ID20260005
rev 1Residential
10 trades
Applies to
Bannock, Bear Lake, Caribou, Franklin, Oneida, Power
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| BRICKLAYER Residential SUID1979-001 | $10.25 | $1.00 | $11.25 | |
| BRICKLAYER Building BRID0003-002 | $30.00 | $17.78 | $47.78 | |
| CARPENTER Residential SUID1979-001 | $7.25 | 0.00 | $7.25 | |
| CARPENTER (FORM WORK ONLY) Heavy SUID2010-037 | $25.27 | $9.10 | $34.37 | |
| CARPENTER (FORM WORK ONLY) Highway SUID2013-015 | $26.57 | $8.10 | $34.67 | |
| CARPENTER: EXCLUDES FORM WORK Heavy CARP0808-009 (ADAMS, BEAR LAKE, BINGHAM, BOISE, BUTTE, BONNEVILLE, CAMAS, CARIBOU, CASSIA, CLARK, CUSTER, ELMORE, FRANKLIN, FREMONT, GEM, GOODING, IDAHO (SOUTH OF THE 46TH PARALLEL), JEFFERSON, JEROME, LEMHI, LINCOLN, MADISON, MINIDOKA, ONEIDA, OWYHEE, PAYETTE, POWER, TETON, TWIN FALLS, VALLEY AND WASHINGTON COUNTIES) ZONE PAY: ZONE 1 0-30 MILES: FREE ZONE 2 MORE THAN 30-60 MILES: $2.00/PER HOUR ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $35.68 | $18.24 | $53.92 | |
| CEMENT MASON/CONCRETE FINISHER Residential SUID1979-001 | $9.53 | 0.00 | $9.53 | |
| CEMENT MASON/CONCRETE FINISHER Building SUID2010-006 | $14.76 | $2.80 | $17.56 | |
| CEMENT MASON/CONCRETE FINISHER Heavy SUID2010-037 | $18.02 | 0.00 | $18.02 | |
| CEMENT MASON/CONCRETE FINISHER Highway PLAS0072-001 (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 | |
| ELECTRICIAN Residential SUID1979-001 | $9.65 | 0.00 | $9.65 | |
| ELECTRICIAN Heavy ELEC0449-004 | $40.00 | $18.74 | $58.74 | |
| ELECTRICIAN Highway SUID2013-015 | $25.00 | $10.93 | $35.93 | |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) Building ELEC0449-007 | $40.00 | $18.74 | $58.74 | |
| HIGHWAY/PARKING LOT STRIPING: PAINTER Highway SUID2013-015 | $24.80 | $6.91 | $31.71 | |
| INSULATOR - MECHANICAL Building SUID2010-006 (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $20.13 | $1.80 | $21.93 | |
| IRONWORKER, REINFORCING Heavy SUID2010-037 | $27.22 | $16.70 | $43.92 | |
| IRONWORKER, STRUCTURAL Building IRON0732-002 | $33.37 | $22.98 | $56.35 | |
| IRONWORKER, STRUCTURAL Heavy IRON0732-003 | $33.37 | $22.98 | $56.35 | |
| LABORER Residential SUID1979-001 | $7.25 | 0.00 | $7.25 | |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR Highway SUID2013-015 | $23.37 | $10.50 | $33.87 | |
| LABORER: COMMON OR GENERAL Heavy SUID2010-037 | $20.26 | $10.15 | $30.41 | |
| LABORER: COMMON OR GENERAL Highway SUID2013-015 | $22.68 | $10.90 | $33.58 | |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) Highway SUID2013-015 | $23.98 | $11.05 | $35.03 | |
| LABORER: GRADE CHECKER Highway SUID2013-015 | $23.52 | $11.05 | $34.57 | |
| LABORER: GROUP 1 COMMON OR GENERAL Building LABO0155-005 Scope differs by code/WD | $32.62 | $16.50 | $49.12 | |
| LABORER: GROUP 1 COMMON OR GENERAL Building LABO0155-005 Scope differs by code/WD | $32.62 | $16.50 | $49.12 | |
| LABORER: GROUP 1 FLAGGER Heavy LABO0155-008 | $33.63 | $16.50 | $50.13 | |
| LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR Heavy LABO0155-008 | $33.83 | $16.50 | $50.33 | |
| LABORER: GROUP 4 MASON TENDER - CEMENT/CONCRETE Building LABO0155-005 Scope differs by code/WD | $33.93 | $16.50 | $50.43 | |
| LABORER: GROUP 4 MASON TENDER - CEMENT/CONCRETE Building LABO0155-005 Scope differs by code/WD | $33.93 | $16.50 | $50.43 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Highway SUID2013-015 | $23.42 | $10.90 | $34.32 | |
| LABORER: PIPELAYER Heavy SUID2010-037 | $18.23 | $3.77 | $22.00 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Heavy SUID2010-037 | $21.15 | $6.14 | $27.29 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Highway SUID2013-015 | $25.74 | $10.07 | $35.81 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Heavy SUID2010-037 | $21.05 | 0.00 | $21.05 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Highway SUID2013-015 | $25.35 | $11.55 | $36.90 | |
| OPERATOR: BROOM/SWEEPER Highway SUID2013-015 | $24.95 | $10.18 | $35.13 | |
| OPERATOR: BULLDOZER Highway SUID2013-015 | $26.19 | $9.60 | $35.79 | |
| OPERATOR: CONCRETE BATCH PLANT Heavy SUID2010-037 | $24.94 | $11.96 | $36.90 | |
| OPERATOR: CRANE Heavy SUID2010-037 | $24.30 | $8.38 | $32.68 | |
| OPERATOR: CRANE Highway SUID2013-015 | $26.22 | $10.00 | $36.22 | |
| OPERATOR: CRUSHER Highway SUID2013-015 | $25.06 | $9.23 | $34.29 | |
| OPERATOR: FORKLIFT Heavy SUID2010-037 | $17.00 | 0.00 | $17.00 | |
| OPERATOR: GRADER/BLADE Heavy SUID2010-037 | $24.91 | $8.79 | $33.70 | |
| OPERATOR: GRADER/BLADE Highway SUID2013-015 | $25.96 | $10.00 | $35.96 | |
| OPERATOR: HYDROSEEDER Highway SUID2013-015 | $24.76 | $11.51 | $36.27 | |
| OPERATOR: LOADER Highway SUID2013-015 | $26.22 | $9.98 | $36.20 | |
| OPERATOR: LOADER (FRONT END) Heavy SUID2010-037 | $21.33 | $4.25 | $25.58 | |
| OPERATOR: MECHANIC Highway SUID2013-015 | $26.91 | $10.22 | $37.13 | |
| OPERATOR: OILER Highway SUID2013-015 | $25.66 | $9.23 | $34.89 | |
| OPERATOR: PAVER Highway SUID2013-015 (ASPHALT, AGGREGATE, AND CONCRETE) | $26.13 | $10.40 | $36.53 | |
| OPERATOR: ROLLER Highway SUID2013-015 | $25.54 | $10.62 | $36.16 | |
| OPERATOR: ROLLER (SUBGRADE) Highway SUID2013-015 | $22.24 | $8.57 | $30.81 | |
| OPERATOR: ROTOMILL Highway SUID2013-015 | $25.84 | $10.63 | $36.47 | |
| OPERATOR: SCREED Highway SUID2013-015 | $25.42 | $9.93 | $35.35 | |
| PAINTER Residential SUID1979-001 | $8.81 | 0.00 | $8.81 | |
| PAINTER: BRUSH, ROLLER AND SPRAY Building SUID2010-006 | $16.12 | 0.00 | $16.12 | |
| PLUMBER Residential SUID1979-001 | $9.86 | 0.00 | $9.86 | |
| PLUMBER Building PLUM0648-004 | $36.75 | $18.93 | $55.68 | |
| POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER Heavy ENGI0370-032 (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | |
| POWER EQUIPMENT OPERATOR: GROUP 3 FORKLIFT ZONE 1 Building ENGI0302-033 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.33 | $16.10 | $52.43 | |
| POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE Building ENGI0302-033 (UP TO 3/4 YD), INDUSTRIAL OILER ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.81 | $16.10 | $52.91 | |
| POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE Building ENGI0302-033 (3/4 YD TO 3 1/2 YD), CRANE (UP TO AND INCLUDING 50 TON) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $36.98 | $16.10 | $53.08 | |
| POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING Heavy ENGI0370-032 (BIT UNDER 8IN), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.98 | $16.10 | $53.08 | |
| POWER EQUIPMENT OPERATOR: GROUP 7 EXCAVATOR, CRANE Building ENGI0302-033 (OVER 50 TONS), TOWER CRANE, HEAVY DUTY MECHANIC ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE Zone 2 30 - 60 miles: $30.00/per day Zone 3 More than 60 miles: $35.00/per day. CRANE LONG BOOM PAY: A. Crane Booms, 100ft to 150ft, fifteen cents over scale B. Crane Booms, 150 ft to 200 ft, thirty cents over scale C. Crane Booms, over 200 ft., forty-five cents over scale | $37.35 | $16.10 | $53.45 | |
| POWER EQUIPMENT OPERATOR: GROUP 7: DRILL Heavy ENGI0370-032 (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | |
| POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER Heavy ENGI0370-032 (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 | |
| ROOFER Residential SUID1979-001 | $9.40 | $1.00 | $10.40 | |
| ROOFER Building ROOF0200-002 | $29.02 | $19.90 | $48.92 | |
| SHEET METAL WORKER Residential SUID1979-001 | $10.47 | $1.79 | $12.26 | |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION Building SHEE0103-003 | $35.50 | $22.25 | $57.75 | |
| SPRINKLER FITTER (FIRE SPRINKLERS) Building SUID2010-006 | $26.80 | $12.00 | $38.80 | |
| TRAFFIC CONTROL: FLAGGER Highway SUID2013-015 | $22.68 | $10.90 | $33.58 | |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER Highway SUID2013-015 | $22.66 | $10.90 | $33.56 | |
| TRUCK DRIVER Residential SUID1979-001 | $8.86 | 0.00 | $8.86 | |
| TRUCK DRIVER, GROUP 5A DUMP (0-16 YDS) Building TEAM0983-001 | $35.60 | $17.00 | $52.60 | |
| TRUCK DRIVER, GROUP 5B DUMP (16-30 YDS) Building TEAM0983-001 | $35.78 | $17.00 | $52.78 | |
| TRUCK DRIVER, GROUP 5C DUMP (30-50 YDS) Building TEAM0983-001 | $36.01 | $17.00 | $53.01 | |
| TRUCK DRIVER, GROUP 5D DUMP (50-75 YDS) Building TEAM0983-001 | $36.12 | $17.00 | $53.12 | |
| TRUCK DRIVER, GROUP 5E DUMP (75-100 YDS) Building TEAM0983-001 | $36.75 | $17.00 | $53.75 | |
| TRUCK DRIVER, GROUP 5F DUMP (OVER 100 YDS) Building TEAM0983-001 | $37.19 | $17.00 | $54.19 | |
| TRUCK DRIVER: DISTRIBUTOR TRUCK Highway SUID2013-015 | $21.66 | $13.04 | $34.70 | |
| TRUCK DRIVER: DUMP TRUCK Heavy SUID2010-037 | $17.53 | 0.00 | $17.53 | |
| TRUCK DRIVER: DUMP TRUCK Highway SUID2013-015 | $21.86 | $13.18 | $35.04 | |
| TRUCK DRIVER: LOWBOY TRUCK Heavy SUID2010-037 | $21.00 | $12.10 | $33.10 | |
| TRUCK DRIVER: LOWBOY TRUCK Highway SUID2013-015 | $21.53 | $12.96 | $34.49 | |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK Highway SUID2013-015 | $22.54 | $12.35 | $34.89 | |
| TRUCK DRIVER: WATER TRUCK Heavy SUID2010-037 | $24.57 | $11.22 | $35.79 | |
| TRUCK DRIVER: WATER TRUCK Highway SUID2013-015 | $21.35 | $13.33 | $34.68 | |
| WATER & SEWER LINES: OPERATOR - EXCAVATOR Heavy SUID2010-037 | $22.07 | 0.00 | $22.07 |
No trade rates match your search and filter selection.
Residential
Applies to
Bannock, Bear Lake, Caribou, Franklin, Oneida, Power
Building
Heavy
Highway
Applies to
Bear Lake, Caribou, Clark, Fremont, Lemhi, Madison, Oneida, Teton
Wage determinations are revised throughout the year. We'll email you when rates covering Caribou County, Idaho are modified.
Free, one email when rates change. Unsubscribe anytime.