KY20260078
rev 0Heavy
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER Building BOIL0040-001 | $43.85 | $28.44 | $72.29 |
| BRICKLAYER Building SUKY2015-036 | $25.09 | $10.05 | $35.14 |
| CARPENTER (Form Work Only) Heavy CARP0064-007 | $33.89 | $24.06 | $57.95 |
| CARPENTER (Form Work Only) Building SUKY2015-036 | $22.54 | $7.12 | $29.66 |
| CARPENTER, Excludes Form Work Building SUKY2015-036 | $23.69 | $7.20 | $30.89 |
| CEMENT MASON/CONCRETE FINISHER Building SUKY2015-036 | $20.56 | $9.56 | $30.12 |
| Concrete Worker Heavy LABO1392-001 | $28.94 | $17.59 | $46.53 |
| ELECTRICIAN Heavy ELEC1701-001 | $37.10 | $8.60 | $45.70 |
| ELECTRICIAN Building SUKY2015-036 | $30.50 | $9.21 | $39.71 |
| GROUP 2 Heavy ENGI0181-046 | $38.69 | $19.60 | $58.29 |
| GROUP 4 Heavy ENGI0181-046 | $38.37 | $19.60 | $57.97 |
| IRONWORKER Heavy IRON0070-001 (ORNAMENTAL AND REINFORCING) | $36.17 | $25.80 | $61.97 |
| IRONWORKER, ORNAMENTAL Building IRON0044-017 | $37.77 | $23.90 | $61.67 |
| IRONWORKER, REINFORCING Building SUKY2015-036 | $27.31 | $16.86 | $44.17 |
| IRONWORKER, STRUCTURAL Heavy SUKY2011-034 | $25.46 | $17.49 | $42.95 |
| IRONWORKER, STRUCTURAL Building SUKY2015-036 | $25.41 | $7.63 | $33.04 |
| LABORER Concrete Finishing Heavy LABO0561-012 | $29.45 | $18.77 | $48.22 |
| LABORER Concrete Saw Heavy LABO1392-001 (Hand Held/Walk Behind) | $29.19 | $17.59 | $46.78 |
| LABORER Flagger Heavy LABO0265-015 | $35.52 | $14.45 | $49.97 |
| LABORER Pipelayer Heavy LABO1214-007 | $27.12 | $19.66 | $46.78 |
| LABORER: Common or General Heavy SUKY2011-034 | $20.62 | $11.32 | $31.94 |
| LABORER: Common or General Building SUKY2015-036 | $18.04 | 0.00 | $18.04 |
| LABORER: Mason Tender - Cement/Concrete Building SUKY2015-036 | $19.85 | $9.87 | $29.72 |
| LABORER: Pipelayer Building SUKY2015-036 | $15.00 | $4.08 | $19.08 |
| OPERATOR: Backhoe/Excavator/Trackhoe Heavy SUKY2011-034 | $23.76 | $13.00 | $36.76 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUKY2015-036 | $29.05 | $10.34 | $39.39 |
| OPERATOR: OPERATOR: Bulldozer Heavy SUKY2011-034 | $23.14 | $15.51 | $38.65 |
| OPERATOR: OPERATOR: Bulldozer Building SUKY2015-036 | $24.51 | $12.72 | $37.23 |
| OPERATOR: OPERATOR: Oiler Heavy SUKY2011-034 | $24.34 | $13.00 | $37.34 |
| OPERATOR: OPERATOR: Paver Building SUKY2015-036 (Asphalt, Aggregate, and Concrete) | $22.52 | $4.00 | $26.52 |
| OPERATOR: OPERATOR: Roller Heavy SUKY2011-034 | $20.21 | $13.00 | $33.21 |
| OPERATOR: OPERATOR: Roller Building SUKY2015-036 | $23.60 | $12.65 | $36.25 |
| OPERATOR: OPERATOR: Trencher Heavy SUKY2011-034 | $26.34 | $12.58 | $38.92 |
| OPERATOR: PAINTER (Brush and Roller) Building SUKY2015-036 | $17.45 | $0.34 | $17.79 |
| OPERATOR: SHEET METAL WORKER, Excludes HVAC Duct Installation Building SUKY2015-036 | $36.24 | $6.89 | $43.13 |
| OPERATOR: TILE FINISHER Building SUKY2015-036 | $15.42 | $7.24 | $22.66 |
| OPERATOR: TILE SETTER Building SUKY2015-036 | $20.96 | 0.00 | $20.96 |
| OPERATOR: TRUCK DRIVER: Dump Truck Heavy SUKY2011-034 | $16.69 | $6.20 | $22.89 |
| OPERATOR: TRUCK DRIVER: Dump Truck Building SUKY2015-036 | $23.60 | $8.03 | $31.63 |
| PAINTER: Spray Building PAIN0156-004 | $30.62 | $20.30 | $50.92 |
| PIPEFITTER Building PLUM0633-001 | $38.41 | $22.26 | $60.67 |
| PLUMBER Building PLUM0184-006 | $44.26 | $20.28 | $64.54 |
| POWER EQUIPMENT OPERATOR Building ENGI0181-053 (Crane) | $40.65 | $19.60 | $60.25 |
| POWER EQUIPMENT OPERATOR Building ENGI0181-054 (Drill) | $40.65 | $19.60 | $60.25 |
| POWER EQUIPMENT OPERATOR Building ENGI0181-079 (Loader) | $40.65 | $19.60 | $60.25 |
| POWER EQUIPMENT OPERATOR Building ENGI0181-080 (Forklift) | $40.65 | $19.60 | $60.25 |
| POWER EQUIPMENT OPERATOR GROUP 1 Heavy ENGI0181-046 | $41.55 | $19.60 | $61.15 |
| ROOFER Building ROOF0106-010 | $30.97 | $13.91 | $44.88 |
| SHEET METAL WORKER Building SHEE0020-001 (HVAC Duct Installation Only) | $40.19 | $27.33 | $67.52 |
No trade rates match your search and filter selection.
Heavy
Building