WI20260014
rev 0Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| (2) All other work Building PLUM0400-001 | $53.23 | $23.40 | $76.63 |
| Asbestos Abatement/Hazardous Waste Building LABO0330-004 (Preparation, removal and Encapsulation of hazardous materials from non-mechanical systems) | $36.65 | $19.97 | $56.62 |
| Asbestos Removal worker/hazardous material handler Building ASBE0127-001 (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not) | $45.24 | $30.56 | $75.80 |
| Asbestos Worker/Heat and Frost Insulator Building SUWI2002-010 | $25.36 | $8.37 | $33.73 |
| BOILERMAKER Boilermaker Building BOIL0107-001 | $46.52 | $34.63 | $81.15 |
| BRICKLAYER Bricklayer, Cement Mason, Plasterer, Tile Layer Building BRWI0003-003 | $38.45 | $27.41 | $65.86 |
| CARPENTER Building CARP1146-005 (Including Acoustical work, Drywall Hanging & Piledriverman; Excluding Batt Insulation) | $41.43 | $29.99 | $71.42 |
| ELECTRICIAN Building ELEC0158-003 | $42.00 | $23.93 | $65.93 |
| Electricians Building ELEC0014-005 (Teledata System Installer/Technician) | $31.17 | $20.08 | $51.25 |
| ELEVATOR MECHANIC Building ELEV0015-001 | $61.96 | $38.44 | $100.40 |
| GLAZIER Building PAIN1204-001 | $42.41 | $20.06 | $62.47 |
| Group 2 Building ENGI0139-002 | $49.28 | $27.89 | $77.17 |
| Group 3 Building ENGI0139-002 | $45.73 | $27.89 | $73.62 |
| Group 4 Building ENGI0139-002 | $45.20 | $27.89 | $73.09 |
| Group 5 Building ENGI0139-002 | $43.13 | $27.89 | $71.02 |
| Group 6 Building ENGI0139-002 | $41.60 | $27.89 | $69.49 |
| IRONWORKER Building IRON0008-001 | $44.66 | $33.67 | $78.33 |
| Laborer, General Building LABO0330-004 | $37.05 | $19.97 | $57.02 |
| Laborers: Concrete Worker Building SUWI2002-010 | $16.34 | $3.59 | $19.93 |
| Laborers: Landscape Building SUWI2002-010 | $8.73 | $4.90 | $13.63 |
| Laborers: ROOFER Building SUWI2002-010 | $18.01 | $3.28 | $21.29 |
| Laborers: Tile & Marble Finisher Building SUWI2002-010 | $13.89 | $8.25 | $22.14 |
| MILLWRIGHT Building CARP1056-001 | $42.00 | $28.85 | $70.85 |
| OPERATOR: Power Equipment Group 1 Building ENGI0139-002 | $50.53 | $27.89 | $78.42 |
| PAINTER Brush, Drywall Taper Building PAIN0802-007 | $37.65 | $21.17 | $58.82 |
| PLUMBER/PIPEFITTER Building PLUM0400-001 (Including HVAC work) (1) Small buildings (except industrial and power plants) where plumbing or heating is $50,000 or less | $50.02 | $23.29 | $73.31 |
| Sheet Metal Worker Building SHEE0018-021 (Including HVAC duct work and Technicians) | $46.47 | $31.33 | $77.80 |
| SOFT FLOOR LAYER Building CARP1146-005 | $41.43 | $29.99 | $71.42 |
| SPRINKLER FITTER Building SFWI0669-002 | $51.68 | $29.73 | $81.41 |
| TRUCK DRIVER 1 & 2 Axles Building TEAM0662-001 | $39.57 | $28.70 | $68.27 |
No trade rates match your search and filter selection.
Building