CO20260007
rev 0Highway
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL Building ASBE0028-002 (Duct, Pipe & Mechanical System Insulation) | $36.98 | $16.82 | $53.80 |
| Asphalt Shoveler Highway SUCO2011-002 | $21.21 | $4.25 | $25.46 |
| Asphalt Spreader Highway SUCO2011-002 | $18.58 | $4.65 | $23.23 |
| BRICKLAYER Building SUCO2013-003 | $21.96 | 0.00 | $21.96 |
| CARPENTER Excludes Form Work Highway SUCO2011-002 | $16.61 | $3.88 | $20.49 |
| CARPENTER, Excludes Drywall Hanging Building SUCO2013-003 | $22.66 | $6.79 | $29.45 |
| CEMENT MASON/CONCRETE FINISHER Highway SUCO2011-002 | $17.39 | $3.00 | $20.39 |
| CEMENT MASON/CONCRETE FINISHER Building SUCO2013-003 | $20.31 | $6.76 | $27.07 |
| Common or General Highway SUCO2011-002 | $16.29 | $4.25 | $20.54 |
| Concrete Saw (Hand Held) Highway SUCO2011-002 | $16.29 | $6.14 | $22.43 |
| DRYWALL FINISHER/TAPER Building SUCO2013-003 | $20.82 | $6.37 | $27.19 |
| DRYWALL HANGER Building SUCO2013-003 | $19.24 | $6.30 | $25.54 |
| ELECTRICIAN Highway SUCO2011-002 | $33.39 | $7.64 | $41.03 |
| ELECTRICIAN Building ELEC0068-018 | $46.80 | $19.53 | $66.33 |
| ELEVATOR MECHANIC Building ELEV0025-001 | $56.57 | $38.44 | $95.00 |
| FENCE ERECTOR Highway SUCO2011-002 | $15.96 | $3.46 | $19.42 |
| Form Work Only Highway SUCO2011-002 | $17.06 | $3.90 | $20.96 |
| GUARDRAIL INSTALLER Highway SUCO2011-002 | $16.21 | $3.63 | $19.84 |
| HIGHWAY/PARKING LOT STRIPING:Painter Highway SUCO2011-002 | $12.62 | $3.21 | $15.83 |
| HVAC MECHANIC: HVAC Unit Installation, Excludes Pipe and Duct Installation Building SUCO2013-003 | $25.23 | $9.36 | $34.59 |
| IRONWORKER, ORNAMENTAL Building IRON0024-009 | $39.21 | $12.50 | $51.71 |
| IRONWORKER, REINFORCING Highway SUCO2011-002 (Excludes Guardrail Installation) | $16.69 | $5.45 | $22.14 |
| IRONWORKER, STRUCTURAL Highway SUCO2011-002 (Excludes Guardrail Installation) | $18.22 | $6.01 | $24.23 |
| IRONWORKER, STRUCTURAL Building IRON0024-010 | $39.21 | $12.50 | $51.71 |
| LABORER Asphalt Raker Highway SUCO2011-002 | $16.29 | $4.25 | $20.54 |
| LABORER: Common or General Building SUCO2013-003 | $11.76 | 0.00 | $11.76 |
| LABORER: Mason Tender - Brick Building SUCO2013-003 | $15.99 | 0.00 | $15.99 |
| LABORER: Mason Tender - Cement/Concrete Building SUCO2013-003 | $16.00 | 0.00 | $16.00 |
| LABORER: Pipelayer Building SUCO2013-003 | $16.96 | $3.68 | $20.64 |
| Landscape and Irrigation Highway SUCO2011-002 | $12.26 | $3.16 | $15.42 |
| Mason Tender- Cement/Concrete Highway SUCO2011-002 | $16.29 | $4.25 | $20.54 |
| MILLWRIGHT Building CARP1607-001 | $42.10 | $19.02 | $61.12 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUCO2013-003 | $20.78 | $5.78 | $26.56 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Building SUCO2013-003 | $18.58 | $2.42 | $21.00 |
| OPERATOR: OPERATOR: Grader/Blade Building SUCO2013-003 | $21.50 | 0.00 | $21.50 |
| OPERATOR: ROOFER Building SUCO2013-003 | $17.14 | 0.00 | $17.14 |
| OPERATOR: TRUCK DRIVER: Dump Truck Building SUCO2013-003 | $17.34 | 0.00 | $17.34 |
| PAINTER Building PAIN0079-006 (Brush, Roller and Spray; Excludes Drywall Finishing/Taping) | $27.41 | $11.56 | $38.97 |
| PAINTER (Spray Only) Highway SUCO2011-002 | $16.99 | $2.87 | $19.86 |
| PIPEFITTER Building PLUM0208-010 (Includes HVAC Pipe Installation; Excludes HVAC Duct and Unit Installation) | $45.55 | $22.11 | $67.66 |
| Pipelayer Highway SUCO2011-002 | $16.74 | $1.89 | $18.63 |
| PLUMBER Building PLUM0003-009 (Excludes HVAC Duct, Pipe and Unit Installation) | $47.23 | $21.68 | $68.91 |
| POWER EQUIPMENT OPERATOR Building ENGI0009-017 (Crane) 141 tons and over | $39.80 | $15.20 | $55.00 |
| POWER EQUIPMENT OPERATOR: (6)-Crane (91-140 tons) Highway ENGI0009-011 | $37.34 | $15.20 | $52.54 |
| POWER EQUIPMENT OPERATOR: Asphalt Laydown Highway SUCO2011-002 | $22.67 | $8.25 | $30.92 |
| POWER EQUIPMENT OPERATOR: Asphalt Paver Highway SUCO2011-002 | $24.19 | $6.58 | $30.77 |
| POWER EQUIPMENT OPERATOR: Asphalt Roller Highway SUCO2011-002 | $23.01 | $9.22 | $32.23 |
| POWER EQUIPMENT OPERATOR: Asphalt Spreader Highway SUCO2011-002 | $22.67 | $8.72 | $31.39 |
| POWER EQUIPMENT OPERATOR: Backhoe/Trackhoe Highway SUCO2011-002 | $21.70 | $5.51 | $27.21 |
| POWER EQUIPMENT OPERATOR: Bobcat/Skid Loader Highway SUCO2011-002 | $15.37 | $4.28 | $19.65 |
| POWER EQUIPMENT OPERATOR: Boom Highway SUCO2011-002 | $22.67 | $8.72 | $31.39 |
| POWER EQUIPMENT OPERATOR: Broom/Sweeper Highway SUCO2011-002 | $22.83 | $8.72 | $31.55 |
| POWER EQUIPMENT OPERATOR: Bulldozer Highway SUCO2011-002 | $26.90 | $5.59 | $32.49 |
| POWER EQUIPMENT OPERATOR: Drill Highway SUCO2011-002 | $21.42 | $2.88 | $24.30 |
| POWER EQUIPMENT OPERATOR: Forklift Highway SUCO2011-002 | $15.91 | $4.27 | $20.18 |
| POWER EQUIPMENT OPERATOR: Grader/Blade Highway SUCO2011-002 | $22.67 | $8.72 | $31.39 |
| POWER EQUIPMENT OPERATOR: Guardrail/Post Driver Highway SUCO2011-002 | $16.54 | $4.10 | $20.64 |
| POWER EQUIPMENT OPERATOR: Loader (Front End) Highway SUCO2011-002 | $22.67 | $8.72 | $31.39 |
| POWER EQUIPMENT OPERATOR: Mechanic Highway SUCO2011-002 | $22.97 | $8.72 | $31.69 |
| POWER EQUIPMENT OPERATOR: Oiler Highway SUCO2011-002 | $22.77 | $9.22 | $31.99 |
| POWER EQUIPMENT OPERATOR: Roller/Compactor Highway SUCO2011-002 (Dirt and Grade Compaction) | $22.32 | $8.72 | $31.04 |
| POWER EQUIPMENT OPERATOR: Rotomill Highway SUCO2011-002 | $16.22 | $4.41 | $20.63 |
| POWER EQUIPMENT OPERATOR: Screed Highway SUCO2011-002 | $22.67 | $8.72 | $31.39 |
| POWER EQUIPMENT OPERATOR: Tractor Highway SUCO2011-002 | $13.13 | $2.95 | $16.08 |
| SHEET METAL WORKER Building SHEE0009-004 (Includes HVAC Duct Installation; Excludes HVAC Pipe and Unit Installation) | $43.05 | $22.65 | $65.70 |
| SOFT FLOOR LAYER Building PAIN0419-001 (Vinyl and Carpet) | $18.25 | $14.33 | $32.58 |
| SPRINKLER FITTER Building SFCO0669-002 (Fire Sprinklers) | $48.60 | $27.57 | $76.17 |
| Traffic Control Highway SUCO2011-002 (Sets Up/Moves Barrels, Cones, Installs Signs, Arrow Boards and Place Stationary Flags) (Excludes Flaggers) | $12.43 | $3.22 | $15.65 |
| Traffic Control (Flagger) Highway SUCO2011-002 | $9.55 | $3.05 | $12.60 |
| TRAFFIC SIGNALIZATION: Dump Truck Highway SUCO2011-002 | $16.41 | $5.27 | $21.68 |
| TRAFFIC SIGNALIZATION: Groundsman Highway SUCO2011-002 | $18.52 | $3.59 | $22.11 |
| TRAFFIC SIGNALIZATION: Lowboy Truck Highway SUCO2011-002 | $17.25 | $5.27 | $22.52 |
| TRAFFIC SIGNALIZATION: Multi-Purpose Specialty & Hoisting Truck Highway SUCO2011-002 | $16.41 | $4.97 | $21.38 |
| TRAFFIC SIGNALIZATION: Pickup and Pilot Car Highway SUCO2011-002 | $13.93 | $3.68 | $17.61 |
| TRAFFIC SIGNALIZATION: Semi/Trailer Truck Highway SUCO2011-002 | $18.39 | $4.13 | $22.52 |
| TRAFFIC SIGNALIZATION: TRUCK DRIVER Distributor Highway SUCO2011-002 | $21.69 | $5.27 | $26.96 |
| TRAFFIC SIGNALIZATION: Truck Mounted Attenuator Highway SUCO2011-002 | $12.43 | $3.22 | $15.65 |
| TRAFFIC SIGNALIZATION: Water Truck Highway SUCO2011-002 | $20.64 | $5.27 | $25.91 |
No trade rates match your search and filter selection.
Highway
Building