New Haven

5 wage determinations 140 trade rates

Popular Trades In New Haven

Trade Rates

Click a row to save its rate for later, then export your selections from the Saved panel.

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Save Trade & Classification Rate Fringe Total
BRICKLAYER Highway
BRCT0001-004 (BRICKLAYERS, CEMENT MASONS, CEMENT FINISHERS, PLASTERERS AND STONE MASONS)
$46.09 $36.29 $82.38
BRICKLAYER Heavy
BRCT0001-011
$46.09 $36.29 $82.38
BRICKLAYER Building
BRCT0001-001
$45.56 $36.94 $82.50
CARPENTER Residential
SUCT2002-005
$16.78 $1.60 $18.38
CARPENTER Building
CARP0326-023 (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, SOFT FLOOR LAYER - VINYL AND RESILIENT)
$42.03 $29.19 $71.22
CARPENTER (SCAFFOLD BUILDER) Building
CARP0326-027
$42.03 $29.19 $71.22
CARPENTER, PILEDRIVER Heavy
CARP0326-020 (ANSONIA, DERBY, MILFORD, ORANGE (WEST OF ORANGE CENTER ROAD AND SOUTH OF ROUTE 1 AND WEST OF THE OYSTER RIVER), OXFORD, SEYMOUR)
$42.03 $29.19 $71.22
CARPENTER: DIVER Heavy
CARP0326-011 (BEACON FALLS, BETHANY, BRANFORD, CHESHIRE, EAST HAVEN, GUILFORD, HAMDEN, MADISON, MERIDEN, MIDDLEBURY, NAUGATUCK, NEW HAVEN, NORTH BRANFORD, NORTH HAVEN, ORANGE (EAST OF ORANGE CENTER ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE)
$50.49 $29.19 $79.68
CARPENTER: DIVER Heavy
CARP0326-020 (ANSONIA, DERBY, MILFORD, ORANGE (WEST OF ORANGE CENTER ROAD AND SOUTH OF ROUTE 1 AND WEST OF THE OYSTER RIVER), OXFORD, SEYMOUR)
$50.49 $29.19 $79.68
CARPENTER: DIVER TENDER Heavy
CARP0326-011 (BEACON FALLS, BETHANY, BRANFORD, CHESHIRE, EAST HAVEN, GUILFORD, HAMDEN, MADISON, MERIDEN, MIDDLEBURY, NAUGATUCK, NEW HAVEN, NORTH BRANFORD, NORTH HAVEN, ORANGE (EAST OF ORANGE CENTER ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE)
$42.03 $29.19 $71.22
CARPENTER: DIVER TENDER Heavy
CARP0326-020 (ANSONIA, DERBY, MILFORD, ORANGE (WEST OF ORANGE CENTER ROAD AND SOUTH OF ROUTE 1 AND WEST OF THE OYSTER RIVER), OXFORD, SEYMOUR)
$42.03 $29.19 $71.22
CARPENTERS, PILEDRIVERS Heavy
CARP0326-011 (BEACON FALLS, BETHANY, BRANFORD, CHESHIRE, EAST HAVEN, GUILFORD, HAMDEN, MADISON, MERIDEN, MIDDLEBURY, NAUGATUCK, NEW HAVEN, NORTH BRANFORD, NORTH HAVEN, ORANGE (EAST OF ORANGE CENTER ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE)
$42.03 $29.19 $71.22
CARPENTERS: CARPENTERS, PILEDRIVERS Highway
CARP0326-014 (TOLLAND COUNTY BOLTON, ELLINGTON, SOMERS, TOLLAND, VERNON)
$42.03 $29.19 $71.22
CARPENTERS: CARPENTERS, PILEDRIVERS Highway
CARP0326-017 Scope differs by code/WD
$42.03 $29.19 $71.22
CARPENTERS: DIVER TENDERS Highway
CARP0326-014 (TOLLAND COUNTY BOLTON, ELLINGTON, SOMERS, TOLLAND, VERNON)
$42.03 $29.19 $71.22
CARPENTERS: DIVER TENDERS Highway
CARP0326-017 Scope differs by code/WD
$42.03 $29.19 $71.22
CARPENTERS: DIVERS Highway
CARP0326-014 (TOLLAND COUNTY BOLTON, ELLINGTON, SOMERS, TOLLAND, VERNON)
$50.49 $29.19 $79.68
CARPENTERS: DIVERS Highway
CARP0326-017 Scope differs by code/WD
$50.49 $29.19 $79.68
CARPENTERS:: CARPENTERS, PILEDRIVERS Highway
CARP0326-003 (LITCHFIELD COUNTY HARWINTON, PLYMOUTH, THOMASTON, WATERTOWN MIDDLESEX COUNTY NEW HAVEN COUNTY BEACON FALLS, BETHANY, BRANFORD, CHESHIRE, EAST HAVEN, GUILFORD, HAMDEN. MADISON, MERIDEN, MIDDLEBURY, NAUGATUCK, NEW HAVEN, NORTH BRANFORD, NORTH HAVEN, ORANGE (EAST OF ORANGE CENTER ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE TOLLAND COUNTY ANDOVER, COL
$42.03 $29.19 $71.22
CARPENTERS:: DIVER TENDERS Highway
CARP0326-003 (LITCHFIELD COUNTY HARWINTON, PLYMOUTH, THOMASTON, WATERTOWN MIDDLESEX COUNTY NEW HAVEN COUNTY BEACON FALLS, BETHANY, BRANFORD, CHESHIRE, EAST HAVEN, GUILFORD, HAMDEN. MADISON, MERIDEN, MIDDLEBURY, NAUGATUCK, NEW HAVEN, NORTH BRANFORD, NORTH HAVEN, ORANGE (EAST OF ORANGE CENTER ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE TOLLAND COUNTY ANDOVER, COLUMBIA, COV
$42.03 $29.19 $71.22
CARPENTERS:: DIVERS Highway
CARP0326-003 (LITCHFIELD COUNTY HARWINTON, PLYMOUTH, THOMASTON, WATERTOWN MIDDLESEX COUNTY NEW HAVEN COUNTY BEACON FALLS, BETHANY, BRANFORD, CHESHIRE, EAST HAVEN, GUILFORD, HAMDEN. MADISON, MERIDEN, MIDDLEBURY, NAUGATUCK, NEW HAVEN, NORTH BRANFORD, NORTH HAVEN, ORANGE (EAST OF ORANGE CENTER ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE TOLLAND COUNTY ANDOVER, COLUMBIA, COVENTRY,
$50.49 $29.19 $79.68
CEMENT MASON/CONCRETE FINISHER Residential
SUCT2002-005
$17.89 0.00 $17.89
CEMENT MASON/CONCRETE FINISHER Heavy
BRCT0001-012
$46.09 $36.29 $82.38
CEMENT MASON/CONCRETE FINISHER Building
BRCT0001-005
$45.56 $36.94 $82.50
DREDGING: CLASS A1: DECK CAPTAIN; MECHANICAL DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$48.48 $15.34 $63.82
DREDGING: CLASS A2: CRANE OPERATOR Heavy
ENGI0025-001 (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$43.20 $14.99 $58.19
DREDGING: CLASS B1: DERRICK OPERATOR Heavy
ENGI0025-001 (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$41.93 $14.90 $56.83
DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$39.46 $14.73 $54.19
DREDGING: CLASS C1: MATE, DRAG BARGE OPERATOR, ASSISTANT FILL PLACER, WELDER, STEWARD. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$38.38 $14.66 $53.04
DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$37.15 $14.57 $51.72
DREDGING: CLASS D: OILER, DECKHAND, SHOREMAN, RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$30.86 $14.15 $45.01
DRYWALL FINISHER/TAPER Building
PAIN0011-023
$40.32 $26.75 $67.07
ELECTRICIAN Highway
ELEC0003-007 (FAIRFIELD COUNTY (DARIEN, GREENWICH, NEW CANAAN, STAMFORD))
$45.00 $36.63 $81.63
ELECTRICIAN Residential
ELEC0090-004 (ENTIRE COUNTY EXCLUDING BEACON FALLS, MIDDLEBURY, MILFORD, NAUGATUCK, OXFORD, PROSPECT, SEYMOUR, SOUTHBURY, WATERBURY AND WOLCOTT TOWNSHIPS)
$46.48 $38.05 $84.53
ELECTRICIAN Residential
ELEC0488-009 (BEACON FALLS, MIDDLEBURY, MILFORD, NAUGATUCK, OXFORD, PROSPECT, SEYMOUR, SOUTHBURY, WATERBURY AND WOLCOTT TOWNSHIPS)
$47.40 $36.74 $84.14
ELECTRICIAN Heavy
ELEC0090-004 (ENTIRE COUNTY EXCLUDING BEACON FALLS, MIDDLEBURY, MILFORD, NAUGATUCK, OXFORD, PROSPECT, SEYMOUR, SOUTHBURY, WATERBURY AND WOLCOTT TOWNSHIPS)
$46.48 $38.05 $84.53
ELECTRICIAN Heavy
ELEC0488-007 (BEACON FALLS, MIDDLEBURY, MILFORD, NAUGATUCK, OXFORD, PROSPECT, SEYMOUR, SOUTHBURY, WATERBURY AND WOLCOTT TOWNSHIPS)
$47.40 $36.74 $84.14
ELECTRICIAN Building
ELEC0090-012 Scope differs by code/WD
$46.48 $38.05 $84.53
ELECTRICIAN Building
ELEC0488-003 (HVAC/TEMPERATURE CONTROLS INSTALLATION)
$47.40 $36.74 $84.14
ELECTRICIAN (ALARM INSTALLATION ONLY) Building
ELEC0090-013
$46.48 $38.05 $84.53
ELECTRICIAN (LOW VOLTAGE WIRING ONLY) Building
ELEC0090-015
$46.48 $38.05 $84.53
ELECTRICIAN: COMMUNICATION TECHNICIAN Building
ELEC0090-014
$46.48 $38.05 $84.53
ELECTRICIANS Highway
ELEC0035-001 (MIDDLESEX COUNTY (CROMWELL, MIDDLEFIELD, MIDDLETON AND PORTLAND); TOLLAND COUNTY; WINDHAM COUNTY)
$48.25 $36.67 $84.92
ELECTRICIANS Highway
ELEC0488-002 Scope differs by code/WD
$47.40 $36.74 $84.14
ELECTRICIANS: Highway
ELEC0090-002
$46.48 $38.05 $84.53
FLOOR LAYER: CARPET ONLY Building
CARP0326-024
$42.03 $29.19 $71.22
FLOOR LAYER: HARDWOOD FLOORS ONLY Building
CARP0326-025
$42.03 $29.19 $71.22
GLAZIER Building
PAIN0011-014
$43.13 $26.75 $69.88
GLAZIER A. PAID HOLIDAYS: LABOR DAY AND CHRISTMAS DAY Residential
PAIN0011-012
$41.18 $24.55 $65.73
HEAT & FROST INSULATOR Building
ASBE0033-002 (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS)
$48.81 $33.65 $82.46
IRONWORKER, STRUCTURAL Heavy
SUCT2002-011
$24.85 $13.83 $38.68
IRONWORKER: REINFORCING A. PAID HOLIDAY: LABOR DAY PROVIDED EMPLOYEE HAS BEEN ON THE PAYROLL FOR THE 5 CONSECUTIVE WORK DAYS PRIOR TO LABOR DAY Heavy
IRON0015-005
$45.25 $43.62 $88.87
IRONWORKER: REINFORCING, STRUCTURAL, ORNAMENTAL Building
IRON0424-001
$45.25 $43.62 $88.87
LABORER: COMMON OR GENERAL Building
SUCT2016-005
$27.85 $18.04 $45.89
LABORER: MASON TENDER- CEMENT/CONCRETE Building
LABO0455-001
$35.70 $28.85 $64.55
LABORERS GROUP 1 LABORERS Heavy
LABO0146-003 (UNSKILLED), CONCRETE SPECIALIST
$35.70 $28.85 $64.55
LABORERS GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN Heavy
LABO0146-003
$35.95 $28.85 $64.80
LABORERS GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER Heavy
LABO0146-003 (HANDHELD), MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CURB SETTER
$36.20 $28.85 $65.05
LABORERS GROUP 4 ASBESTOS/LEAD REMOVAL Heavy
LABO0146-003
$38.70 $28.85 $67.55
LABORERS GROUP 5 BLASTERS Heavy
LABO0146-003
$37.45 $28.85 $66.30
LABORERS GROUP 6 TOXIC WASTE REMOVER Heavy
LABO0146-003
$37.70 $28.85 $66.55
LABORERS GROUP 7 TRAFFIC CONTROL SIGNALMAN Heavy
LABO0146-003
$21.42 $28.85 $50.27
LABORERS GROUP 8: ACETYLENE BURNER Heavy
LABO0146-003 (HOURS WORKED WITH A TORCH)
$36.70 $28.85 $65.55
LABORERS GROUP 9 TOXIC WASTE REMOVERS A OR B WITH PPE Heavy
LABO0146-003 (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO EMPLOYEES REQUIRED TO WEAR OSHA LEVAL A OR B EVEN IF THE PPE IS NOT WORN.)
$38.70 $28.85 $67.55
LABORERS: COMMON OR GENERAL Residential
SUCT2002-005
$10.66 $1.63 $12.29
LABORERS: GROUP 1 LABORERS Highway
LABO0146-001 (UNSKILLED), CONCRETE SPECIALIST
$35.70 $28.85 $64.55
LABORERS: GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN Highway
LABO0146-001
$35.95 $28.85 $64.80
LABORERS: GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER Highway
LABO0146-001 (HANDHELD), MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CURB SETTER
$36.20 $28.85 $65.05
LABORERS: GROUP 4 ASBESTOS/LEAD REMOVAL Highway
LABO0146-001
$38.70 $28.85 $67.55
LABORERS: GROUP 5 BLASTERS Highway
LABO0146-001
$37.45 $28.85 $66.30
LABORERS: GROUP 6 TOXIC WASTE REMOVER Highway
LABO0146-001
$37.70 $28.85 $66.55
LABORERS: GROUP 7 TRAFFIC CONTROL SIGNALMAN Highway
LABO0146-001
$21.42 $28.85 $50.27
LABORERS: GROUP 8: ACETYLENE BURNER Highway
LABO0146-001 (HOURS WORKED WITH A TORCH)
$36.70 $28.85 $65.55
LABORERS: GROUP 9: TOXIC WASTE REMOVERS A OR B WITH PPE Highway
LABO0146-001 (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO EMPLOYEES REQUIRED TO WEAR OSHA LEVAL A OR B EVEN IF THE PPE IS NOT WORN.)
$38.70 $28.85 $67.55
LABORERS: LANDSCAPE Residential
SUCT2002-005
$14.96 $4.63 $19.59
METAL BUILDING ERECTOR (METAL SIDING / WALL PANELS) Building
CARP0326-026
$42.03 $29.19 $71.22
MILLWRIGHT Highway
CARP1121-006
$45.14 $30.24 $75.38
MILLWRIGHT Heavy
CARP1121-006
$45.14 $30.24 $75.38
MILLWRIGHT Building
CARP1121-006
$45.14 $30.24 $75.38
OPERATOR: BULLDOZER Heavy
SUCT2002-011
$25.33 $9.64 $34.97
PAINTER (BRUSH AND ROLLER) Heavy
PAIN0011-013
$36.42 $22.90 $59.32
PAINTER (SPRAY ONLY) Heavy
PAIN0011-013
$39.42 $22.90 $62.32
PAINTER (STEEL ONLY) Heavy
PAIN0011-013
$38.42 $22.90 $61.32
PAINTER: BRUSH AND ROLLER Residential
SUCT2002-005
$14.26 $1.56 $15.82
PAINTER: BRUSH AND ROLLER Building
PAIN0011-021
$39.57 $26.75 $66.32
PAINTERS: BLAST AND SPRAY Highway
PAIN0011-001
$42.57 $26.75 $69.32
PAINTERS: BRUSH AND ROLL Highway
PAIN0011-001
$39.57 $26.75 $66.32
PAINTERS: BRUSH, ROLLER, BLASTING Highway
PAIN0011-003 (SAND, WATER, ETC.) SPRAY (BRIDGE CONSTRUCTION)
$59.70 $26.90 $86.60
PAINTERS: TANKS, TOWERS, SWING Highway
PAIN0011-001
$41.57 $26.75 $68.32
PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) Building
PLUM0777-008
$50.58 $35.85 $86.43
PLUMBER Building
PLUM0777-001
$50.58 $35.85 $86.43
PLUMBER/PIPEFITTER Residential
SUCT2002-005 (INCLUDING HVAC PIPE INSTALLATION)
$16.04 $2.06 $18.10
POWER EQUIPMENT OPERATOR, BULLDOZER: FINEGRADE Building
ENGI0478-005 (SLOPES, SHAPING, LASER OR GPS, ETC.) PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$51.92 $29.80 $81.72
POWER EQUIPMENT OPERATOR: BULLDOZER Residential
ENGI0478-006 (ROUGH GRADE DOZER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$50.22 $29.80 $80.02
POWER EQUIPMENT OPERATOR: CRANES Heavy
ENGI0478-011 (UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY. B. CRANE WITH BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA . CRANE WITH BOOM, INCLUDING JIB, 200 FEET- $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - $5.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300 FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA
$56.79 $29.80 $86.59
POWER EQUIPMENT OPERATOR: CRANES Heavy
ENGI0478-011 (100 TON CAPACITY & OVER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY. B. CRANE WITH BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA . CRANE WITH BOOM, INCLUDING JIB, 200 FEET- $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - $5.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300 FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA
$57.78 $29.80 $87.58
POWER EQUIPMENT OPERATOR: FRONT END LOADER Heavy
ENGI0478-011 (UNDER 3 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$48.67 $29.80 $78.47
POWER EQUIPMENT OPERATOR: FRONT END LOADER Heavy
ENGI0478-011 (7 CUBIC YARDS OR OVER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$53.33 $29.80 $83.13
POWER EQUIPMENT OPERATOR: FRONT END LOADER Heavy
ENGI0478-011 (3 CUBIC YARDS UP TO 7 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$50.22 $29.80 $80.02
POWER EQUIPMENT OPERATOR: LOADER Residential
ENGI0478-006 (UNDER 3 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$48.67 $29.80 $78.47
POWER EQUIPMENT OPERATOR: LOADER Residential
ENGI0478-006 (7 CUBIC YARDS OR OVER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$53.33 $29.80 $83.13
POWER EQUIPMENT OPERATOR: LOADER Residential
ENGI0478-006 (3 CUBIC YARDS UP TO 7 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$50.22 $29.80 $80.02
POWER EQUIPMENT OPERATORS: GROUP 1 CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER Highway
ENGI0478-001 (2 DRUMS OR OVER) HAZARDOUS WASTE PREMIUM BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$58.19 $29.80 $87.99
POWER EQUIPMENT OPERATORS: GROUP 1 CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER Heavy
ENGI0478-001 (2 DRUMS OR OVER) HAZARDOUS WASTE PREMIUM BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$58.19 $29.80 $87.99
POWER EQUIPMENT OPERATORS: GROUP 11 CONVEYOR, EARTH ROLLER, POWER PAVEMENT BREAKER Highway
ENGI0478-001 (WHIPHAMMER), ROBOT DEMOLITION EQUIPMENT. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$45.96 $29.80 $75.76
POWER EQUIPMENT OPERATORS: GROUP 11 CONVEYOR, EARTH ROLLER, POWER PAVEMENT BREAKER Heavy
ENGI0478-001 (WHIPHAMMER), ROBOT DEMOLITION EQUIPMENT. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$45.96 $29.80 $75.76
POWER EQUIPMENT OPERATORS: GROUP 15 POWER SAFETY BOAT, VACUUM TRUCK, ZIM MIXER, SWEEPER; Highway
ENGI0478-001 (MINIMUM FOR ANY JOB REQUIRING A CDL LICENSE) . A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$44.70 $29.80 $74.50
POWER EQUIPMENT OPERATORS: GROUP 15 POWER SAFETY BOAT, VACUUM TRUCK, ZIM MIXER, SWEEPER; Heavy
ENGI0478-001 (MINIMUM FOR ANY JOB REQUIRING A CDL LICENSE) . A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$44.70 $29.80 $74.50
POWER EQUIPMENT OPERATORS: GROUP 16 ELEVATOR OPERATOR, TOW MOTOR OPERATOR Highway
ENGI0478-001 (SOLID TIRE NO ROUGH TERRAIN). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$43.60 $29.80 $73.40
POWER EQUIPMENT OPERATORS: GROUP 16 ELEVATOR OPERATOR, TOW MOTOR OPERATOR Heavy
ENGI0478-001 (SOLID TIRE NO ROUGH TERRAIN). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$43.60 $29.80 $73.40
POWER EQUIPMENT OPERATORS: GROUP 19 FRONT END LOADER Highway
ENGI0478-001 (7 CUBIC YARDS OR OVER); WORK BOAT 26 FT. AND OVER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$53.33 $29.80 $83.13
POWER EQUIPMENT OPERATORS: GROUP 19 FRONT END LOADER Heavy
ENGI0478-001 (7 CUBIC YARDS OR OVER); WORK BOAT 26 FT. AND OVER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$53.33 $29.80 $83.13
POWER EQUIPMENT OPERATORS: GROUP 2 CRANES Highway
ENGI0478-001 (100 TON CAPACITY & OVER) BAUER DRILL/CAISSON HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - $5.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300 FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$57.78 $29.80 $87.58
POWER EQUIPMENT OPERATORS: GROUP 2 CRANES Heavy
ENGI0478-001 (100 TON CAPACITY & OVER) BAUER DRILL/CAISSON HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - $5.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300 FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$57.78 $29.80 $87.58
POWER EQUIPMENT OPERATORS: GROUP 20 EXCAVATOR OVER 2 CUBIC YARDS; PILE DRIVER Highway
ENGI0478-001 ($3.00 PREMIUM WHEN OPERATOR CONTROLS HAMMER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$52.92 $29.80 $82.72
POWER EQUIPMENT OPERATORS: GROUP 20 EXCAVATOR OVER 2 CUBIC YARDS; PILE DRIVER Heavy
ENGI0478-001 ($3.00 PREMIUM WHEN OPERATOR CONTROLS HAMMER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$52.92 $29.80 $82.72
POWER EQUIPMENT OPERATORS: GROUP 21 EXCAVATOR, GRADALL, MASTER MECHANIC, HOISTING ENGINEER Highway
ENGI0478-001 (ALL TYPES OF EQUIPMENT WHERE A DRUM AND CABLE ARE USED TO HOIST OR DRAG MATERIAL REGARDLESS OF MOTIVE POWER OR OPERAING), RUBBER TIRE EXCAVATOR (DROTT 1085 SIMILAR), GRADER OPERATOR, BULLDOZER FINEGRADE (SLOPES SHAPING, LASER OR GPS, ECT.) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$51.92 $29.80 $81.72
POWER EQUIPMENT OPERATORS: GROUP 21 EXCAVATOR, GRADALL, MASTER MECHANIC, HOISTING ENGINEER Heavy
ENGI0478-001 (ALL TYPES OF EQUIPMENT WHERE A DRUM AND CABLE ARE USED TO HOIST OR DRAG MATERIAL REGARDLESS OF MOTIVE POWER OR OPERAING), RUBBER TIRE EXCAVATOR (DROTT 1085 SIMILAR), GRADER OPERATOR, BULLDOZER FINEGRADE (SLOPES SHAPING, LASER OR GPS, ECT.) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$51.92 $29.80 $81.72
POWER EQUIPMENT OPERATORS: GROUP 3 CRANES Highway
ENGI0478-001 (UNDER 100 TON RATED CAPACITY) HAZARDOUS WASTE PREMIUM BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$56.79 $29.80 $86.59
POWER EQUIPMENT OPERATORS: GROUP 3 CRANES Heavy
ENGI0478-001 (UNDER 100 TON RATED CAPACITY) HAZARDOUS WASTE PREMIUM BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET - FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100 TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$56.79 $29.80 $86.59
POWER EQUIPMENT OPERATORS: GROUP 4 TRENCHING MACHINES, LIGHTER DERRICK, CONCRETE FINISHING MACHINE, CMI MACHINE OR SIMILAR, KOEHRING LOADER Highway
ENGI0478-001 (SKOOPER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$51.92 $29.80 $81.72
POWER EQUIPMENT OPERATORS: GROUP 4 TRENCHING MACHINES, LIGHTER DERRICK, CONCRETE FINISHING MACHINE, CMI MACHINE OR SIMILAR, KOEHRING LOADER Heavy
ENGI0478-001 (SKOOPER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$51.92 $29.80 $81.72
POWER EQUIPMENT OPERATORS: GROUP 6 FRONT END LOADER Highway
ENGI0478-001 (3 CU. YDS. UP TO 7 CU. YARDS), BULLDOZER (ROUGH GRADE DOZER) . A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$50.22 $29.80 $80.02
POWER EQUIPMENT OPERATORS: GROUP 6 FRONT END LOADER Heavy
ENGI0478-001 (3 CU. YDS. UP TO 7 CU. YARDS), BULLDOZER (ROUGH GRADE DOZER) . A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$50.22 $29.80 $80.02
POWER EQUIPMENT OPERATORS: GROUP 7 ASPHALT ROLLER, CONCRETE SAWS AND CUTTERS Highway
ENGI0478-001 (RIDE ON TYPES), VERMEER CONCRETE CUTTER, STUMP GRINDER, SCRAPER, SNOOPER, SKIDDER, MILLING MACHINE (24"" AND UNDER MANDREL). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$49.25 $29.80 $79.05
POWER EQUIPMENT OPERATORS: GROUP 7 ASPHALT ROLLER, CONCRETE SAWS AND CUTTERS Heavy
ENGI0478-001 (RIDE ON TYPES), VERMEER CONCRETE CUTTER, STUMP GRINDER, SCRAPER, SNOOPER, SKIDDER, MILLING MACHINE (24"" AND UNDER MANDREL). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$49.25 $29.80 $79.05
POWER EQUIPMENT OPERATORS: GROUP 9 FRONT END LOADER Highway
ENGI0478-001 (UNDER 3 CUBIC YARDS), SKID STEER LOADER (REGARDLESS OF ATTACHMENTS), BOBCAT OR SIMILAR, FORKLIFT, POWER CHIPPER, LANDSCAPE EQUIPMENT (INCLUDING HYDROSEEDER), VACUUM EXACAVATION TRUCK AND HYDROVAC EXCAVATION TRUCK (27 HG PRESSURE OR GREATER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$48.67 $29.80 $78.47
POWER EQUIPMENT OPERATORS: GROUP 9 FRONT END LOADER Heavy
ENGI0478-001 (UNDER 3 CUBIC YARDS), SKID STEER LOADER (REGARDLESS OF ATTACHMENTS), BOBCAT OR SIMILAR, FORKLIFT, POWER CHIPPER, LANDSCAPE EQUIPMENT (INCLUDING HYDROSEEDER), VACUUM EXACAVATION TRUCK AND HYDROVAC EXCAVATION TRUCK (27 HG PRESSURE OR GREATER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
$48.67 $29.80 $78.47
ROOFER, EXCLUDES SLATE, AND TILE ROOFS Residential
SUCT2002-005
$24.20 $7.65 $31.85
ROOFER: COMPOSITION Building
ROOF0009-001
$45.15 $23.53 $68.68
ROOFER: SLATE & TILE ROOF A. PAID HOLIDAYS: JULY 4TH, LABOR DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE IS EMPLOYED 15 DAYS PRIOR TO THE HOLIDAY Residential
ROOF0012-003
$44.50 $24.80 $69.30
ROOFER: SLATE AND TILE Building
ROOF0009-001
$45.65 $23.53 $69.18
SHEET METAL WORKER Building
SHEE0040-001 (INCLUDING HVAC UNIT INSTALLATION)
$44.70 $44.50 $89.20
SHEET METAL WORKER Building
SHEE0040-002 (METAL FLASHING AND HVAC DUCT INSTALLATION ONLY)
$44.70 $44.50 $89.20
SHEET METAL WORKER (METAL ROOFS INSTALLATION) Building
SHEE0040-008
$44.70 $44.50 $89.20
SHEETMETAL WORKER, INCLUDING HVAC DUCT INSTALLATION Residential
SHEE0040-004
$44.70 $44.50 $89.20
SOFT FLOOR LAYER Building
CARP0326-036
$42.03 $29.19 $71.22
TRUCK DRIVER: DUMP TRUCK Building
TEAM0191-001
$36.39 $32.68 $69.07
TRUCK DRIVERS: SPECIALIZED Highway
TEAM0251-002 (EARTH MOVING EQUIPMENT OTHER THAN CONVENTIONAL TYPE ON-THE-ROAD TRUCKS AND SEMI-TRAILERS, INCLUDING EUCLIDS) HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED
$36.44 $32.68 $69.12
TRUCK DRIVERS: SPECIALIZED Heavy
TEAM0064-001 (EARTH MOVING EQUIPMENT OTHER THAN CONVENTIONAL TYPE ON-THE-ROAD TRUCKS AND SEMI-TRAILERS, INCLUDING EUCLIDS) HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED
$36.44 $32.68 $69.12

Wage Determinations

Highway

42 trades

Applies to

Fairfield, Litchfield, Middlesex, New Haven, Tolland, Windham

Heavy

7 trades

Applies to

Fairfield, Hartford, Litchfield, Middlesex, New Haven, New London, Tolland, Windham

Get notified when New Haven County rates change

Wage determinations are revised throughout the year. We'll email you when rates covering New Haven County, Connecticut are modified.

Free, one email when rates change. Unsubscribe anytime.