IL20260018
rev 1General
0 trades
Applies to
Illinois of Adams, Alexander, Bond, Boone, Brown, Bureau, Calhoun, Carroll, Cass, Champaign +92 more
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| DREDGING: General SUIL2003-001 (LEAD DECKHAND) PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H | $29.68 | $7.61 | $37.29 |
| DREDGING: General SUIL2003-001 (FIREMAN, OILER, DECKHAND, & SCOWMAN (WITH DIPPER, HYDRAULIC OR OTHER FLOATING EQUIPMENT ENGAGED IN HYDRAULIC AND DIPPER DREDGING OPERATIONS) PIPELINE MEN (BOTH AFLOAT & ASHORE INCLUDING LOADING, UNLOADING, MAINTAINING, AND HANDLING PIPELINES FOR HYDRAULIC DREDGES AND SANDBOATS RANGEMAN, TANKERMAN, SWEEPMAN AND SERVICE TRUCK DRIVER) | $22.51 | $7.61 | $30.12 |
| DREDGING: ENGINEER AND MECHANIC General SUIL2003-002 (AREA IV: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. PAUL, ROCK ISLAND AND CHICAGO DISTRICTS, CORPS OF ENGINEERS) | $44.78 | $34.21 | $78.99 |
| DREDGING: ENGINEER AND MECHANIC General SUIL2003-002 (AREA III: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE HUNTINGTON DISTRICT, CORPS OF ENGINEERS) | $47.70 | $31.75 | $79.45 |
| DREDGING: ENGINEER AND MECHANIC General SUIL2003-002 (AREA II: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE LOUISVILLE DISTRICT, CORPS OF ENGINEERS) | $47.70 | $31.75 | $79.45 |
| DREDGING: ENGINEER AND MECHANIC General SUIL2003-002 (AREA I: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. LOUIS DISTRICT, CORPS OF ENGINEERS) | $47.83 | $31.75 | $79.58 |
| DREDGING: LEVERMEN AND BOATMAN General SUIL2003-002 (AREA 4: LEVERMAN. OPERATORS ON BACKHOES OVER 130,000 LBS., OPERATORS ON CRANES OVER 165 TONS, AND OPERATORS THAT ARE REQUIRED TO HAVE A LICENSE OR CERTIFICATION TO DO THE WORK ASSIGNED THEM SHALL RECEIVE 5% MORE THAN THE HIGHEST RATE OF PAY PER HOUR LISTED ON THIS AGREEMENT.) | $47.02 | $34.21 | $81.23 |
| DREDGING: LEVERMEN AND BOATMAN General SUIL2003-002 (AREA 4: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. PAUL, ROCK ISLAND AND CHICAGO DISTRICTS, CORPS OF ENGINEERS:) | $44.78 | $34.21 | $78.99 |
| DREDGING: LEVERMEN AND BOATMAN General SUIL2003-002 (AREA 3: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE HUNTINGTON DISTRICT, CORPS OF ENGINEERS:) | $55.54 | $31.75 | $87.29 |
| DREDGING: LEVERMEN AND BOATMAN General SUIL2003-002 (AREA 2: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE LOUISVILLE DISTRICT, CORPS OF ENGINEERS) | $55.54 | $31.75 | $87.29 |
| DREDGING: LEVERMEN AND BOATMAN General SUIL2003-002 (AREA 1: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. LOUIS DISTRICT, CORPS OF ENGINEERS) | $55.69 | $31.75 | $87.44 |
| HYDRAULIC DREDGING: LAUNCH OPERATOR - VESSEL 800 HORSE- POWER OR LESS PAID HOLIDAYS General SUIL2003-001 (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H | $25.15 | $7.61 | $32.76 |
| HYDRAULIC DREDGING: TUG ENGINEER PAID HOLIDAYS General SUIL2003-001 (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. paid holidays: A thru H | $26.49 | $7.61 | $34.10 |
| HYDRAULIC DREDGING: TUG OPERATOR - VESSEL OVER 800 HORSE-POWER PAID HOLIDAYS General SUIL2003-001 (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H | $26.49 | $7.61 | $34.10 |
| HYDRAULIC DREDGING:TUG WORKERS: FIREMAN, LINEMAN, OILER, DECKHAND, TANKERMAN. SCOWMAN General SUIL2003-001 (ON/OR WITH TUGBOATS, LAUNCHES, OR OTHER SELF-PROPELLED BOATS) PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H | $22.51 | $7.61 | $30.12 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: MINNESOTA) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $47.30 | $29.50 | $76.80 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: MICHIGAN) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $42.50 | $33.02 | $75.52 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: INDIANA) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $47.40 | $43.80 | $91.20 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: ILLINOIS) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $63.45 | $51.10 | $114.55 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $46.65 | $30.38 | $77.03 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $42.50 | $24.21 | $66.71 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $43.75 | $16.81 | $60.56 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $45.45 | $16.81 | $62.26 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $54.70 | $35.75 | $90.45 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $55.25 | $33.40 | $88.65 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $45.50 | $36.81 | $82.31 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $56.90 | $33.55 | $90.45 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: MINNESOTA) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $51.80 | $29.50 | $81.30 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: MICHIGAN) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $47.00 | $33.02 | $80.02 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: INDIANA) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $51.90 | $43.80 | $95.70 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: ILLINOIS) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $67.95 | $51.10 | $119.05 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $51.15 | $30.38 | $81.53 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $47.00 | $24.21 | $71.21 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $48.25 | $16.81 | $65.06 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $49.95 | $16.81 | $66.76 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $59.20 | $35.75 | $94.95 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $59.75 | $33.40 | $93.15 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $50.00 | $36.81 | $86.81 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $61.40 | $33.55 | $94.95 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: MINNESOTA) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $59.30 | $29.50 | $88.80 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: MICHIGAN) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $54.50 | $33.02 | $87.52 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: INDIANA) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $59.40 | $43.80 | $103.20 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: ILLINOIS) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $75.45 | $51.10 | $126.55 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $58.65 | $30.38 | $89.03 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $54.50 | $24.21 | $78.71 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $55.75 | $16.81 | $72.56 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $57.45 | $16.81 | $74.26 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $66.70 | $35.75 | $102.45 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $67.25 | $33.40 | $100.65 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $57.50 | $36.81 | $94.31 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $68.90 | $33.55 | $102.45 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: MINNESOTA) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $56.30 | $29.50 | $85.80 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: MICHIGAN) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $51.50 | $33.02 | $84.52 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: INDIANA) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $56.40 | $43.80 | $100.20 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: ILLINOIS) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $72.45 | $51.10 | $123.55 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $55.65 | $30.38 | $86.03 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $51.50 | $24.21 | $75.71 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $52.75 | $16.81 | $69.56 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $54.45 | $16.81 | $71.26 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $63.70 | $35.75 | $99.45 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $64.25 | $33.40 | $97.65 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $54.50 | $36.81 | $91.31 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $65.90 | $33.55 | $99.45 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: MINNESOTA) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $57.80 | $29.50 | $87.30 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: MICHIGAN) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $53.00 | $33.02 | $86.02 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: INDIANA) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $57.90 | $43.80 | $101.70 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: ILLINOIS) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $73.95 | $51.10 | $125.05 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $57.15 | $30.38 | $87.53 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $53.00 | $24.21 | $77.21 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $54.25 | $16.81 | $71.06 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $55.95 | $16.81 | $72.76 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $65.20 | $35.75 | $100.95 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $65.75 | $33.40 | $99.15 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $56.00 | $36.81 | $92.81 |
| MECHANIC General SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $67.40 | $33.55 | $100.95 |
No trade rates match your search and filter selection.
General
Applies to
Illinois of Adams, Alexander, Bond, Boone, Brown, Bureau, Calhoun, Carroll, Cass, Champaign +92 more
General
Applies to
Illinois of Adams, Alexander, Bond, Boone, Brown, Bureau, Calhoun, Carroll, Cass, Champaign +92 more