Jefferson County in Colorado.

1 wage determination 29 trade rates

Popular Trades In Jefferson County in Colorado.

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
BRICKLAYER Building
SUCO2013-009
$21.96 0.00 $21.96
CARPENTER Building
CARP0055-004 (Includes Acoustical Ceiling Installation and Drywall Hanging; Excludes Metal Stud Installation)
$35.09 $13.84 $48.93
CARPENTER Building
SUCO2013-009 (Metal Stud Installation Only)
$17.68 0.00 $17.68
CEMENT MASON/CONCRETE FINISHER Building
SUCO2013-009
$20.33 $6.76 $27.09
DRYWALL FINISHER/TAPER Building
PAIN0079-007
$28.11 $11.56 $39.67
ELECTRICIAN Building
ELEC0068-012 (Includes Low Voltage Wiring)
$46.80 $19.53 $66.33
ELEVATOR MECHANIC Building
ELEV0025-001
$56.57 $38.44 $95.00
GLAZIER Building
PAIN0930-002
$37.26 $13.15 $50.41
INSULATOR - MECHANICAL Building
SUCO2013-009 (Duct, Pipe & Mechanical System Insulation)
$23.12 $7.97 $31.09
IRONWORKER, ORNAMENTAL Building
IRON0024-009
$39.21 $12.50 $51.71
IRONWORKER, STRUCTURAL Building
IRON0024-010
$39.21 $12.50 $51.71
LABORER: Common or General Building
SUCO2013-009
$15.42 $5.35 $20.77
LABORER: Mason Tender - Brick Building
SUCO2013-009
$15.99 0.00 $15.99
LABORER: Mason Tender - Cement/Concrete Building
SUCO2013-009
$16.00 0.00 $16.00
LABORER: Pipelayer Building
SUCO2013-009
$16.96 $3.68 $20.64
MILLWRIGHT Building
CARP1607-001
$42.10 $19.02 $61.12
OPERATOR: Backhoe/Excavator/Trackhoe Building
SUCO2013-009
$20.78 $5.78 $26.56
OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Building
SUCO2013-009
$19.10 $3.89 $22.99
OPERATOR: OPERATOR: Grader/Blade Building
SUCO2013-009
$21.50 0.00 $21.50
OPERATOR: ROOFER Building
SUCO2013-009
$16.96 0.00 $16.96
OPERATOR: TRUCK DRIVER: Dump Truck Building
SUCO2013-009
$17.34 0.00 $17.34
OPERATOR: WATERPROOFER Building
SUCO2013-009
$16.94 0.00 $16.94
PAINTER Building
PAIN0079-006 (Brush, Roller and Spray; Excludes Drywall Finishing/Taping)
$27.41 $11.56 $38.97
PIPEFITTER Building
PLUM0208-010 (Includes HVAC Pipe Installation; Excludes HVAC Duct and Unit Installation)
$45.55 $22.11 $67.66
PLUMBER Building
PLUM0003-009 (Excludes HVAC Duct, Pipe and Unit Installation)
$47.23 $21.68 $68.91
POWER EQUIPMENT OPERATOR Building
ENGI0009-017 (Crane) 141 tons and over
$39.80 $15.20 $55.00
SHEET METAL WORKER Building
SHEE0009-006 (Includes HVAC Duct and Unit Installation; Excludes HVAC Pipe Installation)
$43.05 $22.65 $65.70
SOFT FLOOR LAYER Building
PAIN0419-001 (Vinyl and Carpet)
$18.25 $14.33 $32.58
SPRINKLER FITTER Building
SFCO0669-002 (Fire Sprinklers)
$48.60 $27.57 $76.17

Wage Determinations