Park

4 wage determinations 210 trade rates

Popular Trades In Park

Trade Rates

Click a row to save its rate for later, then export your selections from the Saved panel.

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Save Trade & Classification Rate Fringe Total
BRICKLAYER Building
SUCO2013-012
$21.96 0.00 $21.96
CARPENTER Residential
SUCO2001-004
$17.86 0.00 $17.86
CARPENTER Building
CARP0055-001 (ACOUSTICAL CEILING INSTALLATION AND DRYWALL HANGING ONLY)
$35.09 $13.84 $48.93
CARPENTER Building
SUCO2013-012 (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION)
$20.80 $3.80 $24.60
CARPENTER (METAL STUD INSTALLATION ONLY) Building
SUCO2013-012
$17.68 0.00 $17.68
CARPENTER, EXCLUDES FORM WORK Highway
SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK)
$19.27 $5.08 $24.35
CARPENTER, EXCLUDES FORM WORK (ADAMS) Highway
SUCO2011-001
$16.61 $3.88 $20.49
CARPENTER, FORM WORK ONLY Highway
SUCO2011-001 (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)
$19.11 $5.46 $24.57
CARPENTER, FORM WORK ONLY (ADAMS) Highway
SUCO2011-001
$16.78 $3.57 $20.35
CARPENTER, FORM WORK ONLY (JEFFERSON) Highway
SUCO2011-001
$16.88 $3.81 $20.69
CARPENTER, FORM WORK ONLY (PARK) Highway
SUCO2011-001
$17.28 $5.38 $22.66
CARPENTERS: ALL OTHER WORK Heavy
SUCO2001-005
$15.72 0.00 $15.72
CARPENTERS: FORM BUILDING AND SETTING Heavy
SUCO2001-005
$16.16 $0.82 $16.98
CEMENT MASON/CONCRETE FINISHER Heavy
SUCO2001-005
$14.76 $2.28 $17.04
CEMENT MASON/CONCRETE FINISHER Highway
SUCO2011-001 (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)
$18.37 $3.00 $21.37
CEMENT MASON/CONCRETE FINISHER Building
SUCO2013-012
$20.33 $6.76 $27.09
CEMENT MASON/CONCRETE FINISHER (ADAMS) Highway
SUCO2011-001
$16.05 $3.00 $19.05
CEMENT MASON/CONCRETE FINISHER (ARAPAHOE) Highway
SUCO2011-001
$18.70 $3.85 $22.55
CEMENT MASON/CONCRETE FINISHER (JEFFERSON) Highway
SUCO2011-001
$18.02 $3.42 $21.44
CEMENT MASON/CONCRETE FINISHER (PARK) Highway
SUCO2011-001
$17.09 $2.85 $19.94
DRYWALL FINISHER/TAPER Building
PAIN0079-007
$28.11 $11.56 $39.67
ELECTRICIAN Heavy
ELEC0068-011 (CLEAR CREEK, EAGLE, GILPIN, GRAND, JACKSON, LAKE, LOGAN, MORGAN, PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON AND YUMA COUNTIES)
$46.80 $19.53 $66.33
ELECTRICIAN Heavy
ELEC0111-008 (DELTA, GARFIELD, MONTROSE, AND RIO BLANCO COUNTIES IN COLORADO.)
$31.75 $13.25 $45.00
ELECTRICIAN Heavy
ELEC0111-010 (DOLORES, GUNNISON, HINSDALE, LA PLATA, MOFFAT, MONTEZUMA, OURAY, PITKIN, ROUTT, SAN JUAN AND SAN MIGUEL COUNTIES IN COLORADO.)
$36.95 $14.41 $51.36
ELECTRICIAN Heavy
ELEC0113-004 (CHEYENNE, ELBERT, KIT CARSON, LINCOLN, PARK AND TELLER COUNTIES)
$40.70 $18.47 $59.17
ELECTRICIAN Residential
ELEC0113-008 (CHEYENNE, ELBERT, KIT CARSON, LINCOLN, PARK AND TELLER COUNTIES)
$30.53 $16.30 $46.83
ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) Building
ELEC0068-012
$46.80 $19.53 $66.33
ELECTRICIAN, TRAFFIC SIGNALIZATION ONLY Highway
ELEC0111-003 (CLEAR CREEK)
$38.97 $13.16 $52.13
ELECTRICIAN: Residential
ELEC0012-013 (INCLUDING LOW VOLTAGE WIRING AND INSTALLATION OF FIRE ALARMS) (ALAMOSA, ARCHULETA, BACA, BENT, CHAFFEE, CONEJOS, COSTILLA, CROWLEY, CUSTER, FREMONT, HUERFANO, KIOWA, LAS ANIMAS, MINERAL, OTERO, PROWERS, RIO GRANDE AND SAGUACHE COUNTIES)
$35.40 $16.06 $51.46
ELECTRICIAN: Residential
ELEC0068-015 (INCLUDING LOW VOLTAGE WIRING AND INSTALLATION OF FIRE ALARMS) (CLEAR CREEK, EAGLE, GILPIN, GRAND, JACKSON, LAKE, LOGAN, MORGAN, PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON AND YUMA COUNTIES)
$31.96 $12.50 $44.46
ELECTRICIAN: Residential
ELEC0111-012 (INCLUDING LOW VOLTAGE WIRING AND INSTALLATION OF FIRE ALARMS) (DELTA, GARFIELD, MONTROSE, AND RIO BLANCO COUNTIES IN COLORADO.)
$31.75 $13.25 $45.00
ELECTRICIAN: Residential
ELEC0111-015 (INCLUDING LOW VOLTAGE WIRING AND INSTALLATION OF FIRE ALARMS) (DOLORES, GUNNISON, HINSDALE, LA PLATA, MOFFAT, MONTEZUMA, OURAY, PITKIN, ROUTT, SAN JUAN AND SAN MIGUEL COUNTIES IN COLORADO.)
$36.95 $14.41 $51.36
ELECTRICIAN: EXCLUDES TRAFFIC SIGNAL INSTALLATION Highway
SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK)
$35.13 $6.83 $41.96
ELECTRICIAN: EXCLUDES TRAFFIC SIGNAL INSTALLATION Highway
SUCO2011-001 (ADAMS)
$31.00 $14.01 $45.01
ELECTRICIAN: TRAFFIC SIGNALIZATION ELECTRICIAN Highway
SUCO2011-001 (JEFFERSON)
$26.78 $5.44 $32.22
ELECTRICIAN: TRAFFIC SIGNALIZATION ELECTRICIAN Highway
SUCO2011-001 (ADAMS, ARAPAHOE, BROOMFIELD, ELBERT, GILPIN, PARK)
$27.25 $7.10 $34.35
ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN Highway
SUCO2011-001 (JEFFERSON)
$15.19 $4.72 $19.91
ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN Highway
SUCO2011-001 (CLEAR CREEK)
$15.70 $2.14 $17.84
ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN Highway
SUCO2011-001 (ARAPHAOE, BROOMFIELD, ELBERT, GILPIN, PARK)
$15.24 $3.81 $19.05
ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN Highway
SUCO2011-001 (ADAMS)
$13.96 $2.80 $16.76
ELECTRICIANS Heavy
ELEC0012-006 (ALAMOSA, ARCHULETA, BACA, BENT, CHAFFEE, CONEJOS, COSTILLA, CROWLEY, CUSTER, FREMONT, HUERFANO, KIOWA, LAS ANIMAS, MINERAL, OTERO, PROWERS, PUEBLO, RIO GRANDE, SAGUACHE COUNTIES)
$35.40 $16.06 $51.46
FENCE ERECTOR Highway
SUCO2011-001
$13.02 $3.20 $16.22
FORM WORKER (ARAPAHOE) Highway
SUCO2011-001
$15.30 $3.90 $19.20
GLAZIER Building
PAIN0930-002
$37.26 $13.15 $50.41
GUARDRAIL INSTALLER Highway
SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK)
$12.89 $3.20 $16.09
GUARDRAIL INSTALLER (ADAMS) Highway
SUCO2011-001
$12.89 $3.45 $16.34
HIGHWAY/PARKING LOT STRIPING: PAINTER Highway
SUCO2011-001 (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)
$12.62 $3.21 $15.83
HIGHWAY/PARKING LOT STRIPING:PAINTER (JEFFERSON) Highway
SUCO2011-001
$14.21 $3.21 $17.42
INSULATOR - MECHANICAL Building
SUCO2013-012 (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)
$23.12 $7.97 $31.09
IRONWORKER, STRUCTURAL Residential
IRON0024-001
$39.21 $12.50 $51.71
IRONWORKER, STRUCTURAL Highway
SUCO2011-001
$18.22 $6.01 $24.23
IRONWORKER, STRUCTURAL Building
IRON0024-010
$39.21 $12.50 $51.71
IRONWORKER: ORNAMENTAL Building
IRON0024-009
$39.21 $12.50 $51.71
IRONWORKER: REINFORCING Highway
SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON)
$16.69 $5.45 $22.14
IRONWORKER: REINFORCING (ADAMS) Highway
SUCO2011-001
$22.14 $0.77 $22.91
IRONWORKER: REINFORCING (PARK) Highway
SUCO2011-001
$19.98 $2.89 $22.87
LABORER, COMMON Heavy
SUCO2001-005
$11.11 $3.80 $14.91
LABORER: ASPHALT RAKER Highway
SUCO2011-001 (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON)
$16.29 $4.25 $20.54
LABORER: ASPHALT RAKER (PARK) Highway
SUCO2011-001
$17.41 $1.86 $19.27
LABORER: ASPHALT SHOVELER Highway
SUCO2011-001
$21.21 $4.25 $25.46
LABORER: ASPHALT SPREADER Highway
SUCO2011-001
$18.58 $4.65 $23.23
LABORER: COMMON OR GENERAL Highway
SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)
$16.67 $4.27 $20.94
LABORER: COMMON OR GENERAL Building
SUCO2013-012
$14.86 $4.98 $19.84
LABORER: COMMON OR GENERAL (ADAMS) Highway
SUCO2011-001
$16.29 $4.25 $20.54
LABORER: COMMON OR GENERAL (JEFFERSON) Highway
SUCO2011-001
$16.51 $4.27 $20.78
LABORER: COMMON OR GENERAL (PARK) Highway
SUCO2011-001
$15.64 $2.46 $18.10
LABORER: CONCRETE SAW Highway
SUCO2011-001 (HAND HELD) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK)
$16.29 $6.14 $22.43
LABORER: CONCRETE SAW (HAND HELD) (ADAMS) Highway
SUCO2011-001
$16.29 $5.20 $21.49
LABORER: LANDSCAPE AND IRRIGATION Highway
SUCO2011-001 (ADAMS, ARAPAHOE, BROOMFIELD, ELBERT, GILPIN, JEFFERSON, PARK)
$12.26 $3.16 $15.42
LABORER: LANDSCAPE AND IRRIGATION (CLEAR CREEK) Highway
SUCO2011-001
$14.98 $3.16 $18.14
LABORER: MASON TENDER - BRICK Building
SUCO2013-012
$15.99 0.00 $15.99
LABORER: MASON TENDER - CEMENT/CONCRETE Building
SUCO2013-012
$16.00 0.00 $16.00
LABORER: MASON TENDER-CEMENT/CONCRETE Highway
SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)
$16.96 $4.04 $21.00
LABORER: MASON TENDER-CEMENT/CONCRETE (ADAMS) Highway
SUCO2011-001
$17.71 $2.83 $20.54
LABORER: MASON TENDER-CEMENT/CONCRETE (JEFFERSON) Highway
SUCO2011-001
$16.29 $4.25 $20.54
LABORER: MASON TENDER-CEMENT/CONCRETE (PARK) Highway
SUCO2011-001
$15.08 $3.10 $18.18
LABORER: PIPELAYER Highway
SUCO2011-001
$13.55 $2.41 $15.96
LABORER: PIPELAYER Building
SUCO2013-012
$16.96 $3.68 $20.64
LABORER: TRAFFIC CONTROL Highway
SUCO2011-001 (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS) (EXCLUDES FLAGGERS) (PARK)
$12.76 $3.20 $15.96
LABORER: TRAFFIC CONTROL Highway
SUCO2011-001 (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS) (EXCLUDES FLAGGERS) (CLEAR CREEK)
$13.14 $3.20 $16.34
LABORER: TRAFFIC CONTROL Highway
SUCO2011-001 (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS) (EXCLUDES FLAGGERS) (ADAMS, ARAPAHOE, BROOMFIELD, ELBERT, GILPIN, JEFFERSON)
$12.43 $3.22 $15.65
LABORER: TRAFFIC CONTROL Highway
SUCO2011-001 (FLAGGER) (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)
$9.55 $3.05 $12.60
LABORER: TRAFFIC CONTROL (FLAGGER) (JEFFERSON) Highway
SUCO2011-001
$9.73 $3.05 $12.78
LABORER: TRAFFIC CONTROL (FLAGGER) (PARK) Highway
SUCO2011-001
$9.42 $3.21 $12.63
LABORERS: (COMMON) Residential
SUCO2001-004
$10.33 0.00 $10.33
LINE CONSTRUCTION: GROUNDMEN Heavy
ELEC0111-002
$27.39 $5.82 $33.21
LINE CONSTRUCTION: LINE EQUIPMENT OPERATOR Heavy
ELEC0111-002
$44.27 $9.41 $53.68
LINE CONSTRUCTION: LINEMAN AND WELDER Heavy
ELEC0111-002
$61.36 $14.88 $76.24
MILLWRIGHT Building
CARP1607-001
$42.10 $19.02 $61.12
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building
SUCO2013-012
$20.78 $5.78 $26.56
OPERATOR: BOBCAT/SKID STEER/SKID LOADER Building
SUCO2013-012
$19.10 $3.89 $22.99
OPERATOR: GRADER/BLADE Building
SUCO2013-012
$21.50 0.00 $21.50
PAINTER (SPRAY ONLY) Highway
SUCO2011-001
$16.99 $2.87 $19.86
PAINTER: BRUSH, ROLLER AND SPRAY Building
PAIN0079-006 (EXCLUDES DRYWALL FINISHING/TAPING)
$27.41 $11.56 $38.97
PAINTERS: BRUSH, SPRAY & ROLLER Residential
SUCO2001-004
$15.00 0.00 $15.00
PIPEFITTER Heavy
SUCO2001-005
$18.13 $1.84 $19.97
PIPEFITTER Building
PLUM0208-008 (INCLUDES HVAC PIPE AND UNIT INSTALLATION; EXCLUDES HVAC DUCT INSTALLATION)
$45.40 $22.11 $67.51
PLUMBER Heavy
PLUM0003-003 (CLEAR CREEK, GILPIN, GRAND, JACKSON, LAKE, LOGAN, MORGAN, PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON, AND YUMA. PARTS OF ELBERT, EAGLE, KIT CARSON, LINCOLN, AND PARK COUNTIES)
$50.68 $20.15 $70.83
PLUMBER Heavy
PLUM0058-010 (ALAMOSA, BACA, BENT, CHAFFEE, CHEYENNE, CONEJOS, COSTILLA, CROWLEY, CUSTER, ELBERT (SOUTHERN PORTION INCLUDING TOWNS OF ELBERT, MATHERSON AND SIMLA), FREMONT, HUERFANO, KIOWA, KIT CARSON (INCLUDING TOWNS OF DFALGLER, SIEBERT, VONA, STRATTON AND BETHUNE), LAS ANIMAS, LINCOLN (INCLUDING TOWNS OF GEONA AND ARRIBA IN THE SOUTHERN PORTION OF THE COUNTY), MINERAL, OTERO, PARK (INCLUDING TOWNS OF FAUPLAY, HARTSEL AND LAKE GEORGE), PROWERS, PUEBLO, RIO GRANDE, AND SAGUACHE COUNTIES)
$45.90 $17.17 $63.07
PLUMBER Heavy
PLUM0145-004 (ARCHULETA, DELTA, DOLORES, EAGLE (EAGLE COUNTY IS DIVIDED FROM WHERE PITKIN AND LAKE COUNTIES JOIN ON THE NORTH, AND IN A STRAIGHT LINE TO AND INCLUDING THE TOWN OF EDWARDS AND NORTHERLY TO THE SOUTH EAST CORNER OF ROUTT COUNTY), GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT, MONTEZUMA, MONTROSE, OURAY, PITKIN, RIO BLANCO, ROUTT, SAN JUAN AND SAN MIGUEL COUNTIES)
$41.32 $16.01 $57.33
PLUMBER Building
PLUM0003-009 (EXCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION)
$47.23 $21.68 $68.91
PLUMBER (INCLUDING HVAC PIPE) Residential
SUCO2001-004
$18.06 $2.78 $20.84
PLUMBER: INCLUDES HVAC WORK (TELLER COUNTY) Heavy
PLUM0058-012
$45.90 $17.17 $63.07
POWER EQUIPMENT OPERATOR: Highway
ENGI0009-010 (6)-CRANE (91-140 TONS) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN COUNTIES)
$37.34 $15.20 $52.54
POWER EQUIPMENT OPERATOR: Highway
ENGI0009-010 (5)-DRILL RIG CAISSON (WATSON 2500 SIMILAR OR LARGER), SCRAPER (40 CU.YD AND OVER)
$35.41 $15.20 $50.61
POWER EQUIPMENT OPERATOR: Highway
ENGI0009-010 (5)-CRANE (51-90 TONS) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN COUNTIES)
$36.09 $15.20 $51.29
POWER EQUIPMENT OPERATOR: Highway
ENGI0009-010 (4)-SCRAPER (SINGLE BOWL, UNDER 40 CU. YD)
$35.20 $15.20 $50.40
POWER EQUIPMENT OPERATOR: Highway
ENGI0009-010 (4)-CRANE (50 TONS AND UNDER) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN COUNTIES)
$35.78 $15.20 $50.98
POWER EQUIPMENT OPERATOR: Highway
ENGI0009-010 (3)- DRILL RIG CAISSON (SMALLER THAN WATSON 2500 AND SIMILAR)
$35.03 $15.20 $50.23
POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN Highway
SUCO2011-001 (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON)
$22.67 $8.75 $31.42
POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN (PARK) Highway
SUCO2011-001
$22.67 $8.72 $31.39
POWER EQUIPMENT OPERATOR: ASPHALT PAVER Highway
SUCO2011-001
$24.97 $6.13 $31.10
POWER EQUIPMENT OPERATOR: ASPHALT ROLLER Highway
SUCO2011-001 (JEFFERSON)
$22.84 $7.69 $30.53
POWER EQUIPMENT OPERATOR: ASPHALT ROLLER Highway
SUCO2011-001 (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)
$23.41 $7.67 $31.08
POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (ADAMS) Highway
SUCO2011-001
$24.20 $7.70 $31.90
POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (ARAPAHOE) Highway
SUCO2011-001
$22.68 $8.72 $31.40
POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (PARK) Highway
SUCO2011-001
$22.84 $8.72 $31.56
POWER EQUIPMENT OPERATOR: ASPHALT SPREADER Highway
SUCO2011-001 (JEFFERSON)
$23.34 $8.06 $31.40
POWER EQUIPMENT OPERATOR: ASPHALT SPREADER Highway
SUCO2011-001 (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)
$22.67 $8.67 $31.34
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE Highway
SUCO2011-001 (JEFFERSON)
$21.99 $5.60 $27.59
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE Highway
SUCO2011-001 (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)
$22.19 $6.48 $28.67
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE Highway
SUCO2011-001 (ARAPAHOE)
$24.59 $6.24 $30.83
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (ADAMS) Highway
SUCO2011-001
$20.31 $4.24 $24.55
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (PARK) Highway
SUCO2011-001
$20.81 $6.58 $27.39
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER Highway
SUCO2011-001 (JEFFERSON)
$16.85 $4.28 $21.13
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER Highway
SUCO2011-001 (ARAPAHOE)
$18.23 $4.28 $22.51
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER Highway
SUCO2011-001 (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)
$15.37 $4.28 $19.65
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (PARK) Highway
SUCO2011-001
$22.46 0.00 $22.46
POWER EQUIPMENT OPERATOR: BOOM Highway
SUCO2011-001
$22.67 $8.72 $31.39
POWER EQUIPMENT OPERATOR: BROOM/SWEEPER Highway
SUCO2011-001 (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)
$22.70 $8.07 $30.77
POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (ARAPAHOE) Highway
SUCO2011-001
$22.67 $8.73 $31.40
POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (JEFFERSON) Highway
SUCO2011-001
$22.18 $8.36 $30.54
POWER EQUIPMENT OPERATOR: BULLDOZER Highway
SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK)
$26.90 $5.59 $32.49
POWER EQUIPMENT OPERATOR: BULLDOZER (ADAMS) Highway
SUCO2011-001
$25.20 $6.72 $31.92
POWER EQUIPMENT OPERATOR: CONCRETE PUMP Highway
SUCO2011-001
$21.60 $5.21 $26.81
POWER EQUIPMENT OPERATOR: CRANE (141 TONS AND OVER) Building
ENGI0009-017
$39.80 $15.20 $55.00
POWER EQUIPMENT OPERATOR: CRANE (50 TONS AND UNDER) Building
ENGI0009-017
$35.78 $15.20 $50.98
POWER EQUIPMENT OPERATOR: CRANE (51 TO 90 TONS) Building
ENGI0009-017
$36.09 $15.20 $51.29
POWER EQUIPMENT OPERATOR: CRANE (91 TO 140 TONS) Building
ENGI0009-017
$37.34 $15.20 $52.54
POWER EQUIPMENT OPERATOR: CRANE (ADAMS, PARK) Highway
SUCO2011-001
$22.82 $8.72 $31.54
POWER EQUIPMENT OPERATOR: CRANE (JEFFERSON) Highway
SUCO2011-001
$23.55 $6.68 $30.23
POWER EQUIPMENT OPERATOR: DRILL Highway
SUCO2011-001 (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)
$20.48 $4.71 $25.19
POWER EQUIPMENT OPERATOR: DRILL (JEFFERSON) Highway
SUCO2011-001
$20.65 $5.74 $26.39
POWER EQUIPMENT OPERATOR: FORKLIFT Highway
SUCO2011-001
$15.91 $4.68 $20.59
POWER EQUIPMENT OPERATOR: GRADER/BLADE Highway
SUCO2011-001 (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)
$23.90 $7.93 $31.83
POWER EQUIPMENT OPERATOR: GRADER/BLADE (ADAMS) Highway
SUCO2011-001
$23.94 $8.23 $32.17
POWER EQUIPMENT OPERATOR: GRADER/BLADE (ARAPAHOE) Highway
SUCO2011-001
$22.67 $8.72 $31.39
POWER EQUIPMENT OPERATOR: GRADER/BLADE (JEFFERSON) Highway
SUCO2011-001
$23.28 $7.73 $31.01
POWER EQUIPMENT OPERATOR: GUARDRAIL/POST DRIVER Highway
SUCO2011-001
$16.07 $4.41 $20.48
POWER EQUIPMENT OPERATOR: LOADER Highway
SUCO2011-001 (FRONT END) (JEFFERSON)
$23.06 $7.76 $30.82
POWER EQUIPMENT OPERATOR: LOADER Highway
SUCO2011-001 (FRONT END) (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)
$23.20 $8.33 $31.53
POWER EQUIPMENT OPERATOR: LOADER Highway
SUCO2011-001 (FRONT END) (ARAPAHOE)
$26.80 $4.84 $31.64
POWER EQUIPMENT OPERATOR: LOADER Highway
SUCO2011-001 (FRONT END) (ADAMS)
$23.09 $8.72 $31.81
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (PARK) Highway
SUCO2011-001
$22.67 $8.72 $31.39
POWER EQUIPMENT OPERATOR: MECHANIC Highway
SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)
$24.04 $7.35 $31.39
POWER EQUIPMENT OPERATOR: MECHANIC (ADAMS) Highway
SUCO2011-001
$22.82 $8.72 $31.54
POWER EQUIPMENT OPERATOR: MECHANIC (JEFFERSON) Highway
SUCO2011-001
$23.56 $8.72 $32.28
POWER EQUIPMENT OPERATOR: OILER Highway
SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)
$23.73 $8.41 $32.14
POWER EQUIPMENT OPERATOR: OILER (ADAMS, JEFFERSON) Highway
SUCO2011-001
$21.97 $8.72 $30.69
POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR Highway
SUCO2011-001 (DIRT AND GRADE COMPACTION) (PARK)
$16.52 $3.13 $19.65
POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR Highway
SUCO2011-001 (DIRT AND GRADE COMPACTION) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON)
$20.30 $5.51 $25.81
POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR Highway
SUCO2011-001 (DIRT AND GRADE COMPACTION) (ADAMS)
$16.70 $3.30 $20.00
POWER EQUIPMENT OPERATOR: ROTOMILL Highway
SUCO2011-001
$16.22 $4.41 $20.63
POWER EQUIPMENT OPERATOR: SCREED Highway
SUCO2011-001 (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)
$24.67 $6.02 $30.69
POWER EQUIPMENT OPERATOR: SCREED (ADAMS) Highway
SUCO2011-001
$27.89 $3.50 $31.39
POWER EQUIPMENT OPERATOR: SCREED (ARAPAHOE) Highway
SUCO2011-001
$22.67 $8.72 $31.39
POWER EQUIPMENT OPERATOR: SCREED (JEFFERSON) Highway
SUCO2011-001
$22.64 $8.43 $31.07
POWER EQUIPMENT OPERATOR: SCREED (PARK) Highway
SUCO2011-001
$20.36 $3.04 $23.40
POWER EQUIPMENT OPERATOR: TRACTOR Highway
SUCO2011-001
$13.13 $2.95 $16.08
POWER EQUIPMENT OPERATORS: (BACKHOE) Heavy
SUCO2001-005
$15.93 $3.58 $19.51
POWER EQUIPMENT OPERATORS: (EXCAVATOR) Heavy
SUCO2001-005
$15.39 0.00 $15.39
POWER EQUIPMENT OPERATORS: BOBCAT/SKID LOADER Heavy
SUCO2001-005
$20.22 $4.41 $24.63
POWER EQUIPMENT OPERATORS: BULLDOZER Heavy
SUCO2001-005
$15.08 $4.44 $19.52
POWER EQUIPMENT OPERATORS: FRONT END LOADER Heavy
SUCO2001-005
$15.86 $3.59 $19.45
POWER EQUIPMENT OPERATORS: MECHANIC Heavy
ENGI0009-004
$35.58 $15.20 $50.78
POWER EQUIPMENT OPERATORS: MOTOR GRADER: BLADE-FINISH Heavy
ENGI0009-004
$35.58 $15.20 $50.78
POWER EQUIPMENT OPERATORS: MOTOR GRADER: BLADE-ROUGH Heavy
ENGI0009-004
$35.03 $15.20 $50.23
POWER EQUIPMENT OPERATORS: ROLLER: SELF-PROPELLED, ALL TYPES OVER 5 TONS Heavy
ENGI0009-004
$35.03 $15.20 $50.23
POWER EQUIPMENT OPERATORS: ROLLER: SELF-PROPELLED, RUBBER TIRES UNDER 5 TONS Heavy
ENGI0009-004
$34.58 $15.20 $49.78
POWER EQUIPMENT OPERATORS: TRACKHOE Heavy
ENGI0009-004
$35.20 $15.20 $50.40
ROOFER Building
SUCO2013-012
$16.96 0.00 $16.96
SHEET METAL WORKER Building
SHEE0009-004 (INCLUDES HVAC DUCT INSTALLATION; EXCLUDES HVAC PIPE AND UNIT INSTALLATION)
$43.05 $22.65 $65.70
SOFT FLOOR LAYER (VINYL AND CARPET) Building
PAIN0419-001
$18.25 $14.33 $32.58
SPRINKLER FITTER (FIRE SPRINKLERS) Building
SFCO0669-002
$48.60 $27.57 $76.17
TRUCK DRIVER: DISTRIBUTOR Highway
SUCO2011-001 (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)
$18.19 $5.27 $23.46
TRUCK DRIVER: DISTRIBUTOR (ADAMS) Highway
SUCO2011-001
$15.80 $5.27 $21.07
TRUCK DRIVER: DISTRIBUTOR (ARAPAHOE) Highway
SUCO2011-001
$19.62 $5.27 $24.89
TRUCK DRIVER: DISTRIBUTOR (JEFFERSON) Highway
SUCO2011-001
$19.46 $6.04 $25.50
TRUCK DRIVER: DUMP TRUCK Highway
SUCO2011-001 (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)
$16.47 $5.27 $21.74
TRUCK DRIVER: DUMP TRUCK Building
SUCO2013-012
$17.34 0.00 $17.34
TRUCK DRIVER: DUMP TRUCK (ADAMS) Highway
SUCO2011-001
$16.68 $5.27 $21.95
TRUCK DRIVER: DUMP TRUCK (ARAPAHOE) Highway
SUCO2011-001
$18.94 $5.27 $24.21
TRUCK DRIVER: DUMP TRUCK (JEFFERSON) Highway
SUCO2011-001
$16.97 $4.78 $21.75
TRUCK DRIVER: DUMP TRUCK (PARK) Highway
SUCO2011-001
$15.40 $3.21 $18.61
TRUCK DRIVER: LOWBOY TRUCK Highway
SUCO2011-001 (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)
$17.25 $5.27 $22.52
TRUCK DRIVER: LOWBOY TRUCK (JEFFERSON) Highway
SUCO2011-001
$19.80 $6.42 $26.22
TRUCK DRIVER: MECHANIC Highway
SUCO2011-001
$26.48 $3.50 $29.98
TRUCK DRIVER: MULTI-PURPOSE SPECIALITY AND HOISTING TRUCK Highway
SUCO2011-001 (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)
$17.49 $3.17 $20.66
TRUCK DRIVER: MULTI-PURPOSE SPECIALITY AND HOISTING TRUCK (ARAPAHOE) Highway
SUCO2011-001
$15.79 $2.48 $18.27
TRUCK DRIVER: MULTI-PURPOSE SPECIALITY AND HOISTING TRUCK (JEFFERSON) Highway
SUCO2011-001
$15.13 $3.89 $19.02
TRUCK DRIVER: SEMI/TRAILER TRUCK Highway
SUCO2011-001 (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK)
$18.39 $4.13 $22.52
TRUCK DRIVER: SEMI/TRAILER TRUCK (ARAPAHOE) Highway
SUCO2011-001
$16.00 $2.60 $18.60
TRUCK DRIVER: SINGLE AXLE Highway
SUCO2011-001 (INCLUDES PICKUP AND PILOT CAR) (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)
$14.74 $3.68 $18.42
TRUCK DRIVER: SINGLE AXLE Highway
SUCO2011-001 (INCLUDES PICKUP AND PILOT CAR) (ARAPAHOE)
$15.10 $3.77 $18.87
TRUCK DRIVER: SINGLE AXLE Highway
SUCO2011-001 (INCLUDES PICKUP AND PILOT CAR) (ADAMS, JEFFERSON)
$13.93 $3.68 $17.61
TRUCK DRIVER: TRUCK MOUNTED ATTENUATOR Highway
SUCO2011-001
$12.43 $3.22 $15.65
TRUCK DRIVER: WATER TRUCK Highway
SUCO2011-001 (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)
$19.36 $4.07 $23.43
TRUCK DRIVER: WATER TRUCK (ADAMS) Highway
SUCO2011-001
$17.50 $5.19 $22.69
TRUCK DRIVER: WATER TRUCK (JEFFERSON) Highway
SUCO2011-001
$17.57 $5.27 $22.84
WATERPROOFER Building
SUCO2013-012
$16.94 0.00 $16.94

Wage Determinations

Heavy

28 trades

Applies to

Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Clear Creek, Conejos, Costilla, Crowley +42 more

Residential

10 trades

Applies to

Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Clear Creek, Conejos, Costilla, Crowley +42 more

Highway

140 trades

Applies to

Adams, Arapahoe, Clear Creek, Elbert, Gilpin, Jefferson, Park, Broomfield

Get notified when Park County rates change

Wage determinations are revised throughout the year. We'll email you when rates covering Park County, Colorado are modified.

Free, one email when rates change. Unsubscribe anytime.