| BRICKLAYER General BRCT0001-011 Scope differs by code/WD | $46.09 | $36.29 | $82.38 |
| BRICKLAYER General BRCT0001-001 Scope differs by code/WD | $45.56 | $36.94 | $82.50 |
| BRICKLAYERS, CEMENT MASONS, CEMENT FINISHERS, PLASTERERS, STONE MASONS General BRCT0001-003 | $46.09 | $36.29 | $82.38 |
| CARPENTER General CARP0326-028 (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $42.03 | $29.19 | $71.22 |
| CARPENTER (DIVER TENDERS) General CARP0326-004 | $42.03 | $29.19 | $71.22 |
| CARPENTER (DIVERS) General CARP0326-004 | $50.49 | $29.19 | $79.68 |
| CARPENTER (SCAFFOLD BUILDER) General CARP0326-027 | $42.03 | $29.19 | $71.22 |
| CARPENTER, INCLUDING DRYWALL HANGING General SUCT2002-006 | $15.50 | 0.00 | $15.50 |
| CARPENTERS, PILEDRIVERS General CARP0326-001 Scope differs by code/WD | $42.03 | $29.19 | $71.22 |
| CARPENTERS, PILEDRIVERS General CARP0326-004 Scope differs by code/WD | $42.03 | $29.19 | $71.22 |
| CARPENTERS: DIVER TENDERS General CARP0326-001 | $42.03 | $29.19 | $71.22 |
| CARPENTERS: DIVERS General CARP0326-001 | $50.49 | $29.19 | $79.68 |
| CEMENT MASON/CONCRETE FINISHER General SUCT2002-006 Scope differs by code/WD | $21.22 | 0.00 | $21.22 |
| CEMENT MASON/CONCRETE FINISHER General SUCT2002-012 Scope differs by code/WD | $25.52 | $8.49 | $34.01 |
| CEMENT MASON/CONCRETE FINISHER General BRCT0001-005 Scope differs by code/WD | $45.56 | $36.94 | $82.50 |
| DRYWALL FINISHER/TAPER General SUCT2002-006 Scope differs by code/WD | $16.25 | $2.70 | $18.95 |
| DRYWALL FINISHER/TAPER General PAIN0011-023 Scope differs by code/WD | $40.32 | $26.75 | $67.07 |
| ELECTRICIAN General ELEC0090-003 (EAST LYME, GROTON, NEW LONDON, OLD LYME, WATERFORD, PLUS THE PART OF LEDYARD WHEREIN THE PROPERTY OF THE SUBMARINE BASE IS LOCATED) | $46.48 | $38.05 | $84.53 |
| ELECTRICIAN General SUCT2002-006 Scope differs by code/WD | $19.99 | $2.00 | $21.99 |
| ELECTRICIAN General ELEC0035-011 (BOZRAH, COLCHESTER, FRANKLIN, GRISWOLD, LEBANON, LEDYARD, LISBON, MONTVILLE, NORTH STONINGTON, NORWICH, PRESTON, SALEM, SPRAGUE, STONINGTON AND VOLUNTOWN) | $48.25 | $36.67 | $84.92 |
| ELECTRICIAN General ELEC0090-003 (EAST LYME, GROTON, NEW LONDON, OLD LYME, WATERFORD, PLUS THE PART OF LEDYARD WHEREIN THE PROPERTY OF THE SUBMARINE BASE IS LOCATED) | $46.48 | $38.05 | $84.53 |
| ELECTRICIAN General ELEC0090-012 Scope differs by code/WD | $46.48 | $38.05 | $84.53 |
| ELECTRICIANS: General ELEC0035-003 (BOZRAH, COLCHESTER, FRANKLIN, GRISWOLD, LEBANON, LEDYARD, LISBON, MONTVILLE, NORTH STONINGTON, NORWICH, PRESTON, SALEM, SPRAGUE, STONINGTON AND VOLUNTOWN) | $48.25 | $36.67 | $84.92 |
| FLOOR LAYER: CARPET ONLY General CARP0326-024 | $42.03 | $29.19 | $71.22 |
| HEAT & FROST INSULATOR General ASBE0033-002 (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $48.81 | $33.65 | $82.46 |
| IRONWORKER: REINFORCING, STRUCTURAL, ORNAMENTAL General IRON0015-010 | $45.25 | $43.62 | $88.87 |
| LABORER: COMMON OR GENERAL General LABO0230-001 | $35.70 | $28.85 | $64.55 |
| LABORER: MASON TENDER-CEMENT/CONCRETE General LABO0230-001 | $35.70 | $28.85 | $64.55 |
| LABORERS GROUP 1 LABORERS General LABO0146-005 (UNSKILLED), CONCRETE SPECIALIST | $35.70 | $28.85 | $64.55 |
| LABORERS GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN General LABO0146-005 | $35.95 | $28.85 | $64.80 |
| LABORERS GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER General LABO0146-005 (HANDHELD), MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CURB SETTER | $36.20 | $28.85 | $65.05 |
| LABORERS GROUP 4 ASBESTOS/LEAD REMOVAL General LABO0146-005 | $38.70 | $28.85 | $67.55 |
| LABORERS GROUP 5 BLASTERS General LABO0146-005 | $37.45 | $28.85 | $66.30 |
| LABORERS GROUP 6 TOXIC WASTE REMOVER General LABO0146-005 | $37.70 | $28.85 | $66.55 |
| LABORERS GROUP 7 TRAFFIC CONTROL SIGNALMAN General LABO0146-005 | $21.42 | $28.85 | $50.27 |
| LABORERS GROUP 8 ACETYLENE BURNER General LABO0146-005 (HOURS WORKED WITH A TORCH) | $36.70 | $28.85 | $65.55 |
| LABORERS GROUP 9 TOXIC WASTE REMOVERS A OR B WITH PPE General LABO0146-005 (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO EMPLOYEES REQUIRED TO WEAR OSHA LEVAL A OR B EVEN IF THE PPE IS NOT WORN.) | $38.70 | $28.85 | $67.55 |
| LABORERS: COMMON OR GENERAL General SUCT2002-006 | $13.23 | $1.63 | $14.86 |
| LABORERS: GROUP 1 LABORERS General LABO0146-001 (UNSKILLED), CONCRETE SPECIALIST | $35.70 | $28.85 | $64.55 |
| LABORERS: GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN General LABO0146-001 | $35.95 | $28.85 | $64.80 |
| LABORERS: GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER General LABO0146-001 (HANDHELD), MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CURB SETTER | $36.20 | $28.85 | $65.05 |
| LABORERS: GROUP 4 ASBESTOS/LEAD REMOVAL General LABO0146-001 | $38.70 | $28.85 | $67.55 |
| LABORERS: GROUP 5 BLASTERS General LABO0146-001 | $37.45 | $28.85 | $66.30 |
| LABORERS: GROUP 6 TOXIC WASTE REMOVER General LABO0146-001 | $37.70 | $28.85 | $66.55 |
| LABORERS: GROUP 7 TRAFFIC CONTROL SIGNALMAN General LABO0146-001 | $21.42 | $28.85 | $50.27 |
| LABORERS: GROUP 8: ACETYLENE BURNER General LABO0146-001 (HOURS WORKED WITH A TORCH) | $36.70 | $28.85 | $65.55 |
| LABORERS: GROUP 9: TOXIC WASTE REMOVERS A OR B WITH PPE General LABO0146-001 (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO EMPLOYEES REQUIRED TO WEAR OSHA LEVAL A OR B EVEN IF THE PPE IS NOT WORN.) | $38.70 | $28.85 | $67.55 |
| LABORERS: LANDSCAPE General SUCT2002-006 | $14.96 | $4.63 | $19.59 |
| MILLWRIGHT General CARP1121-006 Scope differs by code/WD | $45.14 | $30.24 | $75.38 |
| MILLWRIGHT General CARP1121-006 Scope differs by code/WD | $45.14 | $30.24 | $75.38 |
| PAINTER (BRUSH AND ROLLER) General PAIN0011-013 | $36.42 | $22.90 | $59.32 |
| PAINTER (SPRAY ONLY) General PAIN0011-013 | $39.42 | $22.90 | $62.32 |
| PAINTER (STEEL ONLY) General PAIN0011-013 | $38.42 | $22.90 | $61.32 |
| PAINTER: BRUSH AND ROLLER General PAIN0011-021 | $39.57 | $26.75 | $66.32 |
| PAINTER: BRUSH AND ROLLER, EXCLUDES DRYWALL FINISHING/TAPING General SUCT2002-006 | $17.10 | $1.56 | $18.66 |
| PAINTERS: BLAST AND SPRAY General PAIN0011-002 | $42.57 | $26.75 | $69.32 |
| PAINTERS: BRUSH AND ROLL General PAIN0011-002 | $39.57 | $26.75 | $66.32 |
| PAINTERS: BRUSH, ROLLER, BLASTING General PAIN0011-003 (SAND, WATER, ETC.) SPRAY (BRIDGE CONSTRUCTION) | $59.70 | $26.90 | $86.60 |
| PAINTERS: TANKS, TOWERS, SWING General PAIN0011-002 | $41.57 | $26.75 | $68.32 |
| PIPEFITTER General PLUM0777-003 | $50.58 | $35.85 | $86.43 |
| PLUMBER General PLUM0777-001 | $50.58 | $35.85 | $86.43 |
| PLUMBER, INCLUDING HVAC PIPE INSTALLATION General SUCT2002-006 | $16.67 | $2.63 | $19.30 |
| POWER EQUIPMENT OPERATOR, BULLDOZER: FINEGRADE General ENGI0478-005 (SLOPES, SHAPING, LASER OR GPS, ETC.) PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 |
| POWER EQUIPMENT OPERATOR: BULLDOZER General ENGI0478-006 (ROUGH GRADE DOZER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 |
| POWER EQUIPMENT OPERATOR: BULLDOZER General ENGI0478-008 (ROUGH GRADE DOZER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 |
| POWER EQUIPMENT OPERATOR: BULLDOZER FINE GRADE General ENGI0478-008 (INCLUDES SLOPES, SHAPING, LASER OR GPS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 |
| POWER EQUIPMENT OPERATOR: CRANES General ENGI0478-008 (UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY. B. CRANE WITH BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA . CRANE WITH BOOM, INCLUDING JIB, 200 FEET- $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - $5.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300 FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA | $56.79 | $29.80 | $86.59 |
| POWER EQUIPMENT OPERATOR: CRANES General ENGI0478-008 (100 TON CAPACITY & OVER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY. B. CRANE WITH BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA . CRANE WITH BOOM, INCLUDING JIB, 200 FEET- $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - $5.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300 FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA | $57.78 | $29.80 | $87.58 |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER General ENGI0478-008 (UNDER 3 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $48.67 | $29.80 | $78.47 |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER General ENGI0478-008 (7 CUBIC YARDS OR OVER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 | $83.13 |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER General ENGI0478-008 (3 CUBIC YARDS UP TO 7 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 |
| POWER EQUIPMENT OPERATOR: LOADER General ENGI0478-006 (UNDER 3 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $48.67 | $29.80 | $78.47 |
| POWER EQUIPMENT OPERATOR: LOADER General ENGI0478-006 (7 CUBIC YARDS OR OVER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 | $83.13 |
| POWER EQUIPMENT OPERATOR: LOADER General ENGI0478-006 (3 CUBIC YARDS UP TO 7 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 |
| POWER EQUIPMENT OPERATORS: GROUP 1 CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER General ENGI0478-001 (2 DRUMS OR OVER) HAZARDOUS WASTE PREMIUM BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $58.19 | $29.80 | $87.99 |
| POWER EQUIPMENT OPERATORS: GROUP 1 CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR TONE; HOISTING ENGINEER General ENGI0478-002 (2 DRUMS OR OVER). HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH 150 FT. BOOM (INCLUDING JIB): $1.50 EXTRA. CRANE WITH 200 FT. BOOM (INCLUDING JIB): JIB): $5.00 EXTRA. CRANE WITH 300 FT. BOOM (INCLUDING JIB): $7.00 EXTRA. CRANE WITH 400 FT. BOOM (INCLUDING JIB); $10.00 EXTRA. 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $58.19 | $29.80 | $87.99 |
| POWER EQUIPMENT OPERATORS: GROUP 11 CONVEYOR, EARTH ROLLER, POWER PAVEMENT BREAKER General ENGI0478-001 (WHIPHAMMER), ROBOT DEMOLITION EQUIPMENT. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $45.96 | $29.80 | $75.76 |
| POWER EQUIPMENT OPERATORS: GROUP 11 CONVEYOR; EARTH ROLLER; POWER PAVEMENT BREAKER General ENGI0478-002 (WHIPHAMMER); ROBOT DEMOLITION EQUIPMENT. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $45.96 | $29.80 | $75.76 |
| POWER EQUIPMENT OPERATORS: GROUP 15 POWER SAFETY BOAT, VACUUM TRUCK, ZIM MIXER, SWEEPER; General ENGI0478-001 (MINIMUM FOR ANY JOB REQUIRING A CDL LICENSE) . A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $44.70 | $29.80 | $74.50 |
| POWER EQUIPMENT OPERATORS: GROUP 15 POWER SAFETY BOAT; VACUUM TRUCK; ZIM MIXER; SWEEPER; General ENGI0478-002 (MINIMUM FOR ANY JOB REQUIRING A CDL LICENSE) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $44.70 | $29.80 | $74.50 |
| POWER EQUIPMENT OPERATORS: GROUP 16 ELEVATOR OPERATOR, TOW MOTOR OPERATOR General ENGI0478-001 (SOLID TIRE NO ROUGH TERRAIN). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $43.60 | $29.80 | $73.40 |
| POWER EQUIPMENT OPERATORS: GROUP 16 ELEVATOR OPERATOR; TOW MOTOR OPERATOR General ENGI0478-002 (SOLID TIRE NO ROUGH TERRAIN). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $43.60 | $29.80 | $73.40 |
| POWER EQUIPMENT OPERATORS: GROUP 19 FRONT END LOADER General ENGI0478-002 (7 CUBIC YARDS OR OVER); WORK BOAT 26 FT. AND OVER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 | $83.13 |
| POWER EQUIPMENT OPERATORS: GROUP 19 FRONT END LOADER General ENGI0478-001 (7 CUBIC YARDS OR OVER); WORK BOAT 26 FT. AND OVER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 | $83.13 |
| POWER EQUIPMENT OPERATORS: GROUP 2 CRANES General ENGI0478-002 (100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON. HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH 150 FT. BOOM (INCLUDING JIB): $1.50 EXTRA. CRANE WITH 200 FT. BOOM (INCLUDING JIB): $2.50 EXTRA. CRANE WITH 250 FT. BOOM (INCLUDING JIB): $5.00 EXTRA. CRANE WITH 300 FT. BOOM (INCLUDING JIB): $7.00 EXTRA. CRANE WITH 400 FT. BOOM (INCLUDING JIB); $10.00 EXTRA. 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $57.78 | $29.80 | $87.58 |
| POWER EQUIPMENT OPERATORS: GROUP 2 CRANES General ENGI0478-001 (100 TON CAPACITY & OVER) BAUER DRILL/CAISSON HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - $5.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300 FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $57.78 | $29.80 | $87.58 |
| POWER EQUIPMENT OPERATORS: GROUP 20 EXCAVATOR OVER 2 CUBIC YARDS; PILE DRIVER General ENGI0478-002 ($3.00 PREMIUM WHEN OPERATOR CONTROLS HAMMER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $52.92 | $29.80 | $82.72 |
| POWER EQUIPMENT OPERATORS: GROUP 20 EXCAVATOR OVER 2 CUBIC YARDS; PILE DRIVER General ENGI0478-001 ($3.00 PREMIUM WHEN OPERATOR CONTROLS HAMMER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $52.92 | $29.80 | $82.72 |
| POWER EQUIPMENT OPERATORS: GROUP 21 EXCAVATOR, GRADALL, MASTER MECHANIC, HOISTING ENGINEER General ENGI0478-002 (ALL TYPES OF EQUIPMENT WHERE A DRUM AND CABLE ARE USED TO HOIST OR DRAG MATERIAL REGARDLESS OF MOTIVE POWER OR OPERAING), RUBBER TIRE EXCAVATOR (DROTT 1085 SIMILAR), GRADER OPERATOR, BULLDOZER FINEGRADE (SLOPES SHAPING, LASER OR GPS, ECT) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 |
| POWER EQUIPMENT OPERATORS: GROUP 21 EXCAVATOR, GRADALL, MASTER MECHANIC, HOISTING ENGINEER General ENGI0478-001 (ALL TYPES OF EQUIPMENT WHERE A DRUM AND CABLE ARE USED TO HOIST OR DRAG MATERIAL REGARDLESS OF MOTIVE POWER OR OPERAING), RUBBER TIRE EXCAVATOR (DROTT 1085 SIMILAR), GRADER OPERATOR, BULLDOZER FINEGRADE (SLOPES SHAPING, LASER OR GPS, ECT.) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 |
| POWER EQUIPMENT OPERATORS: GROUP 3 CRANES General ENGI0478-002 (UNDER 100 TON RATED CAPACITY). HAZARDOUS WASTE PREMIUM 150 FT. BOOM (INCLUDING JIB): $1.50 EXTRA. CRANE WITH 200 FT. BOOM (INCLUDING JIB): $2.50 EXTRA. CRANE WITH 250 FT. BOOM (INCLUDING JIB): $5.00 EXTRA. CRANE WITH 300 FT. BOOM (INCLUDING JIB): JIB); $10.00 EXTRA. 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $56.79 | $29.80 | $86.59 |
| POWER EQUIPMENT OPERATORS: GROUP 3 CRANES General ENGI0478-001 (UNDER 100 TON RATED CAPACITY) HAZARDOUS WASTE PREMIUM BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $56.79 | $29.80 | $86.59 |
| POWER EQUIPMENT OPERATORS: GROUP 4 TRENCHING MACHINES, LIGHTER DERRICK, CONCRETE FINISHING MACHINE, CMI MACHINE OR SIMILAR, KOEHRING LOADER General ENGI0478-001 (SKOOPER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 |
| POWER EQUIPMENT OPERATORS: GROUP 6 FRONT END LOADER General ENGI0478-002 (3 CU. YDS. UP TO 7 CUBIC YARDS); BULLDOZER (ROUGH GRADE DOZER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 |
| POWER EQUIPMENT OPERATORS: GROUP 6 FRONT END LOADER General ENGI0478-001 (3 CU. YDS. UP TO 7 CU. YARDS), BULLDOZER (ROUGH GRADE DOZER) . A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 |
| POWER EQUIPMENT OPERATORS: GROUP 7 ASPHALT ROLLER, CONCRETE SAWS AND CUTTERS General ENGI0478-001 (RIDE ON TYPES), VERMEER CONCRETE CUTTER, STUMP GRINDER, SCRAPER, SNOOPER, SKIDDER, MILLING MACHINE (24"" AND UNDER MANDREL). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $49.25 | $29.80 | $79.05 |
| POWER EQUIPMENT OPERATORS: GROUP 7 ASPHALT ROLLER; CONCRETE SAWS AND CUTTERS General ENGI0478-002 (RIDE ON TYPES); VERMEER CONCRETE CUTTER; STUMP GRINDER; SCRAPER; SNOOPER; SKIDDER; MILLING MACHINE (24"" AND UNDER MANDREL). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $49.25 | $29.80 | $79.05 |
| POWER EQUIPMENT OPERATORS: GROUP 9 FRONT END LOADER General ENGI0478-002 (UNDER 3 CUBIC YARDS); SKID STEER LOADER (REGARDLESS OF ATTACHMENTS); (BOBCAT OR SIMILAR); FORK LIFT; POWER CHIPPER; LANDSCAPE EQUIPMENT (INCLUDING HYDROSEEDER).VACUUM EXCAVATION TRUCK AND HYDROVAC EXCAVATION TRUCK (27 HG PRESSURE OR GREATER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $48.67 | $29.80 | $78.47 |
| POWER EQUIPMENT OPERATORS: GROUP 9 FRONT END LOADER General ENGI0478-001 (UNDER 3 CUBIC YARDS), SKID STEER LOADER (REGARDLESS OF ATTACHMENTS), BOBCAT OR SIMILAR, FORKLIFT, POWER CHIPPER, LANDSCAPE EQUIPMENT (INCLUDING HYDROSEEDER), VACUUM EXACAVATION TRUCK AND HYDROVAC EXCAVATION TRUCK (27 HG PRESSURE OR GREATER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $48.67 | $29.80 | $78.47 |
| ROOFER: COMPOSITION General ROOF0009-005 Scope differs by code/WD | $45.15 | $23.53 | $68.68 |
| ROOFER: COMPOSITION General ROOF0009-001 Scope differs by code/WD | $45.15 | $23.53 | $68.68 |
| ROOFER: SLATE AND TILE General ROOF0009-005 Scope differs by code/WD | $45.65 | $23.53 | $69.18 |
| ROOFER: SLATE AND TILE General ROOF0009-001 Scope differs by code/WD | $45.65 | $23.53 | $69.18 |
| SHEET METAL WORKER General SHEE0040-003 Scope differs by code/WD | $44.70 | $44.50 | $89.20 |
| SHEET METAL WORKER General SHEE0040-002 (METAL FLASHING AND HVAC DUCT INSTALLATION ONLY) | $44.70 | $44.50 | $89.20 |
| SHEET METAL WORKER General SHEE0040-006 Scope differs by code/WD | $44.70 | $44.50 | $89.20 |
| SHEET METAL WORKER (METAL ROOFS INSTALLATION) General SHEE0040-008 | $44.70 | $44.50 | $89.20 |
| TRUCK DRIVER: 3 AXLE & SEMI - TRUCK General SUCT2002-012 | $19.93 | $7.01 | $26.94 |
| TRUCK DRIVER: DUMP TRUCK General TEAM0191-001 | $36.39 | $32.68 | $69.07 |
| TRUCK DRIVERS: SPECIALIZED General TEAM0064-003 (EARTH MOVING EQUIPMENT OTHER THAN CONVENTIONAL TYPE ON-THE-ROAD TRUCKS AND SEMI-TRAILERS, INCLUDING EUCLIDS) HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED | $36.44 | $32.68 | $69.12 |
| TRUCK DRIVERS: SPECIALIZED General TEAM0064-001 (EARTH MOVING EQUIPMENT OTHER THAN CONVENTIONAL TYPE ON-THE-ROAD TRUCKS AND SEMI-TRAILERS, INCLUDING EUCLIDS) HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED | $36.44 | $32.68 | $69.12 |