ME20260006
rev 0Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER Building SUME2014-015 | $27.38 | $9.14 | $36.52 |
| CARPENTER, Includes Form Work Building SUME2014-015 | $17.54 | $4.13 | $21.67 |
| CARPENTER, Includes Form Work Heavy SUME2014-001 | $18.07 | $4.33 | $22.40 |
| CARPENTER, Includes Form Work Highway SUME2014-029 | $18.34 | $2.84 | $21.18 |
| CEMENT MASON/CONCRETE FINISHER Building SUME2014-015 | $16.13 | $3.82 | $19.95 |
| ELECTRICIAN Building SUME2014-015 | $22.78 | $7.35 | $30.13 |
| ELECTRICIAN Heavy SUME2014-001 | $24.87 | $8.54 | $33.41 |
| HIGHWAY/PARKING LOT STRIPING: IRONWORKER, REINFORCING Highway SUME2014-029 | $16.27 | 0.00 | $16.27 |
| HIGHWAY/PARKING LOT STRIPING: Laborer Highway SUME2014-029 | $14.29 | $1.89 | $16.18 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway SUME2014-029 | $14.32 | $3.17 | $17.49 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Common or General Highway SUME2014-029 | $13.23 | $1.22 | $14.45 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Wheelman Highway SUME2014-029 | $15.40 | $3.01 | $18.41 |
| IRONWORKER Building IRON0007-034 (ORNAMENTAL AND REINFORCING) | $33.65 | $26.27 | $59.92 |
| IRONWORKER, STRUCTURAL Building SUME2014-015 | $20.65 | $8.26 | $28.91 |
| IRONWORKER, STRUCTURAL Heavy SUME2014-001 | $24.95 | $12.32 | $37.27 |
| LABORER: Common or General Building LABO0327-003 (Industrial Work Only) | $21.90 | $19.72 | $41.62 |
| LABORER: Common or General Building SUME2014-015 Scope differs by code/WD | $13.59 | $2.72 | $16.31 |
| LABORER: Common or General Heavy SUME2014-001 | $13.57 | $1.38 | $14.95 |
| LABORER: Mason Tender - Brick Building SUME2014-015 | $18.33 | $2.01 | $20.34 |
| LABORER: Pipelayer Heavy SUME2014-001 | $21.17 | $5.63 | $26.80 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUME2014-015 | $20.42 | $3.12 | $23.54 |
| OPERATOR: Backhoe/Excavator/Trackhoe Heavy SUME2014-001 | $24.37 | $5.17 | $29.54 |
| OPERATOR: Backhoe/Excavator/Trackhoe Highway SUME2014-029 | $17.63 | $2.28 | $19.91 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Highway SUME2014-029 | $20.36 | $5.06 | $25.42 |
| OPERATOR: OPERATOR: Broom/Sweeper Highway SUME2014-029 | $16.52 | $6.38 | $22.90 |
| OPERATOR: OPERATOR: Bulldozer Heavy SUME2014-001 | $22.91 | $6.04 | $28.95 |
| OPERATOR: OPERATOR: Bulldozer Highway SUME2014-029 | $16.58 | $2.89 | $19.47 |
| OPERATOR: OPERATOR: Crane Building SUME2014-015 | $24.07 | $6.08 | $30.15 |
| OPERATOR: OPERATOR: Crane Heavy SUME2014-001 | $22.70 | $6.40 | $29.10 |
| OPERATOR: OPERATOR: Loader Heavy SUME2014-001 | $14.62 | $4.24 | $18.86 |
| OPERATOR: OPERATOR: Loader Highway SUME2014-029 | $16.21 | $3.23 | $19.44 |
| OPERATOR: OPERATOR: Mechanic Highway SUME2014-029 | $22.30 | $8.71 | $31.01 |
| OPERATOR: OPERATOR: Roller (Earth) Highway SUME2014-029 | $15.55 | $5.83 | $21.38 |
| OPERATOR: OPERATOR: Screed Highway SUME2014-029 | $18.82 | $4.75 | $23.57 |
| OPERATOR: PAINTER (Brush and Roller) Building SUME2014-015 | $17.38 | $4.70 | $22.08 |
| OPERATOR: SHEET METAL WORKER, Includes HVAC Duct Installation Building SUME2014-015 | $16.97 | $1.92 | $18.89 |
| OPERATOR: TRAFFIC CONTROL: Flagger Highway SUME2014-029 | $9.00 | 0.00 | $9.00 |
| OPERATOR: TRUCK DRIVER: Dump Truck Building SUME2014-015 | $14.79 | $2.53 | $17.32 |
| OPERATOR: TRUCK DRIVER: Dump Truck Heavy SUME2014-001 | $16.54 | $3.39 | $19.93 |
| PIPEFITTER Building PLUM0716-001 | $40.00 | $24.71 | $64.71 |
| POWER EQUIPMENT OPERATOR: Grader/Blade, Milling Machine, Paver Highway ENGI0004-005 (Asphalt, Aggregate, and Concrete), Roller Asphalt | $30.17 | $13.80 | $43.97 |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper Highway SUME2014-029 | $17.48 | $5.37 | $22.85 |
| TRAFFIC CONTROL: TRUCK DRIVER: Dump Truck Highway SUME2014-029 | $14.40 | $7.04 | $21.44 |
| TRAFFIC CONTROL: TRUCK DRIVER: TackTruck Highway SUME2014-029 | $18.82 | $8.29 | $27.11 |
No trade rates match your search and filter selection.
Building
Heavy
Highway