IL20260055
rev 1General
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER: General CARP0790-007 (INCLUDING DRYWALL HANGING AND BATT INSULATION) RATE B - SINGLE FAMILY HOME, DUPLEX AND A MULTI-UNIT BUILDING UP TO AND INCLUDING EIGHT (8) UNITS SUCH AS A ROWHOUSE, TOWNHOUSE AND CONDOMINIUM | $24.61 | $15.94 | $40.55 |
| CARPENTER: General CARP0790-007 (INCLUDING DRYWALL HANGING AND BATT INSULATION) RATE A - MULTI-UNIT BUILDING/STRUCTURE CONTAINING MORE THAN EIGHT (8) UNITS USED EXCLUSIVELY AS INDIVIDUAL RESIDENCES WHETHER THEY BE LEASED OR RENTED | $31.32 | $26.23 | $57.55 |
| CARPENTER: INCLUDING SOFT FLOOR LAYER AND BATT/BLOWN INSULATION (OGLE COUNTY (NORTHERN HALF)) General CARP0792-005 | $37.19 | $26.60 | $63.79 |
| CEMENT MASON/CONCRETE FINISHER General PLAS0011-007 | $27.43 | $22.21 | $49.64 |
| ELECTRICIAN General ELEC0364-006 | $30.61 | $28.17 | $58.78 |
| LABORERS: COMMON AND LANDSCAPE General LABO0727-004 | $19.88 | $11.87 | $31.75 |
| LABORERS: PLANTSMAN General SUIL1996-001 | $9.00 | 0.00 | $9.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 3 PUMPS OVER 3"" General ENGI0150-031 (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, (OGLE COUNTY) PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA | $53.60 | $51.05 | $104.65 |
| OPERATOR: POWER EQUIPMENT, GROUP 4 OILERS General ENGI0150-031 (OGLE COUNTY) PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA | $51.60 | $51.05 | $102.65 |
| PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL General PAIN0030-004 (BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES) | $45.15 | $29.41 | $74.56 |
| PLUMBER/PIPEFITTER General PLUM0023-003 | $55.54 | $31.43 | $86.97 |
| ROOFER General ROOF0011-006 | $50.25 | $30.43 | $80.68 |
| SHEET METAL WORKER (INCLUNDING HVAC) General SHEE0219-002 | $39.47 | $31.55 | $71.02 |
| TERRAZZO WORKER/SETTER General BRIL0021-013 | $44.38 | $25.84 | $70.22 |
| TILE SETTER General BRIL0021-013 | $45.49 | $25.72 | $71.21 |
| TRUCK DRIVER, GROUP 2 General TEAM0722-003 (OGLE COUNTY (SOUTH OF ROUTE 72/WEST OF ROUTE 251)) | $45.88 | $25.42 | $71.30 |
| TRUCK DRIVER, GROUP 3 General TEAM0722-003 (OGLE COUNTY (SOUTH OF ROUTE 72/WEST OF ROUTE 251)) | $46.15 | $25.42 | $71.57 |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS General TEAM0722-003 (OGLE COUNTY (SOUTH OF ROUTE 72/WEST OF ROUTE 251)) | $46.54 | $25.42 | $71.96 |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK General TEAM0722-003 (OGLE COUNTY (SOUTH OF ROUTE 72/WEST OF ROUTE 251)) | $47.64 | $25.42 | $73.06 |
| TRUCK DRIVER: 2-3 AXLES General TEAM0330-006 (OGLE COUNTY (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT)) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.83 | $0.30 | $45.13 |
| TRUCK DRIVER: 4 AXLES General TEAM0330-006 (OGLE COUNTY (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT)) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.98 | $0.30 | $45.28 |
| TRUCK DRIVER: 5 AXLES General TEAM0330-006 (OGLE COUNTY (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT)) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.18 | $0.30 | $45.48 |
| TRUCK DRIVER: 6 AXLES General TEAM0330-006 (OGLE COUNTY (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT)) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.38 | $0.30 | $45.68 |
No trade rates match your search and filter selection.
General