VT20260007
rev 0Residential
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| Carpenter Residential SUVT1990-002 | $7.25 | $0.00 | $7.25 |
| CARPENTER Building CARP0349-003 (Includes Drywall Hanging and Metal Stud Installation) | $30.56 | $19.79 | $50.35 |
| CARPENTER Building CARP0352-001 (Includes Drywall Hanging and Metal Stud Installation) | $30.56 | $19.79 | $50.35 |
| CARPENTER Building SUVT2011-001 (Drywall Hanging Only) | $23.00 | $5.94 | $28.94 |
| CARPENTER, Excludes Acoustical Ceiling Installation, and Drywall Hanging Building SUVT2011-001 | $18.81 | $7.96 | $26.77 |
| CARPENTER, Includes Form Work Highway SUVT2017-009 | $20.00 | $1.64 | $21.64 |
| Cement mason Residential SUVT1990-002 | $7.25 | $0.00 | $7.25 |
| CEMENT MASON/CONCRETE FINISHER Highway SUVT2017-009 | $25.34 | 0.00 | $25.34 |
| Electrician Residential SUVT1990-002 | $7.25 | $0.00 | $7.25 |
| ELECTRICIAN Building SUVT2011-001 | $21.53 | $9.36 | $30.89 |
| ELECTRICIAN Highway SUVT2017-009 | $28.15 | $2.03 | $30.18 |
| HIGHWAY/PARKING LOT STRIPING: INSTALLER - SIGN Highway SUVT2017-009 | $16.25 | $3.20 | $19.45 |
| HIGHWAY/PARKING LOT STRIPING: IRONWORKER, REINFORCING Highway SUVT2017-009 | $21.70 | $1.60 | $23.30 |
| HIGHWAY/PARKING LOT STRIPING: IRONWORKER, STRUCTURAL Highway SUVT2017-009 | $28.77 | $7.91 | $36.68 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Common or General, Including Asphalt Raking, Shoveling, Spreading Highway SUVT2017-009 | $15.87 | $3.07 | $18.94 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Concrete Worker Highway SUVT2017-009 | $22.79 | $2.52 | $25.31 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Landscape Highway SUVT2017-009 | $14.70 | $1.03 | $15.73 |
| HIGHWAY/PARKING LOT STRIPING: Painter Highway SUVT2017-009 | $23.81 | $3.90 | $27.71 |
| Insulator/asbestos worker Residential SUVT1990-002 | $7.25 | $0.00 | $7.25 |
| IRONWORKER, REINFORCING Building IRON0007-002 | $33.65 | $26.12 | $59.77 |
| Laborer, general Residential SUVT1990-002 | $7.25 | $0.00 | $7.25 |
| LABORER: Common or General Building SUVT2011-001 | $13.66 | $2.34 | $16.00 |
| OPERATOR: Backhoe/Excavator/Trackhoe Highway SUVT2017-009 | $20.57 | $3.71 | $24.28 |
| OPERATOR: Crane Building SUVT2011-001 | $19.50 | $6.08 | $25.58 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Highway SUVT2017-009 | $18.03 | $4.31 | $22.34 |
| OPERATOR: OPERATOR: Broom/Sweeper Highway SUVT2017-009 | $19.25 | $5.97 | $25.22 |
| OPERATOR: OPERATOR: Bulldozer Highway SUVT2017-009 | $21.35 | $3.84 | $25.19 |
| OPERATOR: OPERATOR: Crane Highway SUVT2017-009 | $23.42 | $2.38 | $25.80 |
| OPERATOR: OPERATOR: Drill Highway SUVT2017-009 | $19.83 | $3.94 | $23.77 |
| OPERATOR: OPERATOR: Grader/Blade Highway SUVT2017-009 | $21.13 | $5.53 | $26.66 |
| OPERATOR: OPERATOR: Loader Highway SUVT2017-009 | $21.32 | $2.67 | $23.99 |
| OPERATOR: OPERATOR: Mechanic Highway SUVT2017-009 | $22.61 | $5.75 | $28.36 |
| OPERATOR: OPERATOR: Milling Machine Highway SUVT2017-009 | $22.50 | $10.24 | $32.74 |
| OPERATOR: OPERATOR: Paver Highway SUVT2017-009 (Asphalt, Aggregate, and Concrete) | $20.54 | $5.53 | $26.07 |
| OPERATOR: OPERATOR: Pounder Highway SUVT2017-009 | $21.03 | 0.00 | $21.03 |
| OPERATOR: OPERATOR: Roller Highway SUVT2017-009 | $18.27 | $6.45 | $24.72 |
| OPERATOR: OPERATOR: Screed Highway SUVT2017-009 | $20.87 | $7.24 | $28.11 |
| OPERATOR: TRAFFIC CONTROL: Flagger Highway SUVT2017-009 | $12.23 | $2.20 | $14.43 |
| Painter Residential SUVT1990-002 | $7.25 | $0.00 | $7.25 |
| PAINTER: Brush Only Building SUVT2011-001 | $16.11 | $4.14 | $20.25 |
| PAINTER: Roller Building SUVT2011-001 | $16.11 | $4.14 | $20.25 |
| Plumber Residential SUVT1990-002 | $7.25 | $0.00 | $7.25 |
| PLUMBER Building SUVT2011-001 (HVAC Pipe Installation) | $25.35 | $5.79 | $31.14 |
| PLUMBER, Excludes HVAC Pipe Installation Building SUVT2011-001 | $24.04 | $8.25 | $32.29 |
| Power equipment operators: _Backhoe Residential SUVT1990-002 | $7.25 | $0.00 | $7.25 |
| Power equipment operators: _Bulldozer Residential SUVT1990-002 | $7.25 | $0.00 | $7.25 |
| Power equipment operators: _Loader Residential SUVT1990-002 | $7.25 | $0.00 | $7.25 |
| Power equipment operators: Drywall hanger Residential SUVT1990-002 | $7.25 | $0.00 | $7.25 |
| Power equipment operators: Roofer Residential SUVT1990-002 | $7.25 | $0.00 | $7.25 |
| Power equipment operators: Soft floor layer Residential SUVT1990-002 | $7.25 | $0.00 | $7.25 |
| Power equipment operators: Truck driver Residential SUVT1990-002 | $7.25 | $0.00 | $7.25 |
| ROOFER Building SUVT2011-001 | $16.80 | 0.00 | $16.80 |
| SHEET METAL WORKER Building SHEE0063-005 (HVAC Duct Installation Only) | $36.75 | $18.63 | $55.38 |
| SPRINKLER FITTER Building SUVT2011-001 (Fire Sprinklers) | $22.50 | $6.08 | $28.58 |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper Highway SUVT2017-009 | $17.20 | $6.71 | $23.91 |
| TRAFFIC CONTROL: TRUCK DRIVER, Includes all axles including Dump Trucks Highway SUVT2017-009 | $17.66 | $3.82 | $21.48 |
| TRAFFIC CONTROL: TRUCK DRIVER: Distributor Truck Highway SUVT2017-009 | $22.55 | $11.87 | $34.42 |
No trade rates match your search and filter selection.
Residential
Building
Highway