| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER General BRCT0001-004 (BRICKLAYERS, CEMENT MASONS, CEMENT FINISHERS, PLASTERERS AND STONE MASONS) | $46.09 | $36.29 | $82.38 |
| BRICKLAYER General BRCT0001-011 Scope differs by code/WD | $46.09 | $36.29 | $82.38 |
| BRICKLAYER General BRCT0001-006 Scope differs by code/WD | $45.56 | $37.97 | $83.53 |
| CARPENTER General CARP0326-018 Scope differs by code/WD | $42.03 | $29.19 | $71.22 |
| CARPENTER General CARP0326-028 (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $42.03 | $29.19 | $71.22 |
| CARPENTER (SCAFFOLD BUILDER) General CARP0326-027 | $42.03 | $29.19 | $71.22 |
| CARPENTER, PILEDRIVER General CARP0326-019 | $42.03 | $29.19 | $71.22 |
| CARPENTER: DIVER General CARP0326-019 | $50.49 | $29.19 | $79.68 |
| CARPENTER: DIVER TENDER General CARP0326-019 | $42.03 | $29.19 | $71.22 |
| CARPENTERS: CARPENTERS, PILEDRIVERS General CARP0326-014 (TOLLAND COUNTY BOLTON, ELLINGTON, SOMERS, TOLLAND, VERNON) | $42.03 | $29.19 | $71.22 |
| CARPENTERS: CARPENTERS, PILEDRIVERS General CARP0326-017 Scope differs by code/WD | $42.03 | $29.19 | $71.22 |
| CARPENTERS: DIVER TENDERS General CARP0326-014 (TOLLAND COUNTY BOLTON, ELLINGTON, SOMERS, TOLLAND, VERNON) | $42.03 | $29.19 | $71.22 |
| CARPENTERS: DIVER TENDERS General CARP0326-017 Scope differs by code/WD | $42.03 | $29.19 | $71.22 |
| CARPENTERS: DIVERS General CARP0326-014 (TOLLAND COUNTY BOLTON, ELLINGTON, SOMERS, TOLLAND, VERNON) | $50.49 | $29.19 | $79.68 |
| CARPENTERS: DIVERS General CARP0326-017 Scope differs by code/WD | $50.49 | $29.19 | $79.68 |
| CARPENTERS:: CARPENTERS, PILEDRIVERS General CARP0326-003 (LITCHFIELD COUNTY HARWINTON, PLYMOUTH, THOMASTON, WATERTOWN MIDDLESEX COUNTY NEW HAVEN COUNTY BEACON FALLS, BETHANY, BRANFORD, CHESHIRE, EAST HAVEN, GUILFORD, HAMDEN. MADISON, MERIDEN, MIDDLEBURY, NAUGATUCK, NEW HAVEN, NORTH BRANFORD, NORTH HAVEN, ORANGE (EAST OF ORANGE CENTER ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE TOLLAND COUNTY ANDOVER, COL | $42.03 | $29.19 | $71.22 |
| CARPENTERS:: DIVER TENDERS General CARP0326-003 (LITCHFIELD COUNTY HARWINTON, PLYMOUTH, THOMASTON, WATERTOWN MIDDLESEX COUNTY NEW HAVEN COUNTY BEACON FALLS, BETHANY, BRANFORD, CHESHIRE, EAST HAVEN, GUILFORD, HAMDEN. MADISON, MERIDEN, MIDDLEBURY, NAUGATUCK, NEW HAVEN, NORTH BRANFORD, NORTH HAVEN, ORANGE (EAST OF ORANGE CENTER ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE TOLLAND COUNTY ANDOVER, COLUMBIA, COV | $42.03 | $29.19 | $71.22 |
| CARPENTERS:: DIVERS General CARP0326-003 (LITCHFIELD COUNTY HARWINTON, PLYMOUTH, THOMASTON, WATERTOWN MIDDLESEX COUNTY NEW HAVEN COUNTY BEACON FALLS, BETHANY, BRANFORD, CHESHIRE, EAST HAVEN, GUILFORD, HAMDEN. MADISON, MERIDEN, MIDDLEBURY, NAUGATUCK, NEW HAVEN, NORTH BRANFORD, NORTH HAVEN, ORANGE (EAST OF ORANGE CENTER ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE TOLLAND COUNTY ANDOVER, COLUMBIA, COVENTRY, | $50.49 | $29.19 | $79.68 |
| CEMENT MASON/CONCRETE FINISHER General SUCT2002-002 Scope differs by code/WD | $17.89 | 0.00 | $17.89 |
| CEMENT MASON/CONCRETE FINISHER General BRCT0001-012 Scope differs by code/WD | $46.09 | $36.29 | $82.38 |
| CEMENT MASON/CONCRETE FINISHER General BRCT0001-007 Scope differs by code/WD | $45.56 | $37.97 | $83.53 |
| DREDGING: CLASS A1: DECK CAPTAIN; MECHANICAL DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: General ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $48.48 | $15.34 | $63.82 |
| DREDGING: CLASS A2: CRANE OPERATOR General ENGI0025-001 (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $43.20 | $14.99 | $58.19 |
| DREDGING: CLASS B1: DERRICK OPERATOR General ENGI0025-001 (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $41.93 | $14.90 | $56.83 |
| DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: General ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $39.46 | $14.73 | $54.19 |
| DREDGING: CLASS C1: MATE, DRAG BARGE OPERATOR, ASSISTANT FILL PLACER, WELDER, STEWARD. INCENTIVE PAY: General ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $38.38 | $14.66 | $53.04 |
| DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: General ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $37.15 | $14.57 | $51.72 |
| DREDGING: CLASS D: OILER, DECKHAND, SHOREMAN, RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR. INCENTIVE PAY: General ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $30.86 | $14.15 | $45.01 |
| DRYWALL FINISHER/TAPER General PAIN0011-023 | $40.32 | $26.75 | $67.07 |
| ELECTRICIAN General ELEC0003-007 (FAIRFIELD COUNTY (DARIEN, GREENWICH, NEW CANAAN, STAMFORD)) | $45.00 | $36.63 | $81.63 |
| ELECTRICIAN General ELEC0003-004 (DARIEN, GREENWICH, NEW CANAAN, STAMFORD AND THE PORTION OF NORWALK LYING WEST OF FIVE MILE RIVER) | $45.00 | $36.63 | $81.63 |
| ELECTRICIAN General ELEC0488-006 (BETHEL, BRIDGEPORT, BROOKFIELD, DANBURY, EASTON, FAIRFIELD, MONROE, NEW FAIRFIELD, NEWTOWN, NORWALK, REDDING, RIDGEFIELD, SHELTON, SHERMAN, STRATFORD, TRUMBALL, WESTON, WESTPORT AND WILTON TOWNSHIPS) | $47.40 | $36.74 | $84.14 |
| ELECTRICIAN General ELEC0003-004 (DARIEN, GREENWICH, NEW CANAAN, STAMFORD AND THE PORTION OF NORWALK LYING WEST OF FIVE MILE RIVER) | $45.00 | $36.63 | $81.63 |
| ELECTRICIAN General ELEC0488-006 (BETHEL, BRIDGEPORT, BROOKFIELD, DANBURY, EASTON, FAIRFIELD, MONROE, NEW FAIRFIELD, NEWTOWN, NORWALK, REDDING, RIDGEFIELD, SHELTON, SHERMAN, STRATFORD, TRUMBALL, WESTON, WESTPORT AND WILTON TOWNSHIPS) | $47.40 | $36.74 | $84.14 |
| ELECTRICIAN General ELEC0003-006 (INCLUDES LOW VOLTAGE AND INSTALLATION OF ALARMS AND SOUND AND COMMUNICATION SYSTEMS) | $45.00 | $36.63 | $81.63 |
| ELECTRICIAN General ELEC0488-003 (HVAC/TEMPERATURE CONTROLS INSTALLATION) | $47.40 | $36.74 | $84.14 |
| ELECTRICIANS General ELEC0035-001 (MIDDLESEX COUNTY (CROMWELL, MIDDLEFIELD, MIDDLETON AND PORTLAND); TOLLAND COUNTY; WINDHAM COUNTY) | $48.25 | $36.67 | $84.92 |
| ELECTRICIANS General ELEC0488-002 Scope differs by code/WD | $47.40 | $36.74 | $84.14 |
| ELECTRICIANS: General ELEC0090-002 | $46.48 | $38.05 | $84.53 |
| FLOOR LAYER: CARPET ONLY General CARP0326-024 | $42.03 | $29.19 | $71.22 |
| FLOOR LAYER: HARDWOOD FLOORS ONLY General CARP0326-025 | $42.03 | $29.19 | $71.22 |
| FLOOR LAYER: VINYL FLOORING ONLY General CARP0326-030 | $42.03 | $29.19 | $71.22 |
| GLAZIER General PAIN0011-014 | $43.13 | $26.75 | $69.88 |
| GLAZIER A. PAID HOLIDAYS: LABOR DAY AND CHRISTMAS DAY General PAIN0011-012 | $41.18 | $24.55 | $65.73 |
| HEAT & FROST INSULATOR General ASBE0033-002 (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $48.81 | $33.65 | $82.46 |
| IRONWORKER, STRUCTURAL General SUCT2002-008 | $28.62 | $10.84 | $39.46 |
| IRONWORKER: REINFORCING A. PAID HOLIDAY: LABOR DAY PROVIDED EMPLOYEE HAS BEEN ON THE PAYROLL FOR THE 5 CONSECUTIVE WORK DAYS PRIOR TO LABOR DAY General IRON0015-005 | $45.25 | $43.62 | $88.87 |
| IRONWORKER: REINFORCING, STRUCTURAL, ORNAMENTAL General IRON0424-001 | $45.25 | $43.62 | $88.87 |
| LABORER:MASON TENDER-CEMENT/CONCRETE General LABO0230-002 | $35.70 | $28.85 | $64.55 |
| LABORERS GROUP 1 LABORERS General LABO0146-003 (UNSKILLED), CONCRETE SPECIALIST | $35.70 | $28.85 | $64.55 |
| LABORERS GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN General LABO0146-003 | $35.95 | $28.85 | $64.80 |
| LABORERS GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER General LABO0146-003 (HANDHELD), MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CURB SETTER | $36.20 | $28.85 | $65.05 |
| LABORERS GROUP 4 ASBESTOS/LEAD REMOVAL General LABO0146-003 | $38.70 | $28.85 | $67.55 |
| LABORERS GROUP 5 BLASTERS General LABO0146-003 | $37.45 | $28.85 | $66.30 |
| LABORERS GROUP 6 TOXIC WASTE REMOVER General LABO0146-003 | $37.70 | $28.85 | $66.55 |
| LABORERS GROUP 7 TRAFFIC CONTROL SIGNALMAN General LABO0146-003 | $21.42 | $28.85 | $50.27 |
| LABORERS GROUP 8: ACETYLENE BURNER General LABO0146-003 (HOURS WORKED WITH A TORCH) | $36.70 | $28.85 | $65.55 |
| LABORERS GROUP 9 TOXIC WASTE REMOVERS A OR B WITH PPE General LABO0146-003 (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO EMPLOYEES REQUIRED TO WEAR OSHA LEVAL A OR B EVEN IF THE PPE IS NOT WORN.) | $38.70 | $28.85 | $67.55 |
| LABORERS: COMMON OR GENERAL General SUCT2002-002 | $13.13 | $4.24 | $17.37 |
| LABORERS: GROUP 1 LABORERS General LABO0146-001 (UNSKILLED), CONCRETE SPECIALIST | $35.70 | $28.85 | $64.55 |
| LABORERS: GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN General LABO0146-001 | $35.95 | $28.85 | $64.80 |
| LABORERS: GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER General LABO0146-001 (HANDHELD), MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CURB SETTER | $36.20 | $28.85 | $65.05 |
| LABORERS: GROUP 4 ASBESTOS/LEAD REMOVAL General LABO0146-001 | $38.70 | $28.85 | $67.55 |
| LABORERS: GROUP 5 BLASTERS General LABO0146-001 | $37.45 | $28.85 | $66.30 |
| LABORERS: GROUP 6 TOXIC WASTE REMOVER General LABO0146-001 | $37.70 | $28.85 | $66.55 |
| LABORERS: GROUP 7 TRAFFIC CONTROL SIGNALMAN General LABO0146-001 | $21.42 | $28.85 | $50.27 |
| LABORERS: GROUP 8: ACETYLENE BURNER General LABO0146-001 (HOURS WORKED WITH A TORCH) | $36.70 | $28.85 | $65.55 |
| LABORERS: GROUP 9: TOXIC WASTE REMOVERS A OR B WITH PPE General LABO0146-001 (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO EMPLOYEES REQUIRED TO WEAR OSHA LEVAL A OR B EVEN IF THE PPE IS NOT WORN.) | $38.70 | $28.85 | $67.55 |
| LABORERS: LANDSCAPE General SUCT2002-002 | $14.96 | $4.63 | $19.59 |
| METAL BUILDING ERECTOR (METAL SIDING / WALL PANELS) General CARP0326-026 | $42.03 | $29.19 | $71.22 |
| MILLWRIGHT General CARP1121-006 Scope differs by code/WD | $45.14 | $30.24 | $75.38 |
| MILLWRIGHT General CARP1121-006 Scope differs by code/WD | $45.14 | $30.24 | $75.38 |
| MILLWRIGHT General CARP1121-006 Scope differs by code/WD | $45.14 | $30.24 | $75.38 |
| PAINTER (BRUSH AND ROLLER) General PAIN0011-013 | $36.42 | $22.90 | $59.32 |
| PAINTER (SPRAY ONLY) General PAIN0011-013 | $39.42 | $22.90 | $62.32 |
| PAINTER (STEEL ONLY) General PAIN0011-013 | $38.42 | $22.90 | $61.32 |
| PAINTER: BRUSH AND ROLLER General PAIN0011-016 Scope differs by code/WD | $38.07 | $25.70 | $63.77 |
| PAINTER: BRUSH AND ROLLER General PAIN0011-021 Scope differs by code/WD | $39.57 | $26.75 | $66.32 |
| PAINTERS: BLAST AND SPRAY General PAIN0011-001 | $42.57 | $26.75 | $69.32 |
| PAINTERS: BRUSH AND ROLL General PAIN0011-001 | $39.57 | $26.75 | $66.32 |
| PAINTERS: BRUSH, ROLLER, BLASTING General PAIN0011-003 (SAND, WATER, ETC.) SPRAY (BRIDGE CONSTRUCTION) | $59.70 | $26.90 | $86.60 |
| PAINTERS: TANKS, TOWERS, SWING General PAIN0011-001 | $41.57 | $26.75 | $68.32 |
| PIPEFITTER General PLUM0777-003 | $50.58 | $35.85 | $86.43 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) General PLUM0777-009 | $50.58 | $35.85 | $86.43 |
| PLUMBER General PLUM0777-001 | $50.58 | $35.85 | $86.43 |
| PLUMBER/PIPEFITTER General PLUM0777-005 (INCLUDING HVAC PIPE INSTALLATION) | $50.58 | $35.85 | $86.43 |
| POWER EQUIPMENT OPERATOR, BULLDOZER: FINEGRADE General ENGI0478-005 (SLOPES, SHAPING, LASER OR GPS, ETC.) PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 |
| POWER EQUIPMENT OPERATOR: BULLDOZER General ENGI0478-006 (ROUGH GRADE DOZER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 |
| POWER EQUIPMENT OPERATOR: BULLDOZER General ENGI0478-007 (ROUGH GRADE DOZER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 |
| POWER EQUIPMENT OPERATOR: CRANES General ENGI0478-007 (UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY. B. CRANE WITH BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA . CRANE WITH BOOM, INCLUDING JIB, 200 FEET- $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - $5.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300 FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA. | $56.79 | $29.80 | $86.59 |
| POWER EQUIPMENT OPERATOR: CRANES General ENGI0478-007 (100 TON CAPACITY & OVER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY. B. CRANE WITH BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA . CRANE WITH BOOM, INCLUDING JIB, 200 FEET- $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - $5.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300 FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA. | $57.78 | $29.80 | $87.58 |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER General ENGI0478-007 (UNDER 3 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $48.67 | $29.80 | $78.47 |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER General ENGI0478-007 (7 CUBIC YARDS OR OVER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 | $83.13 |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER General ENGI0478-007 (3 CUBIC YARDS UP TO 7 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 |
| POWER EQUIPMENT OPERATOR: LOADER General ENGI0478-006 (UNDER 3 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $48.67 | $29.80 | $78.47 |
| POWER EQUIPMENT OPERATOR: LOADER General ENGI0478-006 (7 CUBIC YARDS OR OVER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 | $83.13 |
| POWER EQUIPMENT OPERATOR: LOADER General ENGI0478-006 (3 CUBIC YARDS UP TO 7 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 |
| POWER EQUIPMENT OPERATORS: GROUP 1 CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER General ENGI0478-001 (2 DRUMS OR OVER) HAZARDOUS WASTE PREMIUM BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $58.19 | $29.80 | $87.99 |
| POWER EQUIPMENT OPERATORS: GROUP 1 CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER General ENGI0478-001 (2 DRUMS OR OVER) HAZARDOUS WASTE PREMIUM BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $58.19 | $29.80 | $87.99 |
| POWER EQUIPMENT OPERATORS: GROUP 11 CONVEYOR, EARTH ROLLER, POWER PAVEMENT BREAKER General ENGI0478-001 (WHIPHAMMER), ROBOT DEMOLITION EQUIPMENT. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $45.96 | $29.80 | $75.76 |
| POWER EQUIPMENT OPERATORS: GROUP 11 CONVEYOR, EARTH ROLLER, POWER PAVEMENT BREAKER General ENGI0478-001 (WHIPHAMMER), ROBOT DEMOLITION EQUIPMENT. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $45.96 | $29.80 | $75.76 |
| POWER EQUIPMENT OPERATORS: GROUP 15 POWER SAFETY BOAT, VACUUM TRUCK, ZIM MIXER, SWEEPER; General ENGI0478-001 (MINIMUM FOR ANY JOB REQUIRING A CDL LICENSE) . A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $44.70 | $29.80 | $74.50 |
| POWER EQUIPMENT OPERATORS: GROUP 15 POWER SAFETY BOAT, VACUUM TRUCK, ZIM MIXER, SWEEPER; General ENGI0478-001 (MINIMUM FOR ANY JOB REQUIRING A CDL LICENSE) . A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $44.70 | $29.80 | $74.50 |
| POWER EQUIPMENT OPERATORS: GROUP 16 ELEVATOR OPERATOR, TOW MOTOR OPERATOR General ENGI0478-001 (SOLID TIRE NO ROUGH TERRAIN). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $43.60 | $29.80 | $73.40 |
| POWER EQUIPMENT OPERATORS: GROUP 16 ELEVATOR OPERATOR, TOW MOTOR OPERATOR General ENGI0478-001 (SOLID TIRE NO ROUGH TERRAIN). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $43.60 | $29.80 | $73.40 |
| POWER EQUIPMENT OPERATORS: GROUP 19 FRONT END LOADER General ENGI0478-001 (7 CUBIC YARDS OR OVER); WORK BOAT 26 FT. AND OVER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 | $83.13 |
| POWER EQUIPMENT OPERATORS: GROUP 19 FRONT END LOADER General ENGI0478-001 (7 CUBIC YARDS OR OVER); WORK BOAT 26 FT. AND OVER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 | $83.13 |
| POWER EQUIPMENT OPERATORS: GROUP 2 CRANES General ENGI0478-001 (100 TON CAPACITY & OVER) BAUER DRILL/CAISSON HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - $5.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300 FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $57.78 | $29.80 | $87.58 |
| POWER EQUIPMENT OPERATORS: GROUP 2 CRANES General ENGI0478-001 (100 TON CAPACITY & OVER) BAUER DRILL/CAISSON HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - $5.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300 FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $57.78 | $29.80 | $87.58 |
| POWER EQUIPMENT OPERATORS: GROUP 20 EXCAVATOR OVER 2 CUBIC YARDS; PILE DRIVER General ENGI0478-001 ($3.00 PREMIUM WHEN OPERATOR CONTROLS HAMMER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $52.92 | $29.80 | $82.72 |
| POWER EQUIPMENT OPERATORS: GROUP 20 EXCAVATOR OVER 2 CUBIC YARDS; PILE DRIVER General ENGI0478-001 ($3.00 PREMIUM WHEN OPERATOR CONTROLS HAMMER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $52.92 | $29.80 | $82.72 |
| POWER EQUIPMENT OPERATORS: GROUP 21 EXCAVATOR, GRADALL, MASTER MECHANIC, HOISTING ENGINEER General ENGI0478-001 (ALL TYPES OF EQUIPMENT WHERE A DRUM AND CABLE ARE USED TO HOIST OR DRAG MATERIAL REGARDLESS OF MOTIVE POWER OR OPERAING), RUBBER TIRE EXCAVATOR (DROTT 1085 SIMILAR), GRADER OPERATOR, BULLDOZER FINEGRADE (SLOPES SHAPING, LASER OR GPS, ECT.) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 |
| POWER EQUIPMENT OPERATORS: GROUP 21 EXCAVATOR, GRADALL, MASTER MECHANIC, HOISTING ENGINEER General ENGI0478-001 (ALL TYPES OF EQUIPMENT WHERE A DRUM AND CABLE ARE USED TO HOIST OR DRAG MATERIAL REGARDLESS OF MOTIVE POWER OR OPERAING), RUBBER TIRE EXCAVATOR (DROTT 1085 SIMILAR), GRADER OPERATOR, BULLDOZER FINEGRADE (SLOPES SHAPING, LASER OR GPS, ECT.) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 |
| POWER EQUIPMENT OPERATORS: GROUP 3 CRANES General ENGI0478-001 (UNDER 100 TON RATED CAPACITY) HAZARDOUS WASTE PREMIUM BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $56.79 | $29.80 | $86.59 |
| POWER EQUIPMENT OPERATORS: GROUP 3 CRANES General ENGI0478-001 (UNDER 100 TON RATED CAPACITY) HAZARDOUS WASTE PREMIUM BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $56.79 | $29.80 | $86.59 |
| POWER EQUIPMENT OPERATORS: GROUP 4 TRENCHING MACHINES, LIGHTER DERRICK, CONCRETE FINISHING MACHINE, CMI MACHINE OR SIMILAR, KOEHRING LOADER General ENGI0478-001 (SKOOPER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 |
| POWER EQUIPMENT OPERATORS: GROUP 4 TRENCHING MACHINES, LIGHTER DERRICK, CONCRETE FINISHING MACHINE, CMI MACHINE OR SIMILAR, KOEHRING LOADER General ENGI0478-001 (SKOOPER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 |
| POWER EQUIPMENT OPERATORS: GROUP 6 FRONT END LOADER General ENGI0478-001 (3 CU. YDS. UP TO 7 CU. YARDS), BULLDOZER (ROUGH GRADE DOZER) . A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 |
| POWER EQUIPMENT OPERATORS: GROUP 6 FRONT END LOADER General ENGI0478-001 (3 CU. YDS. UP TO 7 CU. YARDS), BULLDOZER (ROUGH GRADE DOZER) . A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 |
| POWER EQUIPMENT OPERATORS: GROUP 7 ASPHALT ROLLER, CONCRETE SAWS AND CUTTERS General ENGI0478-001 (RIDE ON TYPES), VERMEER CONCRETE CUTTER, STUMP GRINDER, SCRAPER, SNOOPER, SKIDDER, MILLING MACHINE (24"" AND UNDER MANDREL). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $49.25 | $29.80 | $79.05 |
| POWER EQUIPMENT OPERATORS: GROUP 7 ASPHALT ROLLER, CONCRETE SAWS AND CUTTERS General ENGI0478-001 (RIDE ON TYPES), VERMEER CONCRETE CUTTER, STUMP GRINDER, SCRAPER, SNOOPER, SKIDDER, MILLING MACHINE (24"" AND UNDER MANDREL). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $49.25 | $29.80 | $79.05 |
| POWER EQUIPMENT OPERATORS: GROUP 9 FRONT END LOADER General ENGI0478-001 (UNDER 3 CUBIC YARDS), SKID STEER LOADER (REGARDLESS OF ATTACHMENTS), BOBCAT OR SIMILAR, FORKLIFT, POWER CHIPPER, LANDSCAPE EQUIPMENT (INCLUDING HYDROSEEDER), VACUUM EXACAVATION TRUCK AND HYDROVAC EXCAVATION TRUCK (27 HG PRESSURE OR GREATER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $48.67 | $29.80 | $78.47 |
| POWER EQUIPMENT OPERATORS: GROUP 9 FRONT END LOADER General ENGI0478-001 (UNDER 3 CUBIC YARDS), SKID STEER LOADER (REGARDLESS OF ATTACHMENTS), BOBCAT OR SIMILAR, FORKLIFT, POWER CHIPPER, LANDSCAPE EQUIPMENT (INCLUDING HYDROSEEDER), VACUUM EXACAVATION TRUCK AND HYDROVAC EXCAVATION TRUCK (27 HG PRESSURE OR GREATER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $48.67 | $29.80 | $78.47 |
| ROOFER, EXCLUDES SLATE, AND TILE ROOFS General SUCT2002-002 | $23.39 | $7.87 | $31.26 |
| ROOFER: COMPOSITION General ROOF0009-001 | $45.15 | $23.53 | $68.68 |
| ROOFER: SLATE & TILE ROOF A. PAID HOLIDAYS: JULY 4TH, LABOR DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE IS EMPLOYED 15 DAYS PRIOR TO THE HOLIDAY General ROOF0012-003 | $44.50 | $24.80 | $69.30 |
| ROOFER: SLATE AND TILE General ROOF0009-001 | $45.65 | $23.53 | $69.18 |
| SHEET METAL WORKER General SHEE0038-006 (METAL FLASHING AND HVAC DUCT INSTALLATION ONLY) | $50.60 | $45.61 | $96.21 |
| SHEET METAL WORKER General SHEE0040-001 (INCLUDING HVAC UNIT INSTALLATION) | $44.70 | $44.50 | $89.20 |
| SHEET METAL WORKER (METAL ROOFS INSTALLATION) General SHEE0040-008 | $44.70 | $44.50 | $89.20 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION General SHEE0038-003 | $34.95 | $22.70 | $57.65 |
| SOFT FLOOR LAYER General CARP0326-029 | $42.03 | $29.19 | $71.22 |
| TRUCK DRIVER: DUMP TRUCK General TEAM0191-001 | $36.39 | $32.68 | $69.07 |
| TRUCK DRIVERS: SPECIALIZED General TEAM0251-002 (EARTH MOVING EQUIPMENT OTHER THAN CONVENTIONAL TYPE ON-THE-ROAD TRUCKS AND SEMI-TRAILERS, INCLUDING EUCLIDS) HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED | $36.44 | $32.68 | $69.12 |
| TRUCK DRIVERS: SPECIALIZED General TEAM0064-001 (EARTH MOVING EQUIPMENT OTHER THAN CONVENTIONAL TYPE ON-THE-ROAD TRUCKS AND SEMI-TRAILERS, INCLUDING EUCLIDS) HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED | $36.44 | $32.68 | $69.12 |
No trade rates match your search and filter selection.
General
Applies to
Connecticut of Fairfield, Litchfield, Middlesex, New Haven, Tolland, Windham
General
Applies to
Connecticut of Fairfield, Hartford, Litchfield, Middlesex, New Haven, New London, Tolland, Windham
General
General
General