ME20260007
rev 0Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER Building BRMA0003-013 | $43.91 | $28.47 | $72.38 |
| CARPENTER, Includes Drywall Hanging, and Metal Stud Installation Building SUME2014-016 | $19.75 | $5.10 | $24.85 |
| CARPENTER, Includes Form Work Highway SUME2014-030 | $18.34 | $2.84 | $21.18 |
| CEMENT MASON/CONCRETE FINISHER Building SUME2014-016 | $16.13 | $3.82 | $19.95 |
| DRYWALL FINISHER/TAPER Building SUME2014-016 | $16.84 | $2.87 | $19.71 |
| ELECTRICIAN Building SUME2014-016 | $25.27 | $9.30 | $34.57 |
| ELEVATOR MECHANIC Building ELEV0004-006 | $74.17 | $38.44 | $112.61 |
| HIGHWAY/PARKING LOT STRIPING: IRONWORKER, REINFORCING Highway SUME2014-030 | $16.27 | 0.00 | $16.27 |
| HIGHWAY/PARKING LOT STRIPING: Laborer Highway SUME2014-030 | $14.80 | $1.27 | $16.07 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway SUME2014-030 | $15.40 | $2.69 | $18.09 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Common or General Highway SUME2014-030 | $14.45 | $2.16 | $16.61 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Landscape Highway SUME2014-030 | $18.69 | $2.70 | $21.39 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Wheelman Highway SUME2014-030 | $15.64 | $4.29 | $19.93 |
| IRONWORKER Building IRON0007-034 (ORNAMENTAL AND REINFORCING) | $33.65 | $26.27 | $59.92 |
| IRONWORKER, STRUCTURAL Building SUME2014-016 | $22.17 | $9.28 | $31.45 |
| LABORER: Common or General Building LABO0327-003 (Industrial Work Only) | $21.90 | $19.72 | $41.62 |
| LABORER: Common or General Building SUME2014-016 Scope differs by code/WD | $14.96 | $5.89 | $20.85 |
| LABORER: Mason Tender - Brick Building SUME2014-016 | $18.33 | $2.01 | $20.34 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUME2014-016 | $20.42 | $3.12 | $23.54 |
| OPERATOR: Backhoe/Excavator/Trackhoe Highway SUME2014-030 | $18.80 | $4.16 | $22.96 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Highway SUME2014-030 | $21.66 | $4.91 | $26.57 |
| OPERATOR: OPERATOR: Broom/Sweeper Highway SUME2014-030 | $19.09 | $5.20 | $24.29 |
| OPERATOR: OPERATOR: Bulldozer Highway SUME2014-030 | $17.30 | $3.50 | $20.80 |
| OPERATOR: OPERATOR: Crane Building SUME2014-016 | $23.98 | $7.46 | $31.44 |
| OPERATOR: OPERATOR: Loader Highway SUME2014-030 | $18.59 | $5.53 | $24.12 |
| OPERATOR: OPERATOR: Mechanic Highway SUME2014-030 | $22.07 | $8.73 | $30.80 |
| OPERATOR: OPERATOR: Paver Highway SUME2014-030 (Asphalt, Aggregate, and Concrete) | $21.46 | $8.78 | $30.24 |
| OPERATOR: OPERATOR: Roller (Earth) Highway SUME2014-030 | $16.43 | $3.40 | $19.83 |
| OPERATOR: OPERATOR: Roller Asphalt Highway SUME2014-030 | $21.97 | $7.81 | $29.78 |
| OPERATOR: OPERATOR: Screed Highway SUME2014-030 | $19.02 | $4.82 | $23.84 |
| OPERATOR: PAINTER (Brush and Roller) Building SUME2014-016 | $15.86 | $2.66 | $18.52 |
| OPERATOR: PLUMBER, Includes HVAC Pipe Installation Building SUME2014-016 | $20.35 | $5.09 | $25.44 |
| OPERATOR: SHEET METAL WORKER, Includes HVAC Duct Installation Building SUME2014-016 | $16.97 | $1.92 | $18.89 |
| OPERATOR: TRAFFIC CONTROL: Flagger Highway SUME2014-030 | $9.38 | 0.00 | $9.38 |
| OPERATOR: TRUCK DRIVER: Dump Truck Building SUME2014-016 | $14.79 | $2.53 | $17.32 |
| POWER EQUIPMENT OPERATOR: Grader/Blade, Milling Machine Highway ENGI0004-022 | $30.17 | $13.80 | $43.97 |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper Highway SUME2014-030 | $17.47 | $4.80 | $22.27 |
| TRAFFIC CONTROL: TRUCK DRIVER: Dump Truck Highway SUME2014-030 | $15.07 | $5.15 | $20.22 |
| TRAFFIC CONTROL: TRUCK DRIVER: TackTruck Highway SUME2014-030 | $20.18 | $7.75 | $27.93 |
No trade rates match your search and filter selection.
Building