UT20260017
rev 0Heavy
0 trades
Applies to
Beaver, Emery, Grand, Kane, Piute, Wayne in Utah.
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER Building BOIL0004-001 | $44.37 | $26.87 | $71.24 |
| BRICKLAYER Building SUUT2012-012 | $23.88 | 0.00 | $23.88 |
| CARPENTER Building SUUT2012-012 (Acoustical Ceiling Installation Only) | $20.64 | $0.80 | $21.44 |
| CARPENTER, Excludes Acoustical Ceiling Installation Building SUUT2012-012 | $19.51 | $4.71 | $24.22 |
| CARPENTER, Includes Form Work Heavy SUUT2008-033 (Excludes Natural Gas Pipeline Construction Form Work) | $14.75 | $3.03 | $17.78 |
| CARPENTER, Includes Form Work Highway SUUT2019-014 | $22.07 | $6.88 | $28.95 |
| CEMENT MASON/CONCRETE FINISHER Heavy SUUT2008-033 | $14.00 | $0.56 | $14.56 |
| CEMENT MASON/CONCRETE FINISHER Building SUUT2012-012 | $21.11 | 0.00 | $21.11 |
| CEMENT MASON/CONCRETE FINISHER Highway SUUT2019-014 | $17.36 | $2.04 | $19.40 |
| Common or General, Nail gun, Pipelayer, Pot Tender Heavy LABO0295-018 | $20.59 | $8.65 | $29.24 |
| ELECTRICIAN Building ELEC0354-003 (Excluding Low Voltage Wiring) | $41.23 | $17.12 | $58.35 |
| ELECTRICIAN Building SUUT2012-012 (Low Voltage Wiring Only) | $23.36 | $6.06 | $29.42 |
| ELECTRICIAN Highway SUUT2019-014 | $26.83 | 0.00 | $26.83 |
| Formworker Heavy LABO0295-018 | $20.85 | $8.65 | $29.50 |
| Group 2 Heavy TEAM0222-003 Scope differs by code/WD | $41.06 | $15.75 | $56.81 |
| Group 2 Heavy TEAM0222-003 Scope differs by code/WD | $45.57 | $14.90 | $60.47 |
| Group 3 Heavy TEAM0222-003 Scope differs by code/WD | $40.66 | $15.75 | $56.41 |
| Group 3 Heavy TEAM0222-003 Scope differs by code/WD | $41.57 | $14.90 | $56.47 |
| HIGHWAY/PARKING LOT STRIPING: INSTALLER - GUARDRAIL Highway SUUT2019-014 | $17.79 | 0.00 | $17.79 |
| HIGHWAY/PARKING LOT STRIPING: INSTALLER - SIGN Highway SUUT2019-014 | $18.22 | $2.79 | $21.01 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway SUUT2019-014 | $19.88 | $5.71 | $25.59 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Common or General Highway SUUT2019-014 | $17.77 | $3.95 | $21.72 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Landscape Highway SUUT2019-014 | $14.45 | $2.79 | $17.24 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Mason Tender - Cement/Concrete Highway SUUT2019-014 | $17.03 | $0.36 | $17.39 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Pipelayer Highway SUUT2019-014 | $15.52 | $2.79 | $18.31 |
| HIGHWAY/PARKING LOT STRIPING: Painter Highway SUUT2019-014 | $16.76 | $1.62 | $18.38 |
| INSTALLER - SIDING Building SUUT2012-012 (METAL/ALUMINUM/VINYL) | $14.75 | 0.00 | $14.75 |
| INSULATOR - BATT Building SUUT2012-012 | $13.77 | 0.00 | $13.77 |
| IRONWORKER, REINFORCING Building SUUT2012-012 | $15.00 | 0.00 | $15.00 |
| IRONWORKER, STRUCTURAL Building SUUT2012-012 | $17.41 | $6.13 | $23.54 |
| LABORER Chain Saw and Power Drill Heavy LABO0295-018 | $20.85 | $8.65 | $29.50 |
| LABORER: Common or General Heavy SUUT2008-033 (Excluding Natural Gas Pipeline Construction) | $10.92 | 0.00 | $10.92 |
| LABORER: Common or General Building SUUT2012-012 | $10.63 | 0.00 | $10.63 |
| LABORER: Mason Tender - Brick Building SUUT2012-012 | $16.54 | 0.00 | $16.54 |
| LABORER: Mason Tender - Cement/Concrete Heavy SUUT2008-033 | $9.00 | $0.36 | $9.36 |
| LABORER: Pipelayer Heavy SUUT2008-033 (Excluding Natural Gas Pipeline Construction) | $9.00 | 0.00 | $9.00 |
| Oiler Heavy ENGI0003-054 | $22.03 | $11.88 | $33.91 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUUT2012-012 | $16.59 | $0.79 | $17.38 |
| OPERATOR: Backhoe/Excavator/Trackhoe Highway SUUT2019-014 | $22.10 | $5.97 | $28.07 |
| OPERATOR: Grader/Blade, Excludes Natural Gas Pipeline Construction Heavy SUUT2008-033 | $13.61 | 0.00 | $13.61 |
| OPERATOR: Loader (Front End) Heavy SUUT2008-033 | $11.38 | 0.00 | $11.38 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Highway SUUT2019-014 | $20.05 | $3.31 | $23.36 |
| OPERATOR: OPERATOR: Broom/Sweeper Highway SUUT2019-014 | $18.29 | $5.65 | $23.94 |
| OPERATOR: OPERATOR: Bulldozer Highway SUUT2019-014 | $21.77 | $4.40 | $26.17 |
| OPERATOR: OPERATOR: Concrete Finishing Machine Highway SUUT2019-014 | $22.57 | $6.55 | $29.12 |
| OPERATOR: OPERATOR: Grader/Blade Highway SUUT2019-014 | $23.69 | $5.95 | $29.64 |
| OPERATOR: OPERATOR: Loader Highway SUUT2019-014 | $22.53 | $6.92 | $29.45 |
| OPERATOR: OPERATOR: Mechanic Highway SUUT2019-014 | $25.24 | $10.96 | $36.20 |
| OPERATOR: OPERATOR: Milling Machine Highway SUUT2019-014 | $26.53 | $6.00 | $32.53 |
| OPERATOR: OPERATOR: Oiler Highway SUUT2019-014 | $19.00 | $5.44 | $24.44 |
| OPERATOR: OPERATOR: Paver Highway SUUT2019-014 (Asphalt, Aggregate, and Concrete) | $23.43 | $8.13 | $31.56 |
| OPERATOR: OPERATOR: Roller Highway SUUT2019-014 | $20.23 | $5.61 | $25.84 |
| OPERATOR: OPERATOR: Screed Highway SUUT2019-014 | $19.89 | $5.45 | $25.34 |
| OPERATOR: PLUMBER Building SUUT2012-012 | $24.00 | $4.62 | $28.62 |
| OPERATOR: Power Equipment Heavy ENGI0003-046 (3)Backhoe/Excavator | $30.78 | $16.09 | $46.87 |
| OPERATOR: Power Equipment Backhoe/Excavator/Trackhoe, Blade/Grader, Boom, Bulldozer, Crane, Mechanic, Trencher Heavy ENGI0003-054 | $35.68 | $17.57 | $53.25 |
| OPERATOR: Roller Heavy SUUT2008-033 (Dirt and Grade Compaction) | $10.89 | 0.00 | $10.89 |
| OPERATOR: TILE FINISHER Building SUUT2012-012 | $17.00 | 0.00 | $17.00 |
| OPERATOR: TILE SETTER Building SUUT2012-012 | $19.40 | 0.00 | $19.40 |
| OPERATOR: Trackhoe Heavy SUUT2008-033 (Excluding Natural Gas Pipeline Construction) | $13.63 | 0.00 | $13.63 |
| OPERATOR: TRAFFIC CONTROL: Flagger Highway SUUT2019-014 | $12.47 | $2.53 | $15.00 |
| Powderman Heavy LABO0295-018 | $21.65 | $8.65 | $30.30 |
| Sandblaster Heavy LABO0295-018 | $20.85 | $8.65 | $29.50 |
| SHEET METAL WORKER Building SHEE0312-001 (HVAC Duct Installation Only) | $46.79 | $14.89 | $61.68 |
| SPRINKLER FITTER Building SFUT0669-003 (Fire Sprinklers) | $42.17 | $26.63 | $68.80 |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper Highway SUUT2019-014 | $17.14 | $2.79 | $19.93 |
| TRAFFIC CONTROL: TRUCK DRIVER: Dump Truck Highway SUUT2019-014 | $20.31 | $4.06 | $24.37 |
| TRUCK DRIVER Heavy SUUT2008-033 (Excluding Natural Gas Pipeline Construction) | $12.00 | 0.00 | $12.00 |
| TRUCK DRIVER (Water Truck) Highway TEAM0222-005 | $29.53 | $14.65 | $44.18 |
| TRUCK DRIVER ZONE 1: Group 1 Heavy TEAM0222-003 | $41.71 | $14.75 | $56.46 |
| ZONE 2: Group 1 Heavy TEAM0222-003 | $46.18 | $14.90 | $61.08 |
No trade rates match your search and filter selection.
Heavy
Applies to
Beaver, Emery, Grand, Kane, Piute, Wayne in Utah.
Building
Applies to
Emery, Kane, Millard, Sevier, Wayne in Utah.
Highway
Applies to
Beaver, Wayne in Utah.