FL20260002
rev 2Heavy
Applies to
Alachua, Baker, Bay, Bradford, Brevard, Broward, Calhoun, Charlotte, Citrus, Clay +57 more
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| CARPENTER Residential SUFL2009-081 | $15.83 | 0.00 | $15.83 | |
| CEMENT MASON/CONCRETE FINISHER Residential SUFL2009-081 | $12.81 | 0.00 | $12.81 | |
| COOK (HYDRAULIC DREDGES UNDER 20"") Heavy ENGI0025-006 | $8.11 | $1.73 | $9.84 | |
| DECKHAND (DREDGE 16"" AND OVER) Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| DECKHAND (DREDGE UNDER 16"") Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| DECKHAND (HYDRAULIC DREDGES UNDER 20"") Heavy ENGI0025-006 | $7.77 | $1.73 | $9.50 | |
| DERRICK OPERATOR Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| DOZER OPERATOR Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| DREDGE TENDER OPERATOR (DREDGE 16"" AND OVER) Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| DREDGE TENDER OPERATOR (DREDGE UNDER 16"") Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| DREDGING : CLASS A2: CRANE OPERATOR Heavy ENGI0025-005 (360 SWING) PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $43.20 | $14.99 | $58.19 | |
| DREDGING : CLASS B1: DERRICK OPERATOR Heavy ENGI0025-005 (180 SWING), SPIDER/SPILL BARGE OPERATOR, TIMBER FORK OPERATOR, DOZER OPERATOR, ENGINEER, BLASTER/DRILLER, FILL PLACER, ELECTRICIAN, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55 | $41.93 | $14.90 | $56.83 | |
| ELECTRICIAN Residential SUFL2009-081 | $10.80 | 0.00 | $10.80 | |
| ENGINEER (HYDRAULIC DREDGES UNDER 20"") Heavy ENGI0025-006 | $9.59 | $1.73 | $11.32 | |
| FIREMAN (DREDGE 16"" AND OVER) Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| FIRST ASSISTANT ENGINEER (DREDGE 16"" AND OVER) Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| FIRST COOK (HYDRAULIC DREDGING) Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| HANDYMAN (HYDRAULIC DREDGING) Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| HVAC MECHANIC Residential SUFL2009-081 (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $13.96 | 0.00 | $13.96 | |
| JANITOR - CABIN PERSON (HYDRAULIC DREDGING) Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| LABORER: COMMON OR GENERAL Residential SUFL2009-081 | $7.25 | 0.00 | $7.25 | |
| LABORER: COMMON OR GENERAL Heavy SUFL2009-132 | $8.19 | 0.00 | $8.19 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Residential SUFL2009-081 | $9.00 | 0.00 | $9.00 | |
| LABORER: PIPELAYER Residential SUFL2009-081 | $9.71 | 0.00 | $9.71 | |
| LABORER: PIPELAYER Heavy SUFL2009-132 | $11.58 | 0.00 | $11.58 | |
| LAUNCHMAN (HYDRAULIC DREDGES UNDER 20"") Heavy ENGI0025-006 | $8.19 | $1.73 | $9.92 | |
| LEVERMAN (DREDGE 16"" AND OVER) Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| LEVERMAN (DREDGE UNDER 16"") Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| LEVERMAN (HYDRAULIC DREDGES UNDER 20"") Heavy ENGI0025-006 | $10.03 | $1.73 | $11.76 | |
| MATE (HYDRAULIC DREDGES UNDER 20"") Heavy ENGI0025-006 | $8.82 | $1.73 | $10.55 | |
| MESS COOK (HYDRAULIC DREDGES UNDER 20"") Heavy ENGI0025-006 | $7.71 | $1.73 | $9.44 | |
| MESSMAN & JANITOR (HYDRAULIC DREDGES UNDER 20"") Heavy ENGI0025-006 | $7.53 | $1.73 | $9.26 | |
| OILER (DREDGE 16"" AND OVER) Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| OILER (DREDGE UNDER 16"") Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| OILER (MARSH BUGGY DRAGLINE) Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| OILER & FIREMAN (HYDRAULIC DREDGES UNDER 20"") Heavy ENGI0025-006 | $8.11 | $1.73 | $9.84 | |
| OPERATOR (MARSH BUGGY DRAGLINE) Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| OPERATOR: BACKHOE Residential SUFL2009-081 | $13.92 | 0.00 | $13.92 | |
| OPERATOR: BACKHOE/EXCAVATOR Heavy SUFL2009-132 | $12.25 | $1.33 | $13.58 | |
| OPERATOR: BULLDOZER Heavy SUFL2009-132 | $13.30 | $1.92 | $15.22 | |
| OPERATOR: LOADER Residential SUFL2009-081 | $12.00 | 0.00 | $12.00 | |
| OPERATOR: LOADER Heavy SUFL2009-132 | $14.13 | $1.94 | $16.07 | |
| PAINTER: BRUSH AND SPRAY Heavy PAIN0088-007 | $20.21 | $12.38 | $32.59 | |
| PLUMBER, EXCLUDES HVAC UNIT INSTALLATION Residential SUFL2009-081 | $13.23 | 0.00 | $13.23 | |
| ROOFER, INCLUDES BUILT UP, AND SHAKE & SHINGLE ROOFS Residential SUFL2009-081 | $12.70 | 0.00 | $12.70 | |
| SECOND ASSISTANT ENGINEER (DREDGE 16"" AND OVER) Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| SECOND COOK (HYDRAULIC DREDGING) Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| SELF-PROPELLED HOPPER DREDGE DRAG TENDERS THE FOLLOWING RATES WERE REVISED PURSUANT TO 29 CFR 1.6(C)(1) ON 02/07/2025 Heavy SUFL1993-010 Scope differs by code/WD | $19.70 | 0.00 | $19.70 | |
| SELF-PROPELLED HOPPER DREDGE DRAG TENDERS THE FOLLOWING RATES WERE REVISED PURSUANT TO 29 CFR 1.6(C)(1) ON 02/07/2025 Heavy SUFL1993-010 Scope differs by code/WD | $19.70 | 0.00 | $19.70 | |
| SHOREMAN (DREDGE 16"" AND OVER) Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| SHOREMAN (HYDRAULIC DREDGES UNDER 20"") Heavy ENGI0025-006 | $7.82 | $1.73 | $9.55 | |
| SPIDER BARGE OPERATOR (HYDRAULIC DREDGES UNDER 20"") Heavy ENGI0025-006 | $8.68 | $1.73 | $10.41 | |
| SPILL BARGE OPERATOR (HYDRAULIC DREDGES UNDER 20"") Heavy ENGI0025-006 | $8.68 | $1.73 | $10.41 | |
| THIRD ASSISTANT ENGINEER (DREDGE 16"" AND OVER) Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| TRUCK DRIVER (DREDGE 16"" AND OVER) Heavy SUFL1990-034 | $19.67 | 0.00 | $19.67 | |
| TRUCK DRIVER, INCLUDES DUMP AND LOWBOY Residential SUFL2009-081 | $11.40 | 0.00 | $11.40 | |
| TRUCK DRIVER: DISTRIBUTOR, DUMP, LOWBOY AND TANDEM Heavy SUFL2009-132 | $14.00 | 0.00 | $14.00 | |
| WELDER (HYDRAULIC DREDGES UNDER 20"") Heavy ENGI0025-006 | $9.79 | $1.73 | $11.52 |
No trade rates match your search and filter selection.
Heavy
Applies to
Alachua, Baker, Bay, Bradford, Brevard, Broward, Calhoun, Charlotte, Citrus, Clay +57 more
Residential
Heavy
Heavy
Applies to
Alachua, Baker, Bay, Bradford, Brevard, Broward, Calhoun, Charlotte, Citrus, Clay +57 more
Wage determinations are revised throughout the year. We'll email you when rates covering Highlands County, Florida are modified.
Free, one email when rates change. Unsubscribe anytime.