| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR General ASBE0024-007 (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $40.77 | $20.17 | $60.94 |
| ASBESTOS WORKER/HEAT AND FROST INSULATOR General ASBE0024-001 (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $40.77 | $20.17 | $60.94 |
| BOILERMAKERS General BOIL0193-001 | $47.37 | $25.60 | $72.97 |
| BRICKLAYER General BRDC0001-001 Scope differs by code/WD | $38.80 | $15.17 | $53.97 |
| BRICKLAYER General BRDC0001-002 Scope differs by code/WD | $38.80 | $15.17 | $53.97 |
| BRICKLAYER General SUDC2009-004 Scope differs by code/WD | $20.71 | 0.00 | $20.71 |
| BRICKLAYER: REFRACTORY (FIREBRICK) General BRMD0001-004 | $43.94 | $17.74 | $61.68 |
| CARPENTER, INCLUDING DRYWALL HANGING General SUDC2009-004 | $17.43 | $2.37 | $19.80 |
| CARPENTER: INCLUDES DRYWALL HANGING, FORM WORK, AND SOFT FLOOR LAYING-CARPET General CARP0197-011 | $34.41 | $14.33 | $48.74 |
| CARPENTER/LATHER General CARP0197-010 | $34.41 | $14.33 | $48.74 |
| CEMENT MASON/CONCRETE FINISHER General PLAS0891-006 Scope differs by code/WD | $30.50 | $14.23 | $44.73 |
| CEMENT MASON/CONCRETE FINISHER General SUDC2009-004 Scope differs by code/WD | $18.72 | 0.00 | $18.72 |
| CEMENT MASONS: (HEAVY CONSTRUCTION ONLY) General PLAS0891-001 | $30.50 | $14.23 | $44.73 |
| CEMENT MASONS: CEMENT MASONS General PLAS0891-002 (PAVING & INCIDENTAL GRADING) | $23.50 | $9.75 | $33.25 |
| CEMENT MASONS: CONCRETE SAW OPERATORS General PLAS0891-002 (PAVING & INCIDENTAL GRADING) | $23.50 | $9.75 | $33.25 |
| CEMENT MASONS: FORM SETTERS General PLAS0891-002 (PAVING & INCIDENTAL GRADING) | $23.50 | $9.75 | $33.25 |
| DIVER General CARP0474-007 | $43.92 | $14.47 | $58.39 |
| DIVER TENDER General CARP0474-007 | $36.60 | $14.47 | $51.07 |
| DRYWALL FINISHER/TAPER General SUDC2009-004 | $15.00 | 0.00 | $15.00 |
| ELECTRICAL INSTALLER General ELEC0026-017 (SOUND & COMMUNICATION SYSTEMS) SCOPE OF WORK: INCLUDES LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, VSAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK). WORK EXCLUDED: THE INSTALLATION OF COMPUTER SYSTEMS IN INDUSTRIAL APPLICATIONS SUCH AS ASSEMBLY LINES, ROBOTICS AND COMPUTER CONTROLLER MANUFACTURING SYSTEMS. THE INSTALLATION OF CONDUIT AND/OR RACEWAYS SHALL BE INSTALLED BY INSIDE WIREMEN. ON SITES WHERE THERE IS NO INSIDE WIREMAN EMPLOYED, THE TELEDATA TECHNICIAN MAY INSTALL RACEWAY OR CONDUIT NOT GREATER THAN 10 FEET. FIRE ALARM WORK IS EXCLUDED ON ALL NEW CONSTRUCTION SITES OR WHEREVER THE FIRE ALARM SYSTEM IS INSTALLED IN CONDUIT. ALL HVAC CONTROL WORK | $34.16 | $13.54 | $47.70 |
| ELECTRICIAN General SUDC2009-004 | $19.93 | $3.11 | $23.04 |
| ELECTRICIAN: INCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS General ELEC0026-016 | $59.50 | $23.06 | $82.56 |
| ELECTRICIANS General ELEC0026-001 | $59.50 | $23.06 | $82.56 |
| GLAZIER (GLAZING CONTRACTS OVER $2 MILLION) General PAIN0051-014 | $36.65 | $14.46 | $51.11 |
| GLAZIER: GLAZING CONTRACTS $2 MILLION AND UNDER General PAIN0051-014 | $32.41 | $14.46 | $46.87 |
| IRONWORKER, REINFORCING General IRON0005-012 Scope differs by code/WD | $31.88 | $23.78 | $55.66 |
| IRONWORKER, REINFORCING General IRON0005-012 Scope differs by code/WD | $31.88 | $23.78 | $55.66 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL General IRON0005-005 Scope differs by code/WD | $37.86 | $25.86 | $63.72 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL General IRON0005-005 Scope differs by code/WD | $37.86 | $25.86 | $63.72 |
| LABORER: COMMON OR GENERAL General SUDC2009-003 Scope differs by code/WD | $13.04 | $2.80 | $15.84 |
| LABORER: COMMON OR GENERAL General SUDC2009-004 Scope differs by code/WD | $12.54 | 0.00 | $12.54 |
| LABORER: MASON TENDER - CEMENT/CONCRETE General SUDC2009-003 | $15.40 | $2.85 | $18.25 |
| LABORER: MASON TENDER FOR POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES General SUDC2009-003 (RESTORATION WORK); EXCLUDES POINTING, CAULKING AND CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE AND CEMENT | $11.67 | 0.00 | $11.67 |
| LABORER: MASON TENDER FOR POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES General SUDC2009-004 (RESTORATION WORK); EXCLUDES POINTING, CAULKING AND CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE AND CEMENT | $12.59 | 0.00 | $12.59 |
| LABORER: SKILLED General LABO0011-009 | $30.47 | $8.70 | $39.17 |
| LABORERS GROUP 1 General LABO0011-005 | $34.41 | $8.70 | $43.11 |
| LABORERS GROUP 2 General LABO0011-005 | $35.48 | $8.70 | $44.18 |
| LABORERS GROUP 3 General LABO0011-005 | $38.17 | $8.70 | $46.87 |
| LABORERS GROUP 4 General LABO0011-005 | $39.29 | $8.70 | $47.99 |
| LABORERS: General LABO0011-006 Scope differs by code/WD | $44.04 | $8.70 | $52.74 |
| LABORERS: General LABO0011-006 Scope differs by code/WD | $51.82 | $8.70 | $60.52 |
| LABORERS: ASPHALT RAKER & CONCRETE SAW OPERATOR General LABO0011-007 (PAVING AND INCIDENTAL GRADING) | $24.30 | $8.74 | $33.04 |
| LABORERS: ASPHALT TAMPER & CONCRETE SHOVELER General LABO0011-007 (PAVING AND INCIDENTAL GRADING) | $23.86 | $8.74 | $32.60 |
| LABORERS: BRICK MASONRY WORK General LABO0011-008 (SCAFFOLD BUILDERS, MORTARMEN) | $24.96 | $8.70 | $33.66 |
| LABORERS: BRICK MASONRY WORK (MASON TENDERS) General LABO0011-008 | $24.31 | $8.70 | $33.01 |
| LABORERS: JACK HAMMER General LABO0011-007 (PAVING AND INCIDENTAL GRADING) | $23.89 | $8.74 | $32.63 |
| LABORERS: LABORER (PAVING AND INCIDENTAL GRADING) General LABO0011-007 | $23.06 | $8.74 | $31.80 |
| LABORERS: SAND SETTER & FORM SETTER General LABO0011-007 (PAVING AND INCIDENTAL GRADING) | $25.10 | $8.74 | $33.84 |
| LABORERS:, ASPHALT SHOVELER General LABO0011-007 (PAVING AND INCIDENTAL GRADING) | $23.27 | $8.74 | $32.01 |
| LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 1 General LABO0011-003 | $33.25 | $8.70 | $41.95 |
| LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 2 General LABO0011-003 | $34.27 | $8.70 | $42.97 |
| LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 3 General LABO0011-003 | $34.27 | $8.70 | $42.97 |
| LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 4 General LABO0011-003 | $34.32 | $8.70 | $43.02 |
| LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 5 General LABO0011-003 | $35.00 | $8.70 | $43.70 |
| LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 6 General LABO0011-003 | $35.93 | $8.70 | $44.63 |
| LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 7 General LABO0011-003 | $36.81 | $8.70 | $45.51 |
| LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 8 General LABO0011-003 | $37.95 | $8.70 | $46.65 |
| LABORERS:, SKILLED ASBESTOS ABATEMENT LABORERS General LABO0011-004 (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS) | $32.25 | $8.70 | $40.95 |
| LABORERS:, SKILLED TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS General LABO0011-004 (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS) | $32.25 | $8.70 | $40.95 |
| LINE CONSTRUCTION: CABLE SPLICERS General ELEC0070-001 | $44.56 | $17.50 | $62.06 |
| LINE CONSTRUCTION: EQUIPMENT OPERATORS General ELEC0070-001 | $44.56 | $17.50 | $62.06 |
| LINE CONSTRUCTION: GROUNDMEN General ELEC0070-001 | $18.00 | $11.66 | $29.66 |
| LINE CONSTRUCTION: LINEMEN General ELEC0070-001 | $44.56 | $17.50 | $62.06 |
| LINE CONSTRUCTION: TRUCK DRIVER General ELEC0070-001 | $23.00 | $12.76 | $35.76 |
| MARBLE & STONE MASON General MARB0002-003 (INCLUDES POINTING, CAULKING AND CLEANING OF ALL TYPES OF MASONRY, BRICK, STONE AND CEMENT STRUCTURES) | $45.65 | $21.21 | $66.86 |
| MARBLE, TILE & TERRAZZO FINISHER General MARB0003-004 | $28.85 | $12.55 | $41.40 |
| MILLWRIGHT General CARP0219-001 Scope differs by code/WD | $39.50 | $17.32 | $56.82 |
| MILLWRIGHT General CARP0219-001 Scope differs by code/WD | $39.50 | $17.32 | $56.82 |
| MOSAIC & TERRAZZO WORKER, TILE LAYER General MARB0003-001 | $34.34 | $14.20 | $48.54 |
| PAINTER: BRUSH AND ROLLER General SUDC2009-004 | $15.32 | $5.15 | $20.47 |
| PAINTER: BRUSH, ROLLER, SPRAY AND DRYWALL FINISHER General PAIN0051-015 | $29.16 | $11.86 | $41.02 |
| PAINTERS: General PAIN0051-001 (COMMERCIAL AND MOLD REMEDIATION, PAINTERS, WALLCOVERS AND DRYWALL FINISHERS) | $29.16 | $11.86 | $41.02 |
| PILEDRIVERMAN General CARP0474-006 Scope differs by code/WD | $36.60 | $14.47 | $51.07 |
| PILEDRIVERMAN General CARP0474-006 Scope differs by code/WD | $36.60 | $14.47 | $51.07 |
| PIPEFITTER General PLUM0602-009 (HVAC PIPE INSTALLATION) A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY | $55.00 | $24.46 | $79.46 |
| PLASTERER (INCLUDING FIREPROOFING) General PLAS0891-005 | $32.86 | $10.46 | $43.32 |
| POINTER, CAULKER, CLEANER, INCLUDES POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES General SUDC2009-003 (RESTORATION WORK); EXCLUDES POINTING, CAULKING, CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE OR CEMENT | $18.88 | 0.00 | $18.88 |
| POINTER, CAULKER, CLEANER, INCLUDES POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES General SUDC2009-004 (RESTORATION WORK); EXCLUDES POINTING, CAULKING, CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE OR CEMENT | $18.33 | 0.00 | $18.33 |
| POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2- 35 TON CRANES & ABOVE, DERRICKS, CONCRETE BOOM PUMP, DRILL RIGS General ENGI0077-001 (+50,000 LBS TORQUE), MOLE, MECHANIC. FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY | $43.44 | $13.27 | $56.71 |
| POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 CRANES, HOISTS, DRILL RIGS General ENGI0077-001 (UNDER 50,000 LBS TORQUE), TIE BACK MACHINES, PAVING MIXERS, TUNNEL SHOVELS, BATCH PLANTS, SHIELDS, TUNNEL MINING MACHINES, DRAGLINES, MUCKING MACHINES, GRADERS IN TUNNELS, PILE DRIVING ENGINES, WELDER, HORIZONTAL DIRECTIONAL DRILL OPERATOR, TUG BOATS. A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY | $40.73 | $13.27 | $54.00 |
| POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 BOILERS General ENGI0077-001 (SKELTON), ASPHALT SPREADERS, BULLFLOAT FINISHING MACHINES, CONCRETE FINISHING MACHINES, CONCRETE SPREADERS,CONCRETE MIXER, CONCRETE PUMP, WELL POINTS, HYDRAULIC PUMPS, ELEVATORS, FREEZE UNIITS, TUNNEL MOTORMAN OR DINKY OPERATOR, CONVEYORS, GROUT PUMP, FIREMAN, ULTRA HIGH PRESSURE WATER JET CUTTING TOOL SYSTEM OPERATOR/MECHANIC, HORIZONTAL DIRECTIONAL DRILL LOCATOR, SKID STEERS (FINE GRADING), HIGH LIFTS (LULL TYPE LIFTS). A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY | $31.09 | $13.27 | $44.36 |
| POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 1 GRADALL OPERATOR, CRANE General ENGI0077-002 | $37.07 | $11.17 | $48.24 |
| POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 3 BROOM TRUCK, ASPHALT ROLLER General ENGI0077-002 | $28.09 | $11.17 | $39.26 |
| POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 4 AIR COMPRESSOR, GRADE ROLLERS General ENGI0077-002 | $25.14 | $11.17 | $36.31 |
| POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 5 MECHANIC General ENGI0077-002 | $37.93 | $10.97 | $48.90 |
| POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 1 General ENGI0077-003 | $41.40 | $11.55 | $52.95 |
| POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 2 General ENGI0077-003 | $35.00 | $11.55 | $46.55 |
| POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 3 General ENGI0077-003 | $33.80 | $11.55 | $45.35 |
| POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 4 General ENGI0077-003 | $33.26 | $11.55 | $44.81 |
| POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 5 General ENGI0077-003 | $31.16 | $11.55 | $42.71 |
| POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 6 General ENGI0077-003 | $25.89 | $11.55 | $37.44 |
| ROOFER General ROOF0030-016 Scope differs by code/WD | $36.26 | $14.91 | $51.17 |
| ROOFER General SUDC2009-004 Scope differs by code/WD | $26.33 | 0.00 | $26.33 |
| SHEET METAL WORKER General SUDC2009-004 | $18.33 | 0.00 | $18.33 |
| SPRINKLER FITTER (FIRE SPRINKLERS) General SFDC0669-002 | $45.22 | $27.69 | $72.91 |
| TERRAZZO FINISHER General MARB0003-007 | $28.85 | $12.55 | $41.40 |
| TERRAZZO WORKER/SETTER General MARB0003-006 | $34.34 | $14.20 | $48.54 |
| TILE FINISHER General MARB0003-009 | $28.85 | $12.55 | $41.40 |
| TILE SETTER General MARB0003-008 | $34.34 | $14.20 | $48.54 |
| TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCTION: TRACTOR TRAILER, LOW BOY A. VACATION: EMPLOYEES WILL RECEIVE ONE General TEAM0639-001 (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE | $33.75 | $7.30 | $41.05 |
| TRUCK DRIVERS: PAVING & INCIDENTAL GRADING: ALL PAVING PROJECTS WHERE THE GRADING IS INCIDENTAL TO THE PAVING A. VACATION: EMPLOYEES WILL RECEIVE ONE General TEAM0639-005 (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE | $31.75 | $7.30 | $39.05 |
| TRUCK DRIVERS:, HEAVY & HIGHWAY CONSTRUCTION: TRUCK DRIVERS A. VACATION: EMPLOYEES WILL RECEIVE ONE General TEAM0639-001 (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE | $31.75 | $7.30 | $39.05 |
No trade rates match your search and filter selection.
General
Applies to
District of Columbia of Washington, D.C.
General
Applies to
District of Columbia of Washington, D.C.
General
Applies to
District of Columbia of Washington, D.C.