IL20260008
rev 2Building, Residential
Applies to
Du Page, Grundy, Kane, Kendall, Lake, McHenry, Will
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS WORKER/INSULATOR Building ASBE0017-005 (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $55.02 | $35.75 | $90.77 | |
| BOILERMAKER Building BOIL0001-003 (DU PAGE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) | $53.10 | $38.54 | $91.64 | |
| BRICKLAYER Building BRIL0014-001 (DU PAGE, GRUNDY, LAKE, AND WILL COUNTIES) | $48.56 | $34.05 | $82.61 | |
| BRICKLAYER (KANE, KENDALL, AND MCHENRY COUNTIES) Building BRIL0027-002 | $44.88 | $26.62 | $71.50 | |
| CARPENTER Building CARP0555-010 (KANE, KENDALL, AND MCHENRY COUNTIES RESIDENTIAL) | $45.61 | $35.31 | $80.92 | |
| CARPENTER Heavy CARP0790-004 (CARROLL, JO DAVIESS, LEE, OGLE (OREGON AND SOUTH THEREOF), STEPHENSON, AND WHITESIDE COUNTIES) | $48.60 | $38.53 | $87.13 | |
| CARPENTER (BOONE COUNTY) Heavy CARP0792-003 | $51.00 | $36.13 | $87.13 | |
| CARPENTER (DE KALB COUNTY) Heavy CARP0790-003 | $48.60 | $38.53 | $87.13 | |
| CARPENTER (WILL COUNTY RESIDENTIAL) Building CARP0555-007 | $45.61 | $35.31 | $80.92 | |
| CARPENTER AND PILEDRIVER Heavy CARP0555-011 (KANE, MCHENRY (NORTH OF HWY 52), AND KENDALL COUNTIES) | $52.01 | $38.86 | $90.87 | |
| CARPENTER AND PILEDRIVER (WILL COUNTY) Heavy CARP0555-008 | $49.76 | $38.26 | $88.02 | |
| CARPENTER, CARPENTER, MILLWRIGHT, PILEDRIVER, AND SOFT FLOOR LAYER (GRUNDY COUNTY) Building CARP0555-012 | $45.61 | $35.31 | $80.92 | |
| CARPENTER; MILLWRIGHT; PILEDRIVERMEN Building CARP0555-006 (WILL COUNTY BUILDING) | $52.01 | $41.41 | $93.42 | |
| CARPENTER: BUILDING (DUPAGE ANE LAKE COUNTIES) Building CARP0555-003 | $52.01 | $38.85 | $90.86 | |
| CARPENTER: BUILDING (DUPAGE ANE LAKE COUNTIES) Heavy CARP0555-003 | $52.01 | $38.85 | $90.86 | |
| CARPENTER: CARPENTER, FLOOR LAYER, LATHER, MILLWRIGHT, AND PILEDRIVER Building CARP0555-009 (KANE, KENDALL, AND MCHENRY COUNTIES BUILDING) | $52.01 | $38.86 | $90.87 | |
| CARPENTER: HEAVY & HIGHWAY Building CARP0555-003 (DUPAGE ANE LAKE COUNTIES) | $52.01 | $38.85 | $90.86 | |
| CARPENTER: HEAVY & HIGHWAY Heavy CARP0555-003 (DUPAGE ANE LAKE COUNTIES) | $52.01 | $38.85 | $90.86 | |
| CARPENTER: RESIDENTIAL (DU PAGE AND LAKE COUNTIES) Building CARP0555-004 | $45.61 | $35.31 | $80.92 | |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0011-008 (DE KALB, KANE, KENDALL, AND MCHENRY COUNTIES) | $50.70 | $40.60 | $91.30 | |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0011-012 (GRUNDY AND WILL COUNTIES) | $46.25 | $45.10 | $91.35 | |
| CEMENT MASON/CONCRETE FINISHER Heavy PLAS0011-008 (DE KALB, KANE, KENDALL, AND MCHENRY COUNTIES) | $50.70 | $40.60 | $91.30 | |
| CEMENT MASON/CONCRETE FINISHER (BOONE COUNTY) Heavy PLAS0011-015 | $41.03 | $36.39 | $77.42 | |
| CEMENT MASON/CONCRETE FINISHER (DUPAGE COUNTY) Building PLAS0803-002 | $38.00 | $24.03 | $62.03 | |
| CEMENT MASON/CONCRETE FINISHER (DUPAGE COUNTY) Heavy PLAS0803-001 | $38.00 | $24.03 | $62.03 | |
| CEMENT MASON/CONCRETE FINISHER (LAKE COUNTY) Building PLAS0011-014 | $48.50 | $42.82 | $91.32 | |
| CEMENT MASON/CONCRETE FINISHER (LAKE COUNTY) Heavy PLAS0011-013 | $48.50 | $42.82 | $91.32 | |
| CEMENT MASON/CONCRETE FINISHER (WILL COUNTY) Heavy PLAS0011-002 | $46.25 | $45.10 | $91.35 | |
| DREDGING: Heavy SUIL2003-001 (LEAD DECKHAND) PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H | $29.68 | $7.61 | $37.29 | |
| DREDGING: Heavy SUIL2003-001 (FIREMAN, OILER, DECKHAND, & SCOWMAN (WITH DIPPER, HYDRAULIC OR OTHER FLOATING EQUIPMENT ENGAGED IN HYDRAULIC AND DIPPER DREDGING OPERATIONS) PIPELINE MEN (BOTH AFLOAT & ASHORE INCLUDING LOADING, UNLOADING, MAINTAINING, AND HANDLING PIPELINES FOR HYDRAULIC DREDGES AND SANDBOATS RANGEMAN, TANKERMAN, SWEEPMAN AND SERVICE TRUCK DRIVER) | $22.51 | $7.61 | $30.12 | |
| DREDGING: ENGINEER AND MECHANIC Heavy SUIL2003-002 (AREA IV: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. PAUL, ROCK ISLAND AND CHICAGO DISTRICTS, CORPS OF ENGINEERS) | $44.78 | $34.21 | $78.99 | |
| DREDGING: ENGINEER AND MECHANIC Heavy SUIL2003-002 (AREA III: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE HUNTINGTON DISTRICT, CORPS OF ENGINEERS) | $47.70 | $31.75 | $79.45 | |
| DREDGING: ENGINEER AND MECHANIC Heavy SUIL2003-002 (AREA II: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE LOUISVILLE DISTRICT, CORPS OF ENGINEERS) | $47.70 | $31.75 | $79.45 | |
| DREDGING: ENGINEER AND MECHANIC Heavy SUIL2003-002 (AREA I: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. LOUIS DISTRICT, CORPS OF ENGINEERS) | $47.83 | $31.75 | $79.58 | |
| DREDGING: LEVERMEN AND BOATMAN Heavy SUIL2003-002 (AREA 4: LEVERMAN. OPERATORS ON BACKHOES OVER 130,000 LBS., OPERATORS ON CRANES OVER 165 TONS, AND OPERATORS THAT ARE REQUIRED TO HAVE A LICENSE OR CERTIFICATION TO DO THE WORK ASSIGNED THEM SHALL RECEIVE 5% MORE THAN THE HIGHEST RATE OF PAY PER HOUR LISTED ON THIS AGREEMENT.) | $47.02 | $34.21 | $81.23 | |
| DREDGING: LEVERMEN AND BOATMAN Heavy SUIL2003-002 (AREA 4: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. PAUL, ROCK ISLAND AND CHICAGO DISTRICTS, CORPS OF ENGINEERS:) | $44.78 | $34.21 | $78.99 | |
| DREDGING: LEVERMEN AND BOATMAN Heavy SUIL2003-002 (AREA 3: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE HUNTINGTON DISTRICT, CORPS OF ENGINEERS:) | $55.54 | $31.75 | $87.29 | |
| DREDGING: LEVERMEN AND BOATMAN Heavy SUIL2003-002 (AREA 2: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE LOUISVILLE DISTRICT, CORPS OF ENGINEERS) | $55.54 | $31.75 | $87.29 | |
| DREDGING: LEVERMEN AND BOATMAN Heavy SUIL2003-002 (AREA 1: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. LOUIS DISTRICT, CORPS OF ENGINEERS) | $55.69 | $31.75 | $87.44 | |
| ELECTRICIAN Heavy ELEC0117-001 (KANE (NORTHERN HALF) AND MCHENRY (ALL) COUNTIES) | $59.11 | $42.23 | $101.34 | |
| ELECTRICIAN Heavy ELEC0364-003 (BOONE (ALL) & DEKALB (REMAINDER) COUNTIES) | $62.61 | $43.96 | $106.57 | |
| ELECTRICIAN Heavy ELEC0461-006 (DEKALB (SANDWICH TWP), KANE (SOUTHERN HALF) & KENDALL (ALL) COUNTIES) | $60.17 | $43.50 | $103.67 | |
| ELECTRICIAN (DUPAGE COUNTY) Heavy ELEC0701-001 | $41.00 | $43.40 | $84.40 | |
| ELECTRICIAN (LAKE COUNTY) Heavy ELEC0150-001 | $48.28 | $50.46 | $98.74 | |
| ELECTRICIAN (WILL COUNTY) Heavy ELEC0176-011 | $52.00 | $45.01 | $97.01 | |
| ELECTRICIAN: BUILDING Building ELEC0117-002 (KANE (NORTHERN HALF) AND MCHENRY COUNTIES) | $59.11 | $42.23 | $101.34 | |
| ELECTRICIAN: BUILDING Building ELEC0461-002 (KANE (SOUTHERN HALF) AND KENDALL COUNTIES) | $60.17 | $43.50 | $103.67 | |
| ELECTRICIAN: BUILDING (GRUNDY AND WILL COUNTIES) Building ELEC0176-008 | $52.00 | $45.01 | $97.01 | |
| ELECTRICIAN: BUILDING (LAKE COUNTY) Building ELEC0150-002 | $51.87 | $51.77 | $103.64 | |
| ELECTRICIAN: ELECTRICAL TECHNICIAN: WORK INCLUDES THE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES Building ELEC0117-003 (VOICE, SOUND, DATA AND VIDEO), TELEPHONE, SECURITY, FIRE ALARM SYSTEMS THAT ARE A COMPONENT OF A MULTIPLEX SYSTEM AND SHARE A COMMON CABLE, AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICE, PABX AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN, (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEM DIGITAL NETWORK).THE WORK SHALL COVER THE PULLING OF WIRE IN RACEWAYS, BUT NOT THE INSTALLATION OF RACEWAYS. KANE (NORTHERN HALF), AND MCHENRY COUNTIES) | $48.71 | $35.87 | $84.58 | |
| ELECTRICIAN: ELECTRICAL TECHNICIAN: WORK INCLUDES THE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES Building ELEC0150-003 (VOICE, SOUND, DATA AND VIDEO), TELEPHONE, SECURITY, FIRE ALARM SYSTEMS THAT ARE A COMPONENT OF A MULTIPLEX SYSTEM AND SHARE A COMMON CABLE, AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICE, PABX AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN, (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEM DIGITAL NETWORK).THE WORK SHALL COVER THE PULLING OF WIRE IN RACEWAYS, BUT NOT THE INSTALLATION OF RACEWAYS. (LAKE COUNTY) | $48.00 | $39.85 | $87.85 | |
| ELECTRICIAN: ELECTRICAL TECHNICIAN: WORK INCLUDES THE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES Building ELEC0176-015 (VOICE, SOUND, DATA AND VIDEO), TELEPHONE, SECURITY, FIRE ALARM SYSTEMS THAT ARE A COMPONENT OF A MULTIPLEX SYSTEM AND SHARE A COMMON CABLE, AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICE, PABX AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN, (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEM DIGITAL NETWORK).THE WORK SHALL COVER THE PULLING OF WIRE IN RACEWAYS, BUT NOT THE INSTALLATION OF RACEWAYS. (GRUNDY AND WILL COUNTIES) | $44.00 | $37.91 | $81.91 | |
| ELECTRICIAN: ELECTRICAL TECHNICIAN: WORK INCLUDES THE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES Building ELEC0461-005 (VOICE, SOUND, DATA AND VIDEO), TELEPHONE, SECURITY, FIRE ALARM SYSTEMS THAT ARE A COMPONENT OF A MULTIPLEX SYSTEM AND SHARE A COMMON CABLE, AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICE, PABX AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN, (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEM DIGITAL NETWORK).THE WORK SHALL COVER THE PULLING OF WIRE IN RACEWAYS, BUT NOT THE INSTALLATION OF RACEWAYS. (KANE (SOUTHERN HALF), AND KENDALL COUNTIES) | $49.70 | $38.45 | $88.15 | |
| ELECTRICIAN: ELECTRICAL TECHNICIAN: WORK INCLUDES THE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES Building ELEC0701-003 (VOICE, SOUND, DATA AND VIDEO), TELEPHONE, SECURITY, FIRE ALARM SYSTEMS THAT ARE A COMPONENT OF A MULTIPLEX SYSTEM AND SHARE A COMMON CABLE, AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICE, PABX AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN, (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEM DIGITAL NETWORK).THE WORK SHALL COVER THE PULLING OF WIRE IN RACEWAYS, BUT NOT THE INSTALLATION OF RACEWAYS. (DU PAGE COUNTY) | $40.90 | $44.32 | $85.22 | |
| ELECTRICIAN: RESIDENTIAL Building ELEC0117-004 (KANE (NORTHERN HALF) AND MCHENRY COUNTIES) | $44.40 | $34.59 | $78.99 | |
| ELECTRICIAN: RESIDENTIAL (DUPAGE COUNTY) Building ELEC0701-002 | $39.60 | $32.25 | $71.85 | |
| ELECTRICIAN: RESIDENTIAL (GRUNDY AND WILL COUNTIES) Building ELEC0176-003 | $46.87 | $33.38 | $80.25 | |
| ELEVATOR MECHANIC Building ELEV0002-002 (DU PAGE, KANE, KENDALL, LAKE, & WILL COUNTIES) FOOTNOTES: A) PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING DAY; VETERANS' DAY AND CHRISTMAS DAY. B) EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR EMPLOYEE WITH LESS THAN 5 YEARS SERVICE | $70.68 | $38.44 | $109.12 | |
| ELEVATOR MECHANIC Building ELEV0055-001 (GRUNDY COUNTY) FOOTNOTES: A. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR UNDER 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; VETERANS' DAY & CHRISTMAS DAY | $57.99 | $38.44 | $96.43 | |
| FIRE STOP TECHNICIAN Building ASBE0017-005 | $44.02 | $32.76 | $76.78 | |
| GLAZIER Building PAIN0027-003 | $51.55 | $44.09 | $95.64 | |
| HAZARDOUS MATERIAL HANDLER Building ASBE0017-005 (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | $41.27 | $32.76 | $74.03 | |
| HYDRAULIC DREDGING: LAUNCH OPERATOR - VESSEL 800 HORSE- POWER OR LESS PAID HOLIDAYS Heavy SUIL2003-001 (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H | $25.15 | $7.61 | $32.76 | |
| HYDRAULIC DREDGING: TUG ENGINEER PAID HOLIDAYS Heavy SUIL2003-001 (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. paid holidays: A thru H | $26.49 | $7.61 | $34.10 | |
| HYDRAULIC DREDGING: TUG OPERATOR - VESSEL OVER 800 HORSE-POWER PAID HOLIDAYS Heavy SUIL2003-001 (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H | $26.49 | $7.61 | $34.10 | |
| HYDRAULIC DREDGING:TUG WORKERS: FIREMAN, LINEMAN, OILER, DECKHAND, TANKERMAN. SCOWMAN Heavy SUIL2003-001 (ON/OR WITH TUGBOATS, LAUNCHES, OR OTHER SELF-PROPELLED BOATS) PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H | $22.51 | $7.61 | $30.12 | |
| IRONWORKER Building IRON0393-002 (DUPAGE (REMAINDER), KANE, KENDALL (NORTHERN PART), AND MCHENRY (SOUTHEAST 1/4) COUNTIES) | $48.83 | $39.84 | $88.67 | |
| IRONWORKER Building IRON0444-002 (DUPAGE (ARGONNE & VIC), GRUNDY, KENDALL (SOUTHERN PART), AND WILL COUNTIES) | $47.80 | $42.50 | $90.30 | |
| IRONWORKER Heavy IRON0393-003 (DEKALB (SOUTHEASTERN 2/3 INCLUDING SYCAMORE AND DEKALB), DUPAGE (REMAINDER), KANE, KENDALL (NORTHERN PART), AND MCHENRY (SOUTHEAST 1/4) COUNTIES) | $48.83 | $39.84 | $88.67 | |
| IRONWORKER Heavy IRON0444-006 (KENDALL (SOUTHERN PART) AND WILL COUNTIES) | $47.80 | $42.50 | $90.30 | |
| IRONWORKER Heavy IRON0498-003 (BOONE, DEKALB (EXCEPT SOUTHEAST), AND MCHENRY (NORTHWEST) COUNTIES) | $41.37 | $44.41 | $85.78 | |
| IRONWORKER (MCHENRY COUNTY (NORTHWEST PART)) Building IRON0498-006 | $41.37 | $44.41 | $85.78 | |
| IRONWORKER, ORNAMENTAL Building IRON0063-003 (LAKE, DUPAGE (EASTERN 1/4) AND MCHENRY (HEBRON, WOODSTOCK & EAST THEREOF) COUNTIES) | $59.26 | $44.81 | $104.07 | |
| IRONWORKER, ORNAMENTAL Heavy IRON0063-003 (LAKE, DUPAGE (EASTERN 1/4) AND MCHENRY (HEBRON, WOODSTOCK & EAST THEREOF) COUNTIES) | $59.26 | $44.81 | $104.07 | |
| IRONWORKER: FENCE ERECTOR Building IRON0063-004 (LAKE, DUPAGE (EASTERN 1/4), AND MCHENRY (HEBRON, WOODSTOCK & EAST THEREOF) COUNTIES) | $52.25 | $34.31 | $86.56 | |
| IRONWORKER: MACHINERY MOVERS; RIGGERS; MACHINERY ERECTORS Building IRON0136-002 (LAKE, DUPAGE (EASTERN 1/4) AND MCHENRY (HEBRON, WOODSTOCK & EAST THEREOF) COUNTIES) | $54.25 | $47.38 | $101.63 | |
| IRONWORKER: MASTER RIGGERS Building IRON0136-002 (LAKE, DUPAGE (EASTERN 1/4) AND MCHENRY (HEBRON, WOODSTOCK & EAST THEREOF) COUNTIES) | $56.75 | $47.38 | $104.13 | |
| IRONWORKER: SHEETER Building IRON0001-014 (DU PAGE (EASTERN 1/4), LAKE, AND MCHENRY (HEBRON, WOODSTOCK, AND EAST THEREOF) COUNTIES) | $62.71 | $46.58 | $109.29 | |
| IRONWORKER: SHEETER Heavy IRON0001-014 (DU PAGE (EASTERN 1/4), LAKE, AND MCHENRY (HEBRON, WOODSTOCK, AND EAST THEREOF) COUNTIES) | $62.71 | $46.58 | $109.29 | |
| IRONWORKER: STRUCTURAL AND REINFORCING Building IRON0001-014 (DU PAGE (EASTERN 1/4), LAKE, AND MCHENRY (HEBRON, WOODSTOCK, AND EAST THEREOF) COUNTIES) | $62.46 | $46.58 | $109.04 | |
| IRONWORKER: STRUCTURAL AND REINFORCING Heavy IRON0001-014 (DU PAGE (EASTERN 1/4), LAKE, AND MCHENRY (HEBRON, WOODSTOCK, AND EAST THEREOF) COUNTIES) | $62.46 | $46.58 | $109.04 | |
| LABORER GROUP 1 BUILDING LABORERS, PLASTERER TENDERS, PUMPS FOR DEWATERING & OTHER UNCLASSIFIED LABORERS (DU PAGE COUNTY) Building LABO0002-003 | $51.40 | $36.94 | $88.34 | |
| LABORER GROUP 1 BUILDING LABORERS; PLASTERER TENDERS, GENERAL LABORERS Building LABO0152-001 (WRECKING AND DEMOLITION); FIREPROOFING AND FIRE SHOP LABORERS (LAKE COUNTY) | $51.40 | $36.94 | $88.34 | |
| LABORER GROUP 1 COMMON LABORER, ASPHALT LABORER, ASPHALT PLANT LABORER, STRIPING LABORER, CLIPPER TYPE CONCRETE SAW, SELF-PROPELLED SAWS Heavy LABO0149-002 (BOONE, KANE, KENDALL, AND MCHENRY COUNTIES) | $51.40 | $36.94 | $88.34 | |
| LABORER GROUP 1 GENERAL LABORERS; ASPHALT Heavy LABO0152-003 (LAKE COUNTY) | $51.40 | $36.94 | $88.34 | |
| LABORER GROUP 1 MORTAR MIXERS, HANDLING ASPHALT SHINGLES; SCAFFOLDS; SEWER AND TRENCH WORK Building LABO0075-001 (GROUND LEVEL DOWN TO 8 FEET); CATCH BASIN AND MANHOLE DIGGERS, MESH HANDLING ON ROAD WORK; CEMENT AND MINERAL FILLER HANDLER; CONCRETE PUDDLERS; BATCH DUMPERS (CEMENT & ASPHALT); VIBRATOR OPERATORS; SAND AND STONE WHEELERS TO MIXER HANDLERS); CONCRETE WHEELERS; AIRTAMPING HAMMERMEN; CONCRETE & PAVING BREAKERS; ROCK DRILLERS/JACKHAMMERMEN; CHIPPING HAMMERMEN 1-BAG MIXER; ASPHALT LABORER; CHAIN AND POWER SAWS; PIT MEN; FENCING LABORERS; MASON TENDERS (MORTAR AND BRICK WHEELER); KETTLEMEN & TARMEN, TANK CLEANERS; SCAFFOLD AND STAGING LABORERS; POT FIREMEN (TARMEN); HEATERS TENDER FOR ANY PURPOSE; WATER PUMPS (PORTABLE WATER PUMPS SHALL BE TENDED BY LABORERS IF THE EMPLOYER DETERMINES TENDING IS REQUIRED); RIP RAP; HANDLING OF SLAB STEEL ROAD FORMS IN ANY MANNER, EXCEPT ROAD FORM SETTING, SETTING CENTER STRIPS, CONTRACTION AND EXPANSION JOINTS (ROAD WORK); UNLOADING AND HANDLING OF LUMBER, BRICK, TRANSITE MATERIALS, CAST IRON WATER PIPE, REINFORCED CONCRETE RODS, SEWER AND DRAIN TILE, RAILROAD TILES AND ALL OTHER CREOSOTED MATERIALS; PAVING BLOCKS AND CONCRETE FORMS; HANDLING OF INSULATION OF ANY TYPE; ALL WORK INVOLVING THE UNLOADING OF MATERIALS, FIXTURES, OR FURNISHING, WHETHER CRATED OR UNCRATED; ALL MORTAR AND COMPOSITION MIXERS OF SEWER WORK; TRACK LABORERS; CHIMNEY AND SILO LABORERS WORKING AT A HEIGHT OF 1 TO 48 FEET; ALL LABORERS WORKING ON SWINGING SUSPENDED, OR ANY TYPE OR MAKE OF SCAFFOLDING 1 TO 48 FEET; ALL LABORERS WORKING INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK; WORKING INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK FROM BOTTOM TO A HEIGHT OF 48 FEET; FORM STRIPPERS (ANY TYPE); MECHANICAL OR MOTORIZED BUGGIES, FOR CONCRETE OR MASONS EMPLOYERS; USE OF SKID STEER LOADS OR ANY OTHER MACHINERY WHICH REPLACES THE WHEELBARROW OR BUGGY; HANDLING MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED IN PUBLIC UTILITY WORK UNLESS OTHERWISE SPECIFIED HEREIN; SNAPPING OF WALL TIES AND REMOVAL OF RODS; DRILLING OF ANCHOR BOLT HOLES; CONCRETE OR ASPHALT CLIPPER TYPE SAWS AND SELF-PROPELLED SAWS; SHOULDER AND GRADE LABORERS; ALL HYDRAULIC ELECTRIC AND AIR OR ANY OTHER TYPE OF TOOLS; GROUTING AND CAULKING; CLEANING LUMBER, NAIL PULLING, DECK HAND; DREDGEHAND; SHORE LABORER; BANKMEN ON FLOATING PLANT; TOOL AND MATERIAL CHECKERS; SIGNALMEN AND FLAGMEN ON ALL CONSTRUCTION WORK; CLEANING OF DEBRIS; REMOVAL OF TREES; CONCRETE CURING, TEMPORARY CONCRETE PROTECTION REGARDLESS OF MANNER OR MATERIALS USED; LABORERS ON APSCO; JANITORIAL; WRECKING AND DEMOLITION LABORERS (GRUNDY AND WILL COUNTIES) | $47.40 | $33.16 | $80.56 | |
| LABORER GROUP 1 MORTAR MIXERS, HANDLING ASPHALT SHINGLES; SCAFFOLDS; SEWER AND TRENCH WORK Heavy LABO0075-002 (GROUND LEVEL DOWN TO 8 FEET); CATCH BASIN AND MANHOLE DIGGERS, MESH HANDLING ON ROAD WORK; CEMENT AND MINERAL FILLER HANDLER; CONCRETE PUDDLERS; BATCH DUMPERS (CEMENT & ASPHALT); VIBRATOR OPERATORS; SAND AND STONE WHEELERS TO MIXER HANDLERS); CONCRETE WHEELERS; AIRTAMPING HAMMERMEN; CONCRETE & PAVING BREAKERS; ROCK DRILLERS/JACKHAMMERMEN; CHIPPING HAMMERMEN 1-BAG MIXER; ASPHALT LABORER; CHAIN AND POWER SAWS; PIT MEN; FENCING LABORERS; MASON TENDERS (MORTAR AND BRICK WHEELER); KETTLEMEN & TARMEN, TANK CLEANERS; SCAFFOLD AND STAGING LABORERS; POT FIREMEN (TARMEN); HEATERS TENDER FOR ANY PURPOSE; WATER PUMPS (PORTABLE WATER PUMPS SHALL BE TENDED BY LABORERS IF THE EMPLOYER DETERMINES TENDING IS REQUIRED); RIP RAP; HANDLING OF SLAB STEEL ROAD FORMS IN ANY MANNER, EXCEPT ROAD FORM SETTING, SETTING CENTER STRIPS, CONTRACTION AND EXPANSION JOINTS (ROAD WORK); UNLOADING AND HANDLING OF LUMBER, BRICK, TRANSITE MATERIALS, CAST IRON WATER PIPE, REINFORCED CONCRETE RODS, SEWER AND DRAIN TILE, RAILROAD TILES AND ALL OTHER CREOSOTED MATERIALS; PAVING BLOCKS AND CONCRETE FORMS; HANDLING OF INSULATION OF ANY TYPE; ALL WORK INVOLVING THE UNLOADING OF MATERIALS, FIXTURES, OR FURNISHING, WHETHER CRATED OR UNCRATED; ALL MORTAR AND COMPOSITION MIXERS OF SEWER WORK; TRACK LABORERS; CHIMNEY AND SILO LABORERS WORKING AT A HEIGHT OF 1 TO 48 FEET; ALL LABORERS WORKING ON SWINGING SUSPENDED, OR ANY TYPE OR MAKE OF SCAFFOLDING 1 TO 48 FEET; ALL LABORERS WORKING INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK; WORKING INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK FROM BOTTOM TO A HEIGHT OF 48 FEET; FORM STRIPPERS (ANY TYPE); MECHANICAL OR MOTORIZED BUGGIES, FOR CONCRETE OR MASONS EMPLOYERS; USE OF SKID STEER LOADS OR ANY OTHER MACHINERY WHICH REPLACES THE WHEELBARROW OR BUGGY; HANDLING MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED IN PUBLIC UTILITY WORK UNLESS OTHERWISE SPECIFIED HEREIN; SNAPPING OF WALL TIES AND REMOVAL OF RODS; DRILLING OF ANCHOR BOLT HOLES; CONCRETE OR ASPHALT CLIPPER TYPE SAWS AND SELF-PROPELLED SAWS; SHOULDER AND GRADE LABORERS; ALL HYDRAULIC ELECTRIC AND AIR OR ANY OTHER TYPE OF TOOLS; GROUTING AND CAULKING; CLEANING LUMBER, NAIL PULLING, DECK HAND; DREDGEHAND; SHORE LABORER; BANKMEN ON FLOATING PLANT; TOOL AND MATERIAL CHECKERS; SIGNALMEN AND FLAGMEN ON ALL CONSTRUCTION WORK; CLEANING OF DEBRIS; REMOVAL OF TREES; CONCRETE CURING, TEMPORARY CONCRETE PROTECTION REGARDLESS OF MANNER OR MATERIALS USED; LABORERS ON APSCO; JANITORIAL; WRECKING AND DEMOLITION LABORERS (WILL COUNTY) | $51.40 | $36.94 | $88.34 | |
| LABORER GROUP 10 BOILER SETTER PLASTIC LABORERS Building LABO0002-003 (DU PAGE COUNTY) | $51.85 | $36.94 | $88.79 | |
| LABORER GROUP 10 BOILER SETTER PLASTIC LABORERS Building LABO0152-001 (LAKE COUNTY) | $51.95 | $36.94 | $88.89 | |
| LABORER GROUP 11 DOSIMETER Building LABO0152-001 (ANY DEVICE) MONITORING NUCLEAR EXPOSURE; ASBESTOS ABATEMENT LABORERS; TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS (LAKE COUNTY) | $51.60 | $36.94 | $88.54 | |
| LABORER GROUP 11 JACKHAMMERMEN ON FIRE BRICK WORK ONLY (DU PAGE COUNTY) Building LABO0002-003 | $51.68 | $36.94 | $88.62 | |
| LABORER GROUP 12 DOSIMETER Building LABO0002-003 (ANY DEVICE) MONITORING NUCLEAR EXPOSURE); ASBESTOS ABATEMENT LABORERS; TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS (DU PAGE COUNTY) | $52.40 | $36.94 | $89.34 | |
| LABORER GROUP 2 AIR TAMPERS & VIBRATORS Heavy LABO0149-002 (BOONE, KANE, KENDALL, AND MCHENRY COUNTIES) | $51.68 | $36.94 | $88.62 | |
| LABORER GROUP 2 CEMENT GUN LABORERS (LAKE COUNTY) Heavy LABO0152-003 | $51.48 | $36.94 | $88.42 | |
| LABORER GROUP 2 CEMENT GUN LABORERS AND HOSE Building LABO0152-001 (LAKE COUNTY) | $51.48 | $36.94 | $88.42 | |
| LABORER GROUP 2 FIREPROOFING AND FIRE SHOP LABORERS (DU PAGE COUNTY) Building LABO0002-003 | $51.40 | $36.94 | $88.34 | |
| LABORER GROUP 2 SEWER AND DRAIN PIPE LAYERS AND MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED, ON PUBLIC UTILITY WORK Building LABO0075-001 (GROUND LEVEL TO 8 FEET); PUMPCRETE PIPE HANDLERS (GRUNDY AND WILL COUNTIES) | $47.40 | $33.16 | $80.56 | |
| LABORER GROUP 2 SEWER AND DRAIN PIPE LAYERS AND MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED, ON PUBLIC UTILITY WORK Heavy LABO0075-002 (GROUND LEVEL TO 8 FEET); PUMPCRETE PIPE HANDLERS (WILL COUNTY) | $51.75 | $36.94 | $88.69 | |
| LABORER GROUP 3 ASPHALT TAMPERS AND SMOOTHERS Heavy LABO0152-003 (LAKE COUNTY) | $51.40 | $36.94 | $88.34 | |
| LABORER GROUP 3 CEMENT GUN LABORERS AND HOSE Building LABO0002-003 (DU PAGE COUNTY) | $51.48 | $36.94 | $88.42 | |
| LABORER GROUP 3 CHIMNEY OVER 40 FEET; SCAFFOLD LABORERS; WALL MEN OR WRECKERS (LAKE COUNTY) Building LABO0152-001 | $51.50 | $36.94 | $88.44 | |
| LABORER GROUP 3 MORTAR & CONCRETE MIXERS Heavy LABO0149-002 (BOONE, KANE, KENDALL, AND MCHENRY COUNTIES) | $51.68 | $36.94 | $88.62 | |
| LABORER GROUP 3 TORCHMAN Building LABO0149-001 (DEMOLITION ONLY), MORTARMEN KANE, KENDALL, AND MCHENRY COUNTIES | $51.40 | $36.94 | $88.34 | |
| LABORER GROUP 4 CEMENT GUN NOZZLE Building LABO0152-001 (GUNITE) LABORERS (LAKE COUNTY) | $51.60 | $36.94 | $88.54 | |
| LABORER GROUP 4 CHIMNEY OVER 40 FEET; SCAFFOLD LABORERS; WELDMAN-WRECKERS BURNERS Building LABO0002-003 (DU PAGE COUNTY) | $51.50 | $36.94 | $88.44 | |
| LABORER GROUP 4 POWER TAMPER KANE, KENDALL, AND MCHENRY COUNTIES Building LABO0149-001 | $51.65 | $36.94 | $88.59 | |
| LABORER GROUP 4 RAKERS AND LUTEMEN; MACHINE SCREWMAN; KETTLEMEN; MIXERMEN, DRUM-MEN; JACKHAMMERMEN Heavy LABO0152-003 (ASPHALT); MITE BOX SPREADERS; LABORERS ON BIRCH OVERMAN AND SIMILAR SPREADER EQUIPMENT; LABORERS ON APSCO; LABORERS ON AIR COMPRESSORS; PAVING FORM SETTERS; JACKHAMMERMAN (CONCRETE); POWER DRIVE CONCRETE SAWS (LAKE COUNTY) | $51.63 | $36.94 | $88.57 | |
| LABORER GROUP 4 STRINGLINE & FORM SETTER; TORCHMAN Heavy LABO0149-002 (DEMOLITION), SHEETING & CRIBBING, BLACK TOP RAKERS & LUTEMEN, MACHINE SCREWMEN (BOONE, KANE, KENDALL, AND MCHENRY COUNTIES) | $51.68 | $36.94 | $88.62 | |
| LABORER GROUP 4 TUNNEL MINERS, AND ALL LABORERS INSIDE TUNNEL; AIR BLOW PIPEMEN; TORCHMEN Building LABO0075-001 (BURNERS); MORTARING MEN ON SEWER AND DRAIN PIPE (THE APPLYING OF MORTAR AND COMPOSITION MIXES); ALL BOTTOM MEN ON SEWER WORK-ALL SEWER AND DRAIN PIPELAYERS-MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED ON PUBLIC UTILITY WORK-8 FEET OR MORE BELOW GROUND LEVEL, AND ALL OTHER SEWER AND TRENCH LABORERS 8 FEET OR MORE BELOW GROUND LEVEL REGARDLESS OF EXCAVATION AREA; ALL LABOR WORK INSIDE COFFERDAM; USE OF A 10 FOOT OR MORE DRILL STEEL FOR HAND HELD DRILLS; CAISSON LABORERS GROUND LEVEL DOWN 15 FEET; ALL AIR TOOLS 8 FEET OR MORE BELOW GROUND LEVEL; ALL LABORERS WORKING ON SWINGING-SUSPENDED OR ANY TYPE OR MAKE OF SCAFFOLDS, 48 FEET TO 100 FEET; ALL CHIMNEY AND SILO LABORERS WORKING AT A HEIGHT OF 48 TO 100 FEET; ALL TAMPING HAMMERS OVER 150 LBS.; ALL LABORERS WORKING INSIDE OF A SPHERE OR ANY TYPE OR MAKE OF TANK AT A HEIGHT OF 48 FEET TO 100 FEET; ALL HYDRAULIC, ELECTRIC AND AIR TOOLS OR ANY OTHER TYPE 8 FEET OR MORE BELOW GROUND LEVEL; VIBRATORS-ANY TYPE-8 FEET OR MORE BELOW GROUND LEVEL (GRUNDY AND WILL COUNTIES) | $47.60 | $33.16 | $80.76 | |
| LABORER GROUP 4 TUNNEL MINERS, AND ALL LABORERS INSIDE TUNNEL; AIR BLOW PIPEMEN; TORCHMEN Heavy LABO0075-002 (BURNERS); MORTARING MEN ON SEWER AND DRAIN PIPE (THE APPLYING OF MORTAR AND COMPOSITION MIXES); ALL BOTTOM MEN ON SEWER WORK-ALL SEWER AND DRAIN PIPELAYERS-MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED ON PUBLIC UTILITY WORK-8 FEET OR MORE BELOW GROUND LEVEL, AND ALL OTHER SEWER AND TRENCH LABORERS 8 FEET OR MORE BELOW GROUND LEVEL REGARDLESS OF EXCAVATION AREA; ALL LABOR WORK INSIDE COFFERDAM; USE OF A 10 FOOT OR MORE DRILL STEEL FOR HAND HELD DRILLS; CAISSON LABORERS GROUND LEVEL DOWN 15 FEET; ALL AIR TOOLS 8 FEET OR MORE BELOW GROUND LEVEL; ALL LABORERS WORKING ON SWINGING-SUSPENDED OR ANY TYPE OR MAKE OF SCAFFOLDS, 48 FEET TO 100 FEET; ALL CHIMNEY AND SILO LABORERS WORKING AT A HEIGHT OF 48 TO 100 FEET; ALL TAMPING HAMMERS OVER 150 LBS.; ALL LABORERS WORKING INSIDE OF A SPHERE OR ANY TYPE OR MAKE OF TANK AT A HEIGHT OF 48 FEET TO 100 FEET; ALL HYDRAULIC, ELECTRIC AND AIR TOOLS OR ANY OTHER TYPE 8 FEET OR MORE BELOW GROUND LEVEL; VIBRATORS-ANY TYPE-8 FEET OR MORE BELOW GROUND LEVEL (WILL COUNTY) | $51.75 | $36.94 | $88.69 | |
| LABORER GROUP 5 CEMENT GUN NOZZLE Building LABO0002-003 (GUNITE) LABORERS; WINDLASS AND CAPSTAN PERSON (DU PAGE COUNTY) | $51.55 | $36.94 | $88.49 | |
| LABORER GROUP 5 CEMENT GUN NOZZLE Heavy LABO0152-003 (GUNITE) (LAKE COUNTY) | $51.60 | $36.94 | $88.54 | |
| LABORER GROUP 5 CHAIN SAW MAN, JACKHAMMER MAN, DRILLMAN, CONCRETE BREADERS & AIR SPADE Heavy LABO0149-002 (BOONE, KANE, KENDALL, AND MCHENRY COUNTIES) | $51.63 | $36.94 | $88.57 | |
| LABORER GROUP 5 STONE DERRICKMEN AND HANDLERS Building LABO0152-001 (LAKE COUNTY) | $51.60 | $36.94 | $88.54 | |
| LABORER GROUP 6 ALL UNDERGROUND CAVERN LABORERS; CAISSON LABORERS 50 FEET OR MORE BELOW GROUND LEVEL; LABORERS WORKING UNDER RADIO ACTIVE CONDITIONS Building LABO0075-001 (SUITING UP); BLASTING MEN (POWDERMEN) (GRUNDY AND WILL COUNTIES) | $47.75 | $33.16 | $80.91 | |
| LABORER GROUP 6 ALL UNDERGROUND CAVERN LABORERS; CAISSON LABORERS 50 FEET OR MORE BELOW GROUND LEVEL; LABORERS WORKING UNDER RADIO ACTIVE CONDITIONS Heavy LABO0075-002 (SUITING UP); BLASTING MEN (POWDERMEN) (WILL COUNTY) | $51.75 | $36.94 | $88.69 | |
| LABORER GROUP 6 ASBESTOS ABATEMENT LABORERS; TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS; DOSIMETER Heavy LABO0152-003 (ANY DEVICE MONITORING NUCLEAR EXPOSURE) (LAKE COUNTY) | $51.60 | $36.94 | $88.54 | |
| LABORER GROUP 6 JACKHAMMERMEN Building LABO0152-001 (TAMPERS & VIBRATORS); POWER DRIVEN CONCRETE SAWS (LAKE COUNTY) | $51.63 | $36.94 | $88.57 | |
| LABORER GROUP 6 STONE DERRICKMEN AND HANDLERS Building LABO0002-003 (DU PAGE COUNTY) | $51.60 | $36.94 | $88.54 | |
| LABORER GROUP 6 TILE LAYERS; BOTTOM MEN KANE, KENDALL, AND MCHENRY COUNTIES Building LABO0149-001 | $52.10 | $36.94 | $89.04 | |
| LABORER GROUP 6 TUNNEL LABORERS, TILE LAYERS & BOTTOM MEN Heavy LABO0149-002 (BOONE, KANE, KENDALL, AND MCHENRY COUNTIES) | $51.75 | $36.94 | $88.69 | |
| LABORER GROUP 7 CAISSON DIGGERS, DYNAMITERS Heavy LABO0149-002 (BOONE, KANE, KENDALL, AND MCHENRY COUNTIES) | $51.75 | $36.94 | $88.69 | |
| LABORER GROUP 7 CAISSON LABORERS; DYNAMITERS KANE, KENDALL, AND MCHENRY COUNTIES Building LABO0149-001 | $52.10 | $36.94 | $89.04 | |
| LABORER GROUP 7 DOSIMETER Building LABO0075-001 (ANY DEVICE) USED FOR MONITORING NUCLEAR EXPOSURE; ASBESTOS ABATEMENT WORKER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER; AND CHIMNEY AND SILO LABORERS FOR EVERY ADDITIONAL 50 FEET OR ANY PART THEREOF ABOVE 100 FEET HIGH (GRUNDY AND WILL COUNTIES) | $47.60 | $33.16 | $80.76 | |
| LABORER GROUP 7 DOSIMETER Heavy LABO0075-002 (ANY DEVICE) USED FOR MONITORING NUCLEAR EXPOSURE; ASBESTOS ABATEMENT WORKER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER; AND CHIMNEY AND SILO LABORERS FOR EVERY ADDITIONAL 50 FEET OR ANY PART THEREOF ABOVE 100 FEET HIGH (WILL COUNTY) | $51.60 | $36.94 | $88.54 | |
| LABORER GROUP 7 FIREBRICK & BOILER LABORER SETTERS Building LABO0152-001 (LAKE COUNTY) | $51.73 | $36.94 | $88.67 | |
| LABORER GROUP 7 JACKHAMMERMEN, POWER DRIVEN CONCRETE SAWS AND OTHER POWER EQUIPMENT Building LABO0002-003 (DU PAGE COUNTY) | $51.63 | $36.94 | $88.57 | |
| LABORER GROUP 8 ASBESTOS ABATEMENT LABORERS, TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS, DOSIMETER Building LABO0149-001 (ANY DEVICE) MONITORING NUCLEAR EXPOSUREANE KENDALL, AND MCHENRY COUNTIES | $51.80 | $36.94 | $88.74 | |
| LABORER GROUP 8 CHIMNEY LABORERS Building LABO0152-001 (ON FIRE BRICK); CAISSON DIGGERS; WELL POINT SYSTEM MEN (LAKE COUNTY) | $51.75 | $36.94 | $88.69 | |
| LABORER GROUP 8 FIREBRICK & BOILER LABORERS Building LABO0002-003 (DU PAGE COUNTY) | $51.73 | $36.94 | $88.67 | |
| LABORER GROUP 8 FLAGMAN Heavy LABO0149-002 (BOONE, KANE, KENDALL, AND MCHENRY COUNTIES) | $51.40 | $36.94 | $88.34 | |
| LABORER GROUP 9 ASBESTOS APATEMENT LABORERS, TOXIC & HAZARDOUS WASTE REMOVAL LABORERS & DOSIMETER Heavy LABO0149-002 (ANY DEVICE) MONITORING NUCLEAR EXPOSURE (BOONE, KANE, KENDALL, AND MCHENRY COUNTIES) | $52.40 | $36.94 | $89.34 | |
| LABORER GROUP 9 CHIMNEY ON FIRE BRICK; CAISSON DIGGERS; WELL POINT SYSTEM MEN (DU PAGE COUNTY) Building LABO0002-003 | $51.75 | $36.94 | $88.69 | |
| LABORER GROUP 9 WINDLASS AND CAPSTAN PERSONS Building LABO0152-001 (LAKE COUNTY) | $51.60 | $36.94 | $88.54 | |
| LABORER, COMPRESSED AIR, 0-15 lbs (DU PAGE COUNTY) Heavy LABO0002-009 | $52.40 | $36.94 | $89.34 | |
| LABORER, COMPRESSED AIR, 16-20 lbs (DU PAGE COUNTY) Heavy LABO0002-009 | $52.90 | $36.94 | $89.84 | |
| LABORER, COMPRESSED AIR, 21-26 lbs (DU PAGE COUNTY) Heavy LABO0002-009 | $53.40 | $36.94 | $90.34 | |
| LABORER, COMPRESSED AIR, 27-33 lbs (DU PAGE COUNTY) Heavy LABO0002-009 | $54.40 | $36.94 | $91.34 | |
| LABORER, COMPRESSED AIR: 34 LBS AND OVER Heavy LABO0002-009 (DU PAGE COUNTY) | $55.40 | $36.94 | $92.34 | |
| LABORER, SEWER CONSTRUCTION: GROUP 1 SIGNALMEN TOP LABORERS, AND ALL OTHER LABORERS NOT MENTIONED Heavy LABO0002-004 (DUPAGE COUNTY) | $51.40 | $36.94 | $88.34 | |
| LABORER, SEWER CONSTRUCTION: GROUP 2 CONCRETE LABORERS; STEEL SETTERS. (DUPAGE COUNTY) Heavy LABO0002-004 | $51.53 | $36.94 | $88.47 | |
| LABORER, SEWER CONSTRUCTION: GROUP 3 CEMENT CARRIERS; CEMENT MIXERS; CONCRETE REPAIRMEN; MORTAR MEN; SCAFFOLD MEN; AND SECOND BOTTOM MEN Heavy LABO0002-004 (DUPAGE COUNTY) | $51.63 | $36.94 | $88.57 | |
| LABORER, SEWER CONSTRUCTION: GROUP 5 ASBESTOS ABATEMENT LABORERS, TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS & DOSIMETER USE Heavy LABO0002-004 (ANY DEVICE) MONITORING NUCLEAR EXPOSURE. (DUPAGE COUNTY) | $51.40 | $36.94 | $88.34 | |
| LABORER, TUNNEL: GROUP 1 CAGE TENDERS; DUMPMEN; FLAGMEN; SIGNALMEN; TOP LABORERS (DUPAGE COUNTY) Heavy LABO0002-009 | $51.40 | $36.94 | $88.34 | |
| LABORER, TUNNEL: GROUP 2 AIR HOIST OPERATOR; KEY BOARD OPERATOR; CONCRETE LABORER; GROUT; LOCK TENDERS Heavy LABO0002-009 (FREE AIR SIDE); STEEL SETTERS; TUGGERS; SWITCHMEN; CAR PUSHER (DUPAGE COUNTY) | $51.53 | $36.94 | $88.47 | |
| LABORER, TUNNEL: GROUP 3 CONCRETE REPAIRMEN; LOCK TENDERS Heavy LABO0002-009 (PRESSURE SIDE); MORTAR MEN; MUCKERS; GROUT MACHINE OPERATORS; TRACK LAYERS (DUPAGE COUNTY) | $51.63 | $36.94 | $88.57 | |
| LABORER, TUNNEL: GROUP 5 ASBESTOS ABATEMENT LABORER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER; DOSIMETER Heavy LABO0002-009 (ANY DEVICE) MONITORING NUCLEAR EXPOSURE (DUPAGE COUNTY) | $51.40 | $36.94 | $88.34 | |
| LABORER: GROUP 1 COMMON LABORER KANE, KENDALL, AND MCHENRY COUNTIES Building LABO0149-001 | $51.40 | $36.94 | $88.34 | |
| LABORER: GROUP 2 POWER VIBRATOR KANE, KENDALL, AND MCHENRY COUNTIES Building LABO0149-001 | $51.65 | $36.94 | $88.59 | |
| LABORER: LANDSCAPE DRIVER Building SUIL1993-003 (KANKAKEE COUNTY) HIGHWAY CONSTRUCTION (LANDSCAPE WORK) | $8.75 | $0.17 | $8.92 | |
| LABORER: LANDSCAPE DRIVER 2 & 3 AXLES Building SUIL1993-001 (GRUNDY, LAKE & WILL COUNTIES) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $11.86 | $2.81 | $14.67 | |
| LABORER: LANDSCAPE DRIVER, 2 & 3 AXLES Building SUIL1993-002 (DU PAGE COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $8.32 | $1.02 | $9.34 | |
| LABORER: LANDSCAPE DRIVER, 2 & 3 AXLES Building SUIL1993-002 (COOK COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $9.93 | $1.89 | $11.82 | |
| LABORER: LANDSCAPE DRIVER, 2 & 3 AXLES Building SUIL1993-002 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) (HEAVY CONSTRUCTION (LANDSCAPE WORK) | $11.94 | $2.42 | $14.36 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-001 (DU PAGE COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-001 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-001 (COOK COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-001 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-002 (DU PAGE COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-002 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-002 (COOK COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-002 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-003 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE OPERATOR Building SUIL1993-003 (KANKAKEE COUNTY) HIGHWAY CONSTRUCTION (LANDSCAPE WORK) | $16.57 | $3.56 | $20.13 | |
| LABORER: LANDSCAPE OPERATORS Building SUIL1993-001 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE OPERATORS Building SUIL1993-002 (DU PAGE COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $10.75 | 0.00 | $10.75 | |
| LABORER: LANDSCAPE OPERATORS Building SUIL1993-002 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE OPERATORS Building SUIL1993-002 (COOK COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $10.98 | $2.12 | $13.10 | |
| LABORER: LANDSCAPE OPERATORS Building SUIL1993-002 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $13.11 | $3.01 | $16.12 | |
| LABORER: LANDSCAPE OPERATORS Building SUIL1993-003 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-001 (GRUNDY, LAKE & WILL COUNTIES) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $12.00 | $3.32 | $15.32 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-001 (DU PAGE COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $9.04 | $1.16 | $10.20 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-001 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $9.66 | $0.26 | $9.92 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-001 (COOK COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $9.80 | $1.82 | $11.62 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-002 (DU PAGE COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $10.65 | 0.00 | $10.65 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-002 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $9.66 | $0.26 | $9.92 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-002 (COOK COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $10.08 | $2.06 | $12.14 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-002 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $9.73 | $2.05 | $11.78 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-003 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $9.66 | $0.26 | $9.92 | |
| LABORER: TRUCK DRIVERS 2 & 3 AXLES Building SUIL1993-003 (PEORIA, TAZEWELL, & WOODFORD COUNTIES) HIGHWAY CONSTRUCTION (LANDSCAPE WORK) | $17.58 | $5.88 | $23.46 | |
| LANDSCAPE LABORER Building LABO0032-004 (WINNEBAGO COUNTY) HIGHWAY CONSTRUCTION | $47.04 | $36.31 | $83.35 | |
| LANDSCAPE LABORER Building LABO0309-006 (ROCK ISLAND COUNTY) HIGHWAY CONSTRUCTION | $33.77 | $23.60 | $57.37 | |
| LANDSCAPE LABORER Building LABO0362-003 (MCLEAN COUNTY) HIGHWAY CONSTRUCTION | $31.08 | $24.43 | $55.51 | |
| LANDSCAPE LABORER Building LABO0538-011 (HENRY COUNTY) HIGHWAY CONSTRUCTION | $35.23 | $28.10 | $63.33 | |
| LANDSCAPE LABORER Building LABO0751-004 (KANKAKEE COUNTY) HIGHWAY CONSTRUCTION | $39.44 | $32.54 | $71.98 | |
| LANDSCAPE LABORER Building LABO0996-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) HIGHWAY CONSTRUCTION | $32.73 | $23.74 | $56.47 | |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR Heavy ELEC0196-001 (BOONE, DEKALB, DUPAGE, KANE, KENDALL, LAKE, AND MCHENRY COUNTIES) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | $49.22 | $23.73 | $72.95 | |
| LINE CONSTRUCTION: GROUNDMAN Heavy ELEC0196-001 (BOONE, DEKALB, DUPAGE, KANE, KENDALL, LAKE, AND MCHENRY COUNTIES) INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | $37.81 | $19.86 | $57.67 | |
| LINE CONSTRUCTION: GROUNDMAN (WILL COUNTY) Building ELEC0009-002 | $48.44 | $29.09 | $77.53 | |
| LINE CONSTRUCTION: GROUNDMAN (WILL COUNTY) Heavy ELEC0009-002 | $48.44 | $29.09 | $77.53 | |
| LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER Heavy ELEC0196-001 (BOONE, DEKALB, DUPAGE, KANE, KENDALL, LAKE, AND MCHENRY COUNTIES) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | $39.19 | $20.32 | $59.51 | |
| LINE CONSTRUCTION: LINEMAN AND EQUIPMENT OPERATOR Building ELEC0009-002 (WILL COUNTY) | $62.10 | $37.29 | $99.39 | |
| LINE CONSTRUCTION: LINEMAN AND EQUIPMENT OPERATOR Heavy ELEC0009-002 (WILL COUNTY) | $62.10 | $37.29 | $99.39 | |
| LINE CONSTRUCTION: LINEMAN, SUBSTATION TECHNICIAN, CABLE SPLICING TECHNICIAN, DIGGER OPERATOR, CRANE OPERATOR 20 TONS AND ABOVE, AND SIGNAL TECHNICIAN Heavy ELEC0196-001 (BOONE, DEKALB, DUPAGE, KANE, KENDALL, LAKE, AND MCHENRY COUNTIES) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | $59.17 | $27.12 | $86.29 | |
| MARBLE FINISHER Building BRIL0021-010 | $33.95 | $26.03 | $59.98 | |
| MARBLE SETTER Building BRIL0021-002 | $47.71 | $33.20 | $80.91 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: MINNESOTA) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $47.30 | $29.50 | $76.80 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: MICHIGAN) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $42.50 | $33.02 | $75.52 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: INDIANA) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $47.40 | $43.80 | $91.20 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: ILLINOIS) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $63.45 | $51.10 | $114.55 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $46.65 | $30.38 | $77.03 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $42.50 | $24.21 | $66.71 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $43.75 | $16.81 | $60.56 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $45.45 | $16.81 | $62.26 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $54.70 | $35.75 | $90.45 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $55.25 | $33.40 | $88.65 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $45.50 | $36.81 | $82.31 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $56.90 | $33.55 | $90.45 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: MINNESOTA) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $51.80 | $29.50 | $81.30 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: MICHIGAN) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $47.00 | $33.02 | $80.02 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: INDIANA) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $51.90 | $43.80 | $95.70 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: ILLINOIS) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $67.95 | $51.10 | $119.05 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $51.15 | $30.38 | $81.53 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $47.00 | $24.21 | $71.21 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $48.25 | $16.81 | $65.06 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $49.95 | $16.81 | $66.76 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $59.20 | $35.75 | $94.95 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $59.75 | $33.40 | $93.15 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $50.00 | $36.81 | $86.81 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $61.40 | $33.55 | $94.95 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: MINNESOTA) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $59.30 | $29.50 | $88.80 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: MICHIGAN) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $54.50 | $33.02 | $87.52 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: INDIANA) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $59.40 | $43.80 | $103.20 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: ILLINOIS) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $75.45 | $51.10 | $126.55 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $58.65 | $30.38 | $89.03 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $54.50 | $24.21 | $78.71 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $55.75 | $16.81 | $72.56 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $57.45 | $16.81 | $74.26 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $66.70 | $35.75 | $102.45 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $67.25 | $33.40 | $100.65 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $57.50 | $36.81 | $94.31 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $68.90 | $33.55 | $102.45 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: MINNESOTA) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $56.30 | $29.50 | $85.80 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: MICHIGAN) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $51.50 | $33.02 | $84.52 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: INDIANA) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $56.40 | $43.80 | $100.20 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: ILLINOIS) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $72.45 | $51.10 | $123.55 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $55.65 | $30.38 | $86.03 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $51.50 | $24.21 | $75.71 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $52.75 | $16.81 | $69.56 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $54.45 | $16.81 | $71.26 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $63.70 | $35.75 | $99.45 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $64.25 | $33.40 | $97.65 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $54.50 | $36.81 | $91.31 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $65.90 | $33.55 | $99.45 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: MINNESOTA) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $57.80 | $29.50 | $87.30 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: MICHIGAN) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $53.00 | $33.02 | $86.02 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: INDIANA) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $57.90 | $43.80 | $101.70 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: ILLINOIS) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $73.95 | $51.10 | $125.05 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $57.15 | $30.38 | $87.53 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $53.00 | $24.21 | $77.21 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $54.25 | $16.81 | $71.06 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $55.95 | $16.81 | $72.76 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $65.20 | $35.75 | $100.95 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $65.75 | $33.40 | $99.15 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $56.00 | $36.81 | $92.81 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $67.40 | $33.55 | $100.95 | |
| OPERATOR: POWER EQUIPMENT, GROUP 1 Building ENGI0150-026 (BUILDING AND RESIDENTIAL) MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO(REQUIRES TWO ENGINEERS); BOILER AND THROTTLE VALVE; CAISSON RIGS*; CENTRAL REDI-MIX PLANT*; COMBINATION BACKHOE FRONT ENDLOADER MACHINE; COMPRESSOR AND THROTTLE VALVE; CONCRETE BREAKER (TRUCK MOUNTED)*; CONCRETE CONVEYOR; CONCRETE CONVEYOR, TRUCK MOUNTED; CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER 27E CU FT AND UNDER*; CONCRETE PLACER*; CONCRETE PLACING BOOM; CONCRETE PUMP (TRUCK MOUNTED); CONCRETE TOWER; CRANES*; CRANES, HAMMERHEAD*; CRANES, (GCI AND SIMILAR TYPE REQUIRES TWO OPERATORS ONLY); CRETER CRANE; CRUSHER, STONE, ETC; DERRICKS; DERRICKS, TRAVELING*; FORMLESS CURB AND GUTTER MACHINE*; GRADER, ELEVATING; GROUTING MACHINES; HIGHLIFT SHOVELS OR FRONT ENDLOADER 2 1/4 YD. AND OVER; HOISTS, ELEVATORS, OUTSIDE TYPE RACK AND PINION AND SIMILAR MACHINES; HOISTS, ONE, TWO, AND THREE DRUM; HOISTS, TWO TUGGER ONE FLOOR; HYDRAULIC BACKHOES*; HYDRAULIC BOOM TRUCKS; HYDRAULIC VAC (AND SIMILAR EQUIPMENT);LOCOMOTIVES; MOTOR PATROL*; PILE DRIVERS AMD SKID RIG*; POST HOLE DIGGER; PRE- STRESS MACHINE; PUMP CRETES DUAL RAM(REQUIRING FREQUENT LUBRICATION AND WATER); PUMP CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS GYPSUM BULKER AND PUMP; RAISED AND BLIND HOLE DRILL*; ROTO MILL GRINDER (36"" AND OVER)*; ROTO MILL GRINDER (LESS THAN 36"")*; SCOOPS-TRACTOR DRAWN; SLIP-FORM PAVER*; STRADDLE BUGGIES; TOURNAPULL; TRACTOR WITH BOOM, AND SIDE BOOM; AND TRENCHING MACHINES*. *-REQUIRES OILER | $64.80 | $51.00 | $115.80 | |
| OPERATOR: POWER EQUIPMENT, GROUP 2 Building ENGI0150-026 (BUILDING AND RESIDENTIAL) BOBCAT (OVER 3/4 CU YD); BOILERS; BRICK FORKLIFT; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER (TWO BAG AND OVER); CONVEYOR, PORTABLE; FORKLIFT TRUCKS; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADERS UNDER 2 1/4 CU YD; AOTOMATIC HOISTS, HOISTS, INSIDE ELEVATORS; HOISTS, SEWER DRAGGING MACHINE; HOISTS, TUGGER SINGLE DRUM; LASER SCREED; ROCK DRILL (SELF-PROPELLED); ROCK DRILL (TRUCK MOUNTED)*; ROLLERS; STEAM GENERATORS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES AN ADDITIONAL $.50 PER HOUR); WINCH TRUCKS WITH ""A"" FRAME. *-REQUIRES OILER | $63.50 | $51.00 | $114.50 | |
| OPERATOR: POWER EQUIPMENT, GROUP 3 Building ENGI0150-026 (BUILDING AND RESIDENTIAL) AIR COMPRESSOR-SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR-LARGE OVER 250; COMBINATION-SMALL EQUIPMENT OPERATOR; GENERATOR- SMALL 50 KW AND UNDER; GENERATOR-LARGE OVER 50 KW; HEATERS, MECHANICAL; HOISTS, INSIDE ELEVATORS (REMODELING OR RENOVATIN WORK); HYDRUALIC POWER UNITS (PILE DRIVING, EXTRACTING, AND DRILLING); LOW BOYS; PUMPS OVER 3"" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; BOBCAT (UP TO AND INCLUDING 3/4 CU YD) | $60.95 | $51.00 | $111.95 | |
| OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER Heavy ENGI0150-015 (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES; HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS, TUGGER SINGLE DRUM; JEEP DIGGERS; PIPE JACKING MACHINES; POST- HOLE DIGGER; POWER SAW, CONCRETE, POWER DRIVEN; PUG MILLS; ROLLERS, OTHER THAN ASPHALT; SEED AND STRAW BLOWER; STEAM GENERATORS; STUMP MACHINE; WINCH TRUCKS WITH A-FRAME; WORK BOATS; TAMPER-FORM MOTOR DRIVEN (BOONE AND DE KALB COUNTIES) PREMIUM PAY: LONG BOOM : CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING MACHINES- BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR | $54.75 | $51.05 | $105.80 | |
| OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER Heavy ENGI0150-024 (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES; HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS, TUGGER SINGLE DRUM; JEEP DIGGERS; LOW BOYS; PIPE JACKING MACHINES; POST-HOLE DIGGER; POWER SAW, CONCRETE, POWER DRIVEN; PUG MILLS; ROLLERS, OTHER THAN ASPHALT; SEED AND STRAW BLOWER; STEAM GENERATORS; STUMP MACHINE; WINCH TRUCKS WITH A-FRAME; WORK BOATS; TAMPER-FORM MOTOR DRIVEN (DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) | $60.40 | $51.00 | $111.40 | |
| OPERATOR: POWER EQUIPMENT, GROUP 4 Building ENGI0150-026 (BUILDING AND RESIDENTIAL) BOBCATS AND/OR OTHER SKID STEER LOADERS; BRICK FORKLIFTS; OILERS | $59.20 | $51.00 | $110.20 | |
| OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR - SMALL 185 AND UNDER Heavy ENGI0150-015 (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 185; ASPHALT SPREADER BACKEND MAN; COMBINATION - SMALL EQUIPMENT OPERATOR; GENERATORS - SMALL 50 KW AND UNDER; GENERATORS - LARGE , OVER 50 KW; HEATERS, MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING, EXTRACTING OR DRILLING); LIGHT PLANTS ALL (1 TO 5); PUMPS, OVER 3"" (1 TO 3, NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; TRACTAIRE; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; BOBCATS UP TO AND INCLUDING .75 CU YD (BOONE AND DE KALB COUNTIES) PREMIUM PAY: LONG BOOM : CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING MACHINES- BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR | $53.30 | $51.05 | $104.35 | |
| OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR - SMALL 250 AND UNDER Heavy ENGI0150-024 (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 250; COMBINATION - SMALL EQUIPMENT OPERATOR; DIRECTIONAL BORING MACHINE; GENERATORS - SMALL 50 KW AND UNDER; GENERATORS - LARGE , OVER 50 KW; HEATERS, MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING, EXTRACTING OR DRILLING); LIGHT PLANTS (1 TO 5); PUMPS, OVER 3"" (1 TO 3, NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; TRACTAIRE; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; (DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) | $59.00 | $51.00 | $110.00 | |
| OPERATOR: POWER EQUIPMENT, GROUP 5 BOBCATS Heavy ENGI0150-024 (ALL); BRICK FORKLIFTS; OILERS; DIRECTIONAL BORING (DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) | $57.80 | $51.00 | $108.80 | |
| OPERATOR: POWER EQUIPMENT, GROUP 5 OILERS Heavy ENGI0150-015 (BOONE AND DE KALB COUNTIES) PREMIUM PAY: LONG BOOM : CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING MACHINES- BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR | $50.85 | $51.05 | $101.90 | |
| OPERATORS Building ENGI0150-013 (BOONE, COOK, DUPAGE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) INCLUDES ANGLE DOZER, SMALL; BOBCAT AND OTHER SIMILAR TYPE MACHINES, 1 CU YD OR LESS; CHIPPING MACHINE; COMBINATION BACKHOE AND FRONT END LOADER 1 CU YD OR LESS; FORK LIFT TRUCK; HI-REACH AND HIGH-RANGER;HYDRAULIC BOOM WITH CLAM;LOG SKIDDER; STTRAW BLOWER AND SEEDER; STUMP MACHINE;TRACTORS, CRAWLERS, RUBBER TIRE TRACTORS, HIGHLIFT SHOVELS OR FRONT END LOADERS 1 CU YD OR LESS; TREE SPADES, ALL; UTILITY TRACTOR AND ATTACHMENTS, AND RUBBER TIRE FRONT END LOADER OR SIMILAR MACHINE OF 1 TO 1.5 CU YD SOLELY USED FOR PLACEMENT OF LARGE DECORATIVE BOULDERS, TREES WITH BALLED SOIL, AND OTHER DECORATIVE LANDSCAPE MATERIAL TOO LARGE TO BE ACCOMMODATED IN A 1 CU YD BUCKET. ALL OTHER EQUIPMENT UTILIZED FOR PERFORMING LANDSCAPE WORK, TREE TRIMMING OR REMOVAL OF STEES, AND TO INSTALL PLANTS; TRANSPORT TREES; EXCAVATE PLANT PITS; PLACE SOIL AND OTHER LANDSCAPE MATERIALS; AND APPLY FINISH LANDSCAPE MATERIAL ON SUBGRADE PREPARED BY OTHERS BUILDING AND HIGHWAY CONSTRUCTION (LANDSCAPE WORK): THE LANDSCAPE WORK FOR THE LANDSCAPE EQUIPMENT OPERATOR EXCLUDES THE PREPARATION OF SUB-GRADE PRIOR TO APPLICATION OF FINISH LANDSCAPE MATERIALS AND THE UTILIZATION OF ANY EQUIPMENT OVER ONE CUBIC YARD. FOOTNOTE: A. HEALTH AND WELFARE CONTRIBUTION IS YEAR'S DAY; MEMORIAL DAY; FOURTH OF JULY; LABOR DAY; THANKSGIVING DAY; AND CHRISTMAS DAY PROVIDED THAT ALL SUCH EMPLOYEES SHALL HAVE IN FACT WORKED THEIR REGULARLY SCHEDULED WORK DAY IMMEDIATELY PRECEDING AND THE REGULARLY SCHEDULED WORK DAY IMMEDIATELY SUCCEEDING THE OCCURRENCE OF SUCH HOLIDAY | $37.55 | $9.50 | $47.05 | |
| OPERATORS Building ENGI0150-023 (HENRY, MCLEAN, OGLE, PEORIA, ROCK ISLAND, TAZEWELL, WINNEBAGO, AND WOODFORD COUNTIES) INCLUDES THE FOLLOWING: ANGLE DOZER, SMALL; BOBCAT AND OTHER SIMILAR TYPE MACHINES, 1 CU YD OR LESS; CHIPPING MACHINE; COMBINATION BACKHOE AND FRONT END LOADER 1 CU YD OR LESS; FORK LIFT TRUCK; HI-REACH AND HIGH-RANGER;HYDRAULIC BOOM WITH CLAM;LOG SKIDDER; STTRAW BLOWER AND SEEDER; STUMP MACHINE;TRACTORS, CRAWLERS, RUBBER TIRE TRACTORS, HIGHLIFT SHOVELS OR FRONT END LOADERS 1 CU YD OR LESS; TREE SPADES, ALL; UTILITY TRACTOR AND ATTACHMENTS, AND RUBBER TIRE FRONT END LOADER OR SIMILAR MACHINE OF 1 TO 1.5 CU YD SOLELY USED FOR PLACEMENT OF LARGE DECORATIVE BOULDERS, TREES WITH BALLED SOIL, AND OTHER DECORATIVE LANDSCAPE MATERIAL TOO LARGE TO BE ACCOMMODATED IN A 1 CU YD BUCKET. ALL OTHER EQUIPMENT UTILIZED FOR PERFORMING LANDSCAPE WORK, TREE TRIMMING OR REMOVAL OF STEES, AND TO INSTALL PLANTS; TRANSPORT TREES; EXCAVATE PLANT PITS; PLACE SOIL AND OTHER LANDSCAPE MATERIALS; AND APPLY FINISH LANDSCAPE MATERIAL ON SUBGRADE PREPARED BY OTHERS HIGHWAY CONSTRUCTION (LANDSCAPE WORK): THE LANDSCAPE WORK FOR THE LANDSCAPE EQUIPMENT OPERATOR EXCLUDES THE PREPARATION OF SUB-GRADE PRIOR TO APPLICATION OF FINISH LANDSCAPE MATERIALS AND THE UTILIZATION OF ANY EQUIPMENT OVER ONE CUBIC YARD. FOOTNOTE: A. HEALTH AND WELFARE CONTRIBUTION IS YEAR'S DAY; MEMORIAL DAY; FOURTH OF JULY; LABOR DAY; THANKSGIVING DAY; AND CHRISTMAS DAY PROVIDED THAT ALL SUCH EMPLOYEES SHALL HAVE IN FACT WORKED THEIR REGULARLY SCHEDULED WORK DAY IMMEDIATELY PRECEDING AND THE REGULARLY SCHEDULED WORK DAY IMMEDIATELY SUCCEEDING THE OCCURRENCE OF SUCH HOLIDAY | $37.55 | $9.50 | $47.05 | |
| PAINTER: BRUSH ONLY (LAKE AND WILL COUNTIES) Heavy PAIN0014-003 | $53.05 | $33.91 | $86.96 | |
| PAINTER: BRUSH, DECORATOR, AND PAPERHANGER Building PAIN0014-002 (GRUNDY, LAKE, AND WILL COUNTIES) | $53.05 | $33.91 | $86.96 | |
| PAINTER: BRUSH, DRYWALL TAPER/FINISHER, SANDBLASTER, AND SPRAY Building PAIN0030-001 (DE KALB, DU PAGE, KANE, KENDALL AND MCHENRY COUNTIES) | $53.05 | $27.63 | $80.68 | |
| PAINTER: BRUSH, DRYWALL TAPER/FINISHER, SANDBLASTER, AND SPRAY Heavy PAIN0030-001 (DE KALB, DU PAGE, KANE, KENDALL AND MCHENRY COUNTIES) | $53.05 | $27.63 | $80.68 | |
| PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL Heavy PAIN0030-004 (BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES) | $45.15 | $29.41 | $74.56 | |
| PIPEFITTER Building PLUM0597-001 (DUPAGE (ARGONNE NATIONAL LABORATORIES, AND FERMI NATIONAL LABORATORY), GRUNDY, LAKE, MCHENRY & WILL COUNTIES) | $55.00 | $38.62 | $93.62 | |
| PLASTERER (BOONE COUNTY) Heavy PLAS0011-015 | $37.90 | $37.66 | $75.56 | |
| PLASTERER (DU PAGE COUNTY) Building PLAS0005-006 | $42.25 | $26.65 | $68.90 | |
| PLASTERER (GRUNDY AND WILL COUNTIES) Building PLAS0005-003 | $42.25 | $26.65 | $68.90 | |
| PLASTERER (LAKE COUNTY) Building PLAS0011-014 | $49.65 | $42.17 | $91.82 | |
| PLUMBER Building PLUM0130-002 (DUPAGE (ARGONNE NATIONAL LABORATORIES AND FERMI NATIONAL LABORATORY), GRUNDY & WILL COUNTIES) | $60.50 | $39.02 | $99.52 | |
| PLUMBER (LAKE AND MCHENRY COUNTIES) Building PLUM0093-001 | $45.76 | $26.92 | $72.68 | |
| PLUMBER/PIPEFITTER Building PLUM0501-001 (DUPAGE (EXCLUDING ARGONNE NATIONAL LABORATORY AND FERMI NATIONAL LABORATORY), KANE, AND KENDALL (EXCEPT THE MICH-WIS PUMPING STATION IN MILBROOK, SILICAS AND PLANT AND VILLAGE OF NEWARK, EXCLUDES YORKVILLE) COUNTIES) | $41.20 | $29.15 | $70.35 | |
| ROOFER Building ROOF0011-004 (DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) | $50.25 | $30.43 | $80.68 | |
| ROOFER Building ROOF0011-009 Scope differs by code/WD | $38.50 | $27.23 | $65.73 | |
| SHEET METAL WORKER Building SHEE0265-001 (DU PAGE, GRUNDY, KANE, KENDALL, MCHENRY, AND WILL COUNTIES) | $56.35 | $38.65 | $95.00 | |
| SHEET METAL WORKER (LAKE COUNTY) Building SHEE0073-003 | $49.10 | $42.91 | $92.01 | |
| SHEET METAL WORKER: ALUMINUM GUTTER WORK Building SHEE0073-004 (LAKE COUNTY) | $31.32 | $37.02 | $68.34 | |
| SPRINKLER FITTER Building SFIL0281-002 (DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) | $63.25 | $36.50 | $99.75 | |
| TERRAZZO WORKER/SETTER Building BRIL0021-008 | $48.38 | $30.79 | $79.17 | |
| TILE FINISHER Building BRIL0021-008 | $42.80 | $26.97 | $69.77 | |
| TILE SETTER Building BRIL0021-008 | $49.75 | $30.79 | $80.54 | |
| TRAFFIC CONTROL DEVICE MONITOR Heavy TEAM0731-002 (TRAFFIC SAFETY WORKER: PRIMARY DUTIES INCLUDE BUT ARE NOT LIMITED TO THE DELIVERY, MAINTENANCE AND PICK-UP OF TRAFFIC CONTROL DEVICES, THE SET-UP AND INSTALLATION OF TRAFFIC SIGNS, PAVEMENT MARKINGS, BARRICADES, CRASH BARRELS AND GLARE SCREENS, TRAFFIC CONTROL SURVEILLANCE, THE REPAIR AND MAINTENANCE TRUCKS, CARS, ARROW BOARDS, MESSAGE SIGNS, BARRICADE AND SIGN FABRICATION EQUIPMENT) | $43.40 | $22.71 | $66.11 | |
| TRUCK DRIVER, GROUP 2 Building TEAM0026-005 (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | $45.88 | $25.42 | $71.30 | |
| TRUCK DRIVER, GROUP 2 Building TEAM0371-004 (HENRY AND ROCK ISLAND COUNTIES) | $45.93 | $25.72 | $71.65 | |
| TRUCK DRIVER, GROUP 2 Building TEAM0627-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | $43.83 | $24.27 | $68.10 | |
| TRUCK DRIVER, GROUP 2 Building TEAM0722-005 (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | $45.88 | $25.42 | $71.30 | |
| TRUCK DRIVER, GROUP 3 Building TEAM0026-005 (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | $46.15 | $25.42 | $71.57 | |
| TRUCK DRIVER, GROUP 3 Building TEAM0371-004 (HENRY AND ROCK ISLAND COUNTIES) | $46.25 | $25.72 | $71.97 | |
| TRUCK DRIVER, GROUP 3 Building TEAM0627-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | $44.10 | $24.27 | $68.37 | |
| TRUCK DRIVER, GROUP 3 Building TEAM0722-005 (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | $46.15 | $25.42 | $71.57 | |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS Building TEAM0371-004 (HENRY AND ROCK ISLAND COUNTIES) | $46.60 | $25.72 | $72.32 | |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS Building TEAM0627-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | $44.49 | $24.27 | $68.76 | |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS Building TEAM0722-005 (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | $46.54 | $25.42 | $71.96 | |
| TRUCK DRIVER, GROUP 4LOW BOY AND OIL DISTRIBUTORS Building TEAM0026-005 (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | $46.54 | $25.42 | $71.96 | |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Building TEAM0026-005 (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | $47.64 | $25.42 | $73.06 | |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Building TEAM0627-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | $45.59 | $24.27 | $69.86 | |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Building TEAM0722-005 (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | $47.64 | $25.42 | $73.06 | |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (HENRY AND ROCK ISLAND COUNTIES) Building TEAM0371-004 | $47.71 | $25.72 | $73.43 | |
| TRUCK DRIVER: 2 - 3 AXLES Heavy TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.47 | $26.70 | $75.17 | |
| TRUCK DRIVER: 2 - 3 AXLES Building TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.47 | $26.70 | $75.17 | |
| TRUCK DRIVER: 2 & 3 AXLES Building TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $53.95 | $0.30 | $54.25 | |
| TRUCK DRIVER: 2 OR 3 AXLE TRUCKS Building TEAM0179-001 (GRUNDY, KENDALL, AND WILL COUNTIES) FOOTNOTES: A. PER WEEK. B. LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.12 | $0.30 | $46.42 | |
| TRUCK DRIVER: 2 OR 3 AXLE TRUCKS Heavy TEAM0179-002 (KENDALL AND WILL COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.12 | $0.30 | $46.42 | |
| TRUCK DRIVER: 2 OR 3 AXLES Building TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $44.82 | $0.25 | $45.07 | |
| TRUCK DRIVER: 2 OR 3 AXLES Building TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $45.55 | $30.27 | $75.82 | |
| TRUCK DRIVER: 2-3 AXLES Building TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.54 | $13.40 | $57.94 | |
| TRUCK DRIVER: 2-3 AXLES Building TEAM0673-003 (DU PAGE AND KANE COUNTIES) SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.31 | $0.30 | $45.61 | |
| TRUCK DRIVER: 2-3 AXLES Heavy TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.54 | $13.40 | $57.94 | |
| TRUCK DRIVER: 2-3 AXLES Heavy TEAM0330-002 (DEKALB COUNTY) WEEK;PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.83 | $0.30 | $45.13 | |
| TRUCK DRIVER: 2-3 AXLES Heavy TEAM0673-003 (DU PAGE AND KANE COUNTIES) SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.31 | $0.30 | $45.61 | |
| TRUCK DRIVER: 2-3 AXLES Building TEAM0179-004 (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.12 | $0.30 | $46.42 | |
| TRUCK DRIVER: 2-3 AXLES Building TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.54 | $13.40 | $57.94 | |
| TRUCK DRIVER: 2-3 AXLES Building TEAM0330-004 (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.83 | $0.30 | $45.13 | |
| TRUCK DRIVER: 2-3 AXLES Building TEAM0673-003 (DU PAGE AND KANE COUNTIES) SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.31 | $0.30 | $45.61 | |
| TRUCK DRIVER: 4 AXLE TRUCKS Building TEAM0179-001 (GRUNDY, KENDALL, AND WILL COUNTIES) FOOTNOTES: A. $448.80 HEALTH & WELFARE PER WEEK, $562.80 PENSION PER WEEK. B. LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.27 | $0.30 | $46.57 | |
| TRUCK DRIVER: 4 AXLE TRUCKS Heavy TEAM0179-002 (KENDALL AND WILL COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.27 | $0.30 | $46.57 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.69 | $13.40 | $58.09 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0673-003 (DU PAGE AND KANE COUNTIES) BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.46 | $0.30 | $45.76 | |
| TRUCK DRIVER: 4 AXLES Heavy TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.69 | $13.40 | $58.09 | |
| TRUCK DRIVER: 4 AXLES Heavy TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.62 | $26.70 | $75.32 | |
| TRUCK DRIVER: 4 AXLES Heavy TEAM0330-002 (DEKALB COUNTY) WEEK;PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.98 | $0.30 | $45.28 | |
| TRUCK DRIVER: 4 AXLES Heavy TEAM0673-003 (DU PAGE AND KANE COUNTIES) BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.46 | $0.30 | $45.76 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0179-004 (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.27 | $0.30 | $46.57 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $44.97 | $0.25 | $45.22 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.69 | $13.40 | $58.09 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.62 | $26.70 | $75.32 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0330-004 (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.98 | $0.30 | $45.28 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0673-003 (DU PAGE AND KANE COUNTIES) BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.46 | $0.30 | $45.76 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $45.80 | $30.27 | $76.07 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $54.21 | $0.30 | $54.51 | |
| TRUCK DRIVER: 5 AXLE TRUCKS Building TEAM0179-001 (GRUNDY, KENDALL, AND WILL COUNTIES) FOOTNOTES: A. $448.80 HEALTH & WELFARE PER WEEK, $562.80 PENSION PER WEEK. B. LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.47 | $0.30 | $46.77 | |
| TRUCK DRIVER: 5 AXLE TRUCKS Heavy TEAM0179-002 (KENDALL AND WILL COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.47 | $0.30 | $46.77 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.89 | $13.40 | $58.29 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0673-003 (DU PAGE AND KANE COUNTIES) BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.66 | $0.30 | $45.96 | |
| TRUCK DRIVER: 5 AXLES Heavy TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.89 | $13.40 | $58.29 | |
| TRUCK DRIVER: 5 AXLES Heavy TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.82 | $26.70 | $75.52 | |
| TRUCK DRIVER: 5 AXLES Heavy TEAM0330-002 (DEKALB COUNTY) WEEK;PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.18 | $0.30 | $45.48 | |
| TRUCK DRIVER: 5 AXLES Heavy TEAM0673-003 (DU PAGE AND KANE COUNTIES) BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.66 | $0.30 | $45.96 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0179-004 (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.47 | $0.30 | $46.77 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $45.17 | $0.25 | $45.42 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.89 | $13.40 | $58.29 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.82 | $26.70 | $75.52 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0330-004 (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.18 | $0.30 | $45.48 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0673-003 (DU PAGE AND KANE COUNTIES) BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.66 | $0.30 | $45.96 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $46.00 | $30.27 | $76.27 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $54.43 | $0.30 | $54.73 | |
| TRUCK DRIVER: 6 AXLE TRUCKS Building TEAM0179-001 (GRUNDY, KENDALL, AND WILL COUNTIES) FOOTNOTES: A. $448.80 HEALTH & WELFARE PER WEEK, $562.80 PENSION PER WEEK. B. LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.67 | $0.30 | $46.97 | |
| TRUCK DRIVER: 6 AXLE TRUCKS Heavy TEAM0179-002 (KENDALL AND WILL COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.67 | $0.30 | $46.97 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.09 | $13.40 | $58.49 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0673-003 (DU PAGE AND KANE COUNTIES) BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.86 | $0.30 | $46.16 | |
| TRUCK DRIVER: 6 AXLES Heavy TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.09 | $13.40 | $58.49 | |
| TRUCK DRIVER: 6 AXLES Heavy TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.93 | $26.70 | $75.63 | |
| TRUCK DRIVER: 6 AXLES Heavy TEAM0330-002 (DEKALB COUNTY) WEEK;PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.38 | $0.30 | $45.68 | |
| TRUCK DRIVER: 6 AXLES Heavy TEAM0673-003 (DU PAGE AND KANE COUNTIES) BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.86 | $0.30 | $46.16 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0179-004 (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.67 | $0.30 | $46.97 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $45.37 | $0.25 | $45.62 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.09 | $13.40 | $58.49 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.93 | $26.70 | $75.63 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0330-004 (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.38 | $0.30 | $45.68 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0673-003 (DU PAGE AND KANE COUNTIES) BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.86 | $0.30 | $46.16 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $46.20 | $30.27 | $76.47 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $54.64 | $0.30 | $54.94 |
No trade rates match your search and filter selection.
Building, Residential
Applies to
Du Page, Grundy, Kane, Kendall, Lake, McHenry, Will
Heavy, Highway
Applies to
Boone, De Kalb, Du Page, Kane, Kendall, Lake, McHenry, Will
Heavy
Applies to
Adams, Alexander, Bond, Boone, Brown, Bureau, Calhoun, Carroll, Cass, Champaign +92 more
Heavy
Applies to
Adams, Alexander, Bond, Boone, Brown, Bureau, Calhoun, Carroll, Cass, Champaign +92 more
Building, Heavy, Highway, Residential
Applies to
Boone, Cook, De Kalb, Du Page, Grundy, Henry, Kane, Kankakee, Kendall, Lake +9 more
Wage determinations are revised throughout the year. We'll email you when rates covering Du Page County, Illinois are modified.
Free, one email when rates change. Unsubscribe anytime.