VA20260012
rev 0Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL Building ASBE0024-006 (Duct, Pipe & Mechanical System Insulation) | $40.77 | $20.17 | $60.94 |
| BOILERMAKER Building BOIL0045-003 | $38.97 | $27.39 | $66.36 |
| BRICKLAYER Building SUVA2013-024 | $23.54 | $6.73 | $30.27 |
| CARPENTER Building SUVA2013-024 | $14.81 | $2.19 | $17.00 |
| CARPENTER, Includes Form Work Highway SUVA2016-038 | $17.65 | 0.00 | $17.65 |
| CEMENT MASON/CONCRETE FINISHER Highway SUVA2016-038 | $19.94 | 0.00 | $19.94 |
| Cranes under 90 tons Building ENGI0147-019 | $39.99 | $18.05 | $58.04 |
| ELECTRICIAN Building SUVA2013-024 | $21.78 | $9.31 | $31.09 |
| ELECTRICIAN, Includes Traffic Signalization Highway ELEC0080-011 | $36.85 | $7.80 | $44.65 |
| IRONWORKER, ORNAMENTAL AND STRUCTURAL Building IRON0005-023 | $37.86 | $25.86 | $63.72 |
| IRONWORKER, REINFORCING Building SUVA2013-024 | $25.36 | $6.68 | $32.04 |
| IRONWORKER, REINFORCING Highway SUVA2016-038 | $22.71 | 0.00 | $22.71 |
| IRONWORKER, STRUCTURAL Highway SUVA2016-038 | $27.38 | 0.00 | $27.38 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway SUVA2016-038 | $15.40 | 0.00 | $15.40 |
| LABORER: Common or General Highway SUVA2016-038 | $13.55 | 0.00 | $13.55 |
| LABORER: Common or General, Including Pipelaying Building SUVA2013-024 | $12.38 | $1.40 | $13.78 |
| LABORER: Grade Checker Highway SUVA2016-038 | $15.07 | 0.00 | $15.07 |
| LABORER: Mason Tender - Brick Building SUVA2013-024 | $13.41 | $3.15 | $16.56 |
| LABORER: Mason Tender - Cement/Concrete Building SUVA2013-024 | $15.32 | 0.00 | $15.32 |
| LABORER: Pipelayer Building SUVA2013-024 | $12.00 | $1.17 | $13.17 |
| LABORER: Pipelayer Highway SUVA2016-038 | $15.11 | 0.00 | $15.11 |
| LABORER: Power Tool Operator Highway SUVA2016-038 | $15.69 | 0.00 | $15.69 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUVA2013-024 | $16.24 | $0.87 | $17.11 |
| OPERATOR: Backhoe/Excavator/Trackhoe Highway SUVA2016-038 | $18.53 | 0.00 | $18.53 |
| OPERATOR: OPERATOR: Asphalt Spreader and Distributor Highway SUVA2016-038 | $16.51 | 0.00 | $16.51 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Building SUVA2013-024 | $18.95 | $4.03 | $22.98 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Highway SUVA2016-038 | $19.16 | $4.45 | $23.61 |
| OPERATOR: OPERATOR: Broom/Sweeper Highway SUVA2016-038 | $14.32 | $0.25 | $14.57 |
| OPERATOR: OPERATOR: Bulldozer Building SUVA2013-024 | $16.00 | 0.00 | $16.00 |
| OPERATOR: OPERATOR: Bulldozer, Including Utility Highway SUVA2016-038 | $17.99 | 0.00 | $17.99 |
| OPERATOR: OPERATOR: Crane Highway SUVA2016-038 | $25.82 | 0.00 | $25.82 |
| OPERATOR: OPERATOR: Drill Highway SUVA2016-038 | $24.66 | 0.00 | $24.66 |
| OPERATOR: OPERATOR: Forklift Building SUVA2013-024 | $19.40 | $7.00 | $26.40 |
| OPERATOR: OPERATOR: Gradall Highway SUVA2016-038 | $18.65 | 0.00 | $18.65 |
| OPERATOR: OPERATOR: Grader/Blade Highway SUVA2016-038 | $26.13 | 0.00 | $26.13 |
| OPERATOR: OPERATOR: Hydroseeder Highway SUVA2016-038 | $16.64 | 0.00 | $16.64 |
| OPERATOR: OPERATOR: Loader Building SUVA2013-024 | $21.28 | $3.17 | $24.45 |
| OPERATOR: OPERATOR: Loader Highway SUVA2016-038 | $18.39 | 0.00 | $18.39 |
| OPERATOR: OPERATOR: Mechanic Highway SUVA2016-038 | $20.60 | 0.00 | $20.60 |
| OPERATOR: OPERATOR: Milling Machine Highway SUVA2016-038 | $23.12 | $3.60 | $26.72 |
| OPERATOR: OPERATOR: Paver Highway SUVA2016-038 (Asphalt, Aggregate, and Concrete) | $17.50 | $2.54 | $20.04 |
| OPERATOR: OPERATOR: Piledriver Highway SUVA2016-038 | $21.83 | $4.08 | $25.91 |
| OPERATOR: OPERATOR: Roller Building SUVA2013-024 | $16.25 | $4.88 | $21.13 |
| OPERATOR: OPERATOR: Roller Highway SUVA2016-038 | $14.47 | $2.28 | $16.75 |
| OPERATOR: OPERATOR: Screed Highway SUVA2016-038 | $22.13 | $4.89 | $27.02 |
| OPERATOR: PAINTER (Brush and Roller) Building SUVA2013-024 | $20.01 | 0.00 | $20.01 |
| OPERATOR: PIPEFITTER Building SUVA2013-024 | $24.98 | $9.14 | $34.12 |
| OPERATOR: PLUMBER Building SUVA2013-024 | $21.15 | $3.92 | $25.07 |
| OPERATOR: ROOFER Building SUVA2013-024 | $16.17 | $3.73 | $19.90 |
| OPERATOR: SHEET METAL WORKER, Includes HVAC Duct Installation Building SUVA2013-024 | $18.38 | $3.30 | $21.68 |
| OPERATOR: TILE FINISHER Building SUVA2013-024 | $23.40 | 0.00 | $23.40 |
| OPERATOR: TILE SETTER Building SUVA2013-024 | $27.80 | $10.25 | $38.05 |
| OPERATOR: TRAFFIC CONTROL: Flagger Highway SUVA2016-038 | $11.76 | 0.00 | $11.76 |
| OPERATOR: TRUCK DRIVER : HEAVY 7CY & UNDER Highway SUVA2016-038 | $15.36 | 0.00 | $15.36 |
| OPERATOR: TRUCK DRIVER: 1/Single Axle Truck Highway SUVA2016-038 | $16.59 | 0.00 | $16.59 |
| OPERATOR: TRUCK DRIVER: Dump Truck Building SUVA2013-024 | $16.58 | $1.73 | $18.31 |
| OPERATOR: TRUCK DRIVER: Fuel and Lubricant Service Highway SUVA2016-038 | $18.25 | 0.00 | $18.25 |
| OPERATOR: TRUCK DRIVER: HEAVY OVER 7 CY Highway SUVA2016-038 | $16.60 | 0.00 | $16.60 |
| OPERATOR: TRUCK DRIVER: MULTI AXLE Highway SUVA2016-038 | $17.19 | 0.00 | $17.19 |
| PAINTER: Spray Only Building PAIN0051-033 | $29.16 | $11.86 | $41.02 |
| POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground Building ENGI0147-019 | $40.99 | $18.05 | $59.04 |
No trade rates match your search and filter selection.
Building
Highway