NY20260022
rev 1Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0030-003 (Duct, Pipe, & Mechanical System Insulation) | $43.25 | $27.29 | $70.54 |
| BRICKLAYER Building BRNY0002-018 (Includes Pointing, Caulking, and Cleaning) | $33.45 | $20.14 | $53.59 |
| BRICKLAYER Residential BRNY0003-001 | $25.38 | $12.02 | $37.40 |
| CARPENTER, Includes Acoustical Ceiling Installation, Drywall Hanging, Form Work, and Metal Stud Installation Building SUNY2016-001 | $25.70 | $15.85 | $41.55 |
| CARPENTER, Includes Batt Insulation Residential SUNY2013-010 | $21.58 | 0.00 | $21.58 |
| CEMENT MASON/CONCRETE FINISHER Building SUNY2016-001 | $30.61 | $5.82 | $36.43 |
| CEMENT MASON/CONCRETE FINISHER Residential SUNY2013-010 | $21.73 | $14.28 | $36.01 |
| DRYWALL FINISHER/TAPER Building PAIN0038-001 | $30.90 | $25.36 | $56.26 |
| ELECTRICIAN Building ELEC0910-003 (Includes Low Voltage Wiring and Installation of Alarms, HVAC/Temperature Controls and Sound and Communication Systems) | $43.50 | $25.88 | $69.38 |
| ELECTRICIAN Residential ELEC0910-008 | $28.28 | $16.63 | $44.91 |
| ELEVATOR MECHANIC Residential ELEV0062-004 | $58.44 | $38.44 | $96.88 |
| GLAZIER Building SUNY2016-001 | $29.52 | $11.47 | $40.99 |
| IRONWORKER, ORNAMENTAL Building SUNY2016-001 | $28.70 | $22.02 | $50.72 |
| IRONWORKER, ORNAMENTAL Residential IRON0417-004 | $42.63 | $53.70 | $96.33 |
| IRONWORKER, REINFORCING Building SUNY2016-001 | $28.00 | $21.43 | $49.43 |
| IRONWORKER, REINFORCING Residential SUNY2013-010 | $27.06 | $23.02 | $50.08 |
| IRONWORKER, STRUCTURAL Building SUNY2016-001 | $29.41 | $21.63 | $51.04 |
| IRONWORKER, STRUCTURAL Residential IRON0033-019 | $35.75 | $30.80 | $66.55 |
| LABORER Common or General Building LABO1822-008 | $27.03 | $25.45 | $52.48 |
| LABORER: Asbestos Abatement Building SUNY2016-001 (Removal from Floors, Walls, & Ceilings) | $29.18 | $17.72 | $46.90 |
| LABORER: Asbestos Abatement Residential SUNY2013-010 (Removal from Floors, Walls, & Ceilings) | $16.83 | 0.00 | $16.83 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Building SUNY2016-001 | $20.89 | $10.46 | $31.35 |
| LABORER: Common or General Residential SUNY2013-010 | $16.18 | $9.81 | $25.99 |
| LABORER: Mason Tender - Brick Residential SUNY2013-010 | $18.03 | 0.00 | $18.03 |
| LABORER: Mason Tender - Cement/Concrete Residential SUNY2013-010 | $19.69 | 0.00 | $19.69 |
| LABORER: Pipelayer Building SUNY2016-001 | $20.47 | 0.00 | $20.47 |
| Mason Tender - Brick Building LABO1822-008 | $27.03 | $25.45 | $52.48 |
| Mason Tender - Cement/Concrete Building LABO1822-008 | $27.03 | $25.45 | $52.48 |
| MILLWRIGHT Building CARP1163-003 | $30.20 | $23.83 | $54.03 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUNY2016-001 | $33.62 | $17.98 | $51.60 |
| OPERATOR: Backhoe/Excavator/Trackhoe Residential SUNY2013-010 | $23.35 | 0.00 | $23.35 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Building SUNY2016-001 | $36.17 | $17.76 | $53.93 |
| OPERATOR: OPERATOR: Bulldozer Building SUNY2016-001 | $31.60 | $21.52 | $53.12 |
| OPERATOR: OPERATOR: Bulldozer Residential SUNY2013-010 | $20.80 | 0.00 | $20.80 |
| OPERATOR: OPERATOR: Forklift Building SUNY2016-001 | $33.14 | $21.04 | $54.18 |
| OPERATOR: OPERATOR: Loader Residential SUNY2013-010 | $27.88 | $21.40 | $49.28 |
| OPERATOR: OPERATOR: Paver Building SUNY2016-001 (Asphalt, Aggregate, and Concrete) | $30.19 | $17.42 | $47.61 |
| OPERATOR: OPERATOR: Roller Building SUNY2016-001 | $27.74 | $5.89 | $33.63 |
| OPERATOR: PAINTER Residential SUNY2013-010 (Drywall Finishing/Taping Only) | $18.21 | 0.00 | $18.21 |
| OPERATOR: PAINTER (Brush and Roller) Building SUNY2016-001 | $22.32 | $13.95 | $36.27 |
| OPERATOR: PLUMBER, Includes HVAC Pipe Installation Building SUNY2016-001 | $33.72 | $16.03 | $49.75 |
| OPERATOR: PLUMBER, Includes HVAC Unit Installation Residential SUNY2013-010 | $19.84 | $5.70 | $25.54 |
| OPERATOR: ROOFER Residential SUNY2013-010 | $15.15 | 0.00 | $15.15 |
| OPERATOR: SHEET METAL WORKER, Includes HVAC Duct Installation Residential SUNY2013-010 | $17.11 | $2.75 | $19.86 |
| OPERATOR: SHEET METAL WORKER, Including Installation of HVAC Duct, Metal Flashing, and Siding Building SUNY2016-001 (Aluminum, Metal, Vinyl) | $28.11 | $17.75 | $45.86 |
| OPERATOR: SPRINKLER FITTER Residential SUNY2013-010 (Fire Sprinklers) | $18.05 | $1.44 | $19.49 |
| PAINTER Residential PAIN0031-001 ((BRUSH AND ROLLER), Excludes Drywall Finishing/Taping) | $23.25 | $21.21 | $44.46 |
| PAINTER (Spray) Building PAIN0038-001 | $29.90 | $25.36 | $55.26 |
| PIPEFITTER Building PLUM0073-004 (Excludes HVAC Pipe Installation) | $31.43 | $23.61 | $55.04 |
| POWER EQUIPMENT OPERATOR Building ENGI0158-001 (Crane) | $49.61 | $31.85 | $81.46 |
| ROOFER Building ROOF0195-004 | $35.80 | $25.99 | $61.79 |
| SPRINKLER FITTER Building SFNY0669-003 (Fire Sprinklers) | $45.06 | $30.71 | $75.77 |
| TILE SETTER Building BRNY0002-020 | $31.81 | $17.50 | $49.31 |
No trade rates match your search and filter selection.
Building
Residential