Idaho of Adams

3 wage determinations 50 trade rates

Popular Trades In Idaho of Adams

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
BRICKLAYER General
BRID0003-002
$30.00 $17.78 $47.78
CARPENTER General
SUID1981-002 Scope differs by code/WD
$10.40 0.00 $10.40
CARPENTER General
SUID2010-013 Scope differs by code/WD
$23.68 $7.53 $31.21
CARPENTER, INCLUDES FORM WORK General
SUID2010-029
$25.41 $9.98 $35.39
CEMENT MASON/CONCRETE FINISHER General
SUID1981-002 Scope differs by code/WD
$7.25 $0.70 $7.95
CEMENT MASON/CONCRETE FINISHER General
SUID2010-013 Scope differs by code/WD
$19.43 $5.88 $25.31
CEMENT MASON/CONCRETE FINISHER General
SUID2010-029 Scope differs by code/WD
$23.25 $12.31 $35.56
ELECTRICIAN General
SUID1981-002 Scope differs by code/WD
$8.05 0.00 $8.05
ELECTRICIAN General
ELEC0291-001 Scope differs by code/WD
$42.25 $18.84 $61.09
ELECTRICIAN General
ELEC0291-011 Scope differs by code/WD
$42.25 $18.84 $61.09
INSULATOR - MECHANICAL General
SUID2010-013 (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)
$20.13 $1.80 $21.93
IRONWORKER, REINFORCING General
SUID2010-029
$27.22 $16.70 $43.92
IRONWORKER, STRUCTURAL General
IRON0014-002
$43.40 $30.27 $73.67
IRONWORKER: STRUCTURAL General
IRON0014-018 (ADAMS AND WASHINGTON COUNTIES)
$43.40 $30.27 $73.67
IRONWORKER: STRUCTURAL General
IRON0732-001 (ELMORE, PAYETTE, AND VALLEY COUNTIES)
$30.62 $21.48 $52.10
LABORER General
SUID1981-002
$7.25 0.00 $7.25
LABORER: COMMON OR GENERAL General
SUID2010-013 Scope differs by code/WD
$15.44 0.00 $15.44
LABORER: COMMON OR GENERAL General
SUID2010-029 Scope differs by code/WD
$22.46 $10.00 $32.46
LABORER: GROUP 1 FLAGGER General
LABO0155-008
$33.63 $16.50 $50.13
LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR General
LABO0155-008
$33.83 $16.50 $50.33
LABORER: PIPELAYER General
SUID2010-029
$17.67 $7.26 $24.93
LABORER:MASON TENDER-CEMENT/CONCRETE General
LABO0155-004
$33.93 $16.50 $50.43
OPERATOR: BACKHOE/EXCAVATOR General
SUID2010-013
$20.75 $4.42 $25.17
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE General
SUID2010-029
$26.02 $9.93 $35.95
OPERATOR: BOBCAT/SKID STEER/SKID LOADER General
SUID2010-029
$20.97 0.00 $20.97
OPERATOR: CONCRETE BATCH PLANT General
SUID2010-029
$24.94 $11.96 $36.90
OPERATOR: CRANE General
SUID2010-013
$27.29 $10.53 $37.82
OPERATOR: FORKLIFT General
SUID2010-029
$21.20 0.00 $21.20
PAINTER & TAPER General
SUID1981-002
$7.46 0.00 $7.46
PAINTER: BRUSH, ROLLER AND SPRAY General
SUID2010-013
$16.12 0.00 $16.12
PLUMBER General
SUID1981-002 Scope differs by code/WD
$9.95 0.00 $9.95
PLUMBER General
PLUM0296-003 Scope differs by code/WD
$39.90 $18.67 $58.57
POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER General
ENGI0302-040 (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE
$38.06 $16.10 $54.16
POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER General
ENGI0302-040 (UP TO 4YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE
$36.64 $16.10 $52.74
POWER EQUIPMENT OPERATOR: GROUP 6: BLADE OPERATOR, CRANES General
ENGI0302-040 (UP TO AND INCLUDING 50 TONS), DRILLING (BIT UNDER 8IN), FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT OVER SCALE
$36.98 $16.10 $53.08
POWER EQUIPMENT OPERATOR: GROUP 70 CRANES General
ENGI0302-040 (OVER 50 TONS), DRILL (BIT 8 IN AND OVER), GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS), TOWER CRANE ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE
$37.35 $16.10 $53.45
POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER General
ENGI0302-040 (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE
$37.58 $16.10 $53.68
ROOFER General
SUID1981-002 Scope differs by code/WD
$7.25 $0.53 $7.78
ROOFER General
ROOF0189-002 Scope differs by code/WD
$35.75 $15.21 $50.96
SHEET METAL WORKER General
SUID1981-002 Scope differs by code/WD
$8.36 $0.66 $9.02
SHEET METAL WORKER General
SHEE0055-004 (INCLUDES HVAC DUCT INSTALLATION)
$39.20 $23.59 $62.79
TRUCK DRIVER, GROUP 5A DUMP (0-16 YDS) General
TEAM0483-003
$35.60 $17.00 $52.60
TRUCK DRIVER, GROUP 5B DUMP (16-30 YDS) General
TEAM0483-003
$35.78 $17.00 $52.78
TRUCK DRIVER, GROUP 5C DUMP (30-50 YDS) General
TEAM0483-003
$36.01 $17.00 $53.01
TRUCK DRIVER, GROUP 5D DUMP (50-75 YDS) General
TEAM0483-003
$36.12 $17.00 $53.12
TRUCK DRIVER, GROUP 5E DUMP (75-100 YDS) General
TEAM0483-003
$36.75 $17.00 $53.75
TRUCK DRIVER, GROUP 5F DUMP (OVER 100 YDS) General
TEAM0483-003
$37.19 $17.00 $54.19
TRUCK DRIVER: DUMP TRUCK General
SUID2010-013
$17.82 $2.18 $20.00
TRUCK DRIVER: LOWBOY TRUCK General
SUID2010-029
$21.00 $12.10 $33.10
TRUCK DRIVER: WATER TRUCK General
SUID2010-029
$24.70 $12.10 $36.80

Wage Determinations

General

0 trades

Applies to

Idaho of Adams, Custer, Idaho, Lemhi, Valley

General

0 trades

Applies to

Idaho of Adams, Elmore, Payette, Valley, Washington