Douglas in Colorado.

1 wage determination 74 trade rates

Popular Trades In Douglas in Colorado.

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
Asphalt Shoveler Highway
SUCO2011-004
$21.21 $4.25 $25.46
Asphalt Spreader Highway
SUCO2011-004
$18.58 $4.65 $23.23
CARPENTER (Excludes Form Work) Highway
SUCO2011-004
$19.27 $5.08 $24.35
CARPENTER (Form Work Only) Highway
CARP9901-008
$33.11 $12.17 $45.28
CEMENT MASON/CONCRETE FINISHER Denver Highway
SUCO2011-004
$20.18 $5.75 $25.93
Common or General Denver Highway
SUCO2011-004
$16.76 $6.77 $23.53
Concrete Saw (Hand Held) Highway
SUCO2011-004
$16.29 $6.14 $22.43
Douglas Highway
SUCO2011-004 Scope differs by code/WD
$18.75 $3.00 $21.75
Douglas Highway
SUCO2011-004 Scope differs by code/WD
$13.89 $3.21 $17.10
Douglas Highway
SUCO2011-004 Scope differs by code/WD
$16.29 $4.25 $20.54
Douglas Highway
SUCO2011-004 Scope differs by code/WD
$16.29 $4.25 $20.54
Douglas Highway
SUCO2011-004 Scope differs by code/WD
$16.30 $2.18 $18.48
ELECTRICIAN Highway
SUCO2011-004 (Excludes Traffic Signal Installation)
$35.13 $6.83 $41.96
FENCE ERECTOR Highway
SUCO2011-004 (Excludes Link/Cyclone Fence Erection)
$13.02 $3.20 $16.22
GUARDRAIL INSTALLER Highway
SUCO2011-004
$12.89 $3.20 $16.09
HIGHWAY/PARKING LOT STRIPING:Painter Denver Highway
SUCO2011-004
$12.62 $3.21 $15.83
IRONWORKER, REINFORCING Highway
SUCO2011-004 (Excludes Guardrail Installation)
$16.69 $5.45 $22.14
IRONWORKER, STRUCTURAL Highway
SUCO2011-004 (Includes Link/Cyclone Fence Erection, Excludes Guardrail Installation)
$18.22 $6.01 $24.23
LABORER Asphalt Raker Highway
SUCO2011-004
$16.29 $4.25 $20.54
Landscape and Irrigation Highway
SUCO2011-004
$12.26 $3.16 $15.42
Mason Tender- Cement/Concrete Denver Highway
SUCO2011-004
$16.96 $4.04 $21.00
PAINTER (Spray Only) Highway
SUCO2011-004
$16.99 $2.87 $19.86
Pipelayer Denver Highway
SUCO2011-004
$13.55 $2.41 $15.96
POWER EQUIPMENT OPERATOR: (6)-Crane (91-140 tons) Highway
ENGI0009-008
$35.28 $15.20 $50.48
POWER EQUIPMENT OPERATOR: Asphalt Laydown Denver Highway
SUCO2011-004
$22.67 $8.72 $31.39
POWER EQUIPMENT OPERATOR: Asphalt Paver Denver Highway
SUCO2011-004
$24.97 $6.13 $31.10
POWER EQUIPMENT OPERATOR: Asphalt Roller Denver Highway
SUCO2011-004
$23.13 $7.55 $30.68
POWER EQUIPMENT OPERATOR: Asphalt Spreader Highway
SUCO2011-004
$22.67 $8.72 $31.39
POWER EQUIPMENT OPERATOR: Backhoe/Trackhoe Douglas Highway
SUCO2011-004
$23.82 $6.00 $29.82
POWER EQUIPMENT OPERATOR: Bobcat/Skid Loader Highway
SUCO2011-004
$15.37 $4.28 $19.65
POWER EQUIPMENT OPERATOR: Boom Highway
SUCO2011-004
$22.67 $8.72 $31.39
POWER EQUIPMENT OPERATOR: Broom/Sweeper Denver Highway
SUCO2011-004
$22.47 $8.72 $31.19
POWER EQUIPMENT OPERATOR: Bulldozer Highway
SUCO2011-004
$26.90 $5.59 $32.49
POWER EQUIPMENT OPERATOR: Concrete Pump Highway
SUCO2011-004
$21.60 $5.21 $26.81
POWER EQUIPMENT OPERATOR: Douglas Highway
SUCO2011-004 Scope differs by code/WD
$23.67 $8.47 $32.14
POWER EQUIPMENT OPERATOR: Douglas Highway
SUCO2011-004 Scope differs by code/WD
$25.44 $3.50 $28.94
POWER EQUIPMENT OPERATOR: Douglas Highway
SUCO2011-004 Scope differs by code/WD
$23.63 $6.43 $30.06
POWER EQUIPMENT OPERATOR: Douglas Highway
SUCO2011-004 Scope differs by code/WD
$22.96 $8.22 $31.18
POWER EQUIPMENT OPERATOR: Douglas Highway
SUCO2011-004 Scope differs by code/WD
$20.71 $2.66 $23.37
POWER EQUIPMENT OPERATOR: Douglas Highway
SUCO2011-004 Scope differs by code/WD
$23.88 $8.22 $32.10
POWER EQUIPMENT OPERATOR: Douglas Highway
SUCO2011-004 Scope differs by code/WD
$24.90 $7.67 $32.57
POWER EQUIPMENT OPERATOR: Douglas Highway
SUCO2011-004 Scope differs by code/WD
$22.78 $4.86 $27.64
POWER EQUIPMENT OPERATOR: Douglas Highway
SUCO2011-004 Scope differs by code/WD
$29.99 $1.40 $31.39
POWER EQUIPMENT OPERATOR: Drill Denver Highway
SUCO2011-004
$20.48 $4.71 $25.19
POWER EQUIPMENT OPERATOR: Forklift Highway
SUCO2011-004
$15.91 $4.68 $20.59
POWER EQUIPMENT OPERATOR: Grader/Blade Denver Highway
SUCO2011-004
$22.67 $8.72 $31.39
POWER EQUIPMENT OPERATOR: Guardrail/Post Driver Highway
SUCO2011-004
$16.07 $4.41 $20.48
POWER EQUIPMENT OPERATOR: Loader Highway
SUCO2011-004 (Front End) Douglas
$21.67 $8.22 $29.89
POWER EQUIPMENT OPERATOR: Mechanic Denver Highway
SUCO2011-004
$22.89 $8.72 $31.61
POWER EQUIPMENT OPERATOR: Oiler Denver Highway
SUCO2011-004
$23.73 $8.41 $32.14
POWER EQUIPMENT OPERATOR: Roller/Compactor Highway
SUCO2011-004 (Dirt and Grade Compaction) Denver
$20.30 $5.51 $25.81
POWER EQUIPMENT OPERATOR: Rotomill Highway
SUCO2011-004
$16.22 $4.41 $20.63
POWER EQUIPMENT OPERATOR: Screed Denver Highway
SUCO2011-004
$22.67 $8.38 $31.05
POWER EQUIPMENT OPERATOR: Tractor Highway
SUCO2011-004
$13.13 $2.95 $16.08
Traffic Control Highway
SUCO2011-004 (Sets Up/Moves Barrels, Cones, Install Signs, Arrow Boards and Place Stationary Flags)(Excludes Flaggers)
$12.43 $3.22 $15.65
Traffic Control (Flagger) Highway
SUCO2011-004
$9.55 $3.05 $12.60
TRAFFIC SIGNALIZATION: Douglas Highway
SUCO2011-004 Scope differs by code/WD
$18.67 $7.17 $25.84
TRAFFIC SIGNALIZATION: Douglas Highway
SUCO2011-004 Scope differs by code/WD
$16.98 $5.27 $22.25
TRAFFIC SIGNALIZATION: Douglas Highway
SUCO2011-004 Scope differs by code/WD
$16.39 $5.27 $21.66
TRAFFIC SIGNALIZATION: Douglas Highway
SUCO2011-004 Scope differs by code/WD
$20.05 $2.88 $22.93
TRAFFIC SIGNALIZATION: Douglas Highway
SUCO2011-004 Scope differs by code/WD
$16.43 $3.68 $20.11
TRAFFIC SIGNALIZATION: Douglas Highway
SUCO2011-004 Scope differs by code/WD
$19.46 $2.58 $22.04
TRAFFIC SIGNALIZATION: Dump Truck Denver Highway
SUCO2011-004
$15.27 $5.27 $20.54
TRAFFIC SIGNALIZATION: Groundsman Denver Highway
SUCO2011-004
$17.90 $3.41 $21.31
TRAFFIC SIGNALIZATION: Lowboy Truck Highway
SUCO2011-004
$17.25 $5.27 $22.52
TRAFFIC SIGNALIZATION: Mechanic Highway
SUCO2011-004
$26.48 $3.50 $29.98
TRAFFIC SIGNALIZATION: Multi-Purpose Specialty & Hoisting Truck Denver Highway
SUCO2011-004
$17.49 $3.17 $20.66
TRAFFIC SIGNALIZATION: Pickup and Pilot Car Denver Highway
SUCO2011-004
$14.24 $3.77 $18.01
TRAFFIC SIGNALIZATION: Semi/Trailer Truck Highway
SUCO2011-004
$18.39 $4.13 $22.52
TRAFFIC SIGNALIZATION: Traffic Signal Installation Zone 1 Highway
ELEC0068-016
$26.42 $8.68 $35.10
TRAFFIC SIGNALIZATION: TRUCK DRIVER Distributor Denver Highway
SUCO2011-004
$17.81 $5.82 $23.63
TRAFFIC SIGNALIZATION: Truck Mounted Attenuator Highway
SUCO2011-004
$12.43 $3.22 $15.65
TRAFFIC SIGNALIZATION: Water Truck Denver Highway
SUCO2011-004
$26.27 $5.27 $31.54
TRAFFIC SIGNALIZATION: Zone 2 Highway
ELEC0068-016
$29.42 $8.68 $38.10

Wage Determinations

Highway

0 trades

Applies to

Denver, Douglas in Colorado.