Georgia of Barrow

1 wage determination 20 trade rates

Popular Trades In Georgia of Barrow

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
BRICKLAYER General
SUGA2008-081
$13.83 0.00 $13.83
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK General
SUGA2008-081
$12.00 0.00 $12.00
CEMENT MASON/CONCRETE FINISHER General
SUGA2008-081
$13.02 $3.52 $16.54
DRYWALL FINISHER/TAPER General
SUGA2008-081
$13.45 0.00 $13.45
DRYWALL HANGER General
SUGA2008-081
$11.42 0.00 $11.42
ELECTRICIAN, INCLUDES INSTALLATION OF ALARMS General
SUGA2008-081
$11.57 0.00 $11.57
FORM WORKER General
SUGA2008-081
$8.50 $0.16 $8.66
HVAC MECHANIC (HVAC PIPE INSTALLATION) General
SUGA2008-081
$11.14 0.00 $11.14
LABORER: COMMON OR GENERAL General
SUGA2008-081
$10.19 0.00 $10.19
LABORER: MASON TENDER General
SUGA2008-081
$8.00 0.00 $8.00
OPERATING ENGINEER: BULLDOZER General
ENGI0926-014
$28.32 $13.45 $41.77
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADER General
ENGI0926-009
$28.32 $13.45 $41.77
OPERATOR: EXCAVATOR General
SUGA2008-081
$8.96 0.00 $8.96
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING General
SUGA2008-081
$10.57 0.00 $10.57
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION General
SUGA2008-081
$10.95 0.00 $10.95
ROOFER General
SUGA2008-081
$11.50 0.00 $11.50
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings over 100,000 square feet) General
SHEE0085-006
$32.60 $15.52 $48.12
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet) General
SHEE0085-006
$25.49 $11.73 $37.22
TILE SETTER General
SUGA2008-081
$11.07 0.00 $11.07
TRUCK DRIVER General
SUGA2008-081
$12.13 0.00 $12.13

Wage Determinations