| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER General BRID0003-003 | $26.79 | $17.34 | $44.13 |
| CARPENTER General SUID1981-002 | $10.40 | 0.00 | $10.40 |
| CARPENTER (Form Work Only) Highway SUID2013-015 | $26.57 | $8.10 | $34.67 |
| CEMENT MASON/CONCRETE FINISHER General SUID1981-002 Scope differs by code/WD | $7.25 | $0.70 | $7.95 |
| CEMENT MASON/CONCRETE FINISHER General SUID2010-014 Scope differs by code/WD | $14.76 | $2.80 | $17.56 |
| CEMENT MASON/CONCRETE FINISHER Highway PLAS0072-001 | $40.89 | $18.64 | $59.53 |
| ELECTRICIAN General SUID1981-002 | $8.05 | 0.00 | $8.05 |
| ELECTRICIAN Highway SUID2013-015 | $25.00 | $10.93 | $35.93 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) General ELEC0449-007 | $40.00 | $18.74 | $58.74 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway SUID2013-015 | $23.37 | $10.50 | $33.87 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Common or General Highway SUID2013-015 | $22.68 | $10.90 | $33.58 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Concrete Saw Highway SUID2013-015 (Hand Held/Walk Behind) | $23.98 | $11.05 | $35.03 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Grade Checker Highway SUID2013-015 | $23.52 | $11.05 | $34.57 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Mason Tender - Cement/Concrete Highway SUID2013-015 | $23.42 | $10.90 | $34.32 |
| HIGHWAY/PARKING LOT STRIPING: Painter Highway SUID2013-015 | $24.80 | $6.91 | $31.71 |
| INSULATOR - MECHANICAL General SUID2010-014 (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $20.13 | $1.80 | $21.93 |
| IRONWORKER, STRUCTURAL General IRON0732-002 | $33.37 | $22.98 | $56.35 |
| LABORER General SUID1981-002 | $7.25 | 0.00 | $7.25 |
| LABORER: GROUP 1 COMMON OR GENERAL General LABO0155-005 Scope differs by code/WD | $32.62 | $16.50 | $49.12 |
| LABORER: GROUP 1 COMMON OR GENERAL General LABO0155-005 Scope differs by code/WD | $32.62 | $16.50 | $49.12 |
| LABORER: GROUP 4 MASON TENDER - CEMENT/CONCRETE General LABO0155-005 Scope differs by code/WD | $33.93 | $16.50 | $50.43 |
| LABORER: GROUP 4 MASON TENDER - CEMENT/CONCRETE General LABO0155-005 Scope differs by code/WD | $33.93 | $16.50 | $50.43 |
| OPERATOR: Backhoe/Excavator/Trackhoe Highway SUID2013-015 | $25.74 | $10.07 | $35.81 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Highway SUID2013-015 | $25.35 | $11.55 | $36.90 |
| OPERATOR: OPERATOR: Broom/Sweeper Highway SUID2013-015 | $24.95 | $10.18 | $35.13 |
| OPERATOR: OPERATOR: Bulldozer Highway SUID2013-015 | $26.19 | $9.60 | $35.79 |
| OPERATOR: OPERATOR: Crane Highway SUID2013-015 | $26.22 | $10.00 | $36.22 |
| OPERATOR: OPERATOR: Crusher Highway SUID2013-015 | $25.06 | $9.23 | $34.29 |
| OPERATOR: OPERATOR: Grader/Blade Highway SUID2013-015 | $25.96 | $10.00 | $35.96 |
| OPERATOR: OPERATOR: Hydroseeder Highway SUID2013-015 | $24.76 | $11.51 | $36.27 |
| OPERATOR: OPERATOR: Loader Highway SUID2013-015 | $26.22 | $9.98 | $36.20 |
| OPERATOR: OPERATOR: Mechanic Highway SUID2013-015 | $26.91 | $10.22 | $37.13 |
| OPERATOR: OPERATOR: Oiler Highway SUID2013-015 | $25.66 | $9.23 | $34.89 |
| OPERATOR: OPERATOR: Paver Highway SUID2013-015 (Asphalt, Aggregate, and Concrete) | $26.13 | $10.40 | $36.53 |
| OPERATOR: OPERATOR: Roller Highway SUID2013-015 | $25.54 | $10.62 | $36.16 |
| OPERATOR: OPERATOR: Roller (Subgrade) Highway SUID2013-015 | $22.24 | $8.57 | $30.81 |
| OPERATOR: OPERATOR: Rotomill Highway SUID2013-015 | $25.84 | $10.63 | $36.47 |
| OPERATOR: OPERATOR: Screed Highway SUID2013-015 | $25.42 | $9.93 | $35.35 |
| OPERATOR: TRAFFIC CONTROL: Flagger Highway SUID2013-015 | $22.68 | $10.90 | $33.58 |
| PAINTER & TAPER General SUID1981-002 | $7.46 | 0.00 | $7.46 |
| PAINTER: BRUSH, ROLLER AND SPRAY General SUID2010-014 | $16.12 | 0.00 | $16.12 |
| PLUMBER General SUID1981-002 Scope differs by code/WD | $9.95 | 0.00 | $9.95 |
| PLUMBER General PLUM0648-004 Scope differs by code/WD | $36.75 | $18.93 | $55.68 |
| POWER EQUIPMENT OPERATOR: GROUP 3 FORKLIFT ZONE 1 General ENGI0302-033 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.33 | $16.10 | $52.43 |
| POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE General ENGI0302-033 (UP TO 3/4 YD), INDUSTRIAL OILER ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.81 | $16.10 | $52.91 |
| POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE General ENGI0302-033 (3/4 YD TO 3 1/2 YD), CRANE (UP TO AND INCLUDING 50 TON) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $36.98 | $16.10 | $53.08 |
| POWER EQUIPMENT OPERATOR: GROUP 7 EXCAVATOR, CRANE General ENGI0302-033 (OVER 50 TONS), TOWER CRANE, HEAVY DUTY MECHANIC ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE Zone 2 30 - 60 miles: $30.00/per day Zone 3 More than 60 miles: $35.00/per day. CRANE LONG BOOM PAY: A. Crane Booms, 100ft to 150ft, fifteen cents over scale B. Crane Booms, 150 ft to 200 ft, thirty cents over scale C. Crane Booms, over 200 ft., forty-five cents over scale | $37.35 | $16.10 | $53.45 |
| ROOFER General SUID1981-002 Scope differs by code/WD | $7.25 | $0.53 | $7.78 |
| ROOFER General ROOF0200-002 Scope differs by code/WD | $29.02 | $19.90 | $48.92 |
| SHEET METAL WORKER General SUID1981-002 | $8.36 | $0.66 | $9.02 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION General SHEE0103-003 | $35.50 | $22.25 | $57.75 |
| SPRINKLER FITTER (FIRE SPRINKLERS) General SUID2010-014 | $26.80 | $12.00 | $38.80 |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper Highway SUID2013-015 | $22.66 | $10.90 | $33.56 |
| TRAFFIC CONTROL: TRUCK DRIVER: Distributor Truck Highway SUID2013-015 | $21.66 | $13.04 | $34.70 |
| TRAFFIC CONTROL: TRUCK DRIVER: Dump Truck Highway SUID2013-015 | $21.86 | $13.18 | $35.04 |
| TRAFFIC CONTROL: TRUCK DRIVER: Lowboy Truck Highway SUID2013-015 | $21.53 | $12.96 | $34.49 |
| TRAFFIC CONTROL: TRUCK DRIVER: Oil Distributor Truck Highway SUID2013-015 | $22.54 | $12.35 | $34.89 |
| TRAFFIC CONTROL: TRUCK DRIVER: Water Truck Highway SUID2013-015 | $21.35 | $13.33 | $34.68 |
| TRUCK DRIVER, GROUP 5A DUMP (0-16 YDS) General TEAM0983-001 | $35.60 | $17.00 | $52.60 |
| TRUCK DRIVER, GROUP 5B DUMP (16-30 YDS) General TEAM0983-001 | $35.78 | $17.00 | $52.78 |
| TRUCK DRIVER, GROUP 5C DUMP (30-50 YDS) General TEAM0983-001 | $36.01 | $17.00 | $53.01 |
| TRUCK DRIVER, GROUP 5D DUMP (50-75 YDS) General TEAM0983-001 | $36.12 | $17.00 | $53.12 |
| TRUCK DRIVER, GROUP 5E DUMP (75-100 YDS) General TEAM0983-001 | $36.75 | $17.00 | $53.75 |
| TRUCK DRIVER, GROUP 5F DUMP (OVER 100 YDS) General TEAM0983-001 | $37.19 | $17.00 | $54.19 |
No trade rates match your search and filter selection.
General
Applies to
Idaho of Adams, Custer, Idaho, Lemhi, Valley
General
Applies to
Idaho of Bear Lake, Bingham, Fremont, Lemhi, Oneida, Teton
Highway
Applies to
Bear Lake, Caribou, Clark, Fremont, Lemhi, Madison, Oneida, Teton in Idaho.