ME20260033
rev 0Heavy
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER Building SUME2022-005 | $33.00 | $11.13 | $44.13 |
| CARPENTER Heavy SUME2014-014 | $19.66 | $6.13 | $25.79 |
| CARPENTER Building CARP0349-002 | $30.56 | $19.96 | $50.52 |
| CARPENTER, Includes Form Work Highway SUME2014-044 | $18.66 | $3.46 | $22.12 |
| CEMENT MASON/CONCRETE FINISHER Highway SUME2014-044 | $19.83 | $1.16 | $20.99 |
| CEMENT MASON/CONCRETE FINISHER Building SUME2022-005 | $20.00 | 0.00 | $20.00 |
| ELECTRICIAN Heavy SUME2014-014 | $25.24 | $7.01 | $32.25 |
| ELECTRICIAN Highway SUME2014-044 | $25.21 | $5.63 | $30.84 |
| ELECTRICIAN Building ELEC0567-002 | $38.74 | $21.14 | $59.88 |
| ELEVATOR MECHANIC Building ELEV0004-002 | $74.17 | $38.44 | $112.61 |
| HIGHWAY/PARKING LOT STRIPING: INSTALLER - GUARDRAIL Highway SUME2014-044 | $19.98 | $2.55 | $22.53 |
| HIGHWAY/PARKING LOT STRIPING: IRONWORKER, REINFORCING Highway SUME2014-044 | $21.85 | 0.00 | $21.85 |
| HIGHWAY/PARKING LOT STRIPING: IRONWORKER, STRUCTURAL Highway SUME2014-044 | $22.78 | $4.40 | $27.18 |
| HIGHWAY/PARKING LOT STRIPING: Laborer Highway SUME2014-044 | $16.27 | $2.19 | $18.46 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway SUME2014-044 | $17.53 | $2.13 | $19.66 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Common or General Highway SUME2014-044 | $15.11 | $2.46 | $17.57 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Epoxy Injector Highway SUME2014-044 (Concrete) | $13.43 | $1.15 | $14.58 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Wheelman Highway SUME2014-044 | $20.97 | $5.13 | $26.10 |
| IRONWORKER Building IRON0007-003 | $33.65 | $26.27 | $59.92 |
| IRONWORKER, STRUCTURAL AND REINFORCING Heavy IRON0007-033 | $33.65 | $26.27 | $59.92 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Heavy SUME2014-014 | $13.38 | $1.39 | $14.77 |
| LABORER: Common or General Heavy SUME2014-014 | $15.22 | $3.97 | $19.19 |
| LABORER: Common or General Building LABO0327-004 | $21.90 | $19.72 | $41.62 |
| LABORER: Concrete Worker Heavy SUME2014-014 (includes removing forms, demolition of existing concrete, and pouring, leveling and finishing concrete) | $25.33 | $17.07 | $42.40 |
| LABORER: Mason Tender - Cement/Concrete Building LABO0327-005 | $22.15 | $19.72 | $41.87 |
| LABORER: Pipelayer Heavy SUME2014-014 | $21.84 | $6.42 | $28.26 |
| OPERATOR: Backhoe/Excavator/Trackhoe Heavy SUME2014-014 | $19.88 | $8.48 | $28.36 |
| OPERATOR: Backhoe/Excavator/Trackhoe Highway SUME2014-044 | $20.58 | $3.81 | $24.39 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUME2022-005 | $32.79 | $4.40 | $37.19 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Highway SUME2014-044 | $23.66 | $0.97 | $24.63 |
| OPERATOR: OPERATOR: Broom/Sweeper Highway SUME2014-044 | $19.49 | 0.00 | $19.49 |
| OPERATOR: OPERATOR: Bulldozer Heavy SUME2014-014 | $20.81 | $4.37 | $25.18 |
| OPERATOR: OPERATOR: Bulldozer Highway SUME2014-044 | $21.71 | $5.67 | $27.38 |
| OPERATOR: OPERATOR: Crane Heavy SUME2014-014 | $24.78 | $8.13 | $32.91 |
| OPERATOR: OPERATOR: Grader/Blade Highway SUME2014-044 | $27.40 | $8.13 | $35.53 |
| OPERATOR: OPERATOR: Loader Heavy SUME2014-014 | $19.36 | $3.73 | $23.09 |
| OPERATOR: OPERATOR: Loader Highway SUME2014-044 | $18.91 | $3.27 | $22.18 |
| OPERATOR: OPERATOR: Mechanic Highway SUME2014-044 | $24.71 | $7.83 | $32.54 |
| OPERATOR: OPERATOR: Milling Machine Highway SUME2014-044 | $27.44 | $6.37 | $33.81 |
| OPERATOR: OPERATOR: Paver Highway SUME2014-044 (Asphalt, Aggregate, and Concrete) | $20.17 | $4.83 | $25.00 |
| OPERATOR: OPERATOR: Roller Heavy SUME2014-014 | $16.61 | $3.44 | $20.05 |
| OPERATOR: OPERATOR: Roller (Earth) Highway SUME2014-044 | $16.52 | $1.66 | $18.18 |
| OPERATOR: OPERATOR: Roller Asphalt Highway SUME2014-044 | $19.64 | $6.09 | $25.73 |
| OPERATOR: PAINTER (Brush and Roller) Heavy SUME2014-014 | $22.18 | $6.33 | $28.51 |
| OPERATOR: TRAFFIC CONTROL: Flagger Highway SUME2014-044 | $10.33 | 0.00 | $10.33 |
| OPERATOR: TRUCK DRIVER: Dump Truck Heavy SUME2014-014 | $15.41 | $3.17 | $18.58 |
| PIPEFITTER Building PLUM0131-001 | $43.76 | $25.44 | $69.20 |
| PLUMBER Building PLUM0716-002 | $40.00 | $24.71 | $64.71 |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper Highway SUME2014-044 | $17.84 | $5.91 | $23.75 |
| TRAFFIC CONTROL: TRUCK DRIVER: Dump Truck Highway SUME2014-044 | $19.99 | $4.00 | $23.99 |
No trade rates match your search and filter selection.
Heavy
Highway
Building