Florida of Lafayette

2 wage determinations 31 trade rates

Popular Trades In Florida of Lafayette

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
CARPENTER, EXCLUDES DRYWALL HANGING General
SUFL2009-083
$11.90 0.00 $11.90
CARPENTER, INCLUDES FORM WORK General
SUFL2009-055
$14.79 $1.81 $16.60
CEMENT MASON/CONCRETE FINISHER General
SUFL2009-055 Scope differs by code/WD
$16.79 0.00 $16.79
CEMENT MASON/CONCRETE FINISHER General
SUFL2009-083 Scope differs by code/WD
$10.09 0.00 $10.09
DRYWALL FINISHER/TAPER General
SUFL2009-083
$10.00 0.00 $10.00
DRYWALL HANGER General
SUFL2009-083
$12.35 0.00 $12.35
ELECTRICIAN General
ELEC1205-004 Scope differs by code/WD
$33.50 $13.85 $47.35
ELECTRICIAN General
SUFL2009-083 Scope differs by code/WD
$10.89 0.00 $10.89
GLAZIER General
PAIN0078-001
$28.78 $14.33 $43.11
HVAC MECHANIC (HVAC DUCT INSTALLATION ONLY) General
SUFL2009-083
$10.30 0.00 $10.30
INSULATOR: BATT AND BLOWN General
SUFL2009-083
$14.70 0.00 $14.70
IRONWORKER: STRUCTURAL AND REINFORCING General
IRON0597-004
$29.50 $12.98 $42.48
LABORER: COMMON OR GENERAL General
SUFL2009-055 Scope differs by code/WD
$9.95 0.00 $9.95
LABORER: COMMON OR GENERAL General
SUFL2009-083 Scope differs by code/WD
$9.00 0.00 $9.00
LABORER: MASON TENDER - CEMENT/CONCRETE General
SUFL2009-083
$9.00 0.00 $9.00
LABORER: PIPELAYER General
SUFL2009-055 Scope differs by code/WD
$11.42 $1.95 $13.37
LABORER: PIPELAYER General
SUFL2009-083 Scope differs by code/WD
$9.46 0.00 $9.46
OPERATOR: BACKHOE General
SUFL2009-083
$13.92 0.00 $13.92
OPERATOR: BACKHOE/EXCAVATOR General
SUFL2009-055
$13.19 0.00 $13.19
OPERATOR: CRANE General
ENGI0673-007 (TOWER CRANE; LOCOMOTIVE CRANE; CRAWLER CRANE; TRUCK CRANE; & HYDRO CRANE)
$35.41 $13.60 $49.01
OPERATOR: CRANE (GANTRY CRANE & BRIDGE CRANE) General
ENGI0673-007
$35.41 $13.60 $49.01
OPERATOR: LOADER General
SUFL2009-083
$12.00 0.00 $12.00
OPERATOR: PAVER General
SUFL2009-055 (ASPHALT, AGGREGATE, AND CONCRETE)
$9.58 0.00 $9.58
PAINTER: BRUSH, ROLLER AND SPRAY General
SUFL2009-055
$10.10 0.00 $10.10
PAINTER: INCLUDES BRUSH, ROLLER AND SPRAY General
SUFL2009-083 (EXCLUDES DRYWALL FINISHING/TAPING)
$10.35 0.00 $10.35
PLUMBER General
SUFL2009-055 Scope differs by code/WD
$12.27 $3.33 $15.60
PLUMBER General
SUFL2009-083 Scope differs by code/WD
$13.00 0.00 $13.00
ROOFER, INCLUDES BUILT UP, AND SHAKE & SHINGLE ROOFS General
SUFL2009-083
$11.64 0.00 $11.64
ROOFER: BUILT UP, COMPOSITION, HOT TAR AND SINGLE PLY General
SUFL2009-055
$12.00 0.00 $12.00
TRUCK DRIVER General
SUFL2009-083
$10.00 0.00 $10.00
TRUCK DRIVER, INCLUDES DUMP AND 10 YARD HAUL AWAY General
SUFL2009-055
$8.00 $0.15 $8.15