Piscataquis County in Maine.

3 wage determinations 44 trade rates

Popular Trades In Piscataquis County in Maine.

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
BRICKLAYER Building
SUME2014-020
$27.38 $9.14 $36.52
CARPENTER, Includes Form Work Building
SUME2014-020
$17.84 $5.73 $23.57
CARPENTER, Includes Form Work Heavy
SUME2014-005
$18.07 $4.33 $22.40
CARPENTER, Includes Form Work Highway
SUME2014-036
$18.34 $2.84 $21.18
CEMENT MASON/CONCRETE FINISHER Building
SUME2014-020
$16.13 $3.82 $19.95
ELECTRICIAN Building
SUME2014-020
$22.78 $7.35 $30.13
ELECTRICIAN Heavy
SUME2014-005
$24.87 $8.54 $33.41
HIGHWAY/PARKING LOT STRIPING: IRONWORKER, REINFORCING Highway
SUME2014-036
$16.27 0.00 $16.27
HIGHWAY/PARKING LOT STRIPING: Laborer Highway
SUME2014-036
$15.81 $3.24 $19.05
HIGHWAY/PARKING LOT STRIPING: LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway
SUME2014-036
$14.32 $3.17 $17.49
HIGHWAY/PARKING LOT STRIPING: LABORER: Common or General Highway
SUME2014-036
$13.46 $1.38 $14.84
HIGHWAY/PARKING LOT STRIPING: LABORER: Wheelman Highway
SUME2014-036
$15.40 $3.01 $18.41
IRONWORKER Building
IRON0007-034 (ORNAMENTAL AND REINFORCING)
$33.65 $26.27 $59.92
IRONWORKER, STRUCTURAL Building
SUME2014-020
$21.77 $8.43 $30.20
IRONWORKER, STRUCTURAL Heavy
SUME2014-005
$24.95 $12.32 $37.27
LABORER: Common or General Building
LABO0327-003 (Industrial Work Only)
$21.90 $19.72 $41.62
LABORER: Common or General Building
SUME2014-020 Scope differs by code/WD
$14.14 $4.20 $18.34
LABORER: Common or General Heavy
SUME2014-005
$13.60 $2.12 $15.72
LABORER: Mason Tender - Brick Building
SUME2014-020
$18.33 $2.01 $20.34
LABORER: Pipelayer Heavy
SUME2014-005
$21.17 $5.63 $26.80
OPERATOR: Backhoe/Excavator/Trackhoe Building
SUME2014-020
$20.42 $3.12 $23.54
OPERATOR: Backhoe/Excavator/Trackhoe Heavy
SUME2014-005
$23.48 $4.96 $28.44
OPERATOR: Backhoe/Excavator/Trackhoe Highway
SUME2014-036
$15.18 $3.07 $18.25
OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Highway
SUME2014-036
$20.36 $5.06 $25.42
OPERATOR: OPERATOR: Broom/Sweeper Highway
SUME2014-036
$16.75 $6.47 $23.22
OPERATOR: OPERATOR: Bulldozer Heavy
SUME2014-005
$22.91 $6.04 $28.95
OPERATOR: OPERATOR: Bulldozer Highway
SUME2014-036
$16.58 $2.89 $19.47
OPERATOR: OPERATOR: Crane Building
SUME2014-020
$24.07 $6.08 $30.15
OPERATOR: OPERATOR: Crane Heavy
SUME2014-005
$22.70 $6.40 $29.10
OPERATOR: OPERATOR: Loader Heavy
SUME2014-005
$14.62 $4.24 $18.86
OPERATOR: OPERATOR: Loader Highway
SUME2014-036
$17.18 $4.72 $21.90
OPERATOR: OPERATOR: Mechanic Highway
SUME2014-036
$22.30 $8.71 $31.01
OPERATOR: OPERATOR: Roller (Earth) Highway
SUME2014-036
$15.81 $1.72 $17.53
OPERATOR: OPERATOR: Screed Highway
SUME2014-036
$18.82 $4.75 $23.57
OPERATOR: PAINTER (Brush and Roller) Building
SUME2014-020
$17.38 $4.70 $22.08
OPERATOR: SHEET METAL WORKER, Includes HVAC Duct Installation Building
SUME2014-020
$16.97 $1.92 $18.89
OPERATOR: TRAFFIC CONTROL: Flagger Highway
SUME2014-036
$9.00 0.00 $9.00
OPERATOR: TRUCK DRIVER: Dump Truck Building
SUME2014-020
$14.79 $2.53 $17.32
OPERATOR: TRUCK DRIVER: Dump Truck Heavy
SUME2014-005
$15.91 $3.78 $19.69
PIPEFITTER Building
PLUM0716-001
$40.00 $24.71 $64.71
POWER EQUIPMENT OPERATOR: Grader/Blade, Milling Machine, Paver Highway
ENGI0004-005 (Asphalt, Aggregate, and Concrete), Roller Asphalt
$30.17 $13.80 $43.97
TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper Highway
SUME2014-036
$17.48 $5.37 $22.85
TRAFFIC CONTROL: TRUCK DRIVER: Dump Truck Highway
SUME2014-036
$14.35 $6.33 $20.68
TRAFFIC CONTROL: TRUCK DRIVER: TackTruck Highway
SUME2014-036
$18.82 $8.29 $27.11

Wage Determinations