GA20260003
rev 1Highway
17 trades
Applies to
Barrow, Bartow, Butts, Carroll, Cherokee, Clayton, Cobb, Coweta, Dawson, Dekalb +19 more
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| BRICKLAYER Residential SUGA2008-085 | $13.83 | 0.00 | $13.83 | |
| CARPENTER Highway SUGA2022-003 | $32.68 | 0.00 | $32.68 | |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK Residential SUGA2008-085 | $12.00 | 0.00 | $12.00 | |
| CEMENT MASON/CONCRETE FINISHER Highway SUGA2022-003 | $30.37 | 0.00 | $30.37 | |
| CEMENT MASON/CONCRETE FINISHER Residential SUGA2008-085 | $13.02 | $3.52 | $16.54 | |
| DRYWALL FINISHER/TAPER Residential SUGA2008-085 | $13.45 | 0.00 | $13.45 | |
| DRYWALL HANGER Residential SUGA2008-085 | $11.42 | 0.00 | $11.42 | |
| ELECTRICIAN, INCLUDES INSTALLATION OF ALARMS Residential SUGA2008-085 | $11.57 | 0.00 | $11.57 | |
| FORM WORKER Residential SUGA2008-085 | $8.50 | $0.16 | $8.66 | |
| HVAC MECHANIC (HVAC PIPE INSTALLATION) Residential SUGA2008-085 | $11.14 | 0.00 | $11.14 | |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR Highway SUGA2022-003 | $17.23 | $2.23 | $19.46 | |
| LABORER: COMMON OR GENERAL Highway SUGA2022-003 | $18.70 | 0.00 | $18.70 | |
| LABORER: COMMON OR GENERAL Residential SUGA2008-085 | $8.25 | 0.00 | $8.25 | |
| LABORER: MASON TENDER Residential SUGA2008-085 | $8.00 | 0.00 | $8.00 | |
| LABORER: PIPELAYER Highway SUGA2022-003 | $22.42 | 0.00 | $22.42 | |
| OPERATING ENGINEER: BULLDOZER Residential ENGI0926-014 | $28.32 | $13.45 | $41.77 | |
| OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADER Residential ENGI0926-009 | $28.32 | $13.45 | $41.77 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Highway SUGA2022-003 | $23.53 | $3.63 | $27.16 | |
| OPERATOR: BULLDOZER Highway SUGA2022-003 | $24.68 | $2.59 | $27.27 | |
| OPERATOR: CRANE Highway SUGA2022-003 | $39.31 | 0.00 | $39.31 | |
| OPERATOR: EXCAVATOR Residential SUGA2008-085 | $8.96 | 0.00 | $8.96 | |
| OPERATOR: GRADER/BLADE Highway SUGA2022-003 | $26.18 | $4.28 | $30.46 | |
| OPERATOR: LOADER Highway SUGA2022-003 | $22.37 | $1.40 | $23.77 | |
| OPERATOR: MILLING MACHINE Highway SUGA2022-003 | $29.67 | $6.29 | $35.96 | |
| OPERATOR: PAVER Highway SUGA2022-003 (ASPHALT, AGGREGATE, AND CONCRETE) | $23.62 | $4.10 | $27.72 | |
| OPERATOR: ROLLER Highway SUGA2022-003 | $18.89 | $3.99 | $22.88 | |
| OPERATOR: SCREED Highway SUGA2022-003 | $21.00 | $4.22 | $25.22 | |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING Residential SUGA2008-085 | $10.57 | 0.00 | $10.57 | |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION Residential SUGA2008-085 | $10.95 | 0.00 | $10.95 | |
| ROOFER Residential SUGA2008-085 | $11.50 | 0.00 | $11.50 | |
| SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings over 100,000 square feet) Residential SHEE0085-006 | $32.60 | $15.52 | $48.12 | |
| SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) Residential SHEE0085-006 | $25.49 | $11.73 | $37.22 | |
| TILE SETTER Residential SUGA2008-085 | $11.07 | 0.00 | $11.07 | |
| TRAFFIC CONTROL: FLAGGER Highway SUGA2022-003 | $14.80 | $2.76 | $17.56 | |
| TRUCK DRIVER Residential SUGA2008-085 | $12.13 | 0.00 | $12.13 | |
| TRUCK DRIVER: DUMP TRUCK Highway SUGA2022-003 | $22.21 | $3.58 | $25.79 | |
| TRUCK DRIVER: LOWBOY TRUCK Highway SUGA2022-003 | $25.43 | $4.00 | $29.43 |
No trade rates match your search and filter selection.
Highway
Applies to
Barrow, Bartow, Butts, Carroll, Cherokee, Clayton, Cobb, Coweta, Dawson, Dekalb +19 more
Residential
Wage determinations are revised throughout the year. We'll email you when rates covering Butts County, Georgia are modified.
Free, one email when rates change. Unsubscribe anytime.