FL20260031
rev 1General
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, EXCLUDES DRYWALL HANGING General SUFL2009-070 | $11.05 | 0.00 | $11.05 |
| CEMENT MASON/CONCRETE FINISHER General SUFL2009-070 | $8.42 | 0.00 | $8.42 |
| DRYWALL FINISHER/TAPER General SUFL2009-070 | $12.63 | 0.00 | $12.63 |
| DRYWALL HANGER General SUFL2009-070 | $14.29 | 0.00 | $14.29 |
| ELECTRICIAN General SUFL2009-070 | $10.82 | 0.00 | $10.82 |
| GLAZIER General PAIN0078-001 | $28.78 | $14.33 | $43.11 |
| HVAC MECHANIC (HVAC DUCT INSTALLATION ONLY) General SUFL2009-070 | $10.96 | 0.00 | $10.96 |
| INSULATOR: BATT AND BLOWN General SUFL2009-070 | $14.57 | 0.00 | $14.57 |
| LABORER: COMMON OR GENERAL General SUFL2009-070 | $8.11 | 0.00 | $8.11 |
| LABORER: MASON TENDER - CEMENT/CONCRETE General SUFL2009-070 | $9.00 | 0.00 | $9.00 |
| LABORER: PIPELAYER General SUFL2009-070 | $8.35 | 0.00 | $8.35 |
| OPERATOR: BACKHOE General SUFL2009-070 | $13.92 | 0.00 | $13.92 |
| OPERATOR: LOADER General SUFL2009-070 | $12.00 | 0.00 | $12.00 |
| PAINTER: INCLUDES BRUSH, ROLLER AND SPRAY General SUFL2009-070 (EXCLUDES DRYWALL FINISHING/TAPING) | $9.88 | 0.00 | $9.88 |
| PLUMBER General SUFL2009-070 | $13.00 | 0.00 | $13.00 |
| ROOFER, INCLUDES BUILT UP, AND SHAKE & SHINGLE ROOFS General SUFL2009-070 | $11.32 | 0.00 | $11.32 |
| TRUCK DRIVER General SUFL2009-070 | $10.00 | 0.00 | $10.00 |
No trade rates match your search and filter selection.
General