| CEMENT MASON/CONCRETE FINISHER | 46.09 | 36.29 | 82.38 |
| CARPENTERS, PILEDRIVERS | 42.03 | 29.19 | 71.22 |
| CARPENTER: DIVER TENDER | 42.03 | 29.19 | 71.22 |
| CARPENTER: DIVER | 50.49 | 29.19 | 79.68 |
| CARPENTER: DIVER TENDER | 42.03 | 29.19 | 71.22 |
| CARPENTER: DIVER | 50.49 | 29.19 | 79.68 |
| CARPENTER, PILEDRIVER | 42.03 | 29.19 | 71.22 |
| MILLWRIGHT | 45.14 | 30.24 | 75.38 |
| ELECTRICIAN | 48.25 | 36.67 | 84.92 |
| ELECTRICIAN | 46.48 | 38.05 | 84.53 |
| ELECTRICIAN (HARTLAND TOWNSHIP) | 47.40 | 36.74 | 84.14 |
| POWER EQUIPMENT OPERATORS: GROUP 4 TRENCHING MACHI… | 51.92 | 29.80 | 81.72 |
| POWER EQUIPMENT OPERATORS: GROUP 21 EXCAVATOR, GRA… | 51.92 | 29.80 | 81.72 |
| POWER EQUIPMENT OPERATORS: GROUP 20 EXCAVATOR OVER… | 52.92 | 29.80 | 82.72 |
| POWER EQUIPMENT OPERATORS: GROUP 19 FRONT END LOAD… | 53.33 | 29.80 | 83.13 |
| POWER EQUIPMENT OPERATORS: GROUP 16 ELEVATOR OPERA… | 43.60 | 29.80 | 73.40 |
| POWER EQUIPMENT OPERATORS: GROUP 15 POWER SAFETY B… | 44.70 | 29.80 | 74.50 |
| POWER EQUIPMENT OPERATORS: GROUP 11 CONVEYOR, EART… | 45.96 | 29.80 | 75.76 |
| POWER EQUIPMENT OPERATORS: GROUP 9 FRONT END LOADE… | 48.67 | 29.80 | 78.47 |
| POWER EQUIPMENT OPERATORS: GROUP 7 ASPHALT ROLLER,… | 49.25 | 29.80 | 79.05 |
| POWER EQUIPMENT OPERATORS: GROUP 6 FRONT END LOADE… | 50.22 | 29.80 | 80.02 |
| POWER EQUIPMENT OPERATORS: GROUP 3 CRANES | 56.79 | 29.80 | 86.59 |
| POWER EQUIPMENT OPERATORS: GROUP 2 CRANES | 57.78 | 29.80 | 87.58 |
| POWER EQUIPMENT OPERATORS: GROUP 1 CRANE HANDLING … | 58.19 | 29.80 | 87.99 |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER | 48.67 | 29.80 | 78.47 |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER | 53.33 | 29.80 | 83.13 |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER | 50.22 | 29.80 | 80.02 |
| POWER EQUIPMENT OPERATOR: CRANES | 56.79 | 29.80 | 86.59 |
| POWER EQUIPMENT OPERATOR: CRANES | 57.78 | 29.80 | 87.58 |
| POWER EQUIPMENT OPERATOR: BULLDOZER FINE GRADE | 51.92 | 29.80 | 81.72 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | 50.22 | 29.80 | 80.02 |
| IRONWORKER: STRUCTURAL A. PAID HOLIDAY: LABOR DAY … | 45.25 | 43.62 | 88.87 |
| LABORERS GROUP 9 TOXIC WASTE REMOVERS A OR B WITH … | 38.70 | 28.85 | 67.55 |
| LABORERS GROUP 8 ACETYLENE BURNER | 36.70 | 28.85 | 65.55 |
| LABORERS GROUP 7 TRAFFIC CONTROL SIGNALMAN | 21.42 | 28.85 | 50.27 |
| LABORERS GROUP 6 TOXIC WASTE REMOVER | 37.70 | 28.85 | 66.55 |
| LABORERS GROUP 5 BLASTERS | 37.45 | 28.85 | 66.30 |
| LABORERS GROUP 4 ASBESTOS/LEAD REMOVAL | 38.70 | 28.85 | 67.55 |
| LABORERS GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT B… | 36.20 | 28.85 | 65.05 |
| LABORERS GROUP 2 CHAIN SAW OPERATORS, FENCE AND GU… | 35.95 | 28.85 | 64.80 |
| LABORERS GROUP 1 LABORERS | 35.70 | 28.85 | 64.55 |
| PAINTER (STEEL ONLY) | 38.42 | 22.90 | 61.32 |
| PAINTER (SPRAY ONLY) | 39.42 | 22.90 | 62.32 |
| PAINTER (BRUSH AND ROLLER) | 36.42 | 22.90 | 59.32 |
| TRUCK DRIVER: 3 AXLE & SEMI - TRUCK | 19.93 | 7.39 | 27.32 |
| OPERATOR: EXCAVATOR | 27.77 | 7.60 | 35.37 |
| LABORER: COMMON OR GENERAL | 21.03 | 5.30 | 26.33 |
| IRONWORKER, REINFORCING | 27.13 | 13.57 | 40.70 |
| TRUCK DRIVERS: SPECIALIZED | 36.44 | 32.68 | 69.12 |