IL20260006
rev 1Building, Residential
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS WORKER/INSULATOR Building ASBE0017-004 (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS; PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $55.02 | $35.75 | $90.77 | |
| BOILERMAKER Building BOIL0001-001 | $53.10 | $38.54 | $91.64 | |
| BRICKLAYER, CAULKER, CEMENT MASON, CLEANER, POINTER & STONEMASON (BUILDING) Building BRIL0006-016 | $42.98 | $21.79 | $64.77 | |
| BRICKLAYER, CAULKER, CEMENT MASON, CLEANER, POINTER & STONEMASON (RESIDENTIAL) Building BRIL0006-016 | $32.24 | $21.79 | $54.03 | |
| CARPENTER (GRUNDY COUNTY) Heavy CARP0555-013 | $49.76 | $35.87 | $85.63 | |
| CARPENTER (IROQUOIS AND KANKAKEE COUNTIES) Heavy CARP0555-015 | $42.65 | $38.96 | $81.61 | |
| CARPENTER (LASALLE, MARSHALL, AND PUTNAM COUNTIES) Heavy CARP0174-001 | $40.28 | $38.95 | $79.23 | |
| CARPENTER (LIVINGSTON, MCLEAN, AND FORD COUNTIES) Heavy CARP0237-016 | $37.06 | $31.16 | $68.22 | |
| CARPENTER (WOODFORD COUNTY) Heavy CARP0237-010 | $37.06 | $31.16 | $68.22 | |
| CARPENTER; DRYWALL HANGER; PILEDRIVER; SOFT FLOOR LAYER (BUILDING & RESIDENTIAL) Building CARP0555-016 | $44.46 | $40.96 | $85.42 | |
| CATV INSTALLER Building ELEC0176-014 | $39.00 | $33.78 | $72.78 | |
| CEMENT MASON/CONCRETE FINISHER Heavy PLAS0011-003 (LASALLE & PUTNAM COUNTIES) | $40.50 | $33.54 | $74.04 | |
| CEMENT MASON/CONCRETE FINISHER Heavy PLAS0011-011 (IROQUOIS AND KANKAKEE COUNTIES) | $46.00 | $37.04 | $83.04 | |
| CEMENT MASON/CONCRETE FINISHER Heavy PLAS0018-010 (MARSHALL AND WOODFORD (NORTH AND WEST OF ROUTES 116 AND 117) COUNTIES) | $32.11 | $25.52 | $57.63 | |
| CEMENT MASON/CONCRETE FINISHER Heavy PLAS0018-018 (LIVINGSTON (SOUTHERN PART), MCLEAN, AND WOODFORD (SOUTH OF ROUTE 116) COUNTIES) | $33.46 | $22.22 | $55.68 | |
| CEMENT MASON/CONCRETE FINISHER Heavy PLAS0018-024 (LIVINGSTON (NORTHERN PART) COUNTY) | $32.11 | $25.52 | $57.63 | |
| CEMENT MASON/CONCRETE FINISHER (FORD COUNTY) Heavy PLAS0143-006 | $31.51 | $17.50 | $49.01 | |
| DREDGING: Heavy SUIL2003-001 (LEAD DECKHAND) PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H | $29.68 | $7.61 | $37.29 | |
| DREDGING: Heavy SUIL2003-001 (FIREMAN, OILER, DECKHAND, & SCOWMAN (WITH DIPPER, HYDRAULIC OR OTHER FLOATING EQUIPMENT ENGAGED IN HYDRAULIC AND DIPPER DREDGING OPERATIONS) PIPELINE MEN (BOTH AFLOAT & ASHORE INCLUDING LOADING, UNLOADING, MAINTAINING, AND HANDLING PIPELINES FOR HYDRAULIC DREDGES AND SANDBOATS RANGEMAN, TANKERMAN, SWEEPMAN AND SERVICE TRUCK DRIVER) | $22.51 | $7.61 | $30.12 | |
| DREDGING: ENGINEER AND MECHANIC Heavy SUIL2003-002 (AREA IV: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. PAUL, ROCK ISLAND AND CHICAGO DISTRICTS, CORPS OF ENGINEERS) | $44.78 | $34.21 | $78.99 | |
| DREDGING: ENGINEER AND MECHANIC Heavy SUIL2003-002 (AREA III: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE HUNTINGTON DISTRICT, CORPS OF ENGINEERS) | $47.70 | $31.75 | $79.45 | |
| DREDGING: ENGINEER AND MECHANIC Heavy SUIL2003-002 (AREA II: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE LOUISVILLE DISTRICT, CORPS OF ENGINEERS) | $47.70 | $31.75 | $79.45 | |
| DREDGING: ENGINEER AND MECHANIC Heavy SUIL2003-002 (AREA I: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. LOUIS DISTRICT, CORPS OF ENGINEERS) | $47.83 | $31.75 | $79.58 | |
| DREDGING: LEVERMEN AND BOATMAN Heavy SUIL2003-002 (AREA 4: LEVERMAN. OPERATORS ON BACKHOES OVER 130,000 LBS., OPERATORS ON CRANES OVER 165 TONS, AND OPERATORS THAT ARE REQUIRED TO HAVE A LICENSE OR CERTIFICATION TO DO THE WORK ASSIGNED THEM SHALL RECEIVE 5% MORE THAN THE HIGHEST RATE OF PAY PER HOUR LISTED ON THIS AGREEMENT.) | $47.02 | $34.21 | $81.23 | |
| DREDGING: LEVERMEN AND BOATMAN Heavy SUIL2003-002 (AREA 4: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. PAUL, ROCK ISLAND AND CHICAGO DISTRICTS, CORPS OF ENGINEERS:) | $44.78 | $34.21 | $78.99 | |
| DREDGING: LEVERMEN AND BOATMAN Heavy SUIL2003-002 (AREA 3: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE HUNTINGTON DISTRICT, CORPS OF ENGINEERS:) | $55.54 | $31.75 | $87.29 | |
| DREDGING: LEVERMEN AND BOATMAN Heavy SUIL2003-002 (AREA 2: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE LOUISVILLE DISTRICT, CORPS OF ENGINEERS) | $55.54 | $31.75 | $87.29 | |
| DREDGING: LEVERMEN AND BOATMAN Heavy SUIL2003-002 (AREA 1: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. LOUIS DISTRICT, CORPS OF ENGINEERS) | $55.69 | $31.75 | $87.44 | |
| ELECTRICIAN Heavy ELEC0034-001 (PEORIA DIVISION - MARSHALL (AREA WEST OF BELL PLAIN & ROBERTS TWPS) AND WOODFORD (AREA WEST OF KANSAS, LINN, PALESTINE & ROANOKE TWPS) COUNTIES) | $45.65 | $26.77 | $72.42 | |
| ELECTRICIAN Heavy ELEC0176-004 (KANKAKEE AND LASALLE COUNTIES (LA SALLE (Deer Park, Eden, La Salle, Peru, Utica, & Vermilion)) | $51.60 | $45.00 | $96.60 | |
| ELECTRICIAN Heavy ELEC0176-004 (FORD, IROQUOIS, AND PUTNAM COUNTIES (FORD (REMAINDER), IROQUOIS (EXCLUDING ARTESIA, PEGEON GROVE, LODA, FOUNTAIN CREEK, LOVEJOY & PRAIRIE GREEN TWPS), LA SALLE (DEER PARK, EDEN, LA SALLE, PERU, UTICA, & VERMILION) KANKAKEE, & PUTNAM (GRANVILLE, HENNIPIN & SENACHWINE TWPS) COUNTIES) | $50.45 | $44.96 | $95.41 | |
| ELECTRICIAN Heavy ELEC0197-002 (MCLEAN (REMAINDER) AND WOODFORD (PALESTINE, EL PASO, & KANSAS TWPS) COUNTIES) | $43.86 | $23.72 | $67.58 | |
| ELECTRICIAN Heavy ELEC0538-001 (IROQUOIS COUNTY (FOUNTAIN CREEK, LOVEJOY, AND PRAIRIE GREEN TWPS)) | $41.00 | $27.36 | $68.36 | |
| ELECTRICIAN Heavy ELEC0601-002 (FORD (SOUTH OF BENTON TWP), IROQUOIS (ARTESIA, PEGEON GROVE, & LODA TWPS), LA SALLE (SOUTHEASTERN PART), LIVINGSTON, MCLEAN (CROPSEY, ANCHOR, CHENEY GROVE, & BELLEFLOWER TWPS), MARSHALL (ROBERTS, EVANS, BELL, PLAIN, & BENNINGTON TWPS), PUTNAM (MAGNOLIA TWP), AND WOODFORD (LINN, CLAYTON, MINONK, ROANOKE, GREEN, & PANOLA TWPS) COUNTIES) | $49.63 | $22.51 | $72.14 | |
| ELECTRICIAN (BUILDING) Building ELEC0176-007 | $51.60 | $45.00 | $96.60 | |
| ELECTRICIAN (GRUNDY COUNTY) Heavy ELEC0176-001 | $52.00 | $45.01 | $97.01 | |
| ELECTRICIAN (LASALLE COUNTY) Heavy ELEC0176-001 | $51.60 | $45.00 | $96.60 | |
| ELECTRICIAN (PUTNAM COUNTY) Heavy ELEC0176-001 | $50.45 | $44.96 | $95.41 | |
| ELECTRICIAN (RESIDENTIAL) Building ELEC0176-006 | $46.48 | $33.36 | $79.84 | |
| FIRE STOP TECHNICIAN Building ASBE0017-004 | $44.02 | $32.76 | $76.78 | |
| GLAZIER Building PAIN0027-002 | $51.55 | $44.09 | $95.64 | |
| HAZARDOUS MATERIAL HANDLER Building ASBE0017-004 (INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS) | $41.27 | $32.76 | $74.03 | |
| HYDRAULIC DREDGING: LAUNCH OPERATOR - VESSEL 800 HORSE- POWER OR LESS PAID HOLIDAYS Heavy SUIL2003-001 (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H | $25.15 | $7.61 | $32.76 | |
| HYDRAULIC DREDGING: TUG ENGINEER PAID HOLIDAYS Heavy SUIL2003-001 (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. paid holidays: A thru H | $26.49 | $7.61 | $34.10 | |
| HYDRAULIC DREDGING: TUG OPERATOR - VESSEL OVER 800 HORSE-POWER PAID HOLIDAYS Heavy SUIL2003-001 (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H | $26.49 | $7.61 | $34.10 | |
| HYDRAULIC DREDGING:TUG WORKERS: FIREMAN, LINEMAN, OILER, DECKHAND, TANKERMAN. SCOWMAN Heavy SUIL2003-001 (ON/OR WITH TUGBOATS, LAUNCHES, OR OTHER SELF-PROPELLED BOATS) PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a. $30.10 per day per employee for medical b. Eight paid holidays: A thru H | $22.51 | $7.61 | $30.12 | |
| IRONWORKER Heavy IRON0112-002 (LIVINGSTON, MARSHALL (SOUTHWESTERN CORNER), MCLEAN (WESTERN HALF), AND WOODFORD COUNTIES) | $45.48 | $34.13 | $79.61 | |
| IRONWORKER Heavy IRON0380-005 (FORD AND MCLEAN (EASTERN HALF) COUNTIES) | $40.40 | $29.65 | $70.05 | |
| IRONWORKER Heavy IRON0444-003 (LA SALLE, MARSHALL (EXCEPT THE SOUTHWESTERN PART), AND PUTNMAN COUNTIES) | $45.50 | $38.90 | $84.40 | |
| IRONWORKER (GRUNDY COUNTY) Heavy IRON0444-001 | $47.80 | $42.50 | $90.30 | |
| IRONWORKER (KANKABEE COUNTY) Building IRON0444-005 | $46.00 | $39.30 | $85.30 | |
| IRONWORKER (KANKABEE COUNTY) Heavy IRON0444-005 | $46.00 | $39.30 | $85.30 | |
| LABORER GROUP 1 ALL CLASSIFICATIONS NOT LISTED BELOW (LIVINGSTON, MARSHALL, AND WOODFORD COUNTIES) Heavy LABO0996-001 | $39.17 | $28.01 | $67.18 | |
| LABORER GROUP 1 ALL CLASSIFICATIONS NOT LISTED BELOW (MCLEAN COUNTY) Heavy LABO0362-001 | $37.12 | $30.06 | $67.18 | |
| LABORER GROUP 1 MORTAR MIXERS; SCAFFOLDS; SEWER AND TRENCH WORK Heavy LABO0075-003 (GROUND LEVEL DOWN TO 8 FEET); CATCH BASIN AND MANHOLE DIGGERS, MESH HANDLING ON ROAD TO WORK, CEMENT AND MINERAL FILLER HANDLER, CONCRETE PUDDLERS, BATCH DUMPERS (CEMT & ASPHALT); VIBRATOR OPERATOR; SAND AND STONE WHEELERS TO MIXER (HANDLER); CONCRETE WHEELERS; AIRTAMPING HAMMERMEN; CONCRETE & PAVING BREAKERS; ROCK DRILLERS/ JACKHAMMERMEN; CHIPPING HAMMERMEN; ASPHALT; LABORER; CHAIN AND POWER SAWS; PIT MEN; FENCING LABORERS; MASON TENDER (MORTAR AND BRICK WHEELER); KETTLEMEN & TARMEN, TANK CLEANERS; SCAFFOLD, STAGING LABORERS; POT FIREMEN (TARMEN); HEATERS TENDER FOR ANY PURPOSE; WATER PUMPS (PORTABLE WATER PUMPS SHALL BE TENDED BY LABORERS IF THE EMPLOYER DETERMINES TENDING IS REQUIRED); RIP RAP; HANDLING OF SLAB STEEL ROAD FORMS IN ANY MANNER (EXCEPT ROAD FORM SETTING); SETTING CENTER STRIPS, CONTRACTION AND EXPANSION JOINTS (ROAD WORK); UNLOADING AND HANDLING OF LUMBER, BRICK, TRANSITE MATERIALS, CAST IRON WATER PIPE, REINFORCED CONCRETE RODS, SEWER AND DRAIN TILE RAILROAD TILES AND ALL OTHER CREOSOTED MATERIALS, PAVING BLOCKS AND CONCRETE FORMS; HANDLING OF INSULATION OF ANY TYPE, ALL WORK INVOLVING THE UNLOADING OF MATERIALS, FIXTURES, OR FURNISHING, WHETHER CRATED OR UNCRATED; ALL MORTAR AND COMPOSITION MIXERS OF SEWER WORK; TRACK LABORERS; CHIMNEY AND SILO LABORERS WORKING AT A HEIGHT OF 1 TO 48 FEET; ALL LABORERS WORKING ON SWING, SUSPENDED, OR ANY TYPE OR MAKE OF SCAFFOLDING 1 TO 48 FEET; ALL LABORERS WORKING INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK; WORKING INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK FROM BOTTOM TO A HEIGHT OF 48 FEET; FORM STRIPPERS (ANY TYPE); MECHANICAL OR MOTORIZED BUGGIES, FOR CONCRETE OR MASONSL USE OF SKID STEER LOADS OR ANY OTHER MACHINERY WHICH REPLACES THE WHEELBARROW OR BUGGY; HANDLING MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED IN PUBLIC UTILITY WORK UNLESS OTHERWISE SPECIFIED HEREIN; SNAPPING OF WALL TIES AND REMOVAL OF RODS, DRILLING OF ANCHOR BOLT HOLES; CONCRETE OR ASPAHLT CLIPPER TYPE SAWS AND SELF- PROPELLED SAWS; SHOULDER AND GRADE LABORERS; ALL HYDRAULIC ELECTRIC AND AIR OR ANY OTHER TYPE OF TOOLS; GROUTING AND CAULKING; CLEANING LUMBER, NAIL PULLING, DECK HAND; DREDGEHAND; SHORE LABORER; BANKMEN ON FLOATING PLANT; TOOL AND MATERIAL CHECKERS; SIGNALMEN AND FLAGMEN ON ALL CONSTRUCTION WORK DEFINED HEREIN; CLEANING OF DEBRIS; REMOVAL OF TREES; CONCRETE CURING, TEMPORARY CONCRETE PROTECTION REGARDLESS OF MANNER OR MATERIALS USED; LABORERS ON APSCO; JANITORIAL; WRECKING AND DEMOLITION LABORERS (GRUNDY COUNTY) | $51.40 | $36.94 | $88.34 | |
| LABORER GROUP 1 UNSKILLED - ALL CLASSIFICATIONS NOT LISTED BELOW Heavy LABO0393-001 (BUREAU, LA SALLE, AND PUTNAM COUNTIES) | $40.54 | $32.42 | $72.96 | |
| LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; DYNAMITE MAN; LEAD BASE PAINT ABATEMENT WORKER Building LABO0751-003 | $43.25 | $33.59 | $76.84 | |
| LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER; DYNAMITE MAN (MCLEAN COUNTY) Heavy LABO0362-001 | $38.12 | $30.06 | $68.18 | |
| LABORER GROUP 2 DYNAMITE MAN; ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER Heavy LABO0751-002 (FORD, IROQUOIS, AND KANKAKEE COUNTIES) | $46.08 | $34.34 | $80.42 | |
| LABORER GROUP 2 DYNAMITE MAN; ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; AND LEAD BASE PAINT WORKER Heavy LABO0996-001 (LIVINGSTON, MARSHALL, AND WOODFORD COUNTIES) | $40.17 | $28.01 | $68.18 | |
| LABORER GROUP 2 SEWER AND DRAIN PIPELAYERS AND MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED ON PUBLIC UTILITY WORK Heavy LABO0075-003 (GROUND LEVEL TO 8 FEET); PUMPCRETE PIPEHANDLERS; (GRUNDY COUNTY) | $51.75 | $36.94 | $88.69 | |
| LABORER GROUP 4 DYNAMITE MAN Heavy LABO0393-001 (BUREAU, LA SALLE, AND PUTNAM COUNTIES) | $41.54 | $32.42 | $73.96 | |
| LABORER GROUP 4 TUNNEL MINERS, AND ALL LABORERS INSIDE TUNNEL; AIR BLOWN PIPEMEN, TORCHMEN Heavy LABO0075-003 (BURNERS); MORTARING MEN ON SEWER AND DRAIN PIPE (THE APPLYING OF MORTAR AND COMPOSITION MIXES), ALL BOTTOM MEN ON SEWER WORK-ALL SEWER AND DRAIN PIPELAYERS-MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED ON PUBLIC UTILITY WORK-8 FEET OR MORE BELOW GROUND LEVEL, AND ALL OTHER SEWER AND TRENCH LABORERS 8 FEET OR MORE BELOW GROUND LEVEL REGARDLESS OF EXCAVATION AREA; ALL LABOR WORK INSIDE COFFERDAM; USE OF A 10 FOOT OR MORE DRILL STEEL FOR HAND HELD DRILLS; CAISSON LABORERS GROUND LEVEL DWON 15 FEET; ALL AIR TOOLS 8 FEET OR MORE BELOW GROUND LEVEL; ALL LABORERS WORKING ON SWINING-SUSPENDED ON ANY TYPE OR MAKE OF SCAFFOLD, 48 FEET TO 100 FEET; ALL CHIMNEY AND SILO LABORERS WORKING AT A HEIGHT OF 48 TO 100 FEET; ALL TAMPING HAMMERS OVER 150 LBS.; ALL LABORERS WORKING INSIDE OF A SPHERE OR ANY TYPE OR MAKE OF TANK AT A HEIGHT OF 48 FEET TO 100 FEET; ALL HYDRAULIC, ELECTRIC AND AIR TOOLS OR ANY OTHER TYPE 8 FEET OR MORE BELOW GROUND LEVEL; VIBRATORS-ANY TYPE-8 FEET OR MORE BELOW GROUND LEVEL (GRUNDY COUNTY) | $51.63 | $36.94 | $88.57 | |
| LABORER GROUP 6 ALL UNDERGROUND CAVERN LABORERS; CAISSON LABORERS 50 FEET OR MORE BELOW GROUND LEVEL; LABORERS WORKING UNDER RADIO ACTIVE CONDITIONS Heavy LABO0075-003 (SUITING UP); BLASTING MEN (POWDERMEN) (GRUNDY COUNTY) | $51.75 | $36.94 | $88.69 | |
| LABORER GROUP 7 DOSIMETER Heavy LABO0075-003 (ANY DEVICE) USED FOR MONITORING NUCLEAR EXPOSURE; ASBESTOS ABATEMENT WORKER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER (GRUNDY COUNTY) | $51.60 | $36.94 | $88.54 | |
| LABORER GROUP ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER5 Heavy LABO0393-001 (BUREAU, LA SALLE, AND PUTNAM COUNTIES) | $42.54 | $32.42 | $74.96 | |
| LABORER: LANDSCAPE DRIVER Building SUIL1993-003 (KANKAKEE COUNTY) HIGHWAY CONSTRUCTION (LANDSCAPE WORK) | $8.75 | $0.17 | $8.92 | |
| LABORER: LANDSCAPE DRIVER 2 & 3 AXLES Building SUIL1993-001 (GRUNDY, LAKE & WILL COUNTIES) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $11.86 | $2.81 | $14.67 | |
| LABORER: LANDSCAPE DRIVER, 2 & 3 AXLES Building SUIL1993-002 (DU PAGE COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $8.32 | $1.02 | $9.34 | |
| LABORER: LANDSCAPE DRIVER, 2 & 3 AXLES Building SUIL1993-002 (COOK COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $9.93 | $1.89 | $11.82 | |
| LABORER: LANDSCAPE DRIVER, 2 & 3 AXLES Building SUIL1993-002 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) (HEAVY CONSTRUCTION (LANDSCAPE WORK) | $11.94 | $2.42 | $14.36 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-001 (DU PAGE COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-001 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-001 (COOK COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-001 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-002 (DU PAGE COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-002 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-002 (COOK COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-002 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE LABORERS Building SUIL1993-003 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE OPERATOR Building SUIL1993-003 (KANKAKEE COUNTY) HIGHWAY CONSTRUCTION (LANDSCAPE WORK) | $16.57 | $3.56 | $20.13 | |
| LABORER: LANDSCAPE OPERATORS Building SUIL1993-001 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE OPERATORS Building SUIL1993-002 (DU PAGE COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $10.75 | 0.00 | $10.75 | |
| LABORER: LANDSCAPE OPERATORS Building SUIL1993-002 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE OPERATORS Building SUIL1993-002 (COOK COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $10.98 | $2.12 | $13.10 | |
| LABORER: LANDSCAPE OPERATORS Building SUIL1993-002 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $13.11 | $3.01 | $16.12 | |
| LABORER: LANDSCAPE OPERATORS Building SUIL1993-003 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $7.25 | 0.00 | $7.25 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-001 (GRUNDY, LAKE & WILL COUNTIES) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $12.00 | $3.32 | $15.32 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-001 (DU PAGE COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $9.04 | $1.16 | $10.20 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-001 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $9.66 | $0.26 | $9.92 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-001 (COOK COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $9.80 | $1.82 | $11.62 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-002 (DU PAGE COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $10.65 | 0.00 | $10.65 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-002 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $9.66 | $0.26 | $9.92 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-002 (COOK COUNTY) BUILDING CONSTRUCTION (LANDSCAPE WORK) | $10.08 | $2.06 | $12.14 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-002 (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $9.73 | $2.05 | $11.78 | |
| LABORER: LANDSCAPE PLANTSMAN Building SUIL1993-003 (DE KALB COUNTY) HEAVY CONSTRUCTION (LANDSCAPE WORK) | $9.66 | $0.26 | $9.92 | |
| LABORER: TRUCK DRIVERS 2 & 3 AXLES Building SUIL1993-003 (PEORIA, TAZEWELL, & WOODFORD COUNTIES) HIGHWAY CONSTRUCTION (LANDSCAPE WORK) | $17.58 | $5.88 | $23.46 | |
| LANDSCAPE LABORER Building LABO0032-004 (WINNEBAGO COUNTY) HIGHWAY CONSTRUCTION | $47.04 | $36.31 | $83.35 | |
| LANDSCAPE LABORER Building LABO0309-006 (ROCK ISLAND COUNTY) HIGHWAY CONSTRUCTION | $33.77 | $23.60 | $57.37 | |
| LANDSCAPE LABORER Building LABO0362-003 (MCLEAN COUNTY) HIGHWAY CONSTRUCTION | $31.08 | $24.43 | $55.51 | |
| LANDSCAPE LABORER Building LABO0538-011 (HENRY COUNTY) HIGHWAY CONSTRUCTION | $35.23 | $28.10 | $63.33 | |
| LANDSCAPE LABORER Building LABO0751-004 (KANKAKEE COUNTY) HIGHWAY CONSTRUCTION | $39.44 | $32.54 | $71.98 | |
| LANDSCAPE LABORER Building LABO0996-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) HIGHWAY CONSTRUCTION | $32.73 | $23.74 | $56.47 | |
| LINE CONSTRUCTION: GROUNDMAN Heavy ELEC0009-001 (GRUNDY AND KANKAKEE COUNTIES) | $48.44 | $29.09 | $77.53 | |
| LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR Heavy ELEC0051-001 (ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON CRANE OR LARGER) (FORD, IROQUOIS, LASALLE, LIVINGSTON, MCLEAN, MARSHALL, PUTNAM, AND WOODFORD COUNTIES) | $55.13 | $25.17 | $80.30 | |
| LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER Heavy ELEC0051-001 (FORD, IROQUOIS, LASALLE, LIVINGSTON, MCLEAN, MARSHALL, PUTNAM, AND WOODFORD COUNTIES) | $41.82 | $20.84 | $62.66 | |
| LINE CONSTRUCTION: LINEMAN AND EQUIPMENT OPERATOR Heavy ELEC0009-001 (GRUNDY AND KANKAKEE COUNTIES) | $62.10 | $37.29 | $99.39 | |
| LINE CONSTRUCTION: LINEMAN AND SUBSTATION TECHNICIAN Heavy ELEC0051-001 (FORD, IROQUOIS, LASALLE, LIVINGSTON, MCLEAN, MARSHALL, PUTNAM, AND WOODFORD COUNTIES) | $61.36 | $27.19 | $88.55 | |
| MARBLE FINISHER Building BRIL0021-011 | $33.95 | $26.03 | $59.98 | |
| MARBLE SETTER Building BRIL0021-003 | $44.63 | $26.83 | $71.46 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: MINNESOTA) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $47.30 | $29.50 | $76.80 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: MICHIGAN) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $42.50 | $33.02 | $75.52 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: INDIANA) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $47.40 | $43.80 | $91.20 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: ILLINOIS) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $63.45 | $51.10 | $114.55 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $46.65 | $30.38 | $77.03 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $42.50 | $24.21 | $66.71 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $43.75 | $16.81 | $60.56 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $45.45 | $16.81 | $62.26 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $54.70 | $35.75 | $90.45 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $55.25 | $33.40 | $88.65 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $45.50 | $36.81 | $82.31 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $56.90 | $33.55 | $90.45 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: MINNESOTA) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $51.80 | $29.50 | $81.30 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: MICHIGAN) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $47.00 | $33.02 | $80.02 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: INDIANA) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $51.90 | $43.80 | $95.70 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: ILLINOIS) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $67.95 | $51.10 | $119.05 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $51.15 | $30.38 | $81.53 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $47.00 | $24.21 | $71.21 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $48.25 | $16.81 | $65.06 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $49.95 | $16.81 | $66.76 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $59.20 | $35.75 | $94.95 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $59.75 | $33.40 | $93.15 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $50.00 | $36.81 | $86.81 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $61.40 | $33.55 | $94.95 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: MINNESOTA) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $59.30 | $29.50 | $88.80 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: MICHIGAN) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $54.50 | $33.02 | $87.52 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: INDIANA) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $59.40 | $43.80 | $103.20 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: ILLINOIS) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $75.45 | $51.10 | $126.55 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $58.65 | $30.38 | $89.03 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $54.50 | $24.21 | $78.71 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $55.75 | $16.81 | $72.56 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $57.45 | $16.81 | $74.26 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $66.70 | $35.75 | $102.45 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $67.25 | $33.40 | $100.65 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $57.50 | $36.81 | $94.31 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $68.90 | $33.55 | $102.45 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: MINNESOTA) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $56.30 | $29.50 | $85.80 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: MICHIGAN) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $51.50 | $33.02 | $84.52 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: INDIANA) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $56.40 | $43.80 | $100.20 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: ILLINOIS) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $72.45 | $51.10 | $123.55 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $55.65 | $30.38 | $86.03 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $51.50 | $24.21 | $75.71 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $52.75 | $16.81 | $69.56 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $54.45 | $16.81 | $71.26 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $63.70 | $35.75 | $99.45 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $64.25 | $33.40 | $97.65 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $54.50 | $36.81 | $91.31 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $65.90 | $33.55 | $99.45 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: MINNESOTA) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $57.80 | $29.50 | $87.30 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: MICHIGAN) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $53.00 | $33.02 | $86.02 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: INDIANA) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $57.90 | $43.80 | $101.70 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: ILLINOIS) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanical dredging and Marine construction of this general wage decision. *Working with Hazardous Waste at this level as defined by the U. S. Enviromental Protection Agency | $73.95 | $51.10 | $125.05 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $57.15 | $30.38 | $87.53 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $53.00 | $24.21 | $77.21 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $54.25 | $16.81 | $71.06 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $55.95 | $16.81 | $72.76 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $65.20 | $35.75 | $100.95 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $65.75 | $33.40 | $99.15 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $56.00 | $36.81 | $92.81 | |
| MECHANIC Heavy SUIL2003-001 (UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $67.40 | $33.55 | $100.95 | |
| OPERATOR: POWER EQUIPMENT, GROUP 1 Building ENGI0150-026 (BUILDING AND RESIDENTIAL) MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO(REQUIRES TWO ENGINEERS); BOILER AND THROTTLE VALVE; CAISSON RIGS*; CENTRAL REDI-MIX PLANT*; COMBINATION BACKHOE FRONT ENDLOADER MACHINE; COMPRESSOR AND THROTTLE VALVE; CONCRETE BREAKER (TRUCK MOUNTED)*; CONCRETE CONVEYOR; CONCRETE CONVEYOR, TRUCK MOUNTED; CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER 27E CU FT AND UNDER*; CONCRETE PLACER*; CONCRETE PLACING BOOM; CONCRETE PUMP (TRUCK MOUNTED); CONCRETE TOWER; CRANES*; CRANES, HAMMERHEAD*; CRANES, (GCI AND SIMILAR TYPE REQUIRES TWO OPERATORS ONLY); CRETER CRANE; CRUSHER, STONE, ETC; DERRICKS; DERRICKS, TRAVELING*; FORMLESS CURB AND GUTTER MACHINE*; GRADER, ELEVATING; GROUTING MACHINES; HIGHLIFT SHOVELS OR FRONT ENDLOADER 2 1/4 YD. AND OVER; HOISTS, ELEVATORS, OUTSIDE TYPE RACK AND PINION AND SIMILAR MACHINES; HOISTS, ONE, TWO, AND THREE DRUM; HOISTS, TWO TUGGER ONE FLOOR; HYDRAULIC BACKHOES*; HYDRAULIC BOOM TRUCKS; HYDRAULIC VAC (AND SIMILAR EQUIPMENT);LOCOMOTIVES; MOTOR PATROL*; PILE DRIVERS AMD SKID RIG*; POST HOLE DIGGER; PRE- STRESS MACHINE; PUMP CRETES DUAL RAM(REQUIRING FREQUENT LUBRICATION AND WATER); PUMP CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS GYPSUM BULKER AND PUMP; RAISED AND BLIND HOLE DRILL*; ROTO MILL GRINDER (36"" AND OVER)*; ROTO MILL GRINDER (LESS THAN 36"")*; SCOOPS-TRACTOR DRAWN; SLIP-FORM PAVER*; STRADDLE BUGGIES; TOURNAPULL; TRACTOR WITH BOOM, AND SIDE BOOM; AND TRENCHING MACHINES*. *-REQUIRES OILER | $64.80 | $51.00 | $115.80 | |
| OPERATOR: POWER EQUIPMENT, GROUP 2 Building ENGI0150-026 (BUILDING AND RESIDENTIAL) BOBCAT (OVER 3/4 CU YD); BOILERS; BRICK FORKLIFT; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER (TWO BAG AND OVER); CONVEYOR, PORTABLE; FORKLIFT TRUCKS; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADERS UNDER 2 1/4 CU YD; AOTOMATIC HOISTS, HOISTS, INSIDE ELEVATORS; HOISTS, SEWER DRAGGING MACHINE; HOISTS, TUGGER SINGLE DRUM; LASER SCREED; ROCK DRILL (SELF-PROPELLED); ROCK DRILL (TRUCK MOUNTED)*; ROLLERS; STEAM GENERATORS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES AN ADDITIONAL $.50 PER HOUR); WINCH TRUCKS WITH ""A"" FRAME. *-REQUIRES OILER | $63.50 | $51.00 | $114.50 | |
| OPERATOR: POWER EQUIPMENT, GROUP 3 Building ENGI0150-026 (BUILDING AND RESIDENTIAL) AIR COMPRESSOR-SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR-LARGE OVER 250; COMBINATION-SMALL EQUIPMENT OPERATOR; GENERATOR- SMALL 50 KW AND UNDER; GENERATOR-LARGE OVER 50 KW; HEATERS, MECHANICAL; HOISTS, INSIDE ELEVATORS (REMODELING OR RENOVATIN WORK); HYDRUALIC POWER UNITS (PILE DRIVING, EXTRACTING, AND DRILLING); LOW BOYS; PUMPS OVER 3"" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; BOBCAT (UP TO AND INCLUDING 3/4 CU YD) | $60.95 | $51.00 | $111.95 | |
| OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER Heavy ENGI0150-007 (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES; HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS, TUGGER SINGLE DRUM; JEEP DIGGERS; LOW BOYS; PIPE JACKING MACHINES; POST-HOLE DIGGER; POWER SAW, CONCRETE, POWER DRIVEN; PUG MILLS; ROLLERS, OTHER THAN ASPHALT; SEED AND STRAW BLOWER; STEAM GENERATORS; STUMP MACHINE; WINCH TRUCKS WITH A-FRAME; WORK BOATS;TAMPER-FORM MOTOR DRIVEN (GRUNDY, KANKAKEE, LA SALLE, LIVINGSTON, AND PUTNAM (EAST AND SOUTH OF THE ILLINOIS RIVER) COUNTIES) | $60.40 | $51.00 | $111.40 | |
| OPERATOR: POWER EQUIPMENT, GROUP 3 STRAIGHT FRAMED TRUCK AND TRUCK MOUNTED VAC UNIT, STARTING ENGINEER Heavy ENGI0649-004 (3 TO 5 PIECES); TRAC AIR MACHINE W/O ATTACHMENTS; ROLLERS, 5 TONS & UNDER ON EARTH & GRAVEL; FORM GRADER; BULK CEMENT PLANT; OILERS. (MCLEAN, MARSHALL, PUTNAM (WEST OF THE ILLINOIS RIVER), AND WOODFORD COUNTIES) - ESCALATED RATE ON CRANE, DERRICK BOOMS, AND TOWER CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE ADJACENT GROUND LEVEL OR WATER LEVEL. $.05 PER HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB. $0.02 PER HOUR, PER TON - OVER 50-TON CAPACITY. - OPERATING ENGINEERS WHO OPERATE LATTICE BOOM CRAWLER CRANES, LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL RECEIVE $1.60 PER HOUR OVER SCALE. A. ON DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE GROUP RATE; LEVELS B AND C ADD $3.00 TO THE APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO THE APPROPRIATE GROUP RATE | $38.03 | $43.42 | $81.45 | |
| OPERATOR: POWER EQUIPMENT, GROUP 4 Building ENGI0150-026 (BUILDING AND RESIDENTIAL) BOBCATS AND/OR OTHER SKID STEER LOADERS; BRICK FORKLIFTS; OILERS | $59.20 | $51.00 | $110.20 | |
| OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR - SMALL 250 AND UNDER Heavy ENGI0150-007 (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 250; COMBINATION - SMALL EQUIPMENT OPERATOR; GENERATORS - SMALL 50 KW AND UNDER; GENERATORS - LARGE, OVER 50 KW; HEATERS, MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING, EXTRACTING OR DRILLING); HYDRO-BLASTER REQUIRES TWO OPERATORS (ONE GROUP 2); LIGHT PLANTS ALL (1 TO 5); PUMPS, OVER 3"" (1 TO 3, NOT TO EXCEED A TOTAL OF 300 FT); TRACTAIRE; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES (GRUNDY, KANKAKEE, LA SALLE, LIVINGSTON, AND PUTNAM (EAST AND SOUTH OF THE ILLINOIS RIVER) COUNTIES) | $59.00 | $51.00 | $110.00 | |
| OPERATOR: POWER EQUIPMENT, GROUP 5 BOBCATS Heavy ENGI0150-007 (ALL); BRICK FORKLIFTS; DIRECTIONAL BORING MACHINE LOCATOR; OILERS (GRUNDY, KANKAKEE, LA SALLE, LIVINGSTON, AND PUTNAM (EAST AND SOUTH OF THE ILLINOIS RIVER) COUNTIES) | $57.80 | $51.00 | $108.80 | |
| OPERATORS Building ENGI0150-013 (BOONE, COOK, DUPAGE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) INCLUDES ANGLE DOZER, SMALL; BOBCAT AND OTHER SIMILAR TYPE MACHINES, 1 CU YD OR LESS; CHIPPING MACHINE; COMBINATION BACKHOE AND FRONT END LOADER 1 CU YD OR LESS; FORK LIFT TRUCK; HI-REACH AND HIGH-RANGER;HYDRAULIC BOOM WITH CLAM;LOG SKIDDER; STTRAW BLOWER AND SEEDER; STUMP MACHINE;TRACTORS, CRAWLERS, RUBBER TIRE TRACTORS, HIGHLIFT SHOVELS OR FRONT END LOADERS 1 CU YD OR LESS; TREE SPADES, ALL; UTILITY TRACTOR AND ATTACHMENTS, AND RUBBER TIRE FRONT END LOADER OR SIMILAR MACHINE OF 1 TO 1.5 CU YD SOLELY USED FOR PLACEMENT OF LARGE DECORATIVE BOULDERS, TREES WITH BALLED SOIL, AND OTHER DECORATIVE LANDSCAPE MATERIAL TOO LARGE TO BE ACCOMMODATED IN A 1 CU YD BUCKET. ALL OTHER EQUIPMENT UTILIZED FOR PERFORMING LANDSCAPE WORK, TREE TRIMMING OR REMOVAL OF STEES, AND TO INSTALL PLANTS; TRANSPORT TREES; EXCAVATE PLANT PITS; PLACE SOIL AND OTHER LANDSCAPE MATERIALS; AND APPLY FINISH LANDSCAPE MATERIAL ON SUBGRADE PREPARED BY OTHERS BUILDING AND HIGHWAY CONSTRUCTION (LANDSCAPE WORK): THE LANDSCAPE WORK FOR THE LANDSCAPE EQUIPMENT OPERATOR EXCLUDES THE PREPARATION OF SUB-GRADE PRIOR TO APPLICATION OF FINISH LANDSCAPE MATERIALS AND THE UTILIZATION OF ANY EQUIPMENT OVER ONE CUBIC YARD. FOOTNOTE: A. HEALTH AND WELFARE CONTRIBUTION IS YEAR'S DAY; MEMORIAL DAY; FOURTH OF JULY; LABOR DAY; THANKSGIVING DAY; AND CHRISTMAS DAY PROVIDED THAT ALL SUCH EMPLOYEES SHALL HAVE IN FACT WORKED THEIR REGULARLY SCHEDULED WORK DAY IMMEDIATELY PRECEDING AND THE REGULARLY SCHEDULED WORK DAY IMMEDIATELY SUCCEEDING THE OCCURRENCE OF SUCH HOLIDAY | $37.55 | $9.50 | $47.05 | |
| OPERATORS Building ENGI0150-023 (HENRY, MCLEAN, OGLE, PEORIA, ROCK ISLAND, TAZEWELL, WINNEBAGO, AND WOODFORD COUNTIES) INCLUDES THE FOLLOWING: ANGLE DOZER, SMALL; BOBCAT AND OTHER SIMILAR TYPE MACHINES, 1 CU YD OR LESS; CHIPPING MACHINE; COMBINATION BACKHOE AND FRONT END LOADER 1 CU YD OR LESS; FORK LIFT TRUCK; HI-REACH AND HIGH-RANGER;HYDRAULIC BOOM WITH CLAM;LOG SKIDDER; STTRAW BLOWER AND SEEDER; STUMP MACHINE;TRACTORS, CRAWLERS, RUBBER TIRE TRACTORS, HIGHLIFT SHOVELS OR FRONT END LOADERS 1 CU YD OR LESS; TREE SPADES, ALL; UTILITY TRACTOR AND ATTACHMENTS, AND RUBBER TIRE FRONT END LOADER OR SIMILAR MACHINE OF 1 TO 1.5 CU YD SOLELY USED FOR PLACEMENT OF LARGE DECORATIVE BOULDERS, TREES WITH BALLED SOIL, AND OTHER DECORATIVE LANDSCAPE MATERIAL TOO LARGE TO BE ACCOMMODATED IN A 1 CU YD BUCKET. ALL OTHER EQUIPMENT UTILIZED FOR PERFORMING LANDSCAPE WORK, TREE TRIMMING OR REMOVAL OF STEES, AND TO INSTALL PLANTS; TRANSPORT TREES; EXCAVATE PLANT PITS; PLACE SOIL AND OTHER LANDSCAPE MATERIALS; AND APPLY FINISH LANDSCAPE MATERIAL ON SUBGRADE PREPARED BY OTHERS HIGHWAY CONSTRUCTION (LANDSCAPE WORK): THE LANDSCAPE WORK FOR THE LANDSCAPE EQUIPMENT OPERATOR EXCLUDES THE PREPARATION OF SUB-GRADE PRIOR TO APPLICATION OF FINISH LANDSCAPE MATERIALS AND THE UTILIZATION OF ANY EQUIPMENT OVER ONE CUBIC YARD. FOOTNOTE: A. HEALTH AND WELFARE CONTRIBUTION IS YEAR'S DAY; MEMORIAL DAY; FOURTH OF JULY; LABOR DAY; THANKSGIVING DAY; AND CHRISTMAS DAY PROVIDED THAT ALL SUCH EMPLOYEES SHALL HAVE IN FACT WORKED THEIR REGULARLY SCHEDULED WORK DAY IMMEDIATELY PRECEDING AND THE REGULARLY SCHEDULED WORK DAY IMMEDIATELY SUCCEEDING THE OCCURRENCE OF SUCH HOLIDAY | $37.55 | $9.50 | $47.05 | |
| PAINTER (GRUNDY COUNTY) Heavy PAIN0014-005 | $53.05 | $33.91 | $86.96 | |
| PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES Heavy PAIN0030-010 (BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON, MCDONOUGH, MCLEAN, PUTNAM AND STARK COUNTIES) | $40.00 | $26.90 | $66.90 | |
| PAINTER: BRUSH, ROLLER, TAPER Building PAIN0467-002 (HAND), PAPERHANGER, SWING STAGE, SCAFFOLD OVER 30FT., EPOXY, TOXIC MATERIAL, SANDBLAST, SPRAY, MACHINE TAPING, AND RESIDENTIAL WORK NOT TO EXCEED TWO FAMILIES PER STRUCTURE (IROQUOIS AND KANKAKEE COUNTIES) | $41.00 | $27.80 | $68.80 | |
| PAINTER: BRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK Heavy PAIN0157-001 (FULTON, MARSHALL, MASON, PEORIA, SCHUYLER, TAZEWELL AND WOODFORD COUNTIES) | $40.00 | $26.90 | $66.90 | |
| PILEDRIVERMAN Heavy CARP0237-016 (LIVINGSTON, MCLEAN, AND FORD COUNTIES) | $37.06 | $31.16 | $68.22 | |
| PILEDRIVERMAN (WOODFORD COUNTY) Heavy CARP0237-010 | $37.06 | $31.16 | $68.22 | |
| PIPEFITTER Building PLUM0597-006 | $55.00 | $38.62 | $93.62 | |
| PLUMBER Building PLUM0130-004 | $55.40 | $38.27 | $93.67 | |
| ROOFER Building ROOF0011-002 | $50.25 | $30.43 | $80.68 | |
| SHEET METAL WORKER Building SHEE0265-003 | $56.35 | $38.65 | $95.00 | |
| TILE FINISHER Building BRIL0021-007 | $38.84 | $21.79 | $60.63 | |
| TRUCK DRIVER, 2 OR 3 AXLE TRUCKS Heavy TEAM0179-006 (FORD (NORTH SECTION THE OF THE COUNTY NORTH OF A LINE FROM THE SOUTHEASTERN CORNER OF LIVINGSTON COUNTY STRAIGHT EAST TO THE FORD-IRQUOIS COUNTY LINE), GRUNDY, LIVINGSTON (AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FORREST, GERMANVILLE, INDIAN GROVE, NEBRASKA, ODELL, OWEGA, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, UNION, & WALDO), MCLEAN (NORTH OF A STRAIGHT LINE STARTIN | $44.82 | $0.25 | $45.07 | |
| TRUCK DRIVER, 4 AXLE TRUCKS Heavy TEAM0179-006 (FORD (NORTH SECTION THE OF THE COUNTY NORTH OF A LINE FROM THE SOUTHEASTERN CORNER OF LIVINGSTON COUNTY STRAIGHT EAST TO THE FORD-IRQUOIS COUNTY LINE), GRUNDY, LIVINGSTON (AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FORREST, GERMANVILLE, INDIAN GROVE, NEBRASKA, ODELL, OWEGA, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, UNION, & WALDO), MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT | $44.97 | $0.25 | $45.22 | |
| TRUCK DRIVER, 5 AXLE TRUCKS Heavy TEAM0179-006 (FORD (NORTH SECTION THE OF THE COUNTY NORTH OF A LINE FROM THE SOUTHEASTERN CORNER OF LIVINGSTON COUNTY STRAIGHT EAST TO THE FORD-IRQUOIS COUNTY LINE), GRUNDY, LIVINGSTON (AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FORREST, GERMANVILLE, INDIAN GROVE, NEBRASKA, ODELL, OWEGA, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, UNION, & WALDO), MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT | $45.17 | $0.25 | $45.42 | |
| TRUCK DRIVER, 6 AXLE TRUCKS Heavy TEAM0179-006 (FORD (NORTH SECTION THE OF THE COUNTY NORTH OF A LINE FROM THE SOUTHEASTERN CORNER OF LIVINGSTON COUNTY STRAIGHT EAST TO THE FORD-IRQUOIS COUNTY LINE), GRUNDY, LIVINGSTON (AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FORREST, GERMANVILLE, INDIAN GROVE, NEBRASKA, ODELL, OWEGA, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, UNION, & WALDO), MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT | $45.37 | $0.25 | $45.62 | |
| TRUCK DRIVER, GROUP 2 Heavy TEAM0026-003 (FORD ( ELLIOT, GIBSON CITY, HARPSTER, MELVIN, PAXTON, ROBERTS & SIBLEY), IROQUOIS (FOUNTAIN CREEK, LOVEJOY, MILFORD, PIGEON GROVE, PRAIRIE GREEN & STOCKLAND),MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTIES) | $45.88 | $25.42 | $71.30 | |
| TRUCK DRIVER, GROUP 2 Heavy TEAM0050-005 (MARSHALL AND WOODFORD COUNTIES) | $45.93 | $25.72 | $71.65 | |
| TRUCK DRIVER, GROUP 2 Heavy TEAM0722-004 (LASALLE, LIVINGSTON (ALL OF THE LIVINGSTON EXCEPT AMITY, AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FLANAGAN, FORREST, GERMANSVILLE, INDIAN GROVE, NEBRASKA TOWNSHIP, NEVADA, NEWTON, ODELL, OSWEGO, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, SUNBURY, UNION & WALDO), PUTNAM COUNTIES) | $45.88 | $25.42 | $71.30 | |
| TRUCK DRIVER, GROUP 2 Building TEAM0026-005 (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | $45.88 | $25.42 | $71.30 | |
| TRUCK DRIVER, GROUP 2 Building TEAM0371-004 (HENRY AND ROCK ISLAND COUNTIES) | $45.93 | $25.72 | $71.65 | |
| TRUCK DRIVER, GROUP 2 Building TEAM0627-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | $43.83 | $24.27 | $68.10 | |
| TRUCK DRIVER, GROUP 2 Building TEAM0722-005 (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | $45.88 | $25.42 | $71.30 | |
| TRUCK DRIVER, GROUP 3 Heavy TEAM0026-003 (FORD ( ELLIOT, GIBSON CITY, HARPSTER, MELVIN, PAXTON, ROBERTS & SIBLEY), IROQUOIS (FOUNTAIN CREEK, LOVEJOY, MILFORD, PIGEON GROVE, PRAIRIE GREEN & STOCKLAND),MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTIES) | $46.15 | $25.42 | $71.57 | |
| TRUCK DRIVER, GROUP 3 Heavy TEAM0050-005 (MARSHALL AND WOODFORD COUNTIES) | $46.25 | $25.72 | $71.97 | |
| TRUCK DRIVER, GROUP 3 Heavy TEAM0722-004 (LASALLE, LIVINGSTON (ALL OF THE LIVINGSTON EXCEPT AMITY, AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FLANAGAN, FORREST, GERMANSVILLE, INDIAN GROVE, NEBRASKA TOWNSHIP, NEVADA, NEWTON, ODELL, OSWEGO, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, SUNBURY, UNION & WALDO), PUTNAM COUNTIES) | $46.15 | $25.42 | $71.57 | |
| TRUCK DRIVER, GROUP 3 Building TEAM0026-005 (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | $46.15 | $25.42 | $71.57 | |
| TRUCK DRIVER, GROUP 3 Building TEAM0371-004 (HENRY AND ROCK ISLAND COUNTIES) | $46.25 | $25.72 | $71.97 | |
| TRUCK DRIVER, GROUP 3 Building TEAM0627-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | $44.10 | $24.27 | $68.37 | |
| TRUCK DRIVER, GROUP 3 Building TEAM0722-005 (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | $46.15 | $25.42 | $71.57 | |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS Heavy TEAM0050-005 (MARSHALL AND WOODFORD COUNTIES) | $46.60 | $25.72 | $72.32 | |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS Building TEAM0371-004 (HENRY AND ROCK ISLAND COUNTIES) | $46.60 | $25.72 | $72.32 | |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS Building TEAM0627-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | $44.49 | $24.27 | $68.76 | |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS Building TEAM0722-005 (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | $46.54 | $25.42 | $71.96 | |
| TRUCK DRIVER, GROUP 4- LOW BOY AND OIL DISTRIBUTORS Heavy TEAM0026-003 (FORD ( ELLIOT, GIBSON CITY, HARPSTER, MELVIN, PAXTON, ROBERTS & SIBLEY), IROQUOIS (FOUNTAIN CREEK, LOVEJOY, MILFORD, PIGEON GROVE, PRAIRIE GREEN & STOCKLAND),MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTIES) | $46.54 | $25.42 | $71.96 | |
| TRUCK DRIVER, GROUP 4- LOW BOY AND OIL DISTRIBUTORS Heavy TEAM0722-004 (LASALLE, LIVINGSTON (ALL OF THE LIVINGSTON EXCEPT AMITY, AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FLANAGAN, FORREST, GERMANSVILLE, INDIAN GROVE, NEBRASKA TOWNSHIP, NEVADA, NEWTON, ODELL, OSWEGO, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, SUNBURY, UNION & WALDO), PUTNAM COUNTIES) | $46.54 | $25.42 | $71.96 | |
| TRUCK DRIVER, GROUP 4LOW BOY AND OIL DISTRIBUTORS Building TEAM0026-005 (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | $46.54 | $25.42 | $71.96 | |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Building TEAM0026-005 (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | $47.64 | $25.42 | $73.06 | |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Building TEAM0627-004 (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | $45.59 | $24.27 | $69.86 | |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Building TEAM0722-005 (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | $47.64 | $25.42 | $73.06 | |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (HENRY AND ROCK ISLAND COUNTIES) Building TEAM0371-004 | $47.71 | $25.72 | $73.43 | |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (MARSHALL AND WOODFORD COUNTIES) Heavy TEAM0050-005 | $47.71 | $25.72 | $73.43 | |
| TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Heavy TEAM0026-003 (FORD ( ELLIOT, GIBSON CITY, HARPSTER, MELVIN, PAXTON, ROBERTS & SIBLEY), IROQUOIS (FOUNTAIN CREEK, LOVEJOY, MILFORD, PIGEON GROVE, PRAIRIE GREEN & STOCKLAND),MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTIES) | $47.64 | $25.42 | $73.06 | |
| TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK Heavy TEAM0722-004 (LASALLE, LIVINGSTON (ALL OF THE LIVINGSTON EXCEPT AMITY, AVOCA, BELLE PRAIRIE, BROUGHTON, CHARLOTTE, CHATSWORTH, DWIGHT, EPPARDS POINT, ESMEN, FAYETTE, FLANAGAN, FORREST, GERMANSVILLE, INDIAN GROVE, NEBRASKA TOWNSHIP, NEVADA, NEWTON, ODELL, OSWEGO, PIKE, PLEASANT RIDGE, PONTIAC, ROOKS CREEK, ROUND GROVE, SAUNEMIN, SULLIVAN, SUNBURY, UNION & WALDO), PUTNAM COUNTIES) | $47.64 | $25.42 | $73.06 | |
| TRUCK DRIVER: 2 - 3 AXLES Building TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.47 | $26.70 | $75.17 | |
| TRUCK DRIVER: 2 & 3 AXLES Building TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $53.95 | $0.30 | $54.25 | |
| TRUCK DRIVER: 2 OR 3 AXLES Building TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $44.82 | $0.25 | $45.07 | |
| TRUCK DRIVER: 2 OR 3 AXLES Heavy TEAM0179-007 (KANKAKEE AND IROQUOIS (ALL OF IROQUOIS EXCEPT THE TOWNSHIPS OF MILFORD, STOCKLAND, LODA, PIGEON GROVE, FOUNTAIN CREEK, LOVEJOY, AND PRAIRIE GREEN) COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER WEEK AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $44.82 | $0.25 | $45.07 | |
| TRUCK DRIVER: 2 OR 3 AXLES Building TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $44.82 | $0.25 | $45.07 | |
| TRUCK DRIVER: 2 OR 3 AXLES Building TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $45.55 | $30.27 | $75.82 | |
| TRUCK DRIVER: 2-3 AXLES Building TEAM0179-004 (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.12 | $0.30 | $46.42 | |
| TRUCK DRIVER: 2-3 AXLES Building TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.54 | $13.40 | $57.94 | |
| TRUCK DRIVER: 2-3 AXLES Building TEAM0330-004 (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.83 | $0.30 | $45.13 | |
| TRUCK DRIVER: 2-3 AXLES Building TEAM0673-003 (DU PAGE AND KANE COUNTIES) SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.31 | $0.30 | $45.61 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $44.97 | $0.25 | $45.22 | |
| TRUCK DRIVER: 4 AXLES Heavy TEAM0179-007 (KANKAKEE AND IROQUOIS (ALL OF IROQUOIS EXCEPT THE TOWNSHIPS OF MILFORD, STOCKLAND, LODA, PIGEON GROVE, FOUNTAIN CREEK, LOVEJOY, AND PRAIRIE GREEN) COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER WEEK AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $44.97 | $0.25 | $45.22 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0179-004 (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.27 | $0.30 | $46.57 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $44.97 | $0.25 | $45.22 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.69 | $13.40 | $58.09 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.62 | $26.70 | $75.32 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0330-004 (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.98 | $0.30 | $45.28 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0673-003 (DU PAGE AND KANE COUNTIES) BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.46 | $0.30 | $45.76 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $45.80 | $30.27 | $76.07 | |
| TRUCK DRIVER: 4 AXLES Building TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $54.21 | $0.30 | $54.51 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $45.17 | $0.25 | $45.42 | |
| TRUCK DRIVER: 5 AXLES Heavy TEAM0179-007 (KANKAKEE AND IROQUOIS (ALL OF IROQUOIS EXCEPT THE TOWNSHIPS OF MILFORD, STOCKLAND, LODA, PIGEON GROVE, FOUNTAIN CREEK, LOVEJOY, AND PRAIRIE GREEN) COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER WEEK AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $45.17 | $0.25 | $45.42 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0179-004 (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.47 | $0.30 | $46.77 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $45.17 | $0.25 | $45.42 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $44.89 | $13.40 | $58.29 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.82 | $26.70 | $75.52 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0330-004 (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.18 | $0.30 | $45.48 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0673-003 (DU PAGE AND KANE COUNTIES) BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.66 | $0.30 | $45.96 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $46.00 | $30.27 | $76.27 | |
| TRUCK DRIVER: 5 AXLES Building TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $54.43 | $0.30 | $54.73 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $45.37 | $0.25 | $45.62 | |
| TRUCK DRIVER: 6 AXLES Heavy TEAM0179-007 (KANKAKEE AND IROQUOIS (ALL OF IROQUOIS EXCEPT THE TOWNSHIPS OF MILFORD, STOCKLAND, LODA, PIGEON GROVE, FOUNTAIN CREEK, LOVEJOY, AND PRAIRIE GREEN) COUNTIES) FOOTNOTES: A. $1055.60 PER WEEK. LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER WEEK AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $45.37 | $0.25 | $45.62 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0179-004 (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.67 | $0.30 | $46.97 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0179-008 (KANKAKEE COUNTY) CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $45.37 | $0.25 | $45.62 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0301-001 (LAKE AND MCHENRY COUNTIES) LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.09 | $13.40 | $58.49 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0325-004 (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.93 | $26.70 | $75.63 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0330-004 (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.38 | $0.30 | $45.68 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0673-003 (DU PAGE AND KANE COUNTIES) BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.86 | $0.30 | $46.16 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0731-001 (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $46.20 | $30.27 | $76.47 | |
| TRUCK DRIVER: 6 AXLES Building TEAM0786-001 (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $54.64 | $0.30 | $54.94 |
No trade rates match your search and filter selection.
Building, Residential
Heavy, Highway
Applies to
Ford, Grundy, Iroquois, Kankakee, La Salle, Livingston, Marshall, McLean, Putnam, Woodford
Heavy
Applies to
Adams, Alexander, Bond, Boone, Brown, Bureau, Calhoun, Carroll, Cass, Champaign +92 more
Heavy
Applies to
Adams, Alexander, Bond, Boone, Brown, Bureau, Calhoun, Carroll, Cass, Champaign +92 more
Building, Heavy, Highway, Residential
Applies to
Boone, Cook, De Kalb, Du Page, Grundy, Henry, Kane, Kankakee, Kendall, Lake +9 more
Wage determinations are revised throughout the year. We'll email you when rates covering Kankakee County, Illinois are modified.
Free, one email when rates change. Unsubscribe anytime.