ID20260006
rev 1Residential
7 trades
Applies to
Blaine, Camas, Cassia, Gooding, Jerome, Lincoln, Minidoka, Twin Falls
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| BRICKLAYER Building BRID0003-002 | $30.00 | $17.78 | $47.78 | |
| CARPENTER Residential SUID1989-001 | $9.09 | 0.00 | $9.09 | |
| CARPENTER (FORM WORK ONLY) Heavy SUID2010-050 | $28.00 | 0.00 | $28.00 | |
| CARPENTER (FORM WORK ONLY) Highway SUID2013-011 | $26.57 | $8.10 | $34.67 | |
| CARPENTER, EXCLUDES FORM WORK Building SUID2010-010 | $21.44 | 0.00 | $21.44 | |
| CARPENTER, EXCLUDES FORM WORK Heavy SUID2010-050 | $28.00 | 0.00 | $28.00 | |
| CEMENT MASON/CONCRETE FINISHER Residential SUID1989-001 | $7.25 | $1.20 | $8.45 | |
| CEMENT MASON/CONCRETE FINISHER Building SUID2010-010 | $14.76 | $2.80 | $17.56 | |
| CEMENT MASON/CONCRETE FINISHER Heavy SUID2010-050 | $17.16 | $5.67 | $22.83 | |
| CEMENT MASON/CONCRETE FINISHER Highway PLAS0072-001 (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 | |
| ELECTRICIAN Residential SUID1989-001 | $9.45 | 0.00 | $9.45 | |
| ELECTRICIAN Building ELEC0449-003 | $40.00 | $18.74 | $58.74 | |
| ELECTRICIAN Heavy ELEC0449-004 | $40.00 | $18.74 | $58.74 | |
| ELECTRICIAN Highway ELEC0449-001 | $40.00 | $18.74 | $58.74 | |
| HIGHWAY/PARKING LOT STRIPING: PAINTER Highway SUID2013-011 | $26.38 | $7.89 | $34.27 | |
| HVAC MECHANIC: DUCT INSTALLATION Building SUID2010-010 | $23.63 | $6.63 | $30.26 | |
| INSULATION MECHANIC Residential SUID1989-001 | $9.99 | 0.00 | $9.99 | |
| INSULATOR - MECHANICAL Building SUID2010-010 (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $20.13 | $1.80 | $21.93 | |
| IRONWORKER, REINFORCING Heavy SUID2010-050 | $27.22 | $16.70 | $43.92 | |
| IRONWORKER, STRUCTURAL Building IRON0732-002 | $33.37 | $22.98 | $56.35 | |
| IRONWORKER, STRUCTURAL Heavy IRON0732-003 | $33.37 | $22.98 | $56.35 | |
| LABORER Residential SUID1989-001 | $7.25 | $1.02 | $8.27 | |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR Highway SUID2013-011 | $22.88 | $10.91 | $33.79 | |
| LABORER: COMMON OR GENERAL Building SUID2010-010 | $14.82 | 0.00 | $14.82 | |
| LABORER: COMMON OR GENERAL Heavy SUID2010-050 | $21.08 | $9.94 | $31.02 | |
| LABORER: COMMON OR GENERAL Highway SUID2013-011 | $22.68 | $10.90 | $33.58 | |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) Highway SUID2013-011 | $23.98 | $11.05 | $35.03 | |
| LABORER: GRADE CHECKER Highway SUID2013-011 | $23.45 | $10.97 | $34.42 | |
| LABORER: GROUP 1 FLAGGER Heavy LABO0155-008 | $33.63 | $16.50 | $50.13 | |
| LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR Heavy LABO0155-008 | $33.83 | $16.50 | $50.33 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Highway SUID2013-011 | $23.69 | $10.97 | $34.66 | |
| LABORER: PIPELAYER Building SUID2010-010 | $14.26 | 0.00 | $14.26 | |
| LABORER: PIPELAYER Heavy SUID2010-050 | $16.14 | $2.78 | $18.92 | |
| LABORER: TAMPER (HAND HELD) Building SUID2010-010 | $15.00 | $5.00 | $20.00 | |
| LABORER:MASON TENDER-CEMENT/CONCRETE Building LABO0155-004 | $33.93 | $16.50 | $50.43 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building SUID2010-010 | $18.96 | $4.42 | $23.38 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Heavy SUID2010-050 | $17.39 | $2.85 | $20.24 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Highway SUID2013-011 | $25.80 | $10.00 | $35.80 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Heavy SUID2010-050 | $17.00 | 0.00 | $17.00 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Highway SUID2013-011 | $25.35 | $11.55 | $36.90 | |
| OPERATOR: BROOM/SWEEPER Highway SUID2013-011 | $25.01 | $10.16 | $35.17 | |
| OPERATOR: BULLDOZER Highway SUID2013-011 | $26.19 | $9.60 | $35.79 | |
| OPERATOR: CONCRETE BATCH PLANT Heavy SUID2010-050 | $24.94 | $11.96 | $36.90 | |
| OPERATOR: CRANE Building SUID2010-010 | $27.29 | $10.53 | $37.82 | |
| OPERATOR: CRANE Heavy SUID2010-050 | $26.00 | $9.53 | $35.53 | |
| OPERATOR: CRANE Highway SUID2013-011 | $26.04 | $10.00 | $36.04 | |
| OPERATOR: CRUSHER Highway SUID2013-011 | $25.06 | $9.23 | $34.29 | |
| OPERATOR: FORKLIFT Heavy SUID2010-050 | $17.00 | 0.00 | $17.00 | |
| OPERATOR: GRADER/BLADE Heavy SUID2010-050 | $25.17 | $9.44 | $34.61 | |
| OPERATOR: GRADER/BLADE Highway SUID2013-011 | $26.14 | $10.69 | $36.83 | |
| OPERATOR: HYDROSEEDER Highway SUID2013-011 | $24.76 | $11.51 | $36.27 | |
| OPERATOR: LOADER Highway SUID2013-011 | $25.78 | $10.17 | $35.95 | |
| OPERATOR: LOADER (FRONT END) Heavy SUID2010-050 | $18.91 | 0.00 | $18.91 | |
| OPERATOR: OILER Highway SUID2013-011 | $25.66 | $9.23 | $34.89 | |
| OPERATOR: PAVER Highway SUID2013-011 (ASPHALT, AGGREGATE, AND CONCRETE) | $25.67 | $10.56 | $36.23 | |
| OPERATOR: ROLLER Highway SUID2013-011 | $25.47 | $10.32 | $35.79 | |
| OPERATOR: ROLLER (SUBGRADE) Highway SUID2013-011 | $22.24 | $8.57 | $30.81 | |
| OPERATOR: ROTOMILL Highway SUID2013-011 | $26.54 | $10.00 | $36.54 | |
| OPERATOR: SCREED Highway SUID2013-011 | $25.63 | $10.34 | $35.97 | |
| PAINTER: BRUSH, ROLLER AND SPRAY Building SUID2010-010 | $16.12 | 0.00 | $16.12 | |
| PAINTER: ROLLER AND SPRAY Heavy SUID2010-050 | $17.90 | 0.00 | $17.90 | |
| PLUMBER Residential SUID1989-001 | $12.92 | 0.00 | $12.92 | |
| PLUMBER Building PLUM0648-004 | $36.75 | $18.93 | $55.68 | |
| POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER Heavy ENGI0370-034 (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | |
| POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING Heavy ENGI0370-034 (BIT UNDER 8IN), SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY Zone 3 More than 60 miles: $35.00/per day. If a project is located in more than one zone the lower zone rate shall apply ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: All Cranes and Concrete Pump Boom Trucks 100 ft to 150 ft $.15 over scale 150 ft to 200 ft $.30 over scale Over 200 ft $.45 over scale | $36.98 | $16.10 | $53.08 | |
| POWER EQUIPMENT OPERATOR: GROUP 7: DRILL Heavy ENGI0370-034 (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.35 | $16.10 | $53.45 | |
| POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER Heavy ENGI0370-034 (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.58 | $16.10 | $53.68 | |
| POWER EQUIPMENT OPERATORS: (BACKHOE) Residential SUID1989-001 | $8.36 | $1.42 | $9.78 | |
| ROOFER Building ROOF0200-002 | $29.02 | $19.90 | $48.92 | |
| SHEET METAL WORKER Building SHEE0055-005 (EXCLUDES HVAC DUCT INSTALLATION) | $39.20 | $23.59 | $62.79 | |
| TRAFFIC CONTROL: FLAGGER Highway SUID2013-011 | $22.68 | $10.90 | $33.58 | |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER Highway SUID2013-011 | $22.66 | $10.90 | $33.56 | |
| TREATMENT PLANTS: OPERATOR: CRANE Heavy SUID2010-050 | $27.59 | $9.60 | $37.19 | |
| TRUCK DRIVER: DISTRIBUTOR TRUCK Highway SUID2013-011 | $21.35 | $13.05 | $34.40 | |
| TRUCK DRIVER: DUMP TRUCK Building SUID2010-010 | $17.82 | $2.18 | $20.00 | |
| TRUCK DRIVER: DUMP TRUCK Heavy SUID2010-050 | $17.11 | 0.00 | $17.11 | |
| TRUCK DRIVER: DUMP TRUCK Highway SUID2013-011 | $21.19 | $13.30 | $34.49 | |
| TRUCK DRIVER: GROUP 3 WATER TRUCK Building TEAM0483-002 | $35.00 | $17.00 | $52.00 | |
| TRUCK DRIVER: LOWBOY TRUCK Heavy SUID2010-050 | $21.00 | $12.10 | $33.10 | |
| TRUCK DRIVER: LOWBOY TRUCK Highway SUID2013-011 | $21.53 | $12.98 | $34.51 | |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK Highway SUID2013-011 | $22.54 | $12.35 | $34.89 | |
| TRUCK DRIVER: WATER TRUCK Heavy SUID2010-050 | $23.89 | $9.52 | $33.41 | |
| TRUCK DRIVER: WATER TRUCK Highway SUID2013-011 | $21.35 | $13.05 | $34.40 |
No trade rates match your search and filter selection.
Residential
Applies to
Blaine, Camas, Cassia, Gooding, Jerome, Lincoln, Minidoka, Twin Falls
Building
Heavy
Highway
Wage determinations are revised throughout the year. We'll email you when rates covering Minidoka County, Idaho are modified.
Free, one email when rates change. Unsubscribe anytime.