VA20260015
rev 0Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL Building ASBE0024-006 (Duct, Pipe & Mechanical System Insulation) | $40.77 | $20.17 | $60.94 |
| BOILERMAKER Building BOIL0045-003 | $38.97 | $27.39 | $66.36 |
| BRICKLAYER Building SUVA2013-028 | $20.00 | $1.00 | $21.00 |
| CARPENTER Building SUVA2013-028 | $21.10 | $1.11 | $22.21 |
| CARPENTER, Includes Form Work Highway SUVA2016-045 | $19.22 | 0.00 | $19.22 |
| CEMENT MASON/CONCRETE FINISHER Building SUVA2013-028 | $17.23 | 0.00 | $17.23 |
| CEMENT MASON/CONCRETE FINISHER Highway SUVA2016-045 | $16.03 | 0.00 | $16.03 |
| Cranes under 90 tons Building ENGI0147-019 | $39.99 | $18.05 | $58.04 |
| ELECTRICIAN Building ELEC0666-004 (Includes Low Voltage Wiring) | $37.95 | $8.17 | $46.12 |
| ELECTRICIAN, Includes Traffic Signalization Highway ELEC0080-011 | $36.85 | $7.80 | $44.65 |
| ELEVATOR MECHANIC Building ELEV0051-007 | $51.39 | $38.44 | $89.83 |
| GLAZIER Building SUVA2013-028 | $18.43 | $3.71 | $22.14 |
| HVAC MECHANIC Building SUVA2013-028 (HVAC Duct Installation Only) | $20.60 | $2.93 | $23.53 |
| IRONWORKER, REINFORCING Building SUVA2013-028 | $27.18 | $4.13 | $31.31 |
| IRONWORKER, REINFORCING Highway SUVA2016-045 | $20.80 | 0.00 | $20.80 |
| IRONWORKER, STRUCTURAL Highway SUVA2016-045 | $27.38 | 0.00 | $27.38 |
| IRONWORKER, STRUCTURAL AND ORNAMENTAL Building IRON0028-007 | $31.00 | $18.28 | $49.28 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway SUVA2016-045 | $19.21 | $2.82 | $22.03 |
| LABORER: Common or General Highway SUVA2016-045 | $14.47 | 0.00 | $14.47 |
| LABORER: Common or General, Including Pipelaying Building SUVA2013-028 | $14.58 | 0.00 | $14.58 |
| LABORER: Grade Checker Highway SUVA2016-045 | $14.88 | 0.00 | $14.88 |
| LABORER: Mason Tender - Brick Building SUVA2013-028 | $13.41 | $3.15 | $16.56 |
| LABORER: Mason Tender - Cement/Concrete Building SUVA2013-028 | $12.96 | $3.12 | $16.08 |
| LABORER: Pipelayer Highway SUVA2016-045 | $17.76 | 0.00 | $17.76 |
| LABORER: Power Tool Operator Highway SUVA2016-045 | $15.69 | 0.00 | $15.69 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUVA2013-028 | $19.74 | $1.43 | $21.17 |
| OPERATOR: Backhoe/Excavator/Trackhoe Highway SUVA2016-045 | $18.31 | $2.91 | $21.22 |
| OPERATOR: OPERATOR: Asphalt Spreader and Distributor Highway SUVA2016-045 | $19.09 | $1.81 | $20.90 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Building SUVA2013-028 | $18.95 | $4.03 | $22.98 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Highway SUVA2016-045 | $19.16 | $4.45 | $23.61 |
| OPERATOR: OPERATOR: Broom/Sweeper Highway SUVA2016-045 | $17.40 | $2.01 | $19.41 |
| OPERATOR: OPERATOR: Bulldozer Building SUVA2013-028 | $17.50 | 0.00 | $17.50 |
| OPERATOR: OPERATOR: Bulldozer, Including Utility Highway SUVA2016-045 | $18.22 | $2.69 | $20.91 |
| OPERATOR: OPERATOR: Crane Highway SUVA2016-045 | $24.42 | $4.69 | $29.11 |
| OPERATOR: OPERATOR: Drill Highway SUVA2016-045 | $24.66 | 0.00 | $24.66 |
| OPERATOR: OPERATOR: Forklift Building SUVA2013-028 | $19.40 | $7.00 | $26.40 |
| OPERATOR: OPERATOR: Gradall Highway SUVA2016-045 | $19.26 | 0.00 | $19.26 |
| OPERATOR: OPERATOR: Grader/Blade Highway SUVA2016-045 | $23.21 | 0.00 | $23.21 |
| OPERATOR: OPERATOR: Hydroseeder Highway SUVA2016-045 | $16.64 | 0.00 | $16.64 |
| OPERATOR: OPERATOR: Loader Building SUVA2013-028 | $21.28 | $3.17 | $24.45 |
| OPERATOR: OPERATOR: Loader Highway SUVA2016-045 | $17.17 | 0.00 | $17.17 |
| OPERATOR: OPERATOR: Mechanic Highway SUVA2016-045 | $21.43 | 0.00 | $21.43 |
| OPERATOR: OPERATOR: Milling Machine Highway SUVA2016-045 | $23.12 | $3.60 | $26.72 |
| OPERATOR: OPERATOR: Paver Highway SUVA2016-045 (Asphalt, Aggregate, and Concrete) | $20.32 | 0.00 | $20.32 |
| OPERATOR: OPERATOR: Piledriver Highway SUVA2016-045 | $21.83 | $4.08 | $25.91 |
| OPERATOR: OPERATOR: Roller Building SUVA2013-028 | $16.25 | $4.88 | $21.13 |
| OPERATOR: OPERATOR: Roller Highway SUVA2016-045 | $21.69 | 0.00 | $21.69 |
| OPERATOR: OPERATOR: Roller (Finishing) Highway SUVA2016-045 | $19.05 | $1.29 | $20.34 |
| OPERATOR: OPERATOR: Screed Highway SUVA2016-045 | $22.13 | $4.89 | $27.02 |
| OPERATOR: PAINTER (Brush and Roller) Building SUVA2013-028 | $16.87 | 0.00 | $16.87 |
| OPERATOR: PAINTER: Spray Building SUVA2013-028 | $16.58 | 0.00 | $16.58 |
| OPERATOR: PIPEFITTER: Includes HVAC Pipe, Unit and Temperature Controls Installations Building SUVA2013-028 | $29.45 | $13.95 | $43.40 |
| OPERATOR: ROOFER Building SUVA2013-028 | $17.40 | $1.55 | $18.95 |
| OPERATOR: SHEET METAL WORKER, Excludes HVAC Duct Installation Building SUVA2013-028 | $19.72 | $1.83 | $21.55 |
| OPERATOR: SPRINKLER FITTER Building SUVA2013-028 (Fire Sprinklers) | $20.50 | $2.93 | $23.43 |
| OPERATOR: TILE FINISHER Building SUVA2013-028 | $23.40 | 0.00 | $23.40 |
| OPERATOR: TILE SETTER Building SUVA2013-028 | $27.80 | $10.25 | $38.05 |
| OPERATOR: TRAFFIC CONTROL: Flagger Highway SUVA2016-045 | $12.89 | 0.00 | $12.89 |
| OPERATOR: TRUCK DRIVER : HEAVY 7CY & UNDER Highway SUVA2016-045 | $15.53 | 0.00 | $15.53 |
| OPERATOR: TRUCK DRIVER: Dump Truck Building SUVA2013-028 | $14.88 | 0.00 | $14.88 |
| OPERATOR: TRUCK DRIVER: Fuel and Lubricant Service Highway SUVA2016-045 | $18.25 | 0.00 | $18.25 |
| OPERATOR: TRUCK DRIVER: HEAVY OVER 7 CY Highway SUVA2016-045 | $16.98 | 0.00 | $16.98 |
| OPERATOR: TRUCK DRIVER: Single & Multi Axle Highway SUVA2016-045 | $18.23 | 0.00 | $18.23 |
| OPERATOR: WATERPROOFER Building SUVA2013-028 | $21.17 | $3.41 | $24.58 |
| PLUMBER Building PLUM0010-007 | $33.25 | $19.47 | $52.72 |
| POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground Building ENGI0147-019 | $40.99 | $18.05 | $59.04 |
No trade rates match your search and filter selection.
Building
Highway