VA20260021
rev 1Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL Building ASBE0024-006 (Duct, Pipe & Mechanical System Insulation) | $40.77 | $20.17 | $60.94 |
| BOILERMAKER Building BOIL0045-003 | $38.97 | $27.39 | $66.36 |
| BRICK POINTER/CAULKER/CLEANER Building SUVA2013-036 | $19.68 | 0.00 | $19.68 |
| BRICKLAYER Building BRVA0001-008 | $38.80 | $15.17 | $53.97 |
| CARPENTER, Includes Acoustical Ceiling Installation, Drywall Hanging, and Form Work Building SUVA2013-036 | $23.89 | $5.23 | $29.12 |
| CEMENT MASON/CONCRETE FINISHER Building SUVA2013-036 | $21.94 | $3.36 | $25.30 |
| DRYWALL FINISHER/TAPER Building PAIN0051-036 | $29.16 | $11.86 | $41.02 |
| ELECTRICIAN, Includes Low Voltage Wiring and Installation of Alarms and Sound and Communication Systems Building SUVA2013-036 | $29.87 | $11.77 | $41.64 |
| FIRESTOPPER Building ASBE0024-009 | $30.21 | $10.43 | $40.64 |
| FLOOR LAYER: SOFT FLOORS Building SUVA2013-036 | $18.75 | 0.00 | $18.75 |
| GLAZIER Building PAIN0051-034 | $32.41 | $14.46 | $46.87 |
| IRONWORKER, ORNAMENTAL AND STRUCTURAL Building IRON0005-023 | $37.86 | $25.86 | $63.72 |
| IRONWORKER, REINFORCING Building SUVA2013-036 | $25.85 | $6.94 | $32.79 |
| LABORER: Common or General, including brick mason tending and cement mason tending Building SUVA2013-036 | $15.03 | $2.90 | $17.93 |
| LABORER: Pipelayer Building SUVA2013-036 | $16.81 | $4.26 | $21.07 |
| MASON - STONE Building BRVA0001-009 | $45.65 | $21.21 | $66.86 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUVA2013-036 | $23.50 | $4.50 | $28.00 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Building SUVA2013-036 | $18.95 | $4.03 | $22.98 |
| OPERATOR: OPERATOR: Bulldozer Building SUVA2013-036 | $21.99 | $4.98 | $26.97 |
| OPERATOR: OPERATOR: Crane Building SUVA2013-036 | $31.68 | $2.64 | $34.32 |
| OPERATOR: OPERATOR: Forklift Building SUVA2013-036 | $21.56 | $7.57 | $29.13 |
| OPERATOR: OPERATOR: Loader Building SUVA2013-036 | $22.26 | $3.57 | $25.83 |
| OPERATOR: OPERATOR: Roller Building SUVA2013-036 | $16.25 | $4.88 | $21.13 |
| OPERATOR: ROOFER Building SUVA2013-036 | $15.83 | $3.06 | $18.89 |
| OPERATOR: SHEET METAL WORKER, Includes HVAC Duct Installation Building SUVA2013-036 | $24.46 | $7.91 | $32.37 |
| OPERATOR: TILE FINISHER Building SUVA2013-036 | $23.40 | 0.00 | $23.40 |
| OPERATOR: TILE SETTER Building SUVA2013-036 | $27.80 | $10.25 | $38.05 |
| OPERATOR: TRUCK DRIVER: Dump Truck Building SUVA2013-036 | $19.22 | $2.58 | $21.80 |
| OPERATOR: WATERPROOFER Building SUVA2013-036 | $21.75 | $1.57 | $23.32 |
| PAINTER Brush, Roller and Spray Building PAIN0051-035 | $29.16 | $11.86 | $41.02 |
| PIPEFITTER Building PLUM0602-016 (Includes HVAC Pipe, Unit and Temperature Controls Installations) | $55.00 | $24.46 | $79.46 |
| PLUMBER Building PLUM0005-014 | $53.30 | $23.71 | $77.01 |
| SPRINKLER FITTER Building SFVA0669-006 (Fire Sprinklers) | $45.22 | $27.69 | $72.91 |
No trade rates match your search and filter selection.
Building