Idaho of Minidoka

2 wage determinations 45 trade rates

Popular Trades In Idaho of Minidoka

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
BRICKLAYER General
BRID0003-002
$30.00 $17.78 $47.78
CARPENTER (FORM WORK ONLY) General
SUID2010-050
$28.00 0.00 $28.00
CARPENTER, EXCLUDES FORM WORK General
SUID2010-010 Scope differs by code/WD
$21.44 0.00 $21.44
CARPENTER, EXCLUDES FORM WORK General
SUID2010-050 Scope differs by code/WD
$28.00 0.00 $28.00
CEMENT MASON/CONCRETE FINISHER General
SUID2010-010 Scope differs by code/WD
$14.76 $2.80 $17.56
CEMENT MASON/CONCRETE FINISHER General
SUID2010-050 Scope differs by code/WD
$17.16 $5.67 $22.83
ELECTRICIAN General
ELEC0449-003 Scope differs by code/WD
$40.00 $18.74 $58.74
ELECTRICIAN General
ELEC0449-004 Scope differs by code/WD
$40.00 $18.74 $58.74
HVAC MECHANIC: DUCT INSTALLATION General
SUID2010-010
$23.63 $6.63 $30.26
INSULATOR - MECHANICAL General
SUID2010-010 (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)
$20.13 $1.80 $21.93
IRONWORKER, REINFORCING General
SUID2010-050
$27.22 $16.70 $43.92
IRONWORKER, STRUCTURAL General
IRON0732-002 Scope differs by code/WD
$33.37 $22.98 $56.35
IRONWORKER, STRUCTURAL General
IRON0732-003 Scope differs by code/WD
$33.37 $22.98 $56.35
LABORER: COMMON OR GENERAL General
SUID2010-010 Scope differs by code/WD
$14.82 0.00 $14.82
LABORER: COMMON OR GENERAL General
SUID2010-050 Scope differs by code/WD
$21.08 $9.94 $31.02
LABORER: GROUP 1 FLAGGER General
LABO0155-008
$33.63 $16.50 $50.13
LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR General
LABO0155-008
$33.83 $16.50 $50.33
LABORER: PIPELAYER General
SUID2010-010 Scope differs by code/WD
$14.26 0.00 $14.26
LABORER: PIPELAYER General
SUID2010-050 Scope differs by code/WD
$16.14 $2.78 $18.92
LABORER: TAMPER (HAND HELD) General
SUID2010-010
$15.00 $5.00 $20.00
LABORER:MASON TENDER-CEMENT/CONCRETE General
LABO0155-004
$33.93 $16.50 $50.43
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE General
SUID2010-010 Scope differs by code/WD
$18.96 $4.42 $23.38
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE General
SUID2010-050 Scope differs by code/WD
$17.39 $2.85 $20.24
OPERATOR: BOBCAT/SKID STEER/SKID LOADER General
SUID2010-050
$17.00 0.00 $17.00
OPERATOR: CONCRETE BATCH PLANT General
SUID2010-050
$24.94 $11.96 $36.90
OPERATOR: CRANE General
SUID2010-010 Scope differs by code/WD
$27.29 $10.53 $37.82
OPERATOR: CRANE General
SUID2010-050 Scope differs by code/WD
$26.00 $9.53 $35.53
OPERATOR: FORKLIFT General
SUID2010-050
$17.00 0.00 $17.00
OPERATOR: GRADER/BLADE General
SUID2010-050
$25.17 $9.44 $34.61
OPERATOR: LOADER (FRONT END) General
SUID2010-050
$18.91 0.00 $18.91
PAINTER: BRUSH, ROLLER AND SPRAY General
SUID2010-010
$16.12 0.00 $16.12
PAINTER: ROLLER AND SPRAY General
SUID2010-050
$17.90 0.00 $17.90
PLUMBER General
PLUM0648-004
$36.75 $18.93 $55.68
POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER General
ENGI0370-034 (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE
$38.06 $16.10 $54.16
POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING General
ENGI0370-034 (BIT UNDER 8IN), SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY Zone 3 More than 60 miles: $35.00/per day. If a project is located in more than one zone the lower zone rate shall apply ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: All Cranes and Concrete Pump Boom Trucks 100 ft to 150 ft $.15 over scale 150 ft to 200 ft $.30 over scale Over 200 ft $.45 over scale
$36.98 $16.10 $53.08
POWER EQUIPMENT OPERATOR: GROUP 7: DRILL General
ENGI0370-034 (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE
$37.35 $16.10 $53.45
POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER General
ENGI0370-034 (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE
$37.58 $16.10 $53.68
ROOFER General
ROOF0200-002
$29.02 $19.90 $48.92
SHEET METAL WORKER General
SHEE0055-005 (EXCLUDES HVAC DUCT INSTALLATION)
$39.20 $23.59 $62.79
TREATMENT PLANTS: OPERATOR: CRANE General
SUID2010-050
$27.59 $9.60 $37.19
TRUCK DRIVER: DUMP TRUCK General
SUID2010-010 Scope differs by code/WD
$17.82 $2.18 $20.00
TRUCK DRIVER: DUMP TRUCK General
SUID2010-050 Scope differs by code/WD
$17.11 0.00 $17.11
TRUCK DRIVER: GROUP 3 WATER TRUCK General
TEAM0483-002
$35.00 $17.00 $52.00
TRUCK DRIVER: LOWBOY TRUCK General
SUID2010-050
$21.00 $12.10 $33.10
TRUCK DRIVER: WATER TRUCK General
SUID2010-050
$23.89 $9.52 $33.41

Wage Determinations