Middlesex County in New Jersey.

2 wage determinations 77 trade rates

Popular Trades In Middlesex County in New Jersey.

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
All other work Building
ELEV0001-003
$57.01 $27.61 $84.61
All other work Heavy
CARP1556-003
$52.98 $52.44 $105.42
ALL OTHER WORK Building
ROOF0030-030
$46.03 $34.27 $80.30
Asbestos Removal Laborer Building
LABO0008-001
$28.37 $21.62 $49.99
ASBESTOS WORKER/HEAT & FROST INSULATOR Building
ASBE0032-009 (Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement)
$51.74 $46.20 $97.94
ASBESTOS WORKER/HEAT & FROST INSULATOR Building
ASBE0089-008 (includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement)
$55.80 $40.80 $96.60
Bricklayer Building
BRNJ0002-015
$43.56 $32.50 $76.06
CARPENTER Heavy
CARP0006-014 Scope differs by code/WD
$57.42 $59.25 $116.67
CARPENTER Heavy
CARP1556-003 (Dock Builder) Concrete form work
$52.02 $39.23 $91.25
CARPENTER (Scaffold Builder) Building
CARP0006-009
$57.42 $59.25 $116.67
CARPENTER Including Acoustical Ceiling Installation, Drywall Hanging and Formwork Building
CARP0006-011
$57.42 $59.25 $116.67
CEMENT MASON Heavy
BRNJ0004-001
$49.60 $37.96 $87.56
CEMENT MASON/CONCRETE FINISHER Building
PLAS0592-036
$53.21 $33.42 $86.63
DRYWALL FINISHER/TAPER Building
PAIN0711-018
$44.87 $30.15 $75.02
Electrician Building
ELEC0456-008
$61.40 $63.75 $125.15
Electrician Heavy
ELEC0456-010
$61.40 $63.75 $125.15
ELECTRICIAN Building
ELEC0456-008 (Including Low voltage Wiring) Cable splicer
$65.35 $71.25 $136.60
ELECTRICIAN Cable splicer Heavy
ELEC0456-010
$65.35 $71.25 $136.60
Glazier Building
PAIN0711-021
$52.68 $24.97 $77.65
Ironworker Reinforcing Building
IRON0399-019
$53.24 $38.40 $91.64
Ironworker Reinforcing Heavy
IRON0399-019
$53.24 $38.40 $91.64
Ironworkers: Reinforcing Building
IRON0011-011
$49.94 $50.32 $100.26
Ironworkers: Reinforcing Heavy
IRON0011-011
$49.94 $50.32 $100.26
Ironworkers: Structural, Ornamental, Rigger Building
IRON0011-011
$52.24 $50.32 $102.56
Ironworkers: Structural, Ornamental, Rigger Heavy
IRON0011-011
$52.24 $50.32 $102.56
Laborers: Asphalt Shoveler, Asphalt Spreader, Common or General Laborer, Landscape Laborer, Pipelayer, Power Tool Operator and Screedman Building
LABO0077-005
$35.75 $30.22 $65.97
Laborers: Common or General Laborer; Landscape Laborer, Power Tool Operator Heavy
LABO0172-009
$50.95 $38.53 $89.48
Laborers: Pipelayer Heavy
LABO0172-009
$51.65 $38.53 $90.18
MASON TENDER: LABORER Brick/Cement/Concrete Building
LABO0077-002
$36.50 $30.22 $66.72
MASON TENDER: LABORER Cement/Concrete Heavy
LABO0077-008
$29.35 $23.07 $52.42
Millwright Building
CARP0715-007
$58.84 $0.20 $59.04
Millwright Heavy
CARP0715-007
$58.84 $0.20 $59.04
PAINTER (Brush & Roller) Building
PAIN0711-020
$45.55 $29.86 $75.41
PAINTER (Paperhanger) Building
PAIN0711-020
$45.55 $29.86 $75.41
PAINTER (Spray) Building
PAIN0711-020
$45.55 $29.86 $75.41
Painters: New Construction Brush and roller Heavy
PAIN0711-024
$40.19 $22.72 $62.91
Painters: Repaint work, on projects on which no major alterations occur. Brush and roller Heavy
PAIN0711-024
$29.05 $18.91 $47.96
Painters: Work on bridges Heavy
PAIN0711-023 (Major Bridges Designed for Commercial Navigation)
$58.28 $33.85 $92.13
PIPEFITTER Building
PLUM0009-021 (Including HVAC Pipe Installation)
$59.57 $46.45 $106.02
PIPEFITTER Building
PLUM0475-016 (Including HVAC Pipe Installation)
$56.34 $50.80 $107.14
PIPEFITTER Heavy
PLUM0009-028 Scope differs by code/WD
$59.57 $46.45 $106.02
PIPEFITTER Heavy
PLUM0475-021 Scope differs by code/WD
$56.34 $50.80 $107.14
Plasterer Building
PLAS0008-008
$38.37 $31.64 $70.01
PLUMBER Building
PLUM0009-021 (Excluding HVAC Pipe Installation)
$59.57 $46.45 $106.02
PLUMBER Building
PLUM0024-016 (Excluding HVAC Pipe Installation)
$62.09 $45.05 $107.14
PLUMBER Heavy
PLUM0009-028 Scope differs by code/WD
$59.57 $46.45 $106.02
PLUMBER Heavy
PLUM0024-021 Scope differs by code/WD
$62.09 $45.05 $107.14
Power equipment operators: GROUP 1 Building
ENGI0825-020
$61.72 $37.50 $99.22
Power equipment operators: GROUP 1 Heavy
ENGI0825-021
$61.72 $37.50 $99.22
Power equipment operators: GROUP 2 Building
ENGI0825-020
$60.13 $37.50 $97.63
Power equipment operators: GROUP 2 Heavy
ENGI0825-021
$60.13 $37.50 $97.63
Power equipment operators: GROUP 3 Building
ENGI0825-020
$58.22 $37.50 $95.72
Power equipment operators: GROUP 3 Heavy
ENGI0825-021
$58.22 $37.50 $95.72
Power equipment operators: GROUP 4 Building
ENGI0825-020
$56.59 $37.50 $94.09
Power equipment operators: GROUP 4 Heavy
ENGI0825-021
$56.59 $37.50 $94.09
Power equipment operators: GROUP 5 Building
ENGI0825-020
$52.88 $37.50 $90.38
Power equipment operators: GROUP 5 Heavy
ENGI0825-021
$52.88 $37.50 $90.38
ROOFER Building
ROOF0004-008 (Includes All Types of Roofs)
$44.52 $32.25 $76.77
Roofer SHINGLES Building
ROOF0030-030
$35.95 $21.85 $57.80
Service and Repair Building
PLUM0009-021 Scope differs by code/WD
$46.23 $29.23 $75.46
Service and Repair Building
PLUM0009-021 Scope differs by code/WD
$46.23 $29.23 $75.46
Service and Repair Heavy
PLUM0009-028 Scope differs by code/WD
$46.23 $29.23 $75.46
Service and Repair Heavy
PLUM0009-028 Scope differs by code/WD
$46.23 $29.23 $75.46
SHEET METAL WORKER Building
SHEE0027-010 (Including HVAC Duct Installation)
$59.08 $47.06 $106.14
SLATE AND TILE Building
ROOF0030-030
$38.95 $21.85 $60.80
SPRINKLER FITTER Building
SFNJ0669-009 (Fire Sprinklers)
$69.97 $41.35 $111.32
SPRINKLER FITTER Building
SFNJ0696-005 (Fire Sprinklers)
$67.97 $39.35 $107.32
Structural, Ornamental, Rigger Building
IRON0399-019
$54.24 $38.40 $92.64
Structural, Ornamental, Rigger Heavy
IRON0399-019
$54.24 $38.40 $92.64
Tile finisher Building
BRNJ0007-020 Scope differs by code/WD
$50.05 $33.90 $83.95
Tile finisher Building
BRNJ0007-021 Scope differs by code/WD
$50.05 $33.90 $83.95
Tile setter Building
BRNJ0007-020 Scope differs by code/WD
$64.90 $37.28 $102.18
Tile setter Building
BRNJ0007-021 Scope differs by code/WD
$64.90 $37.28 $102.18
Truck drivers: Dump Truck Building
TEAM0469-005
$48.63 $42.66 $91.28
Truck drivers: Dump Truck; Flatbed Truck;Pick up truck Heavy
TEAM0469-008
$48.63 $42.66 $91.28
Truck drivers: Off the Road Truck Building
TEAM0469-005
$48.78 $42.66 $91.44
Truck drivers: Off the Road Truck Heavy
TEAM0469-008
$48.78 $42.66 $91.44

Wage Determinations