MS20260031
rev 1Residential
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER Residential SUMS2007-028 | $12.82 | 0.00 | $12.82 |
| BRICKLAYER Building SUMS2015-011 | $22.00 | $0.02 | $22.02 |
| CARPENTER (Form Work Only) Highway SUMS2010-056 | $14.43 | 0.00 | $14.43 |
| CARPENTER, Includes Cabinet Installation, and Form Work Residential SUMS2007-028 | $10.49 | 0.00 | $10.49 |
| CARPENTER, Includes Drywall Hanging, Finishing/Taping and Form Work Building SUMS2015-011 | $15.90 | 0.00 | $15.90 |
| CARPENTER, Includes Form Work Heavy SUMS2015-025 | $17.52 | 0.00 | $17.52 |
| CEMENT MASON/CONCRETE FINISHER Residential SUMS2007-028 | $9.87 | 0.00 | $9.87 |
| CEMENT MASON/CONCRETE FINISHER Building SUMS2015-011 | $18.37 | 0.00 | $18.37 |
| CEMENT MASON/CONCRETE FINISHER Heavy SUMS2015-025 | $17.75 | 0.00 | $17.75 |
| CEMENT MASON/CONCRETE FINISHER Highway SUMS2010-056 | $15.25 | 0.00 | $15.25 |
| ELECTRICIAN Residential ELEC0903-005 | $32.90 | $7.89 | $40.79 |
| ELECTRICIAN Building ELEC0903-012 (Includes Low Voltage Wiring) | $32.90 | $7.89 | $40.79 |
| ELECTRICIAN Heavy SUMS2015-025 | $27.16 | $7.45 | $34.61 |
| ELECTRICIAN Highway SUMS2010-056 | $25.57 | $6.79 | $32.36 |
| HIGHWAY/PARKING LOT STRIPING: INSTALLER - SIGN Highway SUMS2010-056 | $13.41 | 0.00 | $13.41 |
| HIGHWAY/PARKING LOT STRIPING: INSTALLER: Guardrail Highway SUMS2010-056 | $11.78 | 0.00 | $11.78 |
| HIGHWAY/PARKING LOT STRIPING: IRONWORKER, REINFORCING Highway SUMS2010-056 | $17.33 | 0.00 | $17.33 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway SUMS2010-056 | $12.27 | 0.00 | $12.27 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Common or General Highway SUMS2010-056 | $11.00 | 0.00 | $11.00 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Flagger Highway SUMS2010-056 | $11.16 | 0.00 | $11.16 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Grade Checker Highway SUMS2010-056 | $15.63 | 0.00 | $15.63 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper Highway SUMS2010-056 | $13.19 | 0.00 | $13.19 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Landscape Highway SUMS2010-056 | $12.00 | 0.00 | $12.00 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Luteman Highway SUMS2010-056 | $12.88 | 0.00 | $12.88 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Mason Tender - Cement/Concrete Highway SUMS2010-056 | $13.14 | 0.00 | $13.14 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Pipelayer Highway SUMS2010-056 | $15.00 | 0.00 | $15.00 |
| HIGHWAY/PARKING LOT STRIPING: OPERATOR: Asphalt Spreader Highway SUMS2010-056 | $14.83 | 0.00 | $14.83 |
| HIGHWAY/PARKING LOT STRIPING: Truck Driver Highway SUMS2010-056 (Line Striping Truck) | $14.75 | 0.00 | $14.75 |
| IRONWORKER, REINFORCING Building IRON0798-009 | $31.00 | $17.77 | $48.77 |
| IRONWORKER, REINFORCING Heavy SUMS2015-025 | $20.63 | 0.00 | $20.63 |
| IRONWORKER, STRUCTURAL Building SUMS2015-011 | $18.51 | 0.00 | $18.51 |
| IRONWORKER, STRUCTURAL Heavy SUMS2015-025 | $19.00 | 0.00 | $19.00 |
| LABORER: Common or General Residential SUMS2007-028 | $9.40 | 0.00 | $9.40 |
| LABORER: Common or General Building SUMS2015-011 | $10.91 | 0.00 | $10.91 |
| LABORER: Common or General, Includes Water Sewer Lines Heavy SUMS2015-025 | $12.41 | 0.00 | $12.41 |
| LABORER: Mason Tender - Brick Residential SUMS2007-028 | $10.92 | 0.00 | $10.92 |
| LABORER: Mason Tender - Cement/Concrete Building SUMS2015-011 | $12.50 | 0.00 | $12.50 |
| LABORER: Pipelayer, Includes Water Sewer Lines Heavy SUMS2015-025 | $14.04 | $1.92 | $15.96 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUMS2015-011 | $17.93 | $1.62 | $19.55 |
| OPERATOR: Backhoe/Excavator/Trackhoe Heavy SUMS2015-025 | $18.86 | 0.00 | $18.86 |
| OPERATOR: Backhoe/Excavator/Trackhoe Highway SUMS2010-056 | $15.62 | 0.00 | $15.62 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Highway SUMS2010-056 | $11.86 | 0.00 | $11.86 |
| OPERATOR: OPERATOR: Broom/Sweeper Highway SUMS2010-056 | $14.25 | 0.00 | $14.25 |
| OPERATOR: OPERATOR: Bulldozer Building SUMS2015-011 | $15.14 | $1.03 | $16.17 |
| OPERATOR: OPERATOR: Bulldozer Heavy SUMS2015-025 | $18.85 | $1.18 | $20.03 |
| OPERATOR: OPERATOR: Bulldozer Highway SUMS2010-056 | $15.47 | 0.00 | $15.47 |
| OPERATOR: OPERATOR: Concrete Saw Highway SUMS2010-056 | $14.96 | $3.27 | $18.23 |
| OPERATOR: OPERATOR: Crane Building SUMS2015-011 | $21.40 | $3.58 | $24.98 |
| OPERATOR: OPERATOR: Crane Heavy SUMS2015-025 | $22.66 | $4.66 | $27.32 |
| OPERATOR: OPERATOR: Crane Highway SUMS2010-056 | $15.89 | 0.00 | $15.89 |
| OPERATOR: OPERATOR: Distributor Highway SUMS2010-056 | $13.87 | 0.00 | $13.87 |
| OPERATOR: OPERATOR: Grader/Blade Highway SUMS2010-056 | $16.44 | 0.00 | $16.44 |
| OPERATOR: OPERATOR: Loader Highway SUMS2010-056 | $14.38 | 0.00 | $14.38 |
| OPERATOR: OPERATOR: Mechanic Highway SUMS2010-056 | $19.33 | 0.00 | $19.33 |
| OPERATOR: OPERATOR: Milling Machine Highway SUMS2010-056 | $15.44 | 0.00 | $15.44 |
| OPERATOR: OPERATOR: Oiler Highway SUMS2010-056 | $12.22 | 0.00 | $12.22 |
| OPERATOR: OPERATOR: Paver Highway SUMS2010-056 (Asphalt, Aggregate, and Concrete) | $15.81 | 0.00 | $15.81 |
| OPERATOR: OPERATOR: Roller (All Types) Highway SUMS2010-056 | $14.23 | 0.00 | $14.23 |
| OPERATOR: OPERATOR: Scraper Highway SUMS2010-056 | $14.00 | 0.00 | $14.00 |
| OPERATOR: OPERATOR: Tractor Highway SUMS2010-056 | $12.29 | 0.00 | $12.29 |
| OPERATOR: PAINTER (Brush and Roller) Building SUMS2015-011 | $17.00 | 0.00 | $17.00 |
| OPERATOR: ROOFER Building SUMS2015-011 | $14.50 | 0.00 | $14.50 |
| OPERATOR: SPRINKLER FITTER Building SUMS2015-011 (Fire Sprinklers) | $21.21 | 0.00 | $21.21 |
| OPERATOR: TILE SETTER Building SUMS2015-011 | $18.00 | 0.00 | $18.00 |
| OPERATOR: TRUCK DRIVER: Dump Truck Building SUMS2015-011 | $14.11 | $0.27 | $14.38 |
| OPERATOR: TRUCK DRIVER: Dump Truck Highway SUMS2010-056 (All Types) | $14.32 | 0.00 | $14.32 |
| OPERATOR: TRUCK DRIVER: Dump Truck, Includes Water Sewer Lines Heavy SUMS2015-025 | $16.03 | $0.95 | $16.98 |
| OPERATOR: TRUCK DRIVER: Flatbed Truck Highway SUMS2010-056 | $14.72 | 0.00 | $14.72 |
| OPERATOR: TRUCK DRIVER: Lowboy Truck Highway SUMS2010-056 | $11.00 | 0.00 | $11.00 |
| OPERATOR: TRUCK DRIVER: Mechanic Highway SUMS2010-056 | $12.31 | 0.00 | $12.31 |
| OPERATOR: TRUCK DRIVER: Semi/Trailer Truck Highway SUMS2010-056 | $14.36 | 0.00 | $14.36 |
| OPERATOR: TRUCK DRIVER: Water Truck Highway SUMS2010-056 | $17.08 | 0.00 | $17.08 |
| PAINTER Residential SUMS2007-028 | $11.00 | 0.00 | $11.00 |
| PIPEFITTER Building PLUM0568-007 (Includes HVAC Unit Installation (Excludes HVAC Pipe Installation)) | $30.41 | $11.47 | $41.88 |
| PLUMBER Residential SUMS2007-028 | $14.62 | 0.00 | $14.62 |
| PLUMBER Building PLUM0568-007 (Includes HVAC Pipe Installation (Excludes HVAC Unit Installation)) | $29.91 | $11.97 | $41.88 |
| POWER EQUIPMENT OPERATOR Forklift Building ENGI0624-008 | $35.50 | $14.55 | $50.05 |
| ROOFER, Includes Waterproofing, and Installation of Built Up, Hot Tar, Modified Bitumen, and Shake & Shingle Roofs Residential SUMS2007-028 | $12.00 | 0.00 | $12.00 |
| SHEET METAL WORKER Building SHEE0441-006 (Includes HVAC Duct Installation) | $30.45 | $13.88 | $44.33 |
No trade rates match your search and filter selection.
Residential
Building
Heavy
Highway