| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0030-003 (Duct, Pipe, & Mechanical System Insulation) | $43.25 | $27.29 | $70.54 |
| BOILERMAKER General BOIL0175-001 | $35.23 | $26.61 | $61.84 |
| BRICKLAYER Building BRNY0002-022 (Includes Pointing, Caulking, and Cleaning) | $34.15 | $19.71 | $53.86 |
| BRICKLAYER General BRNY0002-007 | $34.15 | $19.71 | $53.86 |
| BRICKLAYER Residential BRNY0003-001 | $25.38 | $12.02 | $37.40 |
| capabilities: ELECTRICIAN General ELEC1249-004 (Line Construction) Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic Flagman | $35.34 | $27.65 | $62.99 |
| capabilities: Groundman digging machine operator General ELEC1249-004 | $55.40 | $27.90 | $83.30 |
| capabilities: Groundman truck driver General ELEC1249-004 (tractor trailer unit) | $49.25 | $27.70 | $76.95 |
| capabilities: Groundman Truck driver General ELEC1249-004 | $49.25 | $27.70 | $76.95 |
| capabilities: Lineman and Technician General ELEC1249-004 | $61.56 | $31.90 | $93.46 |
| capabilities: Mechanic General ELEC1249-004 | $49.25 | $27.70 | $76.95 |
| CARPENTER Building CARP0277-025 (Includes Acoustical Ceiling Installation, Drywall Hanging, Form Work, and Metal Stud Installation) | $32.59 | $23.24 | $55.83 |
| CARPENTER Carpenters General CARP0277-003 | $39.52 | $27.16 | $66.68 |
| CARPENTER, Includes Batt Insulation Residential SUNY2013-018 | $17.18 | $2.72 | $19.90 |
| CEMENT MASON/CONCRETE FINISHER Building SUNY2016-004 | $33.12 | $16.84 | $49.96 |
| CEMENT MASON/CONCRETE FINISHER General BRNY0002-017 | $37.23 | $19.51 | $56.74 |
| CEMENT MASON/CONCRETE FINISHER Residential SUNY2013-018 | $21.91 | $13.84 | $35.75 |
| Crane Building ENGI0158-002 | $49.61 | $31.85 | $81.46 |
| DRYWALL FINISHER/TAPER Building PAIN0031-003 | $23.25 | $21.21 | $44.46 |
| ELECTRICIAN Building ELEC0043-012 (Includes Low Voltage Wiring and Installation of Alarms, HVAC/Temperature Controls and Sound and Communication Systems) | $50.50 | $35.03 | $85.53 |
| ELECTRICIAN General ELEC1249-003 (LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems) Flagman | $31.72 | $27.65 | $59.37 |
| ELECTRICIAN General ELEC1249-008 (Line Construction) TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT Cable splicer | $40.81 | $5.77 | $46.58 |
| ELECTRICIAN Residential SUNY2013-018 | $17.26 | $4.92 | $22.18 |
| ELECTRICIAN Cable Splicing General ELEC0043-008 | $55.55 | $35.03 | $90.58 |
| Electricians General ELEC0043-008 | $50.50 | $35.03 | $85.53 |
| ELEVATOR MECHANIC General ELEV0062-002 | $58.44 | $38.44 | $96.88 |
| ELEVATOR MECHANIC Residential ELEV0062-004 | $58.44 | $38.44 | $96.88 |
| FLOOR LAYER: Carpet General SUNY1996-003 | $15.22 | $2.09 | $17.31 |
| GLAZIER Building PAIN0677-005 | $30.00 | $27.59 | $57.59 |
| GLAZIER General PAIN0677-002 | $30.00 | $27.59 | $57.59 |
| Groundman General ELEC1249-008 | $20.53 | $5.77 | $26.30 |
| Groundman (Truck Driver) General ELEC1249-003 | $42.29 | $27.70 | $69.99 |
| Groundman Truck Driver General ELEC1249-003 (tractor trailer unit) | $47.57 | $27.70 | $75.27 |
| GROUP 2 General LABO0633-002 | $36.50 | $25.70 | $62.20 |
| GROUP 3 General LABO0633-002 | $36.70 | $25.70 | $62.40 |
| GROUP 4 General LABO0633-002 | $36.90 | $25.70 | $62.60 |
| Installer Repairman- Teledata Lineman/Technician- Equipment Operator General ELEC1249-008 | $38.73 | $5.77 | $44.50 |
| IRONWORKER Building IRON0060-012 (Ornamental and Reinforcing) | $37.16 | $30.68 | $67.84 |
| IRONWORKER, ORNAMENTAL Residential IRON0417-004 | $42.63 | $53.70 | $96.33 |
| IRONWORKER, REINFORCING Residential SUNY2013-018 | $27.06 | $23.02 | $50.08 |
| IRONWORKER, STRUCTURAL Building SUNY2016-004 | $26.37 | $9.91 | $36.28 |
| IRONWORKER, STRUCTURAL Residential IRON0033-019 | $35.75 | $30.80 | $66.55 |
| LABORER Common or General Building LABO0633-008 | $29.88 | $22.90 | $52.78 |
| LABORER GROUP 1 General LABO0633-002 | $36.30 | $25.70 | $62.00 |
| LABORER Hazardous Waste Removal, Asbestos and Toxic General LABO0633-001 | $33.95 | $23.10 | $57.05 |
| LABORER: Asbestos Abatement Building SUNY2016-004 (Removal from Floors, Walls, & Ceilings) | $29.18 | $17.72 | $46.90 |
| LABORER: Asbestos Abatement Residential SUNY2013-018 (Removal from Floors, Walls, & Ceilings) | $16.83 | 0.00 | $16.83 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Building SUNY2016-004 | $20.89 | $10.46 | $31.35 |
| LABORER: Common or General Residential SUNY2013-018 | $13.55 | $0.62 | $14.17 |
| LABORER: Mason Tender - Brick Residential SUNY2013-018 | $18.03 | 0.00 | $18.03 |
| LABORER: Mason Tender - Cement/Concrete Residential SUNY2013-018 | $19.69 | 0.00 | $19.69 |
| LABORER: Pipelayer Building SUNY2016-004 | $20.47 | 0.00 | $20.47 |
| Lineman & Technician General ELEC1249-003 | $52.86 | $31.90 | $84.76 |
| Mason Tender - Brick Building LABO0633-008 | $23.88 | $19.60 | $43.48 |
| Mechanic General ELEC1249-003 | $42.29 | $27.70 | $69.99 |
| MILLWRIGHT Building CARP1163-003 | $30.20 | $23.83 | $54.03 |
| Nuclear Site or Related Work General LABO0633-001 | $31.45 | $23.10 | $54.55 |
| OPERATOR: Backhoe/Excavator/Trackhoe Residential SUNY2013-018 | $23.35 | 0.00 | $23.35 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader Building SUNY2016-004 | $36.17 | $17.76 | $53.93 |
| OPERATOR: Bulldozer Building SUNY2016-004 | $31.03 | $20.05 | $51.08 |
| OPERATOR: Forklift Building SUNY2016-004 | $33.14 | $21.04 | $54.18 |
| OPERATOR: OPERATOR: Bulldozer Residential SUNY2013-018 | $19.97 | 0.00 | $19.97 |
| OPERATOR: OPERATOR: Loader Residential SUNY2013-018 | $27.88 | $21.40 | $49.28 |
| OPERATOR: PAINTER Residential SUNY2013-018 (Drywall Finishing/Taping Only) | $16.50 | 0.00 | $16.50 |
| OPERATOR: Paver Building SUNY2016-004 (Asphalt, Aggregate, and Concrete) | $30.19 | $17.42 | $47.61 |
| OPERATOR: PLUMBER, Includes HVAC Unit Installation Residential SUNY2013-018 | $19.64 | $6.64 | $26.28 |
| OPERATOR: Roller Building SUNY2016-004 | $28.51 | $12.31 | $40.82 |
| OPERATOR: ROOFER Residential SUNY2013-018 | $15.15 | 0.00 | $15.15 |
| OPERATOR: SHEET METAL WORKER, Includes HVAC Duct Installation Residential SUNY2013-018 | $16.84 | $1.89 | $18.73 |
| OPERATOR: SPRINKLER FITTER Residential SUNY2013-018 (Fire Sprinklers) | $17.83 | $1.17 | $19.00 |
| PAINTER Residential PAIN0031-001 ((BRUSH AND ROLLER), Excludes Drywall Finishing/Taping) | $23.25 | $21.21 | $44.46 |
| PAINTER (Bridges) General PAIN0004-023 | $42.06 | $30.59 | $72.65 |
| PAINTER (Brush and Roller) Building PAIN0031-003 | $23.25 | $21.21 | $44.46 |
| PAINTER (Spray) Building PAIN0038-003 | $24.39 | $21.61 | $46.00 |
| Painters: Brush & Roll General PAIN0004-029 | $29.90 | $26.25 | $56.15 |
| Painters: Metalizing General PAIN0004-029 | $29.90 | $26.25 | $56.15 |
| Painters: Over $100,000 Contracts General PAIN0004-029 | $25.58 | $21.61 | $47.19 |
| Painters: Paperhanging, Vinyl & Tapers General PAIN0004-029 | $30.90 | $26.25 | $57.15 |
| Painters: Under $100,000 Contracts General PAIN0004-029 | $24.39 | $21.61 | $46.00 |
| Piledrivers General CARP0277-003 | $39.52 | $27.16 | $66.68 |
| PIPEFITTER Building PLUM0073-009 (Includes HVAC Pipe Installation) | $31.43 | $23.61 | $55.04 |
| PLASTERER General BRNY0002-007 | $34.15 | $19.71 | $53.86 |
| PLUMBER Building PLUM0267-013 | $35.51 | $24.57 | $60.08 |
| Plumber, Pipefitter, Steamfitter Heating, plumbing, air conditioning, refrigeration and pipefitting General PLUM0073-001 | $32.90 | $23.61 | $56.51 |
| POWER EQUIPMENT OPERATOR Backhoe/Excavator/Trackhoe Building ENGI0158-002 | $48.11 | $31.85 | $79.96 |
| Power equipment operators: GROUP 1 General ENGI0158-020 | $55.85 | $33.40 | $89.25 |
| Power equipment operators: GROUP 2 General ENGI0158-020 | $54.97 | $33.40 | $88.37 |
| Power equipment operators: GROUP 3 General ENGI0158-020 | $51.69 | $33.40 | $85.09 |
| Power equipment operators: GROUP 4 General ENGI0158-020 | $65.51 | $33.40 | $98.91 |
| Power equipment operators: GROUP 5 General ENGI0158-020 | $60.35 | $33.40 | $93.75 |
| Power equipment operators: GROUP 6 General ENGI0158-020 | $58.85 | $33.40 | $92.25 |
| Power equipment operators: GROUP 7 General ENGI0158-020 | $57.20 | $33.40 | $90.60 |
| Projects with sheetmetal work contracts totaling $10 million or less General SHEE0058-005 | $36.29 | $23.31 | $59.60 |
| ROOFER Building ROOF0195-004 | $35.80 | $25.99 | $61.79 |
| ROOFER General ROOF0195-001 | $35.80 | $25.99 | $61.79 |
| Sheet Metal Worker General SHEE0058-005 (Incl. HVAC Duct) Projects over $10 million | $42.29 | $23.31 | $65.60 |
| SHEET METAL WORKER Building SHEE0058-009 (Including Installation of HVAC Duct, Metal Flashing, and Siding (Aluminum, Metal, Vinyl)) | $36.29 | $23.31 | $59.60 |
| SPRINKLER FITTER Building SFNY0669-003 (Fire Sprinklers) | $45.06 | $30.71 | $75.77 |
| SPRINKLER FITTER General SFNY0669-001 | $47.85 | $28.94 | $76.79 |
| Substation: Cable Splicer General ELEC1249-004 | $63.14 | $29.40 | $92.54 |
| Substation: Flagman General ELEC1249-004 Scope differs by code/WD | $35.34 | $27.65 | $62.99 |
| Substation: Flagman General ELEC1249-004 Scope differs by code/WD | $35.34 | $27.65 | $62.99 |
| Substation: Ground man truck driver General ELEC1249-004 | $49.25 | $27.70 | $76.95 |
| Substation: Groundman digging machine operator General ELEC1249-004 | $55.40 | $27.90 | $83.30 |
| Substation: Groundman Digging Machine Operator General ELEC1249-004 | $55.40 | $27.90 | $83.30 |
| Substation: Groundman truck driver General ELEC1249-004 (tractor trailer unit) | $49.25 | $27.70 | $76.95 |
| Substation: Groundman Truck Driver General ELEC1249-004 (tractor-trailer unit) | $49.25 | $27.70 | $76.95 |
| Substation: Groundman Truck Driver General ELEC1249-004 Scope differs by code/WD | $49.25 | $27.70 | $76.95 |
| Substation: Lineman & Technician General ELEC1249-004 Scope differs by code/WD | $61.56 | $31.90 | $93.46 |
| Substation: Lineman & Technician General ELEC1249-004 Scope differs by code/WD | $61.56 | $31.90 | $93.46 |
| Substation: Mechanic General ELEC1249-004 Scope differs by code/WD | $49.25 | $27.70 | $76.95 |
| Substation: Mechanic General ELEC1249-004 Scope differs by code/WD | $49.25 | $27.70 | $76.95 |
| TILE FINISHER General BRNY0002-007 | $26.46 | $19.64 | $46.10 |
| TILE SETTER Building BRNY0002-020 | $31.81 | $17.50 | $49.31 |
| TILE SETTER General BRNY0002-007 | $32.92 | $20.42 | $53.34 |
| Tree Trimmer General ELEC1249-008 | $31.45 | $10.48 | $41.93 |