Millard County in Utah.

2 wage determinations 49 trade rates

Popular Trades In Millard County in Utah.

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
CARPENTER, Includes Form Work Highway
SUUT2019-007
$22.07 $6.88 $28.95
CARPENTER, Includes Form Work Heavy
SUUT2008-026 (Excludes Natural Gas Pipeline Construction Form Work)
$14.75 $3.03 $17.78
CEMENT MASON/CONCRETE FINISHER Highway
SUUT2019-007
$17.36 $2.04 $19.40
CEMENT MASON/CONCRETE FINISHER Heavy
SUUT2008-026
$14.00 $0.56 $14.56
Common or General, Nail gun, Pipelayer, Pot Tender Heavy
LABO0295-018
$20.59 $8.65 $29.24
ELECTRICIAN Highway
SUUT2019-007
$26.83 0.00 $26.83
Formworker Heavy
LABO0295-018
$20.85 $8.65 $29.50
Group 2: A-Frame, Challenger Heavy
TEAM0222-020 (For transportation purposes), Forklift, Fuel Truck, Gin Pole, Rubber-Tired Tractor, Tandem Float (4 & 5 Axle), Track Truck/All-Track Dumper Equipment, Vacuum Truck, Winch Truck
$46.02 $15.75 $61.77
Group 3: Ambulance , Bus, Dump Truck Heavy
TEAM0222-020 (2 and 3 axle), Flatbed Truck (2 and 3 axle), Grease Truck, Hot Pass Truck (3 axle), Jeep, Pick-up, Single Axle Float (3 axle), Skid Truck (2 and 3 axle), Station Wagon, Stringer Bead & Hot Pass (2 axle), Swamp Buggy/ Marsh Buggy, or similar type equipment, Team Driver, Water Truck (2 and 3 axle)
$41.90 $15.75 $57.65
HIGHWAY/PARKING LOT STRIPING: INSTALLER - GUARDRAIL Highway
SUUT2019-007
$17.79 0.00 $17.79
HIGHWAY/PARKING LOT STRIPING: INSTALLER - SIGN Highway
SUUT2019-007
$18.22 $2.79 $21.01
HIGHWAY/PARKING LOT STRIPING: LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway
SUUT2019-007
$19.88 $5.71 $25.59
HIGHWAY/PARKING LOT STRIPING: LABORER: Common or General Highway
SUUT2019-007
$16.09 $2.65 $18.74
HIGHWAY/PARKING LOT STRIPING: LABORER: Landscape Highway
SUUT2019-007
$14.45 $2.79 $17.24
HIGHWAY/PARKING LOT STRIPING: LABORER: Mason Tender - Cement/Concrete Highway
SUUT2019-007
$17.03 $0.36 $17.39
HIGHWAY/PARKING LOT STRIPING: LABORER: Pipelayer Highway
SUUT2019-007
$15.52 $2.79 $18.31
HIGHWAY/PARKING LOT STRIPING: Painter Highway
SUUT2019-007
$16.76 $1.62 $18.38
LABORER Chain Saw and Power Drill Heavy
LABO0295-018
$20.85 $8.65 $29.50
LABORER: Common or General Heavy
SUUT2008-026 (Excluding Natural Gas Pipeline Construction)
$10.92 0.00 $10.92
LABORER: Mason Tender - Cement/Concrete Heavy
SUUT2008-026
$9.00 $0.36 $9.36
LABORER: Pipelayer Heavy
SUUT2008-026 (Excluding Natural Gas Pipeline Construction)
$9.00 0.00 $9.00
Oiler Heavy
ENGI0003-054
$22.03 $11.88 $33.91
OPERATOR: Backhoe/Excavator/Trackhoe Highway
SUUT2019-007
$20.70 $6.02 $26.72
OPERATOR: Grader/Blade, Excludes Natural Gas Pipeline Construction Heavy
SUUT2008-026
$13.61 0.00 $13.61
OPERATOR: Loader (Front End) Heavy
SUUT2008-026
$11.38 0.00 $11.38
OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Highway
SUUT2019-007
$20.05 $3.31 $23.36
OPERATOR: OPERATOR: Broom/Sweeper Highway
SUUT2019-007
$18.29 $5.65 $23.94
OPERATOR: OPERATOR: Bulldozer Highway
SUUT2019-007
$21.77 $4.40 $26.17
OPERATOR: OPERATOR: Concrete Finishing Machine Highway
SUUT2019-007
$22.57 $6.55 $29.12
OPERATOR: OPERATOR: Grader/Blade Highway
SUUT2019-007
$23.69 $5.95 $29.64
OPERATOR: OPERATOR: Loader Highway
SUUT2019-007
$23.73 $6.92 $30.65
OPERATOR: OPERATOR: Mechanic Highway
SUUT2019-007
$25.24 $10.96 $36.20
OPERATOR: OPERATOR: Milling Machine Highway
SUUT2019-007
$26.53 $6.00 $32.53
OPERATOR: OPERATOR: Oiler Highway
SUUT2019-007
$19.00 $5.44 $24.44
OPERATOR: OPERATOR: Paver Highway
SUUT2019-007 (Asphalt, Aggregate, and Concrete)
$23.43 $8.13 $31.56
OPERATOR: OPERATOR: Roller Highway
SUUT2019-007
$18.19 $5.07 $23.26
OPERATOR: OPERATOR: Screed Highway
SUUT2019-007
$19.89 $5.45 $25.34
OPERATOR: Power Equipment Heavy
ENGI0003-046 (3)Backhoe/Excavator
$30.78 $16.09 $46.87
OPERATOR: Power Equipment Backhoe/Excavator/Trackhoe, Blade/Grader, Boom, Bulldozer, Crane, Mechanic, Trencher Heavy
ENGI0003-054
$35.68 $17.57 $53.25
OPERATOR: Roller Heavy
SUUT2008-026 (Dirt and Grade Compaction)
$10.89 0.00 $10.89
OPERATOR: Trackhoe Heavy
SUUT2008-026 (Excluding Natural Gas Pipeline Construction)
$13.63 0.00 $13.63
OPERATOR: TRAFFIC CONTROL: Flagger Highway
SUUT2019-007
$10.47 $2.53 $13.00
Powderman Heavy
LABO0295-018
$21.65 $8.65 $30.30
Sandblaster Heavy
LABO0295-018
$20.85 $8.65 $29.50
TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper Highway
SUUT2019-007
$17.14 $2.79 $19.93
TRAFFIC CONTROL: TRUCK DRIVER: Dump Truck Highway
SUUT2019-007
$19.13 $4.52 $23.65
TRUCK DRIVER Heavy
SUUT2008-026 (Excluding Natural Gas Pipeline Construction)
$12.00 0.00 $12.00
TRUCK DRIVER (Water Truck) Highway
TEAM0222-005
$29.53 $14.65 $44.18
TRUCK DRIVER Group 1: Articulated End Dump, Low Boy, Rollagon or Similar type Equipment, Truck Mechanic Heavy
TEAM0222-020
$46.65 $15.75 $62.40

Wage Determinations