Itawamba County in Mississippi.

3 wage determinations 70 trade rates

Popular Trades In Itawamba County in Mississippi.

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
BRICKLAYER Residential
SUMS2007-008
$19.20 0.00 $19.20
CARPENTER Building
SUMS2015-001
$16.13 0.00 $16.13
CARPENTER (Form Work Only) Highway
SUMS2010-014
$14.13 0.00 $14.13
CARPENTER, Excludes Form Work Highway
SUMS2010-014
$13.49 0.00 $13.49
CARPENTER, Includes Form Work Residential
SUMS2007-008
$11.65 0.00 $11.65
CEMENT MASON/CONCRETE FINISHER Residential
SUMS2007-008
$9.21 0.00 $9.21
CEMENT MASON/CONCRETE FINISHER Building
SUMS2015-001
$20.00 0.00 $20.00
CEMENT MASON/CONCRETE FINISHER Highway
SUMS2010-014
$13.70 0.00 $13.70
ELECTRICIAN Building
ELEC0852-003 (Includes Low Voltage Wiring, HVAC/Temperature Controls Installation and Wiring)
$28.80 $14.14 $42.94
ELECTRICIAN Highway
SUMS2010-014
$21.80 $7.93 $29.73
ELECTRICIAN, Includes Low Voltage Wiring for Traffic Sensors and Signals Residential
SUMS2007-008
$9.38 0.00 $9.38
ELEVATOR MECHANIC Building
SUMS2015-001
$36.28 $29.69 $65.97
HIGHWAY/PARKING LOT STRIPING: INSTALLER - GUARDRAIL Highway
SUMS2010-014
$11.51 0.00 $11.51
HIGHWAY/PARKING LOT STRIPING: IRONWORKER, REINFORCING Highway
SUMS2010-014
$14.82 0.00 $14.82
HIGHWAY/PARKING LOT STRIPING: LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway
SUMS2010-014
$10.39 0.00 $10.39
HIGHWAY/PARKING LOT STRIPING: LABORER: Common or General Highway
SUMS2010-014
$10.22 0.00 $10.22
HIGHWAY/PARKING LOT STRIPING: LABORER: Concrete Worker Highway
SUMS2010-014
$10.69 0.00 $10.69
HIGHWAY/PARKING LOT STRIPING: LABORER: Flagger Highway
SUMS2010-014
$8.00 0.00 $8.00
HIGHWAY/PARKING LOT STRIPING: LABORER: Grade Checker Highway
SUMS2010-014
$12.77 0.00 $12.77
HIGHWAY/PARKING LOT STRIPING: LABORER: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper Highway
SUMS2010-014
$10.38 0.00 $10.38
HIGHWAY/PARKING LOT STRIPING: LABORER: Landscape Highway
SUMS2010-014
$9.83 0.00 $9.83
HIGHWAY/PARKING LOT STRIPING: LABORER: Mason Tender - Cement/Concrete Highway
SUMS2010-014
$11.08 0.00 $11.08
HIGHWAY/PARKING LOT STRIPING: LABORER: Pipelayer Highway
SUMS2010-014
$10.76 0.00 $10.76
HIGHWAY/PARKING LOT STRIPING: OPERATOR: Asphalt Spreader Highway
SUMS2010-014
$16.03 0.00 $16.03
HIGHWAY/PARKING LOT STRIPING: Truck Driver Highway
SUMS2010-014 (Line Striping Truck)
$15.48 0.00 $15.48
IRONWORKER, STRUCTURAL Building
IRON0167-012
$30.00 $19.58 $49.58
LABORER: Common or General Residential
SUMS2007-008
$9.46 0.00 $9.46
LABORER: Common or General Building
SUMS2015-001
$12.83 $0.77 $13.60
LABORER: Mason Tender - Cement/Concrete Residential
SUMS2007-008
$8.03 0.00 $8.03
LABORER: Mason Tender - Cement/Concrete Building
SUMS2015-001
$12.98 0.00 $12.98
LABORER: Pipelayer Residential
SUMS2007-008
$8.65 0.00 $8.65
LABORER: Pipelayer Building
SUMS2015-001
$12.52 $0.75 $13.27
OPERATOR: Backhoe Residential
SUMS2007-008
$13.63 0.00 $13.63
OPERATOR: Backhoe/Excavator/Trackhoe Building
SUMS2015-001
$18.00 0.00 $18.00
OPERATOR: Backhoe/Excavator/Trackhoe Highway
SUMS2010-014
$13.42 0.00 $13.42
OPERATOR: Bulldozer Residential
SUMS2007-008
$13.13 0.00 $13.13
OPERATOR: OPERATOR: Boring Machine Highway
SUMS2010-014
$15.14 0.00 $15.14
OPERATOR: OPERATOR: Broom/Sweeper Highway
SUMS2010-014
$10.94 0.00 $10.94
OPERATOR: OPERATOR: Bulldozer Highway
SUMS2010-014
$14.38 0.00 $14.38
OPERATOR: OPERATOR: Concrete Saw Highway
SUMS2010-014
$15.68 0.00 $15.68
OPERATOR: OPERATOR: Crane Highway
SUMS2010-014
$18.32 0.00 $18.32
OPERATOR: OPERATOR: Distributor Highway
SUMS2010-014
$12.59 0.00 $12.59
OPERATOR: OPERATOR: Drill Highway
SUMS2010-014
$19.22 0.00 $19.22
OPERATOR: OPERATOR: Grader/Blade Highway
SUMS2010-014
$14.13 0.00 $14.13
OPERATOR: OPERATOR: Loader Highway
SUMS2010-014
$11.05 0.00 $11.05
OPERATOR: OPERATOR: Mechanic Highway
SUMS2010-014
$16.00 0.00 $16.00
OPERATOR: OPERATOR: Milling Machine Highway
SUMS2010-014
$15.12 0.00 $15.12
OPERATOR: OPERATOR: Oiler Highway
SUMS2010-014
$12.33 0.00 $12.33
OPERATOR: OPERATOR: Paver Highway
SUMS2010-014 (Asphalt, Aggregate, and Concrete)
$16.47 0.00 $16.47
OPERATOR: OPERATOR: Piledriver Highway
SUMS2010-014
$15.13 0.00 $15.13
OPERATOR: OPERATOR: Roller (All Types) Highway
SUMS2010-014
$11.54 0.00 $11.54
OPERATOR: OPERATOR: Scraper Highway
SUMS2010-014
$13.15 0.00 $13.15
OPERATOR: OPERATOR: Tractor Highway
SUMS2010-014
$10.22 0.00 $10.22
OPERATOR: OPERATOR: Trencher Highway
SUMS2010-014
$15.00 0.00 $15.00
OPERATOR: PAINTER (Brush and Roller) Building
SUMS2015-001
$15.17 0.00 $15.17
OPERATOR: PIPEFITTER Building
SUMS2015-001
$22.77 $6.96 $29.73
OPERATOR: SHEET METAL WORKER, Includes HVAC Duct Installation Building
SUMS2015-001
$21.86 $11.18 $33.04
OPERATOR: TRUCK DRIVER: Dump Truck Building
SUMS2015-001
$13.92 $1.91 $15.83
OPERATOR: TRUCK DRIVER: Dump Truck Highway
SUMS2010-014 (All Types)
$10.49 0.00 $10.49
OPERATOR: TRUCK DRIVER: Flatbed Truck Highway
SUMS2010-014
$13.79 0.00 $13.79
OPERATOR: TRUCK DRIVER: Lowboy Truck Highway
SUMS2010-014
$11.00 0.00 $11.00
OPERATOR: TRUCK DRIVER: Mechanic Highway
SUMS2010-014
$14.23 0.00 $14.23
OPERATOR: TRUCK DRIVER: Off the Road Truck Highway
SUMS2010-014
$12.29 0.00 $12.29
OPERATOR: TRUCK DRIVER: Semi/Trailer Truck Highway
SUMS2010-014
$15.81 0.00 $15.81
OPERATOR: TRUCK DRIVER: Water Truck Highway
SUMS2010-014
$10.58 0.00 $10.58
PAINTER Residential
SUMS2007-008
$10.25 0.00 $10.25
PLUMBER Residential
SUMS2007-008
$11.75 0.00 $11.75
PLUMBER Building
PLUM0568-003
$30.41 $11.47 $41.88
ROOFER, Includes Shake & Shingle Roofs Residential
SUMS2007-008
$11.16 0.00 $11.16
TRUCK DRIVER: Dump Truck Residential
SUMS2007-008
$8.65 0.00 $8.65

Wage Determinations