AZ20260022
rev 1Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| (4) 100 tons and over Building ENGI0428-003 | $35.52 | $12.57 | $48.09 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0073-002 | $51.06 | $16.30 | $67.36 |
| CARPENTER Building CARP1327-001 (Drywall Hanging Only) | $26.24 | $8.86 | $35.10 |
| CARPENTER, Excludes Drywall Hanging Building SUAZ2012-011 | $18.42 | $1.46 | $19.88 |
| Carpenter: Formwork Concrete Highway SUAZ2023-013 | $33.16 | $10.71 | $43.87 |
| CEMENT MASON/CONCRETE FINISHER Building SUAZ2012-011 | $17.71 | $2.60 | $20.31 |
| DRYWALL FINISHER/TAPER ZONE A Building PAIN0086-006 | $23.55 | $7.49 | $31.04 |
| ELECTRICIAN Building ELEC0518-009 (Including Alarm Installation and Low Voltage Wiring) | $36.50 | $10.00 | $46.50 |
| ELECTRICIAN Building ELEC0611-009 (Including Alarm Installation and Low Voltage Wiring) Zone 1 | $40.30 | $13.41 | $53.71 |
| FLOOR LAYER: Hardwood and Resilient Flooring Building SUAZ2012-011 | $17.98 | $6.50 | $24.48 |
| GLAZIER Building SUAZ2012-011 | $15.98 | $0.79 | $16.77 |
| Ironworker Highway IRON0075-013 | $39.50 | $19.91 | $59.41 |
| IRONWORKER, REINFORCING AND STRUCTURAL Building IRON0075-002 | $33.00 | $19.91 | $52.91 |
| LABORER (MASON TENDER-BRICK) Building LABO1184-010 | $27.41 | $9.26 | $36.67 |
| LABORER General or Common Laborer Building LABO1184-009 | $27.41 | $9.26 | $36.67 |
| Laborer: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway LABO1184-025 | $29.91 | $9.26 | $39.17 |
| Laborer: General Highway SUAZ2023-013 | $24.09 | $2.07 | $26.16 |
| LABORER: Landscape & Irrigation Building SUAZ2012-011 | $9.31 | 0.00 | $9.31 |
| Laborer: Mason Tender Highway LABO1184-030 | $29.91 | $9.26 | $39.17 |
| LABORER: Mason Tender - Cement/Concrete Building SUAZ2012-011 | $16.05 | $1.49 | $17.54 |
| Laborer: Pipelayer Highway LABO1184-038 | $31.98 | $9.26 | $41.24 |
| OPERATOR: Backhoe Building SUAZ2012-011 | $14.00 | $1.80 | $15.80 |
| PAINTER: Brush, Roller and Spray Building SUAZ2012-011 | $16.13 | 0.00 | $16.13 |
| Painter: Sign and Display Erector Highway SUAZ2023-013 | $19.06 | $2.99 | $22.05 |
| PIPEFITTER Building SUAZ2012-011 | $22.21 | $6.12 | $28.33 |
| PLUMBER Building SUAZ2012-011 | $19.04 | $3.07 | $22.11 |
| POWER EQUIPMENT OPERATOR Building ENGI0428-003 (CRANE) (2) under 15 tons | $33.41 | $12.57 | $45.98 |
| Power Equipment Operator: Bobcat/Skid Steer/Skid Loader Highway SUAZ2023-013 | $32.53 | 0.00 | $32.53 |
| Power Equipment Operator: Compactor/Roller Highway SUAZ2023-013 | $23.71 | $4.05 | $27.76 |
| Power Equipment Operator: Concrete Screed Highway SUAZ2023-013 | $33.90 | 0.00 | $33.90 |
| Power Equipment Operator: Crane / Derricks Highway SUAZ2023-013 | $45.44 | $13.77 | $59.21 |
| POWER EQUIPMENT OPERATOR: Drill Rig/Auger Highway ENGI0012-068 | $35.56 | $18.12 | $53.68 |
| Power Equipment Operator: Excavator/Trackhoe Highway SUAZ2023-013 | $39.48 | 0.00 | $39.48 |
| Power Equipment Operator: Forklift Highway SUAZ2023-013 | $38.31 | $9.20 | $47.51 |
| Power Equipment Operator: Loader/Front End Loader Highway SUAZ2023-013 | $26.07 | $3.80 | $29.87 |
| Power Equipment Operator: Motor Grader/Blade Highway SUAZ2023-013 | $36.90 | $3.81 | $40.71 |
| Power Equipment Operator: Oiler Highway SUAZ2023-013 | $31.86 | $10.01 | $41.87 |
| Power Equipment Operator: Paver/Spreader/Finish equipment Highway SUAZ2023-013 (asphalt, aggregate, & concrete) | $30.40 | $0.06 | $30.46 |
| Power Equipment Operator: Traffic Control Highway SUAZ2023-013 | $19.43 | $2.54 | $21.97 |
| Power Equipment Operator: Truck Driver: Dump Highway SUAZ2023-013 | $24.50 | $2.72 | $27.22 |
| Power Equipment Operator: Truck Driver: Water Highway SUAZ2023-013 | $27.38 | 0.00 | $27.38 |
| ROOFER, Includes Installation of Metal Roofs Building SUAZ2012-011 | $17.46 | $4.47 | $21.93 |
| SHEET METAL WORKER Building SUAZ2012-011 | $18.68 | $4.91 | $23.59 |
| SPRINKLER FITTER Building SUAZ2012-011 (Fire Sprinklers) | $16.48 | $2.94 | $19.42 |
| TILE SETTER Building SUAZ2012-011 | $15.93 | $0.45 | $16.38 |
| ZONE B Building PAIN0086-006 | $27.05 | $7.49 | $34.54 |
No trade rates match your search and filter selection.
Building
Highway