Benton County in Oregon.

2 wage determinations 71 trade rates

Popular Trades In Benton County in Oregon.

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
BRICKLAYER Heavy
BROR0001-033
$49.60 $25.15 $74.75
BRICKLAYER Building
BROR0001-005
$49.60 $25.15 $74.75
CARPENTER, Excludes Drywall Hanging Building
SUOR2018-014
$28.11 $5.76 $33.87
Carpenters: Excluding Form Work Heavy
CARP0503-011
$53.94 $16.81 $70.75
CEMENT MASON/CONCRETE FINISHER Heavy
PLAS0555-006
$46.13 $20.31 $66.44
CEMENT MASON/CONCRETE FINISHER Building
PLAS0555-007
$46.13 $20.31 $66.44
DRYWALL FINISHER/TAPER Heavy
SUOR2009-050
$24.05 0.00 $24.05
DRYWALL FINISHER/TAPER Building
PAIN0010-009
$45.52 $22.03 $67.55
DRYWALL HANGER Building
CARP0503-001
$52.43 $17.01 $69.44
ELECTRICIAN Heavy
ELEC0280-010
$56.46 $23.05 $79.51
ELECTRICIAN Building
ELEC0280-001
$56.46 $23.05 $79.51
GLAZIER Building
PAIN0740-001
$53.15 $23.21 $76.36
GROUP 1A Heavy
ENGI0701-028
$58.82 $16.90 $75.72
GROUP 1B Heavy
ENGI0701-028
$60.98 $16.90 $77.88
GROUP 2 Heavy
ENGI0701-028
$54.75 $16.90 $71.65
GROUP 3 Heavy
ENGI0701-028
$53.60 $16.90 $70.50
GROUP 4 Heavy
ENGI0701-028
$50.27 $16.90 $67.17
GROUP 5 Heavy
ENGI0701-028
$49.03 $16.90 $65.93
GROUP 6 Heavy
ENGI0701-028
$45.81 $16.90 $62.71
HEAT & FROST INSULATOR Building
ASBE0036-003
$62.02 $22.36 $84.38
HIGHWAY/PARKING LOT STRIPING: LABORER: Asphalt Spreader Heavy
SUOR2009-050
$22.18 $9.39 $31.57
HIGHWAY/PARKING LOT STRIPING: LABORER: Common or General Heavy
SUOR2009-050
$22.84 $5.60 $28.44
HIGHWAY/PARKING LOT STRIPING: LABORER: Form-Stripping Heavy
SUOR2009-050
$19.27 $6.32 $25.59
HIGHWAY/PARKING LOT STRIPING: LABORER: Grade Checker Heavy
SUOR2009-050
$20.02 $7.20 $27.22
HIGHWAY/PARKING LOT STRIPING: LABORER: Landscape Heavy
SUOR2009-050
$10.60 $1.80 $12.40
HIGHWAY/PARKING LOT STRIPING: LABORER: Mason Tender - Cement/Concrete Heavy
SUOR2009-050
$21.81 $6.88 $28.69
HIGHWAY/PARKING LOT STRIPING: LABORER: Pipelayer Heavy
SUOR2009-050
$18.57 $6.95 $25.52
HIGHWAY/PARKING LOT STRIPING: OPERATOR: Backhoe Heavy
SUOR2009-050
$22.65 $6.80 $29.45
HIGHWAY/PARKING LOT STRIPING: OPERATOR: Excavator Heavy
SUOR2009-050
$25.25 $5.94 $31.19
HIGHWAY/PARKING LOT STRIPING: OPERATOR: Roller Heavy
SUOR2009-050
$36.60 0.00 $36.60
HIGHWAY/PARKING LOT STRIPING: OPERATOR: Screed Heavy
SUOR2009-050
$36.60 0.00 $36.60
HIGHWAY/PARKING LOT STRIPING: OPERATOR: Tractor Heavy
SUOR2009-050
$20.00 $0.73 $20.73
HIGHWAY/PARKING LOT STRIPING: Painter Heavy
SUOR2009-050
$23.79 $6.57 $30.36
HIGHWAY/PARKING LOT STRIPING: PAINTER: Spray Heavy
SUOR2009-050
$19.77 0.00 $19.77
HIGHWAY/PARKING LOT STRIPING: PILEDRIVERMAN Heavy
SUOR2009-050
$26.19 $11.58 $37.77
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER Heavy
SUOR2009-050
$32.10 $5.90 $38.00
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER: Dump Truck Heavy
SUOR2009-050
$18.88 $4.62 $23.50
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER: Lowboy Truck Heavy
SUOR2009-050
$17.07 $5.50 $22.57
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER: Water Truck Heavy
SUOR2009-050
$18.65 $6.70 $25.35
IRONWORKER Heavy
IRON0029-011 (Ornamental, Reinforcing, and Structural)
$48.31 $34.52 $82.83
IRONWORKER Building
IRON0029-001
$48.31 $34.52 $82.83
LABORER: Common or General Building
SUOR2018-014
$27.49 $13.82 $41.31
LABORER: Hod Carrier Building
LABO0737-036
$43.79 $17.05 $60.84
LABORER: Mason Tender - Cement/Concrete Building
LABO0737-025
$43.79 $17.05 $60.84
LABORER: Pipelayer Building
LABO0737-038
$40.41 $17.30 $57.71
Laborers: (Mason Tender-Brick) Heavy
LABO0737-006
$43.79 $17.05 $60.84
Laborers: GROUP 1 Heavy
LABO0737-023
$39.11 $17.30 $56.41
Laborers: GROUP 2 Heavy
LABO0737-023
$40.41 $17.30 $57.71
Laborers: GROUP 3 Heavy
LABO0737-023
$34.39 $17.30 $51.69
OPERATOR: Backhoe/Excavator/Trackhoe Building
SUOR2018-014
$37.38 $16.53 $53.91
OPERATOR: Bulldozer Building
ENGI0701-001
$54.75 $16.90 $71.65
OPERATOR: Crane 300-399 Ton Building
ENGI0701-044
$58.82 $16.90 $75.72
OPERATOR: Forklift Building
ENGI0701-041
$45.81 $16.90 $62.71
OPERATOR: Grader/Blade Building
ENGI0701-001
$54.75 $16.90 $71.65
OPERATOR: Loader Building
ENGI0701-001
$54.75 $16.90 $71.65
OPERATOR: Oiler Building
ENGI0701-041
$45.81 $16.90 $62.71
OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Building
SUOR2018-014
$20.43 $2.31 $22.74
OPERATOR: OPERATOR: Drill Building
SUOR2018-014
$27.54 $14.10 $41.64
OPERATOR: OPERATOR: Paver Building
SUOR2018-014 (Asphalt, Aggregate, and Concrete)
$35.76 $3.60 $39.36
OPERATOR: Roller Building
ENGI0701-042
$50.27 $16.90 $67.17
OPERATOR: ROOFER Building
SUOR2018-014
$33.19 0.00 $33.19
OPERATOR: TRUCK DRIVER: Dump Truck Building
SUOR2018-014
$21.30 $5.66 $26.96
PAINTER Building
PAIN0010-010
$40.85 $16.68 $57.53
Painters: Including Brush and Roller Heavy
PAIN0010-007
$39.94 $16.68 $56.62
PIPEFITTER Building
PLUM0290-001
$60.77 $34.72 $95.49
PLUMBER Building
PLUM0290-002
$60.77 $34.72 $95.49
POWER EQUIPMENT OPERATOR GROUP 1 Heavy
ENGI0701-028
$56.66 $16.90 $73.56
SHEET METAL WORKER Building
SHEE0016-003
$54.99 $33.92 $88.91
TILE FINISHER Building
BROR0001-009
$32.68 $16.48 $49.16
TILE SETTER Building
BROR0001-009
$43.93 $21.81 $65.74
Truck drivers: GROUP 1 Heavy
TEAM0037-009
$35.41 $18.30 $53.71

Wage Determinations