AL20260038
rev 0Residential
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0078-001 | $31.10 | $16.40 | $47.50 |
| BOILERMAKER Building BOIL0108-001 | $34.21 | $23.92 | $58.13 |
| BRICKLAYER Residential SUAL2007-122 | $13.29 | 0.00 | $13.29 |
| BRICKLAYER Building SUAL2015-012 | $22.00 | 0.00 | $22.00 |
| CARPENTER Building SUAL2015-012 | $15.72 | $1.85 | $17.57 |
| CARPENTER, Includes Form Work Residential SUAL2007-122 | $12.94 | $0.27 | $13.21 |
| CARPENTER, Includes Form Work Heavy SUAL2015-033 | $20.26 | $8.59 | $28.85 |
| CEMENT MASON/CONCRETE FINISHER Residential SUAL2007-122 | $9.78 | 0.00 | $9.78 |
| CEMENT MASON/CONCRETE FINISHER Building SUAL2015-012 | $18.91 | $4.39 | $23.30 |
| CEMENT MASON/CONCRETE FINISHER, Includes Water Sewer Lines Heavy SUAL2015-033 | $13.71 | 0.00 | $13.71 |
| ELECTRICIAN Residential SUAL2007-122 | $11.91 | 0.00 | $11.91 |
| ELECTRICIAN Building SUAL2015-012 | $17.72 | $2.31 | $20.03 |
| ELECTRICIAN Heavy SUAL2015-033 | $19.98 | $5.53 | $25.51 |
| Forklift Building ENGI0312-001 | $32.57 | $14.05 | $46.62 |
| IRONWORKER, ORNAMENTAL Residential SUAL2007-122 | $10.46 | 0.00 | $10.46 |
| IRONWORKER, REINFORCING Building IRON0092-007 | $33.75 | $14.03 | $47.78 |
| IRONWORKER, STRUCTURAL Residential SUAL2007-122 | $11.91 | $3.40 | $15.31 |
| IRONWORKER, STRUCTURAL Building IRON0092-003 | $33.75 | $14.03 | $47.78 |
| LABORER: Common or General Residential SUAL2007-122 | $8.38 | 0.00 | $8.38 |
| LABORER: Common or General Building SUAL2015-012 | $12.93 | 0.00 | $12.93 |
| LABORER: Common or General, Includes Water Sewer Lines Heavy SUAL2015-033 | $12.39 | 0.00 | $12.39 |
| LABORER: Landscape Residential SUAL2007-122 | $7.66 | 0.00 | $7.66 |
| LABORER: Mason Tender - Brick Building SUAL2015-012 | $12.22 | 0.00 | $12.22 |
| LABORER: Mason Tender - Cement/Concrete Residential SUAL2007-122 | $7.88 | 0.00 | $7.88 |
| LABORER: Mason Tender - Cement/Concrete Building SUAL2015-012 | $14.23 | 0.00 | $14.23 |
| LABORER: Pipelayer Residential SUAL2007-122 | $9.00 | 0.00 | $9.00 |
| LABORER: Pipelayer Building SUAL2015-012 | $15.59 | 0.00 | $15.59 |
| LABORER: Pipelayer, Includes Water Sewer Lines Heavy SUAL2015-033 | $13.91 | $2.04 | $15.95 |
| OPERATOR: Backhoe Residential SUAL2007-122 | $11.20 | 0.00 | $11.20 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUAL2015-012 | $21.48 | $11.20 | $32.68 |
| OPERATOR: Backhoe/Excavator/Trackhoe, Includes Water Sewer Lines Heavy SUAL2015-033 | $18.99 | $3.63 | $22.62 |
| OPERATOR: Bulldozer Residential SUAL2007-122 | $12.60 | 0.00 | $12.60 |
| OPERATOR: Loader (Front End) Residential SUAL2007-122 | $12.52 | 0.00 | $12.52 |
| OPERATOR: OPERATOR: Bulldozer Building SUAL2015-012 | $19.96 | $0.40 | $20.36 |
| OPERATOR: OPERATOR: Grader/Blade Building SUAL2015-012 | $17.52 | $0.89 | $18.41 |
| OPERATOR: OPERATOR: Loader Building SUAL2015-012 | $14.69 | 0.00 | $14.69 |
| OPERATOR: OPERATOR: Roller Building SUAL2015-012 | $14.00 | $1.78 | $15.78 |
| OPERATOR: PAINTER (Brush and Roller) Building SUAL2015-012 | $15.31 | $1.41 | $16.72 |
| OPERATOR: PAINTER: Spray Building SUAL2015-012 | $14.31 | 0.00 | $14.31 |
| OPERATOR: PIPEFITTER Building SUAL2015-012 | $20.78 | $5.04 | $25.82 |
| OPERATOR: PLUMBER Building SUAL2015-012 | $18.97 | $0.36 | $19.33 |
| OPERATOR: ROOFER Building SUAL2015-012 | $13.66 | 0.00 | $13.66 |
| OPERATOR: SHEET METAL WORKER, Includes HVAC Duct Installation Building SUAL2015-012 | $23.25 | $4.17 | $27.42 |
| OPERATOR: TILE SETTER Building SUAL2015-012 | $20.00 | 0.00 | $20.00 |
| OPERATOR: TRUCK DRIVER: Dump Truck Building SUAL2015-012 | $13.60 | 0.00 | $13.60 |
| OPERATOR: TRUCK DRIVER: Dump Truck, Includes Water Sewer Lines Heavy SUAL2015-033 | $12.25 | $2.58 | $14.83 |
| PAINTER Residential SUAL2007-122 | $9.38 | 0.00 | $9.38 |
| PLUMBER Residential SUAL2007-122 | $12.27 | 0.00 | $12.27 |
| POWER EQUIPMENT OPERATOR Crane Building ENGI0312-001 | $32.57 | $14.05 | $46.62 |
| ROOFER, Includes Built Up, Metal, Shake & Shingle, and Single Ply Roofs Residential SUAL2007-122 | $10.00 | 0.00 | $10.00 |
| SHEET METAL WORKER, Includes HVAC Duct Installation Residential SUAL2007-122 | $13.17 | 0.00 | $13.17 |
| TRUCK DRIVER Residential SUAL2007-122 | $9.86 | 0.00 | $9.86 |
No trade rates match your search and filter selection.
Residential
Building
Heavy