08 | |
| POWER EQUIPMENT OPERATORS: (BACKHOE) Heavy SUCO2001-005 | $15.93 | $3.58 | $19.51 | |
| POWER EQUIPMENT OPERATORS: (EXCAVATOR) Heavy SUCO2001-005 | $15.39 | 0.00 | $15.39 | |
| POWER EQUIPMENT OPERATORS: BOBCAT/SKID LOADER Heavy SUCO2001-005 | $20.22 | $4.41 | $24.63 | |
| POWER EQUIPMENT OPERATORS: BULLDOZER Heavy SUCO2001-005 | $15.08 | $4.44 | $19.52 | |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER Heavy SUCO2001-005 | $15.86 | $3.59 | $19.45 | |
| POWER EQUIPMENT OPERATORS: MECHANIC Heavy ENGI0009-004 | $35.58 | $15.20 | $50.78 | |
| POWER EQUIPMENT OPERATORS: MOTOR GRADER: BLADE-FINISH Heavy ENGI0009-004 | $35.58 | $15.20 | $50.78 | |
| POWER EQUIPMENT OPERATORS: MOTOR GRADER: BLADE-ROUGH Heavy ENGI0009-004 | $35.03 | $15.20 | $50.23 | |
| POWER EQUIPMENT OPERATORS: ROLLER: SELF-PROPELLED, ALL TYPES OVER 5 TONS Heavy ENGI0009-004 | $35.03 | $15.20 | $50.23 | |
| POWER EQUIPMENT OPERATORS: ROLLER: SELF-PROPELLED, RUBBER TIRES UNDER 5 TONS Heavy ENGI0009-004 | $34.58 | $15.20 | $49.78 | |
| POWER EQUIPMENT OPERATORS: TRACKHOE Heavy ENGI0009-004 | $35.20 | $15.20 | $50.40 | |
| ROOFER Building SUCO2013-012 | $16.96 | 0.00 | $16.96 | |
| SHEET METAL WORKER Building SHEE0009-004 (INCLUDES HVAC DUCT INSTALLATION; EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $43.05 | $22.65 | $65.70 | |
| SOFT FLOOR LAYER (VINYL AND CARPET) Building PAIN0419-001 | $18.25 | $14.33 | $32.58 | |
| SPRINKLER FITTER (FIRE SPRINKLERS) Building SFCO0669-002 | $48.60 | $27.57 | $76.17 | |
| TRUCK DRIVER: DISTRIBUTOR Highway SUCO2011-001 (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $18.19 | $5.27 | $23.46 | |
| TRUCK DRIVER: DISTRIBUTOR (ADAMS) Highway SUCO2011-001 | $15.80 | $5.27 | $21.07 | |
| TRUCK DRIVER: DISTRIBUTOR (ARAPAHOE) Highway SUCO2011-001 | $19.62 | $5.27 | $24.89 | |
| TRUCK DRIVER: DISTRIBUTOR (JEFFERSON) Highway SUCO2011-001 | $19.46 | $6.04 | $25.50 | |
| TRUCK DRIVER: DUMP TRUCK Highway SUCO2011-001 (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $16.47 | $5.27 | $21.74 | |
| TRUCK DRIVER: DUMP TRUCK Building SUCO2013-012 | $17.34 | 0.00 | $17.34 | |
| TRUCK DRIVER: DUMP TRUCK (ADAMS) Highway SUCO2011-001 | $16.68 | $5.27 | $21.95 | |
| TRUCK DRIVER: DUMP TRUCK (ARAPAHOE) Highway SUCO2011-001 | $18.94 | $5.27 | $24.21 | |
| TRUCK DRIVER: DUMP TRUCK (JEFFERSON) Highway SUCO2011-001 | $16.97 | $4.78 | $21.75 | |
| TRUCK DRIVER: DUMP TRUCK (PARK) Highway SUCO2011-001 | $15.40 | $3.21 | $18.61 | |
| TRUCK DRIVER: LOWBOY TRUCK Highway SUCO2011-001 (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $17.25 | $5.27 | $22.52 | |
| TRUCK DRIVER: LOWBOY TRUCK (JEFFERSON) Highway SUCO2011-001 | $19.80 | $6.42 | $26.22 | |
| TRUCK DRIVER: MECHANIC Highway SUCO2011-001 | $26.48 | $3.50 | $29.98 | |
| TRUCK DRIVER: MULTI-PURPOSE SPECIALITY AND HOISTING TRUCK Highway SUCO2011-001 (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $17.49 | $3.17 | $20.66 | |
| TRUCK DRIVER: MULTI-PURPOSE SPECIALITY AND HOISTING TRUCK (ARAPAHOE) Highway SUCO2011-001 | $15.79 | $2.48 | $18.27 | |
| TRUCK DRIVER: MULTI-PURPOSE SPECIALITY AND HOISTING TRUCK (JEFFERSON) Highway SUCO2011-001 | $15.13 | $3.89 | $19.02 | |
| TRUCK DRIVER: SEMI/TRAILER TRUCK Highway SUCO2011-001 (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK) | $18.39 | $4.13 | $22.52 | |
| TRUCK DRIVER: SEMI/TRAILER TRUCK (ARAPAHOE) Highway SUCO2011-001 | $16.00 | $2.60 | $18.60 | |
| TRUCK DRIVER: SINGLE AXLE Highway SUCO2011-001 (INCLUDES PICKUP AND PILOT CAR) (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $14.74 | $3.68 | $18.42 | |
| TRUCK DRIVER: SINGLE AXLE Highway SUCO2011-001 (INCLUDES PICKUP AND PILOT CAR) (ARAPAHOE) | $15.10 | $3.77 | $18.87 | |
| TRUCK DRIVER: SINGLE AXLE Highway SUCO2011-001 (INCLUDES PICKUP AND PILOT CAR) (ADAMS, JEFFERSON) | $13.93 | $3.68 | $17.61 | |
| TRUCK DRIVER: TRUCK MOUNTED ATTENUATOR Highway SUCO2011-001 | $12.43 | $3.22 | $15.65 | |
| TRUCK DRIVER: WATER TRUCK Highway SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $19.36 | $4.07 | $23.43 | |
| TRUCK DRIVER: WATER TRUCK (ADAMS) Highway SUCO2011-001 | $17.50 | $5.19 | $22.69 | |
| TRUCK DRIVER: WATER TRUCK (JEFFERSON) Highway SUCO2011-001 | $17.57 | $5.27 | $22.84 | |
| WATERPROOFER Building SUCO2013-012 | $16.94 | 0.00 | $16.94 |
No trade rates match your search and filter selection.
Heavy
Applies to
Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Clear Creek, Conejos, Costilla, Crowley +42 more
Residential
Applies to
Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Clear Creek, Conejos, Costilla, Crowley +42 more
Highway
Applies to
Adams, Arapahoe, Clear Creek, Elbert, Gilpin, Jefferson, Park, Broomfield
Building
Wage determinations are revised throughout the year. We'll email you when rates covering Park County, Colorado are modified.
Free, one email when rates change. Unsubscribe anytime.