ID20260003
rev 1Residential
12 trades
Applies to
Benewah, Bonner, Boundary, Clearwater, Kootenai, Latah, Lewis, Shoshone
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building SUID2010-017 | $20.13 | $1.80 | $21.93 | |
| BOILERMAKER (IDAHO COUNTY) Building BOIL0004-003 | $44.37 | $26.87 | $71.24 | |
| BOILERMAKER (LEWIS COUNTY ONLY) Building BOIL0242-003 | $47.67 | $28.38 | $76.05 | |
| BRICKLAYER Residential SUID1981-003 | $11.86 | 0.00 | $11.86 | |
| BRICKLAYER Building BRID0003-001 | $32.05 | $18.27 | $50.32 | |
| CARPENTER Residential SUID1981-003 | $8.30 | 0.00 | $8.30 | |
| CARPENTER Building SUID2010-017 (ACOUSTICAL CEILING INSTALLATION, AND DRYWALL HANGING ONLY) | $24.69 | $1.62 | $26.31 | |
| CARPENTER (FORM WORK ONLY) Heavy CARP0001-045 | $38.87 | $17.84 | $56.71 | |
| CARPENTER (FORM WORK ONLY) Highway SUID2013-016 | $26.57 | $8.10 | $34.67 | |
| CARPENTER, EXCLUDES FORM WORK Heavy SUID2010-047 | $29.92 | $5.20 | $35.12 | |
| CARPENTER: INCLUDES FORM WORK AND SCAFFOLD BUILDING, EXCLUDES ACOUSTICAL CEILING INSTALLATION AND DRYWALL HANGING Building CARP0001-043 (LEWIS AND PART OF IDAHO COUNTY N. OF 46TH PARALLEL) | $38.87 | $17.84 | $56.71 | |
| CARPENTER: INCLUDES FORM WORK AND SCAFFOLD BUILDING, EXCLUDES ACOUSTICAL CEILING INSTALLATION AND DRYWALL HANGING Building CARP0808-002 (AREA SOUTH OF THE 46TH PARALLEL IN IDAHO COUNTY) ZONE PAY: ZONE 1 0-30 MILES: FREE ZONE 2 MORE THAN 30-60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $33.12 | $15.94 | $49.06 | |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0072-002 (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 | |
| CEMENT MASON/CONCRETE FINISHER Heavy PLAS0072-003 (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 | |
| CEMENT MASON/CONCRETE FINISHER Highway PLAS0072-001 (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 | |
| DRYWALL FINISHER/TAPER Building SUID2010-017 | $20.27 | $3.50 | $23.77 | |
| ELECTRICIAN Residential SUID1981-003 | $9.18 | 0.00 | $9.18 | |
| ELECTRICIAN Building ELEC0073-012 | $49.55 | $19.09 | $68.64 | |
| ELECTRICIAN Heavy ELEC0073-011 | $49.55 | $19.09 | $68.64 | |
| ELECTRICIAN Highway SUID2013-016 | $26.83 | $11.94 | $38.77 | |
| HIGHWAY/PARKING LOT STRIPING: PAINTER Highway SUID2013-016 | $23.80 | $6.67 | $30.47 | |
| IRONWORKER: REINFORCING AND STRUCTURAL Building IRON0014-003 | $43.40 | $30.27 | $73.67 | |
| IRONWORKER: REINFORCING AND STRUCTURAL Heavy IRON0014-006 | $43.40 | $30.27 | $73.67 | |
| LABORER Residential SUID1981-003 | $7.25 | 0.00 | $7.25 | |
| LABORER Building LABO0238-012 (MASON TENDER (CEMENT/CONCRETE, BRICK (HOD)) | $26.84 | $12.35 | $39.19 | |
| LABORER (PIPELINE ONLY): COMMON Heavy LABO0238-028 | $26.28 | $12.15 | $38.43 | |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR Highway SUID2013-016 | $22.86 | $9.40 | $32.26 | |
| LABORER: CARPENTER TENDER Building SUID2010-017 | $17.71 | $1.82 | $19.53 | |
| LABORER: COMMON OR GENERAL Heavy SUID2010-047 | $23.75 | $8.98 | $32.73 | |
| LABORER: COMMON OR GENERAL Highway SUID2013-016 | $22.92 | $10.01 | $32.93 | |
| LABORER: COMMON OR GENERAL ZONE DIFFERENTIAL Building LABO0238-011 (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $32.15 | $16.30 | $48.45 | |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) Highway SUID2013-016 | $23.98 | $11.05 | $35.03 | |
| LABORER: GRADE CHECKER Highway SUID2013-016 | $23.41 | $10.78 | $34.19 | |
| LABORER: GROUP 4 ASPHALT INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR ZONE DIFFERENTIAL Heavy LABO0238-031 (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $28.48 | $13.00 | $41.48 | |
| LABORER: LANDSCAPE Heavy SUID2010-047 | $22.13 | $11.13 | $33.26 | |
| LABORER: MASON TENDER (CEMENT/CONCRETE) Highway LABO0238-013 | $28.21 | $13.00 | $41.21 | |
| LABORER: PIPELAYER Heavy SUID2010-047 | $17.67 | $7.26 | $24.93 | |
| LABORER:GROUP 1A FLAGGER ZONE DIFFERENTIAL Heavy LABO0238-031 (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $25.84 | $13.00 | $38.84 | |
| OPERATOR: BACKHOE/EXCAVATOR Building SUID2010-017 | $20.75 | $4.42 | $25.17 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Highway SUID2013-016 | $25.97 | $10.95 | $36.92 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Heavy SUID2010-047 | $20.97 | 0.00 | $20.97 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Highway SUID2013-016 | $25.35 | $11.55 | $36.90 | |
| OPERATOR: BROOM/SWEEPER Highway SUID2013-016 | $26.82 | $11.55 | $38.37 | |
| OPERATOR: BULLDOZER Highway SUID2013-016 | $25.73 | $11.51 | $37.24 | |
| OPERATOR: CONCRETE BATCH PLANT Heavy SUID2010-047 | $24.94 | $11.96 | $36.90 | |
| OPERATOR: CRANE Building SUID2010-017 | $27.29 | $10.53 | $37.82 | |
| OPERATOR: CRANE Highway SUID2013-016 | $27.18 | $10.97 | $38.15 | |
| OPERATOR: CRUSHER Highway SUID2013-016 | $25.06 | $9.23 | $34.29 | |
| OPERATOR: FORKLIFT Heavy SUID2010-047 | $21.20 | 0.00 | $21.20 | |
| OPERATOR: GRADER/BLADE Highway SUID2013-016 | $26.00 | $10.30 | $36.30 | |
| OPERATOR: HYDROSEEDER Highway SUID2013-016 | $24.76 | $11.51 | $36.27 | |
| OPERATOR: LOADER Highway SUID2013-016 | $25.76 | $10.31 | $36.07 | |
| OPERATOR: MECHANIC Highway SUID2013-016 | $26.00 | $9.93 | $35.93 | |
| OPERATOR: OILER Highway SUID2013-016 | $25.66 | $9.23 | $34.89 | |
| OPERATOR: PAVER Highway SUID2013-016 (ASPHALT, AGGREGATE, AND CONCRETE) | $25.66 | $11.03 | $36.69 | |
| OPERATOR: ROLLER Highway SUID2013-016 | $25.49 | $11.55 | $37.04 | |
| OPERATOR: ROLLER (SUBGRADE) Highway SUID2013-016 | $22.24 | $8.57 | $30.81 | |
| OPERATOR: ROTOMILL Highway SUID2013-016 | $29.78 | $4.52 | $34.30 | |
| OPERATOR: SCREED Highway SUID2013-016 | $25.71 | $11.55 | $37.26 | |
| PAINTER Residential SUID1981-003 | $8.00 | 0.00 | $8.00 | |
| PAINTER: BRUSH, ROLLER AND SPRAY Building SUID2010-017 | $19.31 | $4.41 | $23.72 | |
| PLUMBER Residential SUID1981-003 | $8.50 | 0.00 | $8.50 | |
| PLUMBER Building PLUM0044-006 (LEWIS COUNTY AND AREA N OF 46TH PARALLEL IN IDAHO COUNTY) | $44.57 | $26.58 | $71.15 | |
| PLUMBER (IDAHO COUNTY, S. OF 46TH PARALLEL) Building PLUM0296-011 | $39.90 | $18.67 | $58.57 | |
| PLUMBER (ZONE 1) Heavy PLUM0044-015 | $37.71 | $23.44 | $61.15 | |
| POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS Heavy ENGI0370-035 (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $27.51 | $15.95 | $43.46 | |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER Heavy ENGI0370-035 (UP TO D-6) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $28.44 | $15.95 | $44.39 | |
| POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER Heavy ENGI0370-035 (UNDER 4 YDS) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.60 | $15.95 | $44.55 | |
| POWER EQUIPMENT OPERATOR: GROUP 5: BACKHOE Heavy ENGI0370-035 (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.76 | $15.95 | $44.71 | |
| POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE Heavy ENGI0370-035 (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.04 | $15.95 | $44.99 | |
| POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE Heavy ENGI0370-035 (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.31 | $15.95 | $45.26 | |
| POWER EQUIPMENT OPERATOR: GROUP 8 CRANES Heavy ENGI0370-035 (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $30.41 | $15.95 | $46.36 | |
| POWER EQUIPMENT OPERATORS: (BACKHOE) Residential SUID1981-003 | $8.34 | 0.00 | $8.34 | |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER Residential SUID1981-003 | $8.75 | 0.00 | $8.75 | |
| POWER EQUIPMENT OPERATORS: PAVER; BLADE, SCREED AND ROLLER (ASPHALT) Residential SUID1981-003 | $8.00 | 0.00 | $8.00 | |
| ROOFER Residential SUID1981-003 | $10.00 | 0.00 | $10.00 | |
| ROOFER Building ROOF0189-002 | $35.75 | $15.21 | $50.96 | |
| SHEET METAL WORKER Residential SUID1981-003 | $10.00 | $1.10 | $11.10 | |
| SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION Building SHEE0055-001 (IDAHO COUNTY ONLY) | $39.20 | $23.59 | $62.79 | |
| SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION Building SHEE0055-003 (LEWIS COUNTY) | $39.00 | $22.42 | $61.42 | |
| TRAFFIC CONTROL: FLAGGER Highway SUID2013-016 | $21.46 | $10.12 | $31.58 | |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER Highway SUID2013-016 | $22.66 | $10.90 | $33.56 | |
| TRUCK DRIVER Residential SUID1981-003 | $10.33 | 0.00 | $10.33 | |
| TRUCK DRIVER: DUMP (6 YDS AND UNDER) Heavy TEAM0690-002 | $36.58 | $20.93 | $57.51 | |
| TRUCK DRIVER: DUMP (OVER 6 YDS) Heavy TEAM0690-002 | $37.02 | $20.93 | $57.95 | |
| TRUCK DRIVER: DUMP TRUCK Building SUID2010-017 | $17.82 | $2.18 | $20.00 | |
| TRUCK DRIVER: DUMP TRUCK Highway SUID2013-016 | $23.40 | $10.75 | $34.15 | |
| TRUCK DRIVER: LOWBOY TRUCK Heavy SUID2010-047 | $21.00 | $12.10 | $33.10 | |
| TRUCK DRIVER: LOWBOY TRUCK Highway SUID2013-016 | $22.12 | $13.20 | $35.32 | |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK Highway SUID2013-016 | $22.54 | $12.35 | $34.89 | |
| TRUCK DRIVER: WATER TRUCK Heavy SUID2010-047 | $24.48 | $11.67 | $36.15 | |
| TRUCK DRIVER: WATER TRUCK Highway SUID2013-016 | $23.12 | $10.75 | $33.87 |
No trade rates match your search and filter selection.
Residential
Applies to
Benewah, Bonner, Boundary, Clearwater, Kootenai, Latah, Lewis, Shoshone
Building
Applies to
Idaho, Lewis
Heavy
Highway
Applies to
Benewah, Boundary, Clearwater, Lewis
Wage determinations are revised throughout the year. We'll email you when rates covering Lewis County, Idaho are modified.
Free, one email when rates change. Unsubscribe anytime.