IL20260009
rev 2Building, Heavy, Highway, Residential
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS WORKER/INSULATOR Building ASBE0017-001 (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $55.02 | $35.75 | $90.77 | |
| BOILERMAKER Building BOIL0001-001 | $53.10 | $38.54 | $91.64 | |
| BRICKLAYER Building BRIL0021-001 | $44.88 | $26.62 | $71.50 | |
| CARPENTER (RESIDENTIAL CONSTRUCTION) Building CARP0555-002 | $45.61 | $35.31 | $80.92 | |
| CARPENTER: CARPENTER, LATHER, MILLWRIGHT, PILEDRIVER, AND SOFT FLOOR LAYER (Building) Building CARP0555-001 | $52.01 | $38.85 | $90.86 | |
| CARPENTER: CARPENTER, LATHER, MILLWRIGHT, PILEDRIVER, AND SOFT FLOOR LAYER (Heavy & Highway) Building CARP0555-001 | $52.01 | $38.85 | $90.86 | |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0502-001 | $53.10 | $43.80 | $96.90 | |
| DREDGING: Heavy SUIL2003-001 (LEAD DECKHAND) PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H | $29.68 | $7.61 | $37.29 | |
| DREDGING: Heavy SUIL2003-001 (FIREMAN, OILER, DECKHAND, & SCOWMAN (WITH DIPPER, HYDRAULIC OR OTHER FLOATING EQUIPMENT ENGAGED IN HYDRAULIC AND DIPPER DREDGING OPERATIONS) PIPELINE MEN (BOTH AFLOAT & ASHORE INCLUDING LOADING, UNLOADING, MAINTAINING, AND HANDLING PIPELINES FOR HYDRAULIC DREDGES AND SANDBOATS RANGEMAN, TANKERMAN, SWEEPMAN AND SERVICE TRUCK DRIVER) | $22.51 | $7.61 | $30.12 | |
| DREDGING: ENGINEER AND MECHANIC Heavy SUIL2003-002 (AREA IV: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. PAUL, ROCK ISLAND AND CHICAGO DISTRICTS, CORPS OF ENGINEERS) | $44.78 | $34.21 | $78.99 | |
| DREDGING: ENGINEER AND MECHANIC Heavy SUIL2003-002 (AREA III: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE HUNTINGTON DISTRICT, CORPS OF ENGINEERS) | $47.70 | $31.75 | $79.45 | |
| DREDGING: ENGINEER AND MECHANIC Heavy SUIL2003-002 (AREA II: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE LOUISVILLE DISTRICT, CORPS OF ENGINEERS) | $47.70 | $31.75 | $79.45 | |
| DREDGING: ENGINEER AND MECHANIC Heavy SUIL2003-002 (AREA I: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. LOUIS DISTRICT, CORPS OF ENGINEERS) | $47.83 | $31.75 | $79.58 | |
| DREDGING: LEVERMEN AND BOATMAN Heavy SUIL2003-002 (AREA 4: LEVERMAN. OPERATORS ON BACKHOES OVER 130,000 LBS., OPERATORS ON CRANES OVER 165 TONS, AND OPERATORS THAT ARE REQUIRED TO HAVE A LICENSE OR CERTIFICATION TO DO THE WORK ASSIGNED THEM SHALL RECEIVE 5% MORE THAN THE HIGHEST RATE OF PAY PER HOUR LISTED ON THIS AGREEMENT.) | $47.02 | $34.21 | $81.23 | |
| DREDGING: LEVERMEN AND BOATMAN Heavy SUIL2003-002 (AREA 4: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. PAUL, ROCK ISLAND AND CHICAGO DISTRICTS, CORPS OF ENGINEERS:) | $44.78 | $34.21 | $78.99 | |
| DREDGING: LEVERMEN AND BOATMAN Heavy SUIL2003-002 (AREA 3: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE HUNTINGTON DISTRICT, CORPS OF ENGINEERS:) | $55.54 | $31.75 | $87.29 | |
| DREDGING: LEVERMEN AND BOATMAN Heavy SUIL2003-002 (AREA 2: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE LOUISVILLE DISTRICT, CORPS OF ENGINEERS) | $55.54 | $31.75 | $87.29 | |
| DREDGING: LEVERMEN AND BOATMAN Heavy SUIL2003-002 (AREA 1: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. LOUIS DISTRICT, CORPS OF ENGINEERS) | $55.69 | $31.75 | $87.44 | |
| ELECTRICIAN Building ELEC0134-001 | $57.75 | $42.89 | $100.64 | |
| FIRE STOP TECHNICIAN Building ASBE0017-001 | $44.02 | $32.76 | $76.78 | |
| GLAZIER Building PAIN0027-001 | $51.55 | $44.09 | $95.64 | |
| HAZARDOUS MATERIAL HANDLER Building ASBE0017-001 (INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS) | $41.27 | $32.76 | $74.03 | |
| HYDRAULIC DREDGING: LAUNCH OPERATOR - VESSEL 800 HORSE- POWER OR LESS PAID HOLIDAYS Heavy SUIL2003-001 (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H | $25.15 | $7.61 | $32.76 | |
| HYDRAULIC DREDGING: TUG ENGINEER PAID HOLIDAYS Heavy SUIL2003-001 (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. paid holidays: A thru H | $26.49 | $7.61 | $34.10 | |
| HYDRAULIC DREDGING: TUG OPERATOR - VESSEL OVER 800 HORSE-POWER PAID HOLIDAYS Heavy SUIL2003-001 (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H | $26.49 | $7.61 | $34.10 | |
| HYDRAULIC DREDGING:TUG WORKERS: FIREMAN, LINEMAN, OILER, DECKHAND, TANKERMAN. SCOWMAN Heavy SUIL2003-001 (ON/OR WITH TUGBOATS, LAUNCHES, OR OTHER SELF-PROPELLED BOATS) PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H | $22.51 | $7.61 | $30.12 | |
| IRONWORKER Building IRON0136-001 (MACHINERY MOVERS; RIGGERS; MACHINERY ERECTORS) | $54.25 | $47.38 | $101.63 | |
| IRONWORKER (FENCE ERECTOR) Building IRON0063-002 | $52.25 | $34.31 | $86.56 | |
| IRONWORKER: MASTER RIGGERS Building IRON0136-001 | $56.75 | $47.38 | $104.13 | |
| IRONWORKER: ORNAMENTAL Building IRON0063-001 | $59.26 | $44.81 | $104.07 | |
| IRONWORKER: SHEETER Building IRON0001-026 | $62.71 | $46.58 | $109.29 | |
| IRONWORKER: STRUCTURAL AND REINFORCING Building IRON0001-026 | $62.46 | $46.58 | $109.04 | |
| LABORER, BUILDING & RESIDENTIAL: GROUP 1 BUILDING LABORERS; PLASTERER TENDERS; PUMPS FOR DEWATERING; AND OTHER UNCLASSIFIED LABORERS Building LABO0002-006 | $51.40 | $36.94 | $88.34 | |
| LABORER, BUILDING & RESIDENTIAL: GROUP 10 BOILER SETTER PLASTIC LABORERS Building LABO0002-006 | $51.85 | $36.94 | $88.79 | |
| LABORER, BUILDING & RESIDENTIAL: GROUP 11 JACKHAMMERMEN ON FIRE BRICK WORK ONLY Building LABO0002-006 | $51.68 | $36.94 | $88.62 | |
| LABORER, BUILDING & RESIDENTIAL: GROUP 12 DOSIMETER USE Building LABO0002-006 (ANY DEVICE) MONITORING NUCLEAR EXPOSURE); ASBESTOS ABATEMENT LABORER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS | $52.40 | $36.94 | $89.34 | |
| LABORER, BUILDING & RESIDENTIAL: GROUP 2 FIREPROOFING AND FIRE SHOP LABORERS Building LABO0002-006 | $51.40 | $36.94 | $88.34 | |
| LABORER, BUILDING & RESIDENTIAL: GROUP 3 CEMENT GUN Building LABO0002-006 | $51.48 | $36.94 | $88.42 | |
| LABORER, BUILDING & RESIDENTIAL: GROUP 4 CHIMNEY OVER 40 FT.; SCAFFOLD LABORERS Building LABO0002-006 | $51.50 | $36.94 | $88.44 | |
| LABORER, BUILDING & RESIDENTIAL: GROUP 5 CEMENT GUN NOZZLE LABORERS Building LABO0002-006 (GUNITE); WINDLASS AND CAPSTAN PERSON | $51.55 | $36.94 | $88.49 | |
| LABORER, BUILDING & RESIDENTIAL: GROUP 6 STONE DERRICKMEN & HANDLERS Building LABO0002-006 | $51.60 | $36.94 | $88.54 | |
| LABORER, BUILDING & RESIDENTIAL: GROUP 7 JACKHAMMERMEN; POWER DRIVEN CONCRETE SAWS; AND OTHER POWER TOOLS Building LABO0002-006 | $51.63 | $36.94 | $88.57 | |
| LABORER, BUILDING & RESIDENTIAL: GROUP 8 FIREBRICK & BOILER LABORERS Building LABO0002-006 | $51.73 | $36.94 | $88.67 | |
| LABORER, BUILDING & RESIDENTIAL: GROUP 9 CHIMNEY ON FIRE BRICK; CAISSON DIGGERS; & WELL POINT SYSTEM MEN Building LABO0002-006 | $51.75 | $36.94 | $88.69 | |
| LABORER, COMPRESSED AIR: 0 - 15 POUNDS Building LABO0002-008 | $52.40 | $36.94 | $89.34 | |
| LABORER, COMPRESSED AIR: 16 - 20 POUNDS Building LABO0002-008 | $52.90 | $36.94 | $89.84 | |
| LABORER, COMPRESSED AIR: 21 - 26 POUNDS Building LABO0002-008 | $53.40 | $36.94 | $90.34 | |
| LABORER, COMPRESSED AIR: 27 - 33 POUNDS Building LABO0002-008 | $54.40 | $36.94 | $91.34 | |
| LABORER, COMPRESSED AIR: 34 - AND OVER Building LABO0002-008 | $55.40 | $36.94 | $92.34 | |
| LABORER, DEMOLITION/WRECKING: GROUP 1 COMPLETE DEMOLITION Building LABO0225-001 | $46.40 | $36.94 | $83.34 | |
| LABORER, DEMOLITION/WRECKING: GROUP 2 INTERIOR WRECKING AND STRIP OUT WORK Building LABO0225-001 | $51.40 | $36.94 | $88.34 | |
| LABORER, DEMOLITION/WRECKING: GROUP 3 ASBESTOS WORK WITH COMPLETE DEMOLITION/WRECKING OR STRIP OUT WORK Building LABO0225-001 | $51.40 | $36.94 | $88.34 | |
| LABORER, HEAVY & HIGHWAY: GROUP 1 COMMON LABORER; TENDERS; MATERIAL EXPEDITOR Building LABO0002-007 (ASPHALT PLANT); STREET PAVING, GRADE SEPARATION, SIDEWALK, CURB & GUTTER, STRIPPERS & ALL LABORERS NOT OTHERWISE MENTIONED | $51.40 | $36.94 | $88.34 | |
| LABORER, HEAVY & HIGHWAY: GROUP 2 ASPHALT TAMPERS & SMOOTHERS; CEMENT GUN LABORERS Building LABO0002-007 | $51.48 | $36.94 | $88.42 | |
| LABORER, HEAVY & HIGHWAY: GROUP 3 CEMENT GUN NOZZLE Building LABO0002-007 (LABORERS), GUNITE | $51.55 | $36.94 | $88.49 | |
| LABORER, HEAVY & HIGHWAY: GROUP 4 RAKERS, LUTEMEN; MACHINE-SCREWMEN; KETTLEMEN; MIXERMEN; DRUN-MEN; JACKHAMMERMEN Building LABO0002-007 (ASPHALT); PAINTMEN; MITRE BOX SPREADERS; LABORERS ON BIRCH, OVERMAN AND SIMILAR SPREADER EQUIPMENT; LABORERS ON APSCO; LABORERS ON AIR COMPRESSOR; PAVING FORM SETTER; JACKHAMMERMEN (CONCRETE); POWER DRIVE CONCRETE SAWS; OTHER POWER TOOLS | $51.68 | $36.94 | $88.62 | |
| LABORER, HEAVY & HIGHWAY: GROUP 5 ASBESTOS ABATEMENT LABORERS; TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS, DOSIMETER Building LABO0002-007 (ANY DEVICE) MONITORING NUCLEAR EXPOSURE | $51.40 | $36.94 | $88.34 | |
| LABORER, TUNNEL AND SEWER: GROUP 1 CAGE TENDERS; DUMPMEN; FLAGMEN; SIGNALMEN; TOP LABORERS Building LABO0002-008 | $51.40 | $36.94 | $88.34 | |
| LABORER, TUNNEL AND SEWER: GROUP 2 AIR HOIST OPERATOR; KEY BOARD OPERATOR; CONCRETE LABORER; GROUT; LOCK TENDERS Building LABO0002-008 (FREE AIR SIDE); STEEL SETTERS; TUGGERS; SWITCHMEN; CAR PUSHER | $51.53 | $36.94 | $88.47 | |
| LABORER, TUNNEL AND SEWER: GROUP 3 CONCRETE REPAIRMEN; LOCK TENDERS Building LABO0002-008 (PRESSURE SIDE); MORTAR MEN; MUCKERS; GROUT MACHINE OPERATORS; TRACK LAYERS | $51.63 | $36.94 | $88.57 | |
| LABORER, TUNNEL AND SEWER: GROUP 5 ASBESTOS ABATEMENT LABORER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER; DOSIMETER Building LABO0002-008 (ANY DEVICE) MONITORING NUCLEAR EXPOSURE LABORER CLASSIFICATIONS (SEWER) | $51.40 | $36.94 | $88.34 | |
| LABORER: LANDSCAPE DRIVER Building SUIL1993-003 (KANKAKEE COUNTY) HIGHWAY CONSTRUCTION (LANDSCAPE WORK) | $8.75 | $0.17 | $8.92 | |
| LABORER: LANDSCAPE DRIVER 2 & 3 AXLES Building SUIL1993-001 (GRUNDY, LAKE & WILL COUNTIES) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $11.86 | $2.81 | $14.67 | |
| LABORER: LANDSCAPE DRIVER, 2 & 3 AXLES Building SUIL1993-002 (DU PAGE COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $8.32 | $1.02 | $9.34 | |
| LABORER: LANDSCAPE DRIVER, 2 & 3 AXLES Building SUIL1993-002 (COOK COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $9.93 | $1.89 | $11.82 | |
| LABORER: LANDSCAPE DRIVER, 2 & 3 AXLES Building SUIL1993-002 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) (HEAVY CONSTRUCTION (LANDSCAPE WORK) | $11.94 | $2.42 | $14.36 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-001 (DU PAGE COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-001 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-001 (COOK COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-001 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-002 (DU PAGE COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-002 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-002 (COOK COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-002 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-003 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE OPERATOR Building SUIL1993-003 (KANKAKEE COUNTY) HIGHWAY CONSTRUCTION (LANDSCAPE WORK) | $16.57 | $3.56 | $20.13 | |
| LABORER: LANDSCAPE OPERATORS Building SUIL1993-001 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE OPERATORS Building SUIL1993-002 (DU PAGE COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $10.75 | 0.00 | $10.75 | |
| LABORER: LANDSCAPE OPERATORS Building SUIL1993-002 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE OPERATORS Building SUIL1993-002 (COOK COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $10.98 | $2.12 | $13.10 | |
| LABORER: LANDSCAPE OPERATORS Building SUIL1993-002 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $13.11 | $3.01 | $16.12 | |
| LABORER: LANDSCAPE OPERATORS Building SUIL1993-003 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-001 (GRUNDY, LAKE & WILL COUNTIES) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $12.00 | $3.32 | $15.32 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-001 (DU PAGE COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $9.04 | $1.16 | $10.20 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-001 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $9.66 | $0.26 | $9.92 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-001 (COOK COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $9.80 | $1.82 | $11.62 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-002 (DU PAGE COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $10.65 | 0.00 | $10.65 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-002 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $9.66 | $0.26 | $9.92 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-002 (COOK COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $10.08 | $2.06 | $12.14 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-002 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $9.73 | $2.05 | $11.78 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-003 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $9.66 | $0.26 | $9.92 | |
| LABORER: TRUCK DRIVERS 2 & 3 AXLES Building SUIL1993-003 (PEORIA, TAZEWELL, & WOODFORD COUNTIES) HIGHWAY CONSTRUCTION (LANDSCAPE WORK) | $17.58 | $5.88 | $23.46 | |
| LANDSCAPE LABORER Building LABO0032-004 (WINNEBAGO COUNTY) HIGHWAY CONSTRUCTION | $47.04 | $36.31 | $83.35 | |
| LANDSCAPE LABORER Building LABO0309-006 (ROCK ISLAND COUNTY) HIGHWAY CONSTRUCTION | $33.77 | $23.60 | $57.37 | |
| LANDSCAPE LABORER Building LABO0362-003 (MCLEAN COUNTY) HIGHWAY CONSTRUCTION | $31.08 | $24.43 | $55.51 | |
| LANDSCAPE LABORER Building LABO0538-011 (HENRY COUNTY) HIGHWAY CONSTRUCTION | $35.23 | $28.10 | $63.33 | |
| LANDSCAPE LABORER Building LABO0751-004 (KANKAKEE COUNTY) HIGHWAY CONSTRUCTION | $39.44 | $32.54 | $71.98 | |
| LANDSCAPE LABORER Building LABO0996-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) HIGHWAY CONSTRUCTION | $32.73 | $23.74 | $56.47 | |
| LINE CONSTRUCTION (LINEMAN AND EQUIPMENT OPERATOR) Building ELEC0009-003 | $62.10 | $37.29 | $99.39 | |
| LINE CONSTRUCTION: GROUNDMAN Building ELEC0009-003 | $48.44 | $29.09 | $77.53 | |
| MARBLE FINISHER Building BRIL0021-009 | $33.95 | $26.03 | $59.98 | |
| MARBLE MASON Building BRIL0021-004 | $44.63 | $26.83 | $71.46 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: MINNESOTA) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $47.30 | $29.50 | $76.80 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: MICHIGAN) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $42.50 | $33.02 | $75.52 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: INDIANA) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $47.40 | $43.80 | $91.20 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: ILLINOIS) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $63.45 | $51.10 | $114.55 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $46.65 | $30.38 | $77.03 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $42.50 | $24.21 | $66.71 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $43.75 | $16.81 | $60.56 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $45.45 | $16.81 | $62.26 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $54.70 | $35.75 | $90.45 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $55.25 | $33.40 | $88.65 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $45.50 | $36.81 | $82.31 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $56.90 | $33.55 | $90.45 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: MINNESOTA) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $51.80 | $29.50 | $81.30 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: MICHIGAN) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $47.00 | $33.02 | $80.02 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: INDIANA) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $51.90 | $43.80 | $95.70 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: ILLINOIS) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $67.95 | $51.10 | $119.05 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $51.15 | $30.38 | $81.53 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $47.00 | $24.21 | $71.21 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $48.25 | $16.81 | $65.06 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $49.95 | $16.81 | $66.76 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $59.20 | $35.75 | $94.95 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $59.75 | $33.40 | $93.15 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $50.00 | $36.81 | $86.81 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $61.40 | $33.55 | $94.95 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: MINNESOTA) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $59.30 | $29.50 | $88.80 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: MICHIGAN) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $54.50 | $33.02 | $87.52 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: INDIANA) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $59.40 | $43.80 | $103.20 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: ILLINOIS) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $75.45 | $51.10 | $126.55 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $58.65 | $30.38 | $89.03 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $54.50 | $24.21 | $78.71 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $55.75 | $16.81 | $72.56 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $57.45 | $16.81 | $74.26 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $66.70 | $35.75 | $102.45 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $67.25 | $33.40 | $100.65 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $57.50 | $36.81 | $94.31 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $68.90 | $33.55 | $102.45 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: MINNESOTA) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $56.30 | $29.50 | $85.80 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: MICHIGAN) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $51.50 | $33.02 | $84.52 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: INDIANA) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $56.40 | $43.80 | $100.20 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: ILLINOIS) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $72.45 | $51.10 | $123.55 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $55.65 | $30.38 | $86.03 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $51.50 | $24.21 | $75.71 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $52.75 | $16.81 | $69.56 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $54.45 | $16.81 | $71.26 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $63.70 | $35.75 | $99.45 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $64.25 | $33.40 | $97.65 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $54.50 | $36.81 | $91.31 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $65.90 | $33.55 | $99.45 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: MINNESOTA) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $57.80 | $29.50 | $87.30 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: MICHIGAN) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $53.00 | $33.02 | $86.02 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: INDIANA) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $57.90 | $43.80 | $101.70 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: ILLINOIS) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $73.95 | $51.10 | $125.05 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $57.15 | $30.38 | $87.53 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $53.00 | $24.21 | $77.21 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $54.25 | $16.81 | $71.06 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $55.95 | $16.81 | $72.76 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $65.20 | $35.75 | $100.95 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $65.75 | $33.40 | $99.15 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $56.00 | $36.81 | $92.81 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $67.40 | $33.55 | $100.95 | |
| OPERATOR: POWER EQUIPMENT, GROUP 1 Building ENGI0150-006 (BUILDING AND RESIDENTIAL CONSTRUCTION) MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO(REQUIRES TWO ENGINEERS); BOILER AND THROTTLE VALVE; CAISSON RIGS*; CENTRAL REDI-MIX PLANT*; COMBINATION BACKHOE FRONT ENDLOADER MACHINE; COMPRESSOR AND THROTTLE VALVE; CONCRETE BREAKER (TRUCK MOUNTED)*; CONCRETE CONVEYOR; CONCRETE CONVEYOR, TRUCK MOUNTED; CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER 27E CU FT AND UNDER*; CONCRETE PLACER*; CONCRETE PLACING BOOM; CONCRETE PUMP (TRUCK MOUNTED); CONCRETE TOWER; CRANES*; CRANES, HAMMERHEAD*; CRANES, (GCI AND SIMILAR TYPE REQUIRES TWO OPERATORS ONLY); CRETER CRANE; CRUSHER, STONE, ETC; DERRICKS; DERRICKS, TRAVELING*; FORMLESS CURB AND GUTTER MACHINE*; GRADER, ELEVATING; GROUTING MACHINES; HIGHLIFT SHOVELS OR FRONT ENDLOADER 2 1/4 YD. AND OVER; HOISTS, ELEVATORS, OUTSIDE TYPE RACK AND PINION AND SIMILAR MACHINES; HOISTS, ONE, TWO, AND THREE DRUM; HOISTS, TWO TUGGER ONE FLOOR; HYDRAULIC BACKHOES*; HYDRAULIC BOOM TRUCKS; HYDRAULIC VAC (AND SIMILAR EQUIPMENT);LOCOMOTIVES; MOTOR PATROL*; PILE DRIVERS AMD SKID RIG*; POST HOLE DIGGER; PRE- STRESS MACHINE; PUMP CRETES DUAL RAM(REQUIRING FREQUENT LUBRICATION AND WATER); PUMP CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS GYPSUM BULKER AND PUMP; RAISED AND BLIND HOLE DRILL*; ROTO MILL GRINDER (36"" AND OVER)*; ROTO MILL GRINDER (LESS THAN 36"")*; SCOOPS-TRACTOR DRAWN; SLIP-FORM PAVER*; STRADDLE BUGGIES; TOURNAPULL; TRACTOR WITH BOOM, AND SIDE BOOM; AND TRENCHING MACHINES*. *-REQUIRES OILER | $64.80 | $51.00 | $115.80 | |
| OPERATOR: POWER EQUIPMENT, GROUP 1 Building ENGI0150-025 (HEAVY AND HIGHWAY CONSTRUCTION) ASPHALT PLANT*; ASPHALT HEATER AND PLANER COMBINATION; ASPHALT HEATER SCARFIRE*, ASPHALT SPREADER; AUTOGRADER/ GOMACO OR SIMILAR; ABG PAVER*, BACKHOES WITH CAISSON ATTACHMENT*, BALLAST REGULATOR, BELT LOADER*; CAISSON RIGS*CAR DUMPER, CENTRAL REDI-MIX PLANT*, COMBINATION BACKHOE; FRONT END LOADER MACHINE (1 CU YD OR OVER BACKHOE BUCKET OR WITH ATTACHMENTS); CONCRETE BREAKER (TRUCK MOUNTED); CONCRETE CONVEYOR; CONCRETE PAVER OVER 27E CU FT*; CONCRETE PLACER*; CONCRETE TUBE FLOAT; CRANES, ALL ATTACHMENTS*; CRANES, HAMMERHEAD, LINDEN, PECO AND MACHINES OF A LIKE NATURE*; CRETER CRANE; CRUSHER, STONE; ALL DERRICKS; DERRICK BOATS; DERRICKS, TRAVELING*; DOWELL MACHINE WITH AIR COMPRESSOR ($1.00 ABOVE CLASS 1); DREDGES*; FIELD MECHANIC WELDER; FORMLESS CURB AND GUTTER MACHINE*; GRADALL AND MACHINES OF A LIKE NATURE*; GRADER, ELEVATING; GRADER, MOTOR GRADER, MOTOR PATROL, AUTO PATROL, FORM GRADER, PULL GRADER, SUBGRADER; GUARD RAIL POST DRIVER MOUNTED*; HOISTS, ONE, TWO, AND THREE DRUM; HYDRAULIC BACKHOES*; BACKHOES WITH SHEAR ATTACHMENTS*; MUCKING MACHINE; PILE DRIVERS AND SKID RIG*; PRE-STRESS MACHINE; PUMP CRETES DUAL RAM (REQUIRES FREQUENT LUBRICATION AND WATER)*; ROCK DRILL- CRAWLER OR SKID RIG*; ROCK DRILL TRUCK MOUNTED*; ROCK/ TRACK TAMPER; ROTO MILL GRINDER, (36"" AND OVER)*; SLIP-FORM PAVER*; SOIL TEST DRILL RIG, TRUCK MOUNTED*; STRADDLE BUGGIES; HYDRAULIC TELESCOPING FORM (TUNNEL); TRACTOR DRAWN BELT LOADER*; TRACTOR DRAWN BELT LOADER WITH ATTACHED PUSHER (TWO ENGINEERS); TRACTOR WITH BOOM; TRACTAIRE WITH ATTACHMENT; TRAFFIC BARRIER TRANSFER MACHINE*; TRENCHING MACHINE; TRUCK MOUNTED CONCRETE PUMP WITH BOOM*; UNDERGROUND BORING AND/OR MINING MACHINES 5 FT IN DIAMETER AND OVER TUNNEL, ETC.*; WHEEL EXCAVATOR* & WIDENER (APSCO); RAISED OR BLIND HOE DRILL, TUNNEL & SHAFT* *REQUIRES OILER | $63.00 | $51.00 | $114.00 | |
| OPERATOR: POWER EQUIPMENT, GROUP 2 Building ENGI0150-006 (BUILDING AND RESIDENTIAL CONSTRUCTION) BOBCAT (OVER 3/4 CU YD); BOILERS; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER (TWO BAG AND OVER); CONVEYOR, PORTABLE; FORKLIFT TRUCKS; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADERS UNDER 2 1/4 CU YD; AOTOMATIC HOISTS, HOISTS, INSIDE ELEVATORS; HOISTS, SEWER DRAGGING MACHINE; HOISTS, TUGGER SINGLE DRUM; LASER SCREED; ROCK DRILL (SELF-PROPELLED); ROCK DRILL (TRUCK MOUNTED)*; ROLLERS; STEAM GENERATORS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES AN ADDITIONAL $.50 PER HOUR); WINCH TRUCKS WITH ""A"" FRAME. *-REQUIRES OILER | $63.50 | $51.00 | $114.50 | |
| OPERATOR: POWER EQUIPMENT, GROUP 2 Building ENGI0150-025 (HEAVY AND HIGHWAY CONSTRUCTION) BATCH PLANT*; BITUMINOUS MIXER; BOILER AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING CONVEYORS; COMBINATION BACKKHOE FRONT END LOADER MACHINE, (LESS THAN 1 CU YD BACKHOE BUCKET WITH ATTACHMENTS); COMPRESSOR AND THROTTLE VALVE; COMPRESSOR, COMMON RECEIVER (3); CONCRETE BREAKER OR HYDRO HAMMER; CONCRETE GRINDING MACHINE; CONCRETE MIXER OR PAVER 7S SERIES TO AND INCLUDING 27 CU FT; CONCRETE SPREADER; CONCRETE CURING MACHINE; BURLAP MACHINE; BELTING MACHINE AND SEALING MACHINE; CONCRETE WHEEL SAW; CONVEYOR MUCK CARS (HAGLUND OR SIMILAR TYPE); DRILLS (ALL); FINISHING MACHINE-CONCRETE; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADER; HOIST- SEWER DRAGGING MACHINE; HYDRAULIC BOOM TRUCKS, ALL ATTACHMENTS; HYDRO-BLASTER (REQUIRES TWO OPERATORS); LASER SCREED*; LOCOMOTIVES, DINKY; OFF-ROAD HAULING UNITS (INCLUDING ARTICULATING); PUMP CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS, GYPSUM BULKER AND PUMP; ROLLER ASPHALT; ROTARY SNOW PLOWS; ROTOTILLER, SEAMAN, SELF-PROPELLED; SCOOPS-TRACTOR DRAWN; SELF- PROPELLED COMPACTOR; SPREADER-CHIP-STONE; SCRAPER; SCRAPER-PRIME MOVER IN TANDEM REGARDLESS OF SIZE (ADD $1.00 TO GROUP 2 HOURLY RATE FOR EACH HOUR AND FOR EACH MACHINE ATTACHED THERETO ADD $1.00 TO GROUP 2 HOURLY RATE FOR EACH HOUR); TANK CAR HEATER; TRACTORS, PUSH, PULLING SHEEPS FOOT, DISC, OR COMPACTOR, ETC; TUG BOATS *REQUIRES OILER | $62.45 | $51.00 | $113.45 | |
| OPERATOR: POWER EQUIPMENT, GROUP 3 Building ENGI0150-006 (BUILDING AND RESIDENTIAL CONSTRUCTION) AIR COMPRESSOR-SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR-LARGE OVER 250; COMBINATION-SMALL EQUIPMENT OPERATOR; GENERATOR- SMALL 50 KW AND UNDER; GENERATOR-LARGE OVER 50 KW; HEATERS, MECHANICAL; HOISTS, INSIDE ELEVATORS (REMODELING OR RENOVATIN WORK); HYDRUALIC POWER UNITS (PILE DRIVING, EXTRACTING, AND DRILLING); LOW BOYS; PUMPS OVER 3"" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; BOBCAT (UP TO AND INCLUDING 3/4 CU YD) | $60.95 | $51.00 | $111.95 | |
| OPERATOR: POWER EQUIPMENT, GROUP 3 Building ENGI0150-025 (HEAVY AND HIGHWAY CONSTRUCTION) BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES; HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS, TUGGER SINGLE DRUM; JEEP DIGGERS; LOW BOYS; PIPE JACKING MACHINES; POST-HOLE DIGGER; POWER SAW, CONCRETE, POWER DRIVEN; PUG MILLS; ROLLERS, OTHER THAN ASPHALT; SEED AND STRAW BLOWER; STEAM GENERATORS; STUMP MACHINE; WINCH TRUCKS WITH A-FRAME; WORK BOATS; TAMPER-FORM MOTOR DRIVEN | $60.40 | $51.00 | $111.40 | |
| OPERATOR: POWER EQUIPMENT, GROUP 4 Building ENGI0150-006 (BUILDING AND RESIDENTIAL CONSTRUCTION) BOBCATS AND/OR OTHER SKID STEER LOADERS; BRICK FORKLIFTS; OILERS | $59.20 | $51.00 | $110.20 | |
| OPERATOR: POWER EQUIPMENT, GROUP 4 Building ENGI0150-025 (HEAVY AND HIGHWAY CONSTRUCTION) AIR COMPRESSOR - SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 250; COMBINATION - SMALL EQUIPMENT OPERATOR; DIRECTIONAL BORING MACHINE; GENERATORS - SMALL 50 KW AND UNDER; GENERATORS - LARGE , OVER 50 KW; HEATERS, MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING, EXTRACTING OR DRILLING); LIGHT PLANTS (1 TO 5); PUMPS, OVER 3"" (1 TO 3, NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; TRACTAIRE; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; | $59.00 | $51.00 | $110.00 | |
| OPERATOR: POWER EQUIPMENT, GROUP 5 Building ENGI0150-025 (HEAVY AND HIGHWAY CONSTRUCTION) BOBCATS (ALL); BRICK FORKLIFTS; OILERS; DIRECTIONAL BORING | $57.80 | $51.00 | $108.80 | |
| OPERATORS Building ENGI0150-013 (BOONE, COOK, DUPAGE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) INCLUDES ANGLE DOZER, SMALL; BOBCAT AND OTHER SIMILAR TYPE MACHINES, 1 CU YD OR LESS; CHIPPING MACHINE; COMBINATION BACKHOE AND FRONT END LOADER 1 CU YD OR LESS; FORK LIFT TRUCK; HI-REACH AND HIGH-RANGER;HYDRAULIC BOOM WITH CLAM;LOG SKIDDER; STTRAW BLOWER AND SEEDER; STUMP MACHINE;TRACTORS, CRAWLERS, RUBBER TIRE TRACTORS, HIGHLIFT SHOVELS OR FRONT END LOADERS 1 CU YD OR LESS; TREE SPADES, ALL; UTILITY TRACTOR AND ATTACHMENTS, AND RUBBER TIRE FRONT END LOADER OR SIMILAR MACHINE OF 1 TO 1.5 CU YD SOLELY USED FOR PLACEMENT OF LARGE DECORATIVE BOULDERS, TREES WITH BALLED SOIL, AND OTHER DECORATIVE LANDSCAPE MATERIAL TOO LARGE TO BE ACCOMMODATED IN A 1 CU YD BUCKET. ALL OTHER EQUIPMENT UTILIZED FOR PERFORMING LANDSCAPE WORK, TREE TRIMMING OR REMOVAL OF STEES, AND TO INSTALL PLANTS; TRANSPORT TREES; EXCAVATE PLANT PITS; PLACE SOIL AND OTHER LANDSCAPE MATERIALS; AND APPLY FINISH LANDSCAPE MATERIAL ON SUBGRADE PREPARED BY OTHERS BUILDING AND HIGHWAY CONSTRUCTION (LANDSCAPE WORK): THE LANDSCAPE WORK FOR THE LANDSCAPE EQUIPMENT OPERATOR EXCLUDES THE PREPARATION OF SUB-GRADE PRIOR TO APPLICATION OF FINISH LANDSCAPE MATERIALS AND THE UTILIZATION OF ANY EQUIPMENT OVER ONE CUBIC YARD. FOOTNOTE: A. HEALTH AND WELFARE CONTRIBUTION IS YEAR'S DAY; MEMORIAL DAY; FOURTH OF JULY; LABOR DAY; THANKSGIVING DAY; AND CHRISTMAS DAY PROVIDED THAT ALL SUCH EMPLOYEES SHALL HAVE IN FACT WORKED THEIR REGULARLY SCHEDULED WORK DAY IMMEDIATELY PRECEDING AND THE REGULARLY SCHEDULED WORK DAY IMMEDIATELY SUCCEEDING THE OCCURRENCE OF SUCH HOLIDAY | $37.55 | $9.50 | $47.05 | |
| OPERATORS Building ENGI0150-023 (HENRY, MCLEAN, OGLE, PEORIA, ROCK ISLAND, TAZEWELL, WINNEBAGO, AND WOODFORD COUNTIES) INCLUDES THE FOLLOWING: ANGLE DOZER, SMALL; BOBCAT AND OTHER SIMILAR TYPE MACHINES, 1 CU YD OR LESS; CHIPPING MACHINE; COMBINATION BACKHOE AND FRONT END LOADER 1 CU YD OR LESS; FORK LIFT TRUCK; HI-REACH AND HIGH-RANGER;HYDRAULIC BOOM WITH CLAM;LOG SKIDDER; STTRAW BLOWER AND SEEDER; STUMP MACHINE;TRACTORS, CRAWLERS, RUBBER TIRE TRACTORS, HIGHLIFT SHOVELS OR FRONT END LOADERS 1 CU YD OR LESS; TREE SPADES, ALL; UTILITY TRACTOR AND ATTACHMENTS, AND RUBBER TIRE FRONT END LOADER OR SIMILAR MACHINE OF 1 TO 1.5 CU YD SOLELY USED FOR PLACEMENT OF LARGE DECORATIVE BOULDERS, TREES WITH BALLED SOIL, AND OTHER DECORATIVE LANDSCAPE MATERIAL TOO LARGE TO BE ACCOMMODATED IN A 1 CU YD BUCKET. ALL OTHER EQUIPMENT UTILIZED FOR PERFORMING LANDSCAPE WORK, TREE TRIMMING OR REMOVAL OF STEES, AND TO INSTALL PLANTS; TRANSPORT TREES; EXCAVATE PLANT PITS; PLACE SOIL AND OTHER LANDSCAPE MATERIALS; AND APPLY FINISH LANDSCAPE MATERIAL ON SUBGRADE PREPARED BY OTHERS HIGHWAY CONSTRUCTION (LANDSCAPE WORK): THE LANDSCAPE WORK FOR THE LANDSCAPE EQUIPMENT OPERATOR EXCLUDES THE PREPARATION OF SUB-GRADE PRIOR TO APPLICATION OF FINISH LANDSCAPE MATERIALS AND THE UTILIZATION OF ANY EQUIPMENT OVER ONE CUBIC YARD. FOOTNOTE: A. HEALTH AND WELFARE CONTRIBUTION IS YEAR'S DAY; MEMORIAL DAY; FOURTH OF JULY; LABOR DAY; THANKSGIVING DAY; AND CHRISTMAS DAY PROVIDED THAT ALL SUCH EMPLOYEES SHALL HAVE IN FACT WORKED THEIR REGULARLY SCHEDULED WORK DAY IMMEDIATELY PRECEDING AND THE REGULARLY SCHEDULED WORK DAY IMMEDIATELY SUCCEEDING THE OCCURRENCE OF SUCH HOLIDAY | $37.55 | $9.50 | $47.05 | |
| PAINTER (INCLUDING TAPER) Building PAIN0014-001 | $53.05 | $33.91 | $86.96 | |
| PIPEFITTER Building PLUM0597-002 | $55.00 | $38.62 | $93.62 | |
| PLASTERER Building PLAS0005-002 | $42.25 | $26.65 | $68.90 | |
| PLUMBER Building PLUM0130-001 | $60.50 | $39.02 | $99.52 | |
| POINTER, CLEANER AND CAULKER Building BRIL0021-012 | $45.42 | $24.06 | $69.48 | |
| ROOFER Building ROOF0011-001 | $50.25 | $30.43 | $80.68 | |
| SHEET METAL WORKER Building SHEE0073-001 | $49.10 | $42.91 | $92.01 | |
| SHEET METAL WORKER (ALUMINUM GUTTER WORK) Building SHEE0073-002 | $31.32 | $37.02 | $68.34 | |
| SPRINKLER FITTER Building SFIL0281-001 | $63.25 | $36.50 | $99.75 | |
| TERRAZZO WORKER/SETTER Building BRIL0021-006 | $44.38 | $25.84 | $70.22 | |
| TILE FINISHER Building BRIL0021-006 | $38.56 | $22.10 | $60.66 | |
| TILE SETTER Building BRIL0021-006 | $45.49 | $25.72 | $71.21 | |
| TRAFFIC CONTROL DEVICE MONITOR Building TEAM0731-002 (TRAFFIC SAFETY WORKER: PRIMARY DUTIES INCLUDE BUT ARE NOT LIMITED TO THE DELIVERY, MAINTENANCE AND PICK-UP OF TRAFFIC CONTROL DEVICES, THE SET-UP AND INSTALLATION OF TRAFFIC SIGNS, PAVEMENT MARKINGS, BARRICADES, CRASH BARRELS AND GLARE SCREENS, TRAFFIC CONTROL SURVEILLANCE, THE REPAIR AND MAINTENANCE TRUCKS, CARS, ARROW BOARDS, MESSAGE SIGNS, BARRICADE AND SIGN FABRICATION EQUIPMENT) | $43.40 | $22.71 | $66.11 | |
| TRUCK DRIVER, GROUP 2 Building TEAM0026-005 (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | $45.88 | $25.42 | $71.30 | |
| TRUCK DRIVER, GROUP 2 Building TEAM0371-004 (HENRY AND ROCK ISLAND COUNTIES) | $45.93 | $25.72 | $71.65 | |
| TRUCK DRIVER, GROUP 2 Building TEAM0627-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | $43.83 | $24.27 | $68.10 | |
| TRUCK DRIVER, GROUP 2 Building TEAM0722-005 (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | $45.88 | $25.42 | $71.30 | |
| TRUCK DRIVER, GROUP 3 Building TEAM0026-005 (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | $46.15 | $25.42 | $71.57 | |
| TRUCK DRIVER, GROUP 3 Building TEAM0371-004 (HENRY AND ROCK ISLAND COUNTIES) | $46.25 | $25.72 | $71.97 | |
| TRUCK DRIVER, GROUP 3 Building TEAM0627-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | $44.10 | $24.27 | $68.37 | |
| TRUCK DRIVER, GROUP 3 Building TEAM0722-005 (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | $46.15 | $25.42 | $71.57 | |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS Building TEAM0371-004 (HENRY AND ROCK ISLAND COUNTIES) | $46.60 | $25.72 | $72.32 | |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS Building TEAM0627-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | $44.49 | $24.27 | $68.76 | |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS Building TEAM0722-005 (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | $46.54 | $25.42 | $71.96 | |
| TRUCK DRIVER, GROUP 4LOW BOY AND OIL DISTRIBUTORS Building TEAM0026-005 (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | $46.54 | $25.42 | $71.96 | |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Building TEAM0026-005 (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | $47.64 | $25.42 | $73.06 | |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Building TEAM0627-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | $45.59 | $24.27 | $69.86 | |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Building TEAM0722-005 (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | $47.64 | $25.42 | $73.06 | |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (HENRY AND ROCK ISLAND COUNTIES) Building TEAM0371-004 | $47.71 | $25.72 | $73.43 | |
| TRUCK DRIVER: 2 - 3 AXLES Building TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.47 | $26.70 | $75.17 | |
| TRUCK DRIVER: 2 & 3 AXLES Building TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $53.95 | $0.30 | $54.25 | |
| TRUCK DRIVER: 2 & 3 AXLES Building TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $53.95 | $0.30 | $54.25 | |
| TRUCK DRIVER: 2 OR 3 AXLES Building TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $45.55 | $30.27 | $75.82 | |
| TRUCK DRIVER: 2 OR 3 AXLES Building TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $44.82 | $0.25 | $45.07 | |
| TRUCK DRIVER: 2 OR 3 AXLES Building TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $45.55 | $30.27 | $75.82 | |
| TRUCK DRIVER: 2-3 AXLES Building TEAM0179-004 (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.12 | $0.30 | $46.42 | |
| TRUCK DRIVER: 2-3 AXLES Building TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.54 | $13.40 | $57.94 | |
| TRUCK DRIVER: 2-3 AXLES Building TEAM0330-004 (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.83 | $0.30 | $45.13 | |
| TRUCK DRIVER: 2-3 AXLES Building TEAM0673-003 (DU PAGE AND KANE COUNTIES) SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.31 | $0.30 | $45.61 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $45.80 | $30.27 | $76.07 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $54.21 | $0.30 | $54.51 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0179-004 (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.27 | $0.30 | $46.57 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $44.97 | $0.25 | $45.22 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.69 | $13.40 | $58.09 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.62 | $26.70 | $75.32 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0330-004 (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.98 | $0.30 | $45.28 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0673-003 (DU PAGE AND KANE COUNTIES) BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.46 | $0.30 | $45.76 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $45.80 | $30.27 | $76.07 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $54.21 | $0.30 | $54.51 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $46.00 | $30.27 | $76.27 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $54.43 | $0.30 | $54.73 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0179-004 (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.47 | $0.30 | $46.77 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $45.17 | $0.25 | $45.42 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.89 | $13.40 | $58.29 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.82 | $26.70 | $75.52 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0330-004 (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.18 | $0.30 | $45.48 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0673-003 (DU PAGE AND KANE COUNTIES) BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.66 | $0.30 | $45.96 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $46.00 | $30.27 | $76.27 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $54.43 | $0.30 | $54.73 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $46.20 | $30.27 | $76.47 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $54.64 | $0.30 | $54.94 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0179-004 (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.67 | $0.30 | $46.97 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $45.37 | $0.25 | $45.62 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.09 | $13.40 | $58.49 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.93 | $26.70 | $75.63 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0330-004 (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.38 | $0.30 | $45.68 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0673-003 (DU PAGE AND KANE COUNTIES) BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.86 | $0.30 | $46.16 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $46.20 | $30.27 | $76.47 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $54.64 | $0.30 | $54.94 |
No trade rates match your search and filter selection.
Building, Heavy, Highway, Residential
Heavy
Applies to
Adams, Alexander, Bond, Boone, Brown, Bureau, Calhoun, Carroll, Cass, Champaign +92 more
Heavy
Applies to
Adams, Alexander, Bond, Boone, Brown, Bureau, Calhoun, Carroll, Cass, Champaign +92 more
Building, Heavy, Highway, Residential
Applies to
Boone, Cook, De Kalb, Du Page, Grundy, Henry, Kane, Kankakee, Kendall, Lake +9 more
Wage determinations are revised throughout the year. We'll email you when rates covering Cook County, Illinois are modified.
Free, one email when rates change. Unsubscribe anytime.