VT20260006
rev 0Residential
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| Bricklayer Residential SUVT1990-012 | $7.93 | $0.00 | $7.93 |
| Carpenter Residential SUVT1990-012 | $7.25 | $0.00 | $7.25 |
| CARPENTER Building CARP0108-007 (Including Acoustical Ceiling Installation and Industrial Only; Excluding Drywall Hanging) | $32.39 | $23.43 | $55.82 |
| CARPENTER Building SUVT2011-007 (Drywall Hanging Only) | $23.00 | $5.94 | $28.94 |
| CARPENTER, Excludes Acoustical Ceiling Installation, and Drywall Hanging Building SUVT2011-007 | $16.48 | 0.00 | $16.48 |
| CARPENTER, Includes Form Work Highway SUVT2017-018 | $20.00 | $4.06 | $24.06 |
| CARPENTER, Includes Form Work Heavy SUVT2017-003 | $22.81 | $13.40 | $36.21 |
| Cement mason Residential SUVT1990-012 | $7.25 | $0.00 | $7.25 |
| CEMENT MASON/CONCRETE FINISHER Highway SUVT2017-018 | $25.34 | 0.00 | $25.34 |
| Electrician Residential SUVT1990-012 | $7.25 | $0.00 | $7.25 |
| ELECTRICIAN Building SUVT2011-007 | $20.24 | $7.27 | $27.51 |
| ELECTRICIAN Highway SUVT2017-018 | $28.28 | $1.90 | $30.18 |
| ELECTRICIAN Heavy SUVT2017-003 | $24.56 | $12.63 | $37.19 |
| HIGHWAY/PARKING LOT STRIPING: INSTALLER - SIGN Highway SUVT2017-018 | $18.50 | $5.52 | $24.02 |
| HIGHWAY/PARKING LOT STRIPING: IRONWORKER, REINFORCING Highway SUVT2017-018 | $21.00 | $4.92 | $25.92 |
| HIGHWAY/PARKING LOT STRIPING: IRONWORKER, STRUCTURAL Highway SUVT2017-018 | $28.97 | $8.72 | $37.69 |
| HIGHWAY/PARKING LOT STRIPING: LABORER: Common or General, Including Asphalt Raking, Shoveling, Spreading and Concrete Work Highway SUVT2017-018 | $17.23 | $2.58 | $19.81 |
| HIGHWAY/PARKING LOT STRIPING: Painter Highway SUVT2017-018 | $20.80 | $4.62 | $25.42 |
| Insulator/asbestos worker Residential SUVT1990-012 | $7.25 | $0.00 | $7.25 |
| IRONWORKER, REINFORCING Building IRON0007-002 | $33.65 | $26.12 | $59.77 |
| LABORER: Common or General Building SUVT2011-007 | $13.65 | $2.46 | $16.11 |
| LABORER: Common or General, including landscaping and pipelaying Heavy SUVT2017-003 | $17.90 | $1.51 | $19.41 |
| Laborers: _General Residential SUVT1990-012 | $7.25 | $0.00 | $7.25 |
| Laborers: _Raker Residential SUVT1990-012 | $7.25 | $0.00 | $7.25 |
| Laborers: Painter Residential SUVT1990-012 | $7.25 | $0.00 | $7.25 |
| Laborers: Plumber Residential SUVT1990-012 | $7.25 | $0.00 | $7.25 |
| OPERATOR: Backhoe/Excavator/Trackhoe Highway SUVT2017-018 | $22.86 | $4.03 | $26.89 |
| OPERATOR: Backhoe/Excavator/Trackhoe Heavy SUVT2017-003 | $22.48 | $3.26 | $25.74 |
| OPERATOR: Crane Building SUVT2011-007 | $19.50 | $6.08 | $25.58 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Highway SUVT2017-018 | $21.15 | $12.05 | $33.20 |
| OPERATOR: OPERATOR: Broom/Sweeper Highway SUVT2017-018 | $19.94 | $6.29 | $26.23 |
| OPERATOR: OPERATOR: Bulldozer Highway SUVT2017-018 | $20.71 | $0.92 | $21.63 |
| OPERATOR: OPERATOR: Crane Highway SUVT2017-018 | $22.62 | $3.78 | $26.40 |
| OPERATOR: OPERATOR: Drill Highway SUVT2017-018 | $20.23 | $4.50 | $24.73 |
| OPERATOR: OPERATOR: Grader/Blade Highway SUVT2017-018 | $20.91 | $5.79 | $26.70 |
| OPERATOR: OPERATOR: Loader Highway SUVT2017-018 | $24.13 | $5.23 | $29.36 |
| OPERATOR: OPERATOR: Loader Heavy SUVT2017-003 | $22.01 | 0.00 | $22.01 |
| OPERATOR: OPERATOR: Mechanic Highway SUVT2017-018 | $20.45 | $4.54 | $24.99 |
| OPERATOR: OPERATOR: Milling Machine Highway SUVT2017-018 | $28.76 | $16.77 | $45.53 |
| OPERATOR: OPERATOR: Paver Highway SUVT2017-018 (Asphalt, Aggregate, and Concrete) | $21.32 | $7.24 | $28.56 |
| OPERATOR: OPERATOR: Paver Heavy SUVT2017-003 (Asphalt, Aggregate, and Concrete) | $23.33 | 0.00 | $23.33 |
| OPERATOR: OPERATOR: Pounder Highway SUVT2017-018 | $21.18 | 0.00 | $21.18 |
| OPERATOR: OPERATOR: Roller Highway SUVT2017-018 | $25.79 | $2.42 | $28.21 |
| OPERATOR: OPERATOR: Roller Heavy SUVT2017-003 | $21.26 | 0.00 | $21.26 |
| OPERATOR: OPERATOR: Screed Highway SUVT2017-018 | $20.63 | $7.83 | $28.46 |
| OPERATOR: TRAFFIC CONTROL: Flagger Highway SUVT2017-018 | $13.89 | $3.35 | $17.24 |
| OPERATOR: TRAFFIC CONTROL: Flagger Heavy SUVT2017-003 | $15.24 | $0.29 | $15.53 |
| OPERATOR: TRUCK DRIVER: Dump Truck Heavy SUVT2017-003 | $18.95 | 0.00 | $18.95 |
| PAINTER: Brush Only Building SUVT2011-007 | $16.11 | $4.14 | $20.25 |
| PAINTER: Roller Building SUVT2011-007 | $16.11 | $4.14 | $20.25 |
| PLUMBER Building SUVT2011-007 (HVAC Pipe Installation) | $25.35 | $5.79 | $31.14 |
| PLUMBER, Excludes HVAC Pipe Installation Building SUVT2011-007 | $24.04 | $8.25 | $32.29 |
| Power equipment operators: _Backhoe Residential SUVT1990-012 | $7.25 | $0.00 | $7.25 |
| Power equipment operators: _Bulldozer Residential SUVT1990-012 | $7.25 | $0.00 | $7.25 |
| Power equipment operators: _Paver Residential SUVT1990-012 | $7.25 | $0.00 | $7.25 |
| Power equipment operators: _Roller Residential SUVT1990-012 | $7.25 | $0.00 | $7.25 |
| Power equipment operators: Drywall hanger Residential SUVT1990-012 | $7.25 | $0.00 | $7.25 |
| Power equipment operators: Roofer Residential SUVT1990-012 | $7.25 | $0.00 | $7.25 |
| Power equipment operators: Truck driver Residential SUVT1990-012 | $7.25 | $0.00 | $7.25 |
| Power equipment operators: TRUCK DRIVER: Tireperson Residential SUVT1990-012 | $7.25 | $0.00 | $7.25 |
| ROOFER Building SUVT2011-007 | $17.25 | $1.71 | $18.96 |
| SHEET METAL WORKER Building SHEE0063-005 (HVAC Duct Installation Only) | $36.75 | $18.63 | $55.38 |
| SPRINKLER FITTER Building SUVT2011-007 (Fire Sprinklers) | $22.50 | $6.08 | $28.58 |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper Highway SUVT2017-018 | $17.42 | $7.11 | $24.53 |
| TRAFFIC CONTROL: TRUCK DRIVER, Includes all axles including Dump Trucks Highway SUVT2017-018 | $17.13 | $3.94 | $21.07 |
| TRAFFIC CONTROL: TRUCK DRIVER: Distributor Truck Highway SUVT2017-018 | $22.32 | 0.00 | $22.32 |
No trade rates match your search and filter selection.
Residential
Building
Highway
Heavy