DE20260005
rev 0Highway
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| Bobcat/Skid Steer/Skid Loader Highway ENGI0542-001 | $43.76 | $30.77 | $74.53 |
| BOILERMAKER Building BOIL0013-009 | $55.00 | $35.48 | $90.48 |
| Bricklayer Building BRDE0001-001 | $34.19 | $27.98 | $62.17 |
| BRICKLAYER Brick Refractory/Brick Placement Worker Building BRDE0001-001 | $35.00 | $24.57 | $59.57 |
| CARPENTER Highway SUDE2022-002 | $50.06 | $4.32 | $54.38 |
| CARPENTER Building CARP0173-009 (Includes Acoustical Ceiling Installation, Drywall Hanging, Form Work, Metal Stud Installation, Scaffold Building, Excludes Masonry/Brick, and Excludes Soft Floor Layer) | $38.27 | $25.34 | $63.61 |
| CARPENTER (Includes Form Work) Heavy CARP0173-010 | $38.27 | $25.34 | $63.61 |
| CEMENT MASON/CONCRETE FINISHER Highway SUDE2022-002 | $33.03 | $5.25 | $38.28 |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0592-009 | $41.69 | $27.28 | $68.97 |
| CEMENT MASON/CONCRETE FINISHER Heavy SUDE2014-008 | $25.78 | $0.58 | $26.36 |
| Crane Highway ENGI0542-001 | $45.81 | $31.38 | $77.19 |
| Drill Highway ENGI0542-001 | $43.76 | $30.77 | $74.53 |
| ELECTRICIAN Highway SUDE2022-002 | $65.99 | 0.00 | $65.99 |
| ELECTRICIAN Building ELEC0313-002 (Includes Low Voltage Wiring and Installation of Alarms, HVAC/Temperature Controls and Sound and Communication Systems) | $47.50 | $35.93 | $83.43 |
| ELECTRICIAN Heavy SUDE2014-008 | $34.42 | $24.02 | $58.44 |
| ELEVATOR MECHANIC Building ELEV0005-003 | $71.85 | $38.44 | $110.28 |
| FORM WORKER Highway SUDE2022-002 | $49.77 | $3.37 | $53.14 |
| GLAZIER Building PAIN0252-002 | $49.96 | $37.56 | $87.52 |
| IRONWORKER Building IRON0451-005 (Ornamental, Reinforcing, and Structural) | $41.10 | $38.23 | $79.33 |
| IRONWORKER, REINFORCING Highway SUDE2022-002 | $55.67 | 0.00 | $55.67 |
| LABORER Highway LABO0199-001 (Asphalt, Includes Raker, Shoveler, Spreader and Distributor) | $31.15 | $16.50 | $47.65 |
| LABORER Backfiller, Common or General, Jack Hammer, Mason Tender - Brick, Pipelayer, Scaffold Builder Building LABO0199-005 (Brick and Masonry), Tamper (Hand Held) | $29.45 | $25.70 | $55.15 |
| LABORER Backfiller, Common or General, Pipelayer, and Tamper (Hand Held) Heavy LABO0199-008 | $29.45 | $25.70 | $55.15 |
| LABORER: Common or General Highway SUDE2022-002 | $36.33 | $3.50 | $39.83 |
| LABORER: Mason Tender - Cement/Concrete Highway SUDE2022-002 | $43.30 | $1.66 | $44.96 |
| LINE CONSTRUCTION (Lineman) Heavy ELEC0126-003 | $65.10 | $11.50 | $76.60 |
| Mason Tender - Cement/Concrete Building LABO0199-005 | $31.45 | $25.70 | $57.15 |
| MILLWRIGHT Building CARP1906-003 | $51.54 | $39.26 | $90.80 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUDE2014-005 | $33.96 | 0.00 | $33.96 |
| OPERATOR: Backhoe/Excavator/Trackhoe Heavy SUDE2014-008 | $34.29 | $16.18 | $50.47 |
| OPERATOR: Bulldozer Highway SUDE2022-002 | $37.55 | $16.19 | $53.74 |
| OPERATOR: Loader Highway SUDE2022-002 | $38.36 | $4.31 | $42.67 |
| OPERATOR: Mechanic Highway SUDE2022-002 | $28.11 | $11.18 | $39.29 |
| OPERATOR: Milling Machine Highway SUDE2022-002 | $38.29 | $11.15 | $49.44 |
| OPERATOR: OPERATOR: Bulldozer Building SUDE2014-005 | $25.89 | 0.00 | $25.89 |
| OPERATOR: OPERATOR: Bulldozer Heavy SUDE2014-008 | $27.09 | $18.20 | $45.29 |
| OPERATOR: OPERATOR: Crane Building SUDE2014-005 | $32.40 | $18.27 | $50.67 |
| OPERATOR: OPERATOR: Loader Heavy SUDE2014-008 | $31.88 | $12.57 | $44.45 |
| OPERATOR: PAINTER (Brush and Roller) Building SUDE2014-005 | $38.80 | $0.91 | $39.71 |
| OPERATOR: PLUMBER Building SUDE2014-005 | $47.73 | $18.40 | $66.13 |
| OPERATOR: ROOFER Building SUDE2014-005 (Installation of Metal Roofs Only) | $39.09 | $30.77 | $69.86 |
| OPERATOR: ROOFER, Excludes Installation of Metal Roofs Building SUDE2014-005 | $27.98 | $27.90 | $55.88 |
| OPERATOR: TILE FINISHER Building SUDE2014-005 | $35.40 | $4.31 | $39.71 |
| OPERATOR: TILE SETTER Building SUDE2014-005 | $57.98 | $1.11 | $59.09 |
| OPERATOR: TRUCK DRIVER: Dump Truck Heavy SUDE2014-008 | $22.60 | $7.56 | $30.16 |
| Paver Highway ENGI0542-001 (Asphalt, Aggregate and Concrete) | $45.81 | $31.38 | $77.19 |
| PIPEFITTER Building PLUM0074-002 (Includes HVAC Pipe Installation and Excludes Industrial Work) | $41.35 | $38.19 | $79.54 |
| PIPEFITTER (INDUSTRIAL) Building PLUM0074-003 | $56.43 | $43.35 | $99.78 |
| PLASTERER (Fireproofer) Building PLAS0008-006 | $38.37 | $31.64 | $70.01 |
| Pounder Highway ENGI0542-001 | $43.76 | $30.77 | $74.53 |
| POWER EQUIPMENT OPERATOR Building ENGI0542-003 (Forklift) | $48.73 | $32.23 | $80.96 |
| POWER EQUIPMENT OPERATOR Heavy ENGI0542-009 (Crane, Forklift, and Scraper) | $48.73 | $32.23 | $80.96 |
| POWER EQUIPMENT OPERATOR Backhoe/Excavator/Trackhoe Highway ENGI0542-001 | $45.81 | $31.38 | $77.19 |
| Roller Highway ENGI0542-001 | $43.40 | $30.66 | $74.06 |
| SHEET METAL WORKER Building SHEE0019-021 (Includes HVAC Duct Installation) | $33.63 | $40.60 | $74.23 |
| SOFT FLOOR LAYER Building CARP0251-008 | $38.02 | $25.39 | $63.41 |
| SPRINKLER FITTER Building SFDE0669-002 (Fire Sprinklers) | $46.47 | $29.56 | $76.03 |
| TRAFFIC CONTROL: Flagger Highway SUDE2022-002 | $37.49 | 0.00 | $37.49 |
| Trencher Hand Guided Heavy LABO0199-008 | $31.45 | $25.70 | $57.15 |
| TRUCK DRIVER: Dump Truck Highway SUDE2022-002 | $29.31 | $9.84 | $39.15 |
No trade rates match your search and filter selection.
Highway
Building
Heavy